HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 5508157SECTION 00950 CHANGE ORDER NO.1 PROJECT TITLE: LEE MARTINEZ FARM ADDITION #5942 PO#: 5508157 BID M 5942 CONTRACTOR: Empire Carpentry DESCRIPTION: Demolition, sewer Line, Closets and Doors 1. Reason for change: Request from City 2. Description of Change: • Demolish extra thick sidewalk • Add extra sewer line • Add replacement water line • Add information technology (11) closet • Add mop -sink closet • Re -design door plan 3. Change in Contract Cost: Net adds and deducts $ 39393.80 4. Change in Contract Time: 0 day ORIGINAL CONTRACT COST 160,562.96 TOTAL APPROVED CHANGE ORDER 3,393.80 TOTAL PENDING CHANGE ORDER 00.00 TOTAL THIS CHANGE ORDER 3,393.80 TOTAL G.O.% OF ORIGNINAL CONTRACT 2.1% ADJUSTED CONTRACT COST (Assuming all change orders approved) 163,956.76 ACCEPTED BY: DATE: b o 0 E Con tors R sentative ACCEPTED BY: DATE: - -0 Project Wnher APPROVED BY: DATE: Title: APPROVED BY: Purchasing Agent over cc: City Clerk Architect �Contractor Project File Engineer !` Rit `7�19�) ✓l. 1 i�R,Cr�Q,�✓1 �e" r� ! M,Lfn L v� Lee Martinez Farm Addition #5942 Change Order #1 Schedule of Values PO# 6W8157 Ibm a Requested Change Order Ibm _ Deb aubconbidw a Rabrmm 0 aubomt, atw aubtohN Prolecbd Taw Cos! to city 'a Cown s FN Sww ( a PProwrdanY) Deb 1 IT closet 1 1/17/06 carD@ntry Em iro $30D.00 1/601 power&I ht 1h Brian's $196.00 1/17/06 oond rian's 200.00 Mop sink ce closets u n law Framing Empire $5w.00 irim Sheet Rock Cottonwood $175.00 APPROVED 3 DOORS -Redesign door plan 1/10/08 DOORS F&CDOOR -$1,894.00 -$1,894.00 -$1,894.00 APPROVED 2f7/06 4 DOORS-Reframe rough openings 1/1 Framing Empire $300.00 $300.00 $316.00 APPROVED 217/00 5 XTRA thick sidewalk 7" 12/2 Excavation Hiigenberg $745.00 $745.00 $782.25 APPROVED 1/10/06 6 DIG UPWATER LINE/ BACKFILL,&COMPACT 12/29= Excavation Hilgenberg $540.00 $540.00 $N7.00 APPROVED 1/10/06 7 XTRA SEWER LINE 12129/05 Excavation Hllgenberg $80.00 $80.00 $84.00 APPROVED 1/10/08 TOTAL $3,393.80