Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5954 TIMBERLINE ROAD WIDENINGujwudOj aaaa. s-3dzz w ct m m m . W m H Un o G t:r r rt � � p r m r � O N P� oa rn� r• P. m 5 00 ro n 0 u. m t n� dp NIP Z O =a D m D ni Project. Timberline Road Widening Project Dale- 01/11/2006 Spec/Item Description Estimated Unit Unit Cost Item Cost Number Quantity Spring Creek Farms North - City of Fort Collins Police Facility Interior Roadways Speclltem Estimated Number Description Quantity Unit Unit Cost Item Cost 202-09 Remove Irrigation Structures 9 EA 351.75 3,165.75 203-01 Unclassified Excavation (Includes Slopes + Detention Ponds 203-04 Topsoil (Stripping, Stockpiling, Placing) - Top 6' 203-10 Import Topsoil (Screened) - 3" Depth 208-01 Erosion Control 208-02 Straw Bale Inlet Filter 210-01 Adjust Manhole Frame 210-03 Adjust Valve Box 304-01 Aggregate Base Course - (CL 5 or 6) - 9" Depth - (CIP) 306-01 Sidewalk Preparation 307-01 Fly Ash Subgrage Stabilization 19.898 Cv 1.65 32,831.70 4479 Cv 3.20 14,332.80 440 Cv 19.95 8,778.00 1 LS 840.00 840.00 2 LS 42.00 84.00 9 EA 340.00 3,060.00 11 EA 180.00 1,980.00 3,184 TON 10.45 33,272.80 1,975 Sv 1.75 3,456.25 9,827 Sv 4.95 48,643.65 403-01 Hot Bituminous Pavement - Grading S - (3' Depth) - (PG 64-28) 1,083 TON 50.15 54,312.45 403-02 Hot Bituminous Pavement - Grading SG - (3' Depth) - (PG 64-22) 1,083 TON 39.50 42,778.50 506-02 6X6X18 Type L Rip Rap with 6' Topsoil Cover 2 EA 487.20 974.40 603-02 10' Class III RCP 15 LF 26.85 402.75 603-03 24' Class III RCP 38 LF 32.90 1,250.20 603-20 27" Class III RCP 156 LF 50.05 7,807.80 603-21 27' Class III RCP - FES 2 EA 722.40 1,444.80 603-22 8' PVC Sanitary Sewer (22-24 Feet Deep) 995 LF 45.90 45,670.50 603-23 10" PVC Sanitary Sewer (22-24 Feet Deep) 686 LF 56.05 38,450.30 603-24 6" PVC Sanitary Sewer Service (22-24 Feet Deep) 50 LF 52.50 2,625.00 603-25 Concrete Encasement 2 EA 393.75 787.50 603-26 21" PVC Irrigation Pipe 960 LF 46.30 44,448.00 603-27 Pipe Headwall with Trash Rack 1 EA 2194.50 2,194.50 Section 00300 Page 9 I'� 'iecl. T,nn,edine Road Widening Project Dale. 01 1 V2006 SpeclItem Description Number Estimated Quantity Unit Unit Cost Item Cost 604-01 5' Type R Inlet 4 EA 3209.85 12,839.40 604-05 4' Diameter Manhole 9 EA 2662.80 23, 965.20 604-06 5' Diameter Manhole 4 EA 2118.90 8,475.60 608-03 Concrete Access Ramps (8") with Truncated Dome Warning Panels 608-04 Concrete Drive Approach and Concrete Driveway (6") 608-09 4.5' Detached Sidewalk (6" Thick) 609-01 Vertical Curb and Gutter (30") 609-02 Driveway Curb Cuts (30' Wide) 619-01 8" DIP CL-52 Water Main 619-03 8" X 2" Blow -Off w/Thrust Block 619-04 8" Gate valve and box 619-10 Fire Hydrant Assembly (6") 619-11 6" DIP CL-52 Water Main 619-12 6" Gate valve and box 619-13 8"X8" Cross 619-14 2" Copper Service 619-15 2" Curb Stop 619-16 8" Water Line Lowering 619-17 8"X8"X6" Swivel Tee 630-01 Type III Barricades 938 SF 7.90 7,410.20 1,000 SF 3.35 3,350.00 17,775 SF 2.75 48,881.25 4,032 LF 9.15 36, 892.80 3 EA 261.60 784.80 2,322 LF 30.10 69,892.20 4 EA 421.05 1,684.20 6 EA 974.40 5,846.40 4 EA 2985.15 11,940.60 144 LF 30.65 4,413.60 1 EA 685.65 685.65 2 EA 418.95 837.90 1 EA 1803.90 1,803.90 1 EA 261.45 261.45 3 EA 2382.45 7,147.35 5 EA 327.60 1,638.00 15 SECTION 183.75 2,756.25 iap t h3iY i Y(irt 4A, •. 645,098.40 U a f a t h r T� L^r' 3 TOTAL PROJECT= $ 5,359,148.90 Five Million Three Hundred Fifty-nine, One Hundred Forty-eight Dollars Cents Section 00300 Page 10 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECTFULLY SUBMITTED: Lafarge West, Inc. CONTRACTOR BY: Steven B. Peterson 2/14/06 Signature Date VP/G Title 00239 License Number (If Applicable) (Seal - if Bid is by corporation) At A d ess 1800 North Taft Hill Road Fort Collins, CO 80521 Telephone 970-407-3600 Email kelly.steele@lafarge-na.com 7/96 Section 00300 Page 11 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Lafarge West, Inc. 2. Permanent main office address: 1800 North Taft Hill Road, Fort Collins, CO 3. When organized: 1989 4. If a corporation, where incorporated: Delaware 5. How many years have you been engaged in the contracting business under your present firm or trade name? 8 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of Trail Head Ph 1 $1,027,425.00 completion.) 4/26/06 Brightwater Landing $1,069,329 29 6/30/06 Sidehill Filing 2 $1 254 145 61 9/30/06 Wellington Downs $ 576,967.42 10/31/06 7. General character of Work performed by your company: Asphalt Paving Aggregate and RediMix Supply 8. Have you ever failed to If so, where and why? complete any Work awarded to you? NO 9. Have your ever defaulted on a contract? NO If so, where and why? 10. Are you debarred by any If yes list agency name. government agency? NO 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. City of Ft Collins Overlay $2,216,393.34 12/31/05 Larimer County Overlay $20107,804.13 12/31/05 The Meadows -Wellington $ 997,000.00 11/30/05 12. List your major equipment available for this contract. What ever is necessary to complete the project 13. Experience in construction Work similar in importance to this project: City of Fort Collins Overlay 2iekler Road Reconstruction Harmony/Timberline Road Reconstruction 14. Background and experience of the principal members of your organization, including officers: Steven B. Peterson VP/GM 20+ years Kenneth R. Ball General Manager 20+ years Bob Tewc Operations Manager 20+ years 15. Credit available: $ Unlimited 16. Bank reference: Wells Fargo 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? City of Fort Collins What class, license and numbers? General Contractor #00239 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 41% and to whom? Please see attached sheet 20 Are any lawsuits pending against you or your firm at this time? NO IF yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL $10 00M00 00 What company? Safeco Insurance Company of America 22. What are your company's bonding limitations? $80,532,000.00 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 8:00 a.m. this 14 day of February 20_Df�. Lafarge West, Inc. Name of n- By: �. V`�YGYiLu� Title: Steven B. Peterson, VP/GM State of Colorado County of Larimer Steven B. Peterson being duly sworn deposes and says that he is VP/GM of Lafarge West, Inc. and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscri ed and sworn to fore me this 14 day of February . 20_U. Notary Publ' �e N OTARy ?