HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 25922CHANGE ORDER NO. 2
PROJECT TITLE: Northside Aztlan Center
CONTRACTOR: Pinkard Construction Co.
DESCRIPTION:
1. Reason for change
2. Description of Change:
3.
Change
in
Contract
Cost:
4.
Change
in
Contract
Time:
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(PO. No. 55505679)
Owner Request
Feasibility Study for LEED Gold,
Boundary, and Topo Surveys
$ 27,243.00
0 calendar days
$ 8,093,502.00
$ 70,586.00
$ 27,243.00
0.33%
0.34's
$ 8,191,331.00
ACCEPTED BY: DATE: 124 �0
Co racto representat ve
ACCEPTED BY: \R,t _ O 1 DATE: 0 6
ProjecttManager
ACCEPTED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer chasm
Jan, 25. 2006 12:0?PM
No.6547 P. 4
INVOICE INVOICE # 3-LEED li
January 16, 2006�I
Current Charges through January 16, 2006 f
. JA�
David Lingle
Ailer Lingle Architects PC QQ
712 Whalers way
#s-100
Fort Collins, CO 80525
Professional Services: Northside Aztlan Center - LEID Gold Study
EDAW Job # 01030"893
Lao 4'.00 ',�,q�►d.00
J. McKcnzie &0 hrs. OWS-W ll,8Etl9t:'
E. Russel 1.0 hrs. ® 9P.2-0 S4" &O-10. 00
7.0 '*alto
Exf
(none) $0.00
$0.00
Current Charges
l 970.464.9013
MIS PATNE7LLiREDAW_INC_GEE'.L928@_Q�L09_ANAELE9..CALIFQg}nIi@OO,B.49?d9
lE PAYMENT TO WELLS FARGO BANK, 420 MONTOOMERV STREET - SAN FAANCIECD CALWORNIA 94104 - AOUTINO .12100024E (DOMESTIC) . SW)FT MPO)Us98 (INTL)
.T 4403001519E
IN MAKING PAYMENT. PLEASE REFERENCE ITEMIZED AMOUNT BY INVOICE NUMBER AND EDAW JOB NUMBER. PAYMENT TERMS NET 30 DAYS. A 1.9% PER MONTH FINANCE
,RGE WILL BE ASSESSED ON ALL PAST DUE 'AOCOUNTS.
RE:NortJan. 25. 2 0 0 6te 12 : 0 7 P Niver to Gold Study No.6547 P. 5
Subject: RE: Northside Aztlan Center LEED Silver to Gold Study
From: "Ben Nelson" <BNELSON@a MARTS MARTIN.COM>
— Date: Tue, 17 Jan 2006 08:35:34 -0700
To: "David Lingle" <dlingle@aller-lingle.com>, "Chris Kastelic" Aastelic@sinkcombs.com>
CC: "Steve Bums" <steve.bums@pinkardcc.com>, "Shaun Moscrip" <smoscrip@aller-lingle.com>
David:
Thank you for the update regarding the LEED decision. Our work relative
to this effort was very minimal and totaled only 6 hours of my time (and
no expenses) throughout the process. Our total C.O.R. is therefore $810
and will be itemized on our next invoice coming to you shortly. Thanks.
Ben
-----Original Message -----
From: David Lingle(mailto:dlingle@aller-lingle.com]
Sent: Monday, January 16, 2006 11:25 AM
To: Chris Kastelic; Kurt Friesen; Mike Oberlander; Tricia Kroetch; Ben
Nelson; Mike Ballard; Craig Perry; Kelly Tsarm2l; Adam Jackaway
Cc: Steve Burns; Shaun Moscrip
Subject: Northside Aztlan Center LEED Silver to Gold Study f
Team:
At last Tuesday's study session, the Fort Collins City Council decided l
to not pursue changing the LEED goal for our Northside Aztlan Community
Center project from Silver to Gold. Therefore we will proceed with the I
Design Development phase of the project using our current design.
We need to accumulate the fees and expenses we expended in this study as
soon as possible so they can be submitted to the City as a change order
request. Please send me an invoice itemizing your professional fees on
an hourly basis, using the hourly rates attached to your contracts, plus
reimbursable expenses attributable to this study by *Friday, January 20,
2006,* to Aller-Lingle Architects P.C. We will assemble the additional
costs and forward to Pinkard Construction.
Thank you in advance,
Dave
This e-mail and any file (s) transmitted with it contain privileged and confidential
information and are intended
solely for the use of the individual or entity to which they are addressed. If you
are not the intended recipient or
the person responsible for delivering the e-mail to the intended recipient, you are
hereby notified that any
dissemination, disclosure or copying of this e-mail or any of its attachments is
strictly prohibited. If you have
received this e-mail in error, please immediately notify the sending individual or
entity by e-mail and permanently
delete the original e-mail and attachment(s) from your computer system. Thank you
1
7
1/19/2006 9:04 AM
Jan.25. 2006 12:08PM No.6547 P. 6
Tin war+ GrM.ft
Mwhw hal ConuftV bgm ms
P.O. So 36W
Dam C*Kodo 9w"w
3M-9BN514
FAX3054"17 Invoice number 21499
January 23, 2006
Page number 1
Project No. 05117.10 Northside Aztlan Recreation Center - Lead Gold
MRB
Aller-Lingle Architects, P.C.
712 Whalers Way
Bldg., "B", Suite 100
Fort Collina, CO 80525
Professional Services - December 16, 2005 through January 15, 2006
Fee Agreement: Hourly
Professional Services
---------------------
Senior Principal
HVAC
Project Engineer
HVAC
Outstanding Invoices
--------------------
Invoice
Project Billing Summary
Professional Services
Total
Services total
Hours Amount
6.00 810.00
8.00 544.00
14.00 1,354.00
Invoice total 1,354.00
Number Date Amount
----------------------------
21320 12-28-05 810.00
Total Unpaid Invoices 810.00
e 2,164.00
Total
2,164.00
2,164.00
Balance du
Prior Current
810.00 1,354.00
810.00 1,354.00
oan. /5, 2006 12:08PM
No.6547 P, 7
Mr. David Lingle
Aller-Lingle AIA
712 Whalen Way, Suite B100
Ft. Collins, CO 80525
Date:
Project Name:
Project No.:
Fee Damon
Hourly
December 31, 2005
Northside Azdan Recreation 25036.01 Center - LEEA Gold
Invoice No.: 1
JA.N n 5 2006 r
00
CNIP: 8.50 hours @ $90.001hour = =00
Previously Invoiced = Tom $ 765.00
(Less Reimbursables) $ i
Reimbursables: Total s S 765.00
December 15, 2005:140 miles @ .485/mile $ 67
Total due this invoice = S 32.90
✓V
Date of Invoice:
Total this Invoice:
