HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 5508157SECTION 00950
CHANGE ORDER NO.1
PROJECT TITLE: LEE MARTINEZ FARM ADDITION #5942
PO#: 5508157
BID M 5942
CONTRACTOR: Empire Carpentry
DESCRIPTION: Demolition, sewer Line, Closets and Doors
1. Reason for change: Request from City
2. Description of Change:
• Demolish extra thick sidewalk
• Add extra sewer line
• Add replacement water line
• Add information technology (11) closet
• Add mop -sink closet
• Re -design door plan
3. Change in Contract Cost: Net adds and deducts $ 39393.80
4. Change in Contract Time: 0 day
ORIGINAL CONTRACT COST
160,562.96
TOTAL APPROVED CHANGE ORDER
3,393.80
TOTAL PENDING CHANGE ORDER
00.00
TOTAL THIS CHANGE ORDER
3,393.80
TOTAL G.O.% OF ORIGNINAL CONTRACT
2.1%
ADJUSTED CONTRACT COST (Assuming all change orders approved)
163,956.76
ACCEPTED BY: DATE: b o 0 E
Con tors R sentative
ACCEPTED BY: DATE: - -0
Project Wnher
APPROVED BY: DATE:
Title:
APPROVED BY:
Purchasing Agent over
cc: City Clerk Architect
�Contractor
Project File
Engineer !`
Rit
`7�19�) ✓l. 1
i�R,Cr�Q,�✓1 �e" r� !
M,Lfn L v�
Lee Martinez Farm Addition #5942
Change Order #1 Schedule of Values
PO# 6W8157
Ibm a
Requested Change Order Ibm
_
Deb
aubconbidw
a
Rabrmm 0
aubomt, atw
aubtohN
Prolecbd Taw
Cos! to city
'a
Cown s FN
Sww ( a PProwrdanY)
Deb
1
IT closet
1
1/17/06
carD@ntry
Em iro
$30D.00
1/601
power&I ht
1h
Brian's
$196.00
1/17/06
oond
rian's
200.00
Mop sink ce closets
u n
law
Framing
Empire
$5w.00
irim
Sheet Rock
Cottonwood
$175.00
APPROVED
3
DOORS -Redesign door plan
1/10/08
DOORS
F&CDOOR
-$1,894.00
-$1,894.00
-$1,894.00
APPROVED
2f7/06
4
DOORS-Reframe rough openings
1/1
Framing
Empire
$300.00
$300.00
$316.00
APPROVED
217/00
5
XTRA thick sidewalk 7"
12/2
Excavation
Hiigenberg
$745.00
$745.00
$782.25
APPROVED
1/10/06
6
DIG UPWATER LINE/
BACKFILL,&COMPACT
12/29=
Excavation
Hilgenberg
$540.00
$540.00
$N7.00
APPROVED
1/10/06
7
XTRA SEWER LINE
12129/05
Excavation
Hllgenberg
$80.00
$80.00
$84.00
APPROVED
1/10/08
TOTAL $3,393.80