�9 My commission expires 5/23/09J',PUBLIC O Q �OF C01O� 7/96 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List of contractors for asphalt rotomilling, earthwork, waterline, sanitary sewer, storm sewer pipe, concrete, bridge construction, asphalt paving, traffic control, landscaping and fencing and all subcontractors performing over 15% of the contract. ITEM Traffic Control Rotomilling Concrete Landscaping Fencing Erosion Control Surveying Guard Rail Tree Removal Bridge, Pipe, Dirt SUBCONTRACTOR Quality Traffic Control Don Kehn Construction Express Concrete Bath, Inc. Town & Country Fenco CO All Terrain Erosin King Surveyor, INc. Adarand Constructors, Inc. Jordan's Tree Moving Gerrard Excavating 7/96 Section 00430 Page 1 r' SECTION 00410 BID BOND Lafarge North America, Inc. KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned DBA Lafarae West. Inc. as Principal, and*"as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ 5% of Amount Bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. *Safeco Insurance Company of America THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 5954 Timberline Road Widening Project. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 14th day of February , 2006 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Lafarge North America, Inc. Name: DBA Lafaroe West Inc. Address: 1800 N.. Taft Hi I I Road a° n J . SEAL) j •`f ME SURETY Safeco Insurance Company of America Safeco Plaza Seattle, WA 98185 (800)332-3226 By:?�/mot Title: Melissa D. Evans, Attorney -in -Fact Section 00410 Page 3 ® POWER Safeco Insurance Companies OF ATTORNEY PO Box 34526 Seattle, WA 96124-1526 NO. 6957 KNOW ALL BY THESE PRESENTS: That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby appoint kkkk*R«*KEVIN B. ALEXANDER, LAURA E. COON; MELISSA D. EVANS; MARY T. FLANIGAN; MICHAEL C. FROST; DAVID M. LOCKTON; RONALD J. LOCKTON; KATHY M. LOFTUS; CLAUDIA MANDATO; CHRISTY M. MCCART; PATRICK T. MOUGHAN; JAMES C. PATEIDL; PATRICK T. PRIBYL; DEBRA L SCARBOROUGH; CAROLYN VAN HAAREN; CLIFFORD B. YOUNG, Kansas City, M1S$OLRkskRtktktikRti RRkkkiikkkRktktktkikkkR kkk Rki Rtkkk its true and lawful attomey(s)-in-fad, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character issued in the course of its business, and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents this STEPHANIE DALEY-WATSON, SECRETARY CERTIFICATE day of MIKE PETERS, PRESIDENT, SURETY Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA:- 2DO5 'Article V, Section 13. - FIDELITY AND SURETY BONDS... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fideftty and surety bonds and other documents of similar character issued by the company in the course of its business... On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any Instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be Impressed or affixed or In any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaldng.' Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (1) The provisions of Article V, Section 13 of the By -Laws, and (if) A copy of the powerof-attomey appointment, executed pursuant thereto, and fill) Certifying that said power-c&attomey appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof." I, Stephanie Daley -Watson, Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation 4 2 ! �' S-0974/D$ 4/05 ra$iis this FEB 1 4 2" day of A04a,rW -/t/Ctf.�vk,/ STEPHANIE DALEY-WATSON, SECRETARY Salem and the Safeco logo are registered trademarks of Safsoo Corporation. WEB PDF SECTION 00300 BID FORM PROJECT: 5954 Timberline Road Widening Project Place 215 West Mason Street, 2nd Floor Date 2/14/06 1. In compliance with your Invitation to Bid dated January 11, 2006 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed )n the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% GAB ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Safeco Insurance Company of America, Safeco Plaza, Seattle, WA 98185 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through Z 7/96 Section 00300 Page 1 a- dID o(.HEDULE (Base Bid) Project: Timberline Road Widening Project Date: 01/112006 Spec/Item Description Estimated Unit Unit Cost Item Cost Number Quantity 202-01 Remove Pipe (RCP, CMP, PVC) 1,361 202-02 Remove Curb and Gutter 2,456 202-03 Remove Sidewalk, Crosspan, Driveway 14,757 202-04 Rotomill Asphalt Pavement (Profile 0" - 3" Avg. Depth 13,206 202-05 Rotomilf Asphalt Pavement 14 112" - 5 1/2" Depth) 36,190 202-06 Remove Asphalt Bike Path Pavement 1,068 202-07 Remove Concrete Median and 18" Oulfall Curb 3,929 202-08 Remove Parapet Wall and Railing 120 202-09 Remove Irrigation Structure 6 202-10 Remove Fence - (Various Types) 1,215 202-11 Remove Existing Area Inlet 3 202-12 Remove Bollards (Various Locations) 18 202-13 Remove Sprinklers @ Gas Metering Station 1 202-14 Remove Existing Sidewalk Chase 2 202-15 Remove Light Pole Base (Top T and Haul Off -Site) 4 202-16 Remove Temporary Roadway for Traffic Switch 2.000 202-17 Remove Landscape Timbers 1 202-18 Remove Water Service/Abandon at Main 1 202-19 Remove Rip Rap Areas 10 202-20 Remove FES 2 202-21 Remove Gravel Driveways 694 202-22 Remove Landscaping in the North Median at Drake and Timberline Intersections 1 202-23 Remove Existing Concrete Curb -Cut and Channel 1 202-24 Abandon Existing Area Inlet, Cap Existing 4' Pipe at Each End 1 202-25 Remove Existing COFC Fire Hydrant 1 202-26 Abandon Existing Curb -Stop and Water Meter at Main 1 202-27 Remove Existing 15' Type R Inlet 1 202-28 Remove Existing 5' Type R Inlet 3 202-29 Remove Existing 5' Type R Inlet Top 1 202-30 Remove Tree Stumps (Avg. Width = 48") 5 LF 10.40 14,154.40 LF 1.75 4,298.00 4F 0.35 5,164.95 Sv 1.95 25,751.70 Sv 2.50 90,475.00 Sv 2.30 2,456.40 SF 0.70 2,750.30 LF 66.95 8,034.00 EA 407.40 2,444.40 LF 0.55 668.25 EA 407.40 _1,222.20 EA 71.40 1,285.20 LS 582.75 582.75 LS 110.25 110.25 EA 543.90 2,175.60 Sv 4.45 8,900.00 LS 189.00 189.00 EA 568.05 568.05 Sv 15.55 155.50 EA 181.65 363.30 Sv 0.40 277.60 LS 6363.00 6,363-00 EA 357.00 357.00 EA 452.55 452.55 EA 1016.40 1016.40 EA 407.40 407.40 LS 588.00 588.00 EA 456.75 1,370.25 EA 1559.25 1,559.25 EA 226.80 1,134.00 Section 00300 Page 2 P, n -ct I;,nberline Road Widening Project rj lw II11,2006 SpeciItem Description Estimated Unit Unit Cost Item Cost Number quantity 203-01 Unclassified Excavation(Includes Slope+ Detention Ponds) 19,498 CY 4.05 78,966.90 203-02 Embankment - (CIP) 21,695 CY 3.20 69,424.00 203-03 Borrow Suitable Fill Material 2,197 CY 6.20 13, 621.40 203-04 Topsoil (Stripping, Stockpiling, Placing) - Top 6" 12,216 CY 4.50 54,972.00 203-05 Muck Excavation - (CIP) 200 CY 24.40 4,840.00 203-06 Borrow ABC (Class 5 or 6) 300 TON 12.50 3,750.00 20307 Median Splashblock Shaping (CIP) 9,954 SF 0.95 9,456.30 203-08 Flow Fill Shallow Utilities 400 LF 1.24 . 70 9,880.00 203-09 Median Fill 1,106 CY 4-9 5,308.80 203-10 Import Topsoil (Screened) -3" Depth 941 CY 23.25 21,878..25 203-11 Swale GradinglShaping/Blue Tops 3,500 LF 1.75 6,125.00 203-12 Regrade Irrigation Ditch 50 LF 3.45 172.50 203-13 Potholing 1 Ls 6300.00 6,300.00 203-14 Temporary Roadway for Traffic Switch 1 LS 3522.65 3,522.65 203-15 Flow Fill Under Exposed Aggregate for Glue Down Median 274 CY 92.15 25,249.10 203-16 Flow Fill Under Exposed Aggregate on the Prospect Median 138 CY 94.35 13,020.30 206-01 Structure Excavation 1,167 CY 5.80 6,768.60 206-02 Structure Backfll (On -Site Fill) 282 CY 15.00 4,230.00 206-03 Structure Backfill Flow Fill 500 CY 66.35 33,175.00 206-04 Dewatenng 1 Ls 27172.95 27,172.95 206-05 Haul and Dispose 885 CY 3.70 3,274.50 206-06 Structure Muck Excavation 444 CY 6.60 2,930.40 208-01 Erosion Control 208-02 Straw Bales (Sets of 4) 208-03 Soil Retention Blanket (Photo Dissolve) 210-01 Adjust Manhole Frame 210-02 Modify Manhole 210-03 Adjust Valve Box 1 Ls 7350.00 7,350.00 25 EA 42.00 1,050.00 1,200 BY 1.60 1,920.00 30 EA 340.00 10,200.00 2 EA 1159.20 2,318.40 32 EA 180.00 5,760.00 Section 00300 Page 3 Project: Timberline Road Widening Project Date. r!1112006 Spec!Item Number Description Estimated Quantity Unit Unit Cost Item Cost 210-04 Relocate Mailboxes 2 EA 210.00 420.00 210-05 Relocate COFC Water Meter, Manhole and Sprinkler Valve It 12 LF) 1 EA 3540.60 3, 540. 60 210-06 Relocate COFC Fire Hydrant 6 EA 2580.90 _ 15,485.40 210-07 Relocate COFC CP Test Station 9 EA 105.00 945.00 210-08 Relocate 3-Rail Dowel Fence 570 LF 6.25 3,562.50 210-09 Irrigation Service 1" 4 EA 1123.50 4,494.00 210-10 Raise Existing Fire Hydrant (Approximately 12") 1 EA 502. 95 502.95 210-11 Relocate COFC Vent Pipe 5 EA 1137.15 5,685.75 210-12 Adjust Existing Gas Valve with Nut Extension 1 EA 315.00 315.00 210-13 Relocate Existing Water Manhole (34 LF of DIP) 1 EA 2102.10 2,102.10 304-01 Aggregate Base Course (CI 5 or 6) - 9" Depth - (CIP) 304-02 ABC - (CI 5 or 6) - 9" Depth - (CIP) - Patch Placement 304-02 Shouldering (CI 5 or 6)-4"Depth 306-01 Sidewalk Preparation 307-01 Fly Ash Sub -Grade Stabilization 403-01 Hot Bituminous Pavement - Grading S - 3" Depth (PG 64-28) 403-02 Hot Bituminous Pavement - Grading SG - 3" Depth (PG 64-22) Er ! J-72 403-03 Hot Bituminous Pavement - Grading S - (3" Depth) Temporary (OG 64-28) 403-04 HBP Paver Patch - Grading S - (3" Depth) - (PG 64-28) 403-05 HBP Paver Patch - Grading SG - (3" Depth) - (PG 64-22) 403-06 HBP Hand Patch - Grading S - (3" Depth) - (PG 64-28) 403-07 HBP Hand Patch - Grading SG - (4" Depth) - (PG 64-22) 403-08 HBP Hand Patch - Grading SG - (6" Depth) - (PG 64-22) - Temporary Patch 412-01 Concrete Paving (10" Thick) 502-01 Pile Driving (HP 12X53) 502-02 End Plates and Tips 32,085 TON 10.90 349, 726.50 976 TON 18.80 18,348.80 100 TON 15.45 1,545.00 6,973 Sv 1.95 13,597.35 66,019 Sr 4.85 320,192.15 11,729 TON 49.20 577,066.80 9,607 TON 39.10 375,633.70 1,000 TON 41.60 41, 600.00 314 TON 54.30 17,050.20 314 TON 46.60 14,632.40 14 TON 145.85 2,041.90 14 TON 115.20 1,612.80 173 TON 83.80 14,497.40 323 SY 59-90 19,347.70 1 Ls 36873.90 36,873.90 36 EA 124.95 4,498.20 Section 00300 Page 4 rroject. Timberline Road Widening Project Dalr,. 011111200. Spedltem Number Description Estimated Quantity Unit Unit Cost Item Cost 506-01 Rip Rap 150X5OX3 1 Ls 45847.20 45,847.20 506-02 6X6X18 Type L Rip Rap with 6' Topsoil Cover 10 EA 222.60 2,226.00 506-03 8X8X24 Type M Rip Rap 2 EA 357.00 714.00 506-04 24" Hand Placed Type M Rip Rap per Spring Creek Trail Detail 100 LF 45.40 4,540.00 515-01 Waterproofing Membrane 597 SY 13.40 7,999.80 601-01 Bridge Exl�nsion For Spring Creek 1 Ls 451320.20 451, 320.20 603-01 15" Class III RCP 90 LF 33.65 3,028.50 603-02 18" Class III RCP 1,843 LF 32.70 60,266.10 603-03 24" Class III RCP 1,017 LF 36.75 37,374.75 603-04 30" Class III RCP 688 LF 61.15 42,071.20 603-05 36' Class It RCP 188 LF 94.30 17,728.40 603-06 14" X 23" Class If HERCP 159 LF 53.50 8,506.50 603-07 19" X 30" Class III HERCP 135 LF 53.80 7,263.00 603-08 15" Class III RCP- FES 2 EA 405.30 810.60 603-09 18" Class III RCP- FES 10 EA 452.55 4,525.50 603-10 18" Class III RCP - FES with 14" orifice plate 1 EA 673.05 673.05 603-11 24" Class III RCP -FES i EA 572.25 572.25 603-12 14" X 23" Class III HERCP - FES 1 EA 438.90 438.90 603-13 4" PVC Schedule 40 Irrigation Sleeving 300 LF 7.90 -.2 , 3 70 . 00 603-14 4" Median Under Drain Pipe System (Perorated Pipe wrapped in weed barrier) 1,583 LF 12.65 20,024.95 603-15 4" Median Under Drain Pipe System (Solid Pipe) 293 LF 9.50 2,783.50 603-16 Tie 30" RCP to Existing Area Inlet 1 EA 745.50 745.50 603-17 Bore(@27 Deep)12' PVC Sanitary Sewer across Timberline Road 194 LF 396.70 76,959.80 603-18 4" Under Drain Connection 2 EA 126.00 252.00 603-19 3" Perorated Pipe Wrapped in weed barrier 1,551 LF 2.05 3,179.55 604-01 5'TypeRInlet 3 EA 3306.45 9,919.35 604-02 10' Type R Inlet 2 EA 6890.10 13,780.20 604-03 15' Type R Inlet 3 EA 7044.45 21, 133.35 604-04 Modified 15' Type R Inlet i EA 6851.25 6,851.25 604-05 4'DlameterManhole 20 EA 1811.25 36,225.00 Section 00300 Page 5 Prejeet. 1,mberhne Road Widening Project D,lr_ ut, I V2006 Spec/item Number Description Estimated Quantity Unit Unit Cost Item Cost 604-06 5' Diameter Manhole 7 EA 2409.75 16,868.25 604-07 Irrigation Ditch Box Connection 1 EA 1160.25 1,160.25 604-08 Area Inlet Lids (Grated Top) 2 EA 498.75 997.50 604-09 Concrete Sidewalk Culvert (10') - on existing curb 1 EA 2412.40 2,412.40 604-10 Concrete Sidewalk Culvert (9) 2 EA 1090.70 2,181.40 604-11 Concrete Cap (Per Detail) 120 SF 6.05 726.00 r04-12 Gruen-!^ Headwall (Per Detail 1 LS 1626.35 1,626.35 606-01 Guardrail 141 LF 54.80 7,726.80 606-02 End Anchor 4 EA 1244.25 4,977.00 607-01 3 Rail Dowel Fence with no climb fabric 304 LF 11.00 3,344.00 607-02 Orange Safety Fence 1,035 LF 2.10 2,173.50 608-01 7' Detached Concrete Sidewalk (6") 60,035 SF 2.75 1372596.25 608-02 Attached Concrete Sidewalk (6") - Widths Vary 12,725 SF 2.75 34,993.75 608-03 Concrete Access Ramps (8") with Truncated Dome Warring Panels 9,268 SF 7.90 73,217.20 608-04 Concrete Drive Approach and Concrete Driveway (6") 600 SF 3.40 2,040.00 608-05 Pedestrian Refuge Islands (6") 700 SF 5.65 3,955.00 608-06 Hi -Early Concrete (24 hr.) 200 CY 104 . 50 20,900.00 608-07 Flow Fill Concrete 2,636 CY 52.80 139,180.80 608-08 Colored Concrete Bike Path (5" Fibermesh) 8,400 SF 4 . 50 , 37 , 800 , 00 609-01 Vertical Curb and Gutter (30") 10,967 LF 9.05 99,251.35 609-02 Outfall Curb and Gutter (18") 7,570 LF 9.25 70,022.50 609-03 Rollover Curb and Gutter (18") 120 LF 10.70 1,284.00 609-04 Driveway Curb Cuts (30' Wide) 2 EA 409.05 818.10 609-05 Concrete Median Curb (Epoxied) 2,217 LF 8.95 19,842.15 Section 00300 Page 6 Project: Timberline Road Widening Project Date: 01/11/2006 SpectItem Number Description Estimated Quantity Unit Unit Cost Item Cast 609-06 Exposed Aggregate Concrete Median Splashblock for Glue Down Median 7,373 SF 4.45 32,809.85 609-07 Exposed Aggregate Concrete Median Splashblock (4") 13,631 SF 4.00 54,524.00 609-08 R&R vertical Curb and Gutter 150 LF 24.85 3,727.50 609-09 R&R Concrete Sidewalk 300 SF 5.25 1,575.00 609-10 R&R Splashblock 800 SF 7.05 5,640.00 619-01 8" DIP CL-52 Water Main 249 LF 47.25 11, 765.25 F19-02 24"X 8" Tapping Saddle 4 EA 3659.25 14,637.00 619-03 8" X 2" Blow -Off w/Thrust Block 4 EA 420.00 1,680.00 619-04 8" Gate valve and box 4 EA 974.40 3,897.60 619-05 1" Copper Irrigation Service 32 LF 16.45 526.40 619-06 1" Curb Stop 4 EA 139.65 558.60 619-07 1" Meter Pit w/V Yoke 4 EA 355.95 1,423.80 619-08 1' Corp Stop 4 EA 365.40 1,461.60 619-09 6"DIP (CL-52 Water Main) 10 LF 55.75 557.50 619-10 Fire Hydrant Assembly (Per Detail) 1 EA 3333.75 3,333.75 Subtotal Timberline Road Widening Quantities: $ 4,176,572.65 Landscaping Quantities: 2810-01 Irrigation 1 Ls 43552.95 43,552.95 2900-01 PatmoreAsh 11 EA 357.00 3,927.00 2900-02 Marshall Ash 11 EA 357.00 3,927.00 2900-03 Western Catalpa 11 EA 325.50 3,580.50 2900-04 Cudleaf Mountain Mahogany 15 EA 27.30 409.50 290405 Pawnee Buttes Western Sand Cherry 105 EA 28.60 3,003.00 2900-06 Bright Red Shrub Rose 154 EA 30.75 4,735.50 2900-07 Morden Sun Rise Rose 122 EA 30.75 3,751.50 2900-08 Hughes Juniper 46 EA 27 . 85 1,281.10 Section 00300 Page 7 Project: Timberline Road Widening Project Date. 01/11/2006 SpeciItem Number Description Estimated Quantity Unit Unit Cost Item Cost 2900-09 Buffalo Juniper 144 EA 27.85 4,010.40 2900-10 Broadmoor Juniper 150 EA 26.50 3,975.00 2900-11 Landscape Cobbles (CIP 6"-9" Size) 74 TON 81.60 6,038.40 2900-12 MSE 8"-18" Block Wall 85 LF 36.90 3,136.50 2900-13 Topsoil - 60/40 Compost Mix for Medians 3780 CY 22.85 86,373.00 2900-14 Wood Mulch 34.098 SF 0.55 18, 753. 90 Subtotal Timberline Road Widening Landscaping Quantities: $ 190,455.25 Miscellaneous Quantities: - Contract Bond 1 Ls 56054.80 56,054.80 625-01 Construction Surveying 1 Ls 60875.95 60,875.95 626-01 Mobilization 1 Ls 24358.95 24,358.95 630-01 Type III Barricades 630-02 Message Boards 630-03 Jersey Barriers (25 Barriers for approximately 4 months 630-04 Flaggers 630-05 Traffic Control Subtotal Timberline Road Widening Misc. Quantities: 20 SECTION 183.75 3,675.00 70 DAY 131.25 9,187.50 200 LF 34.15 6,830.00 Soo HOURS 19.15 5,745.00 1 LS 180295.40 180,295.40 Four Million Seven Hundred -Fourteen Fifty Dollars Fif tv Cents 347 4,714,050.50 Section 00300 Page 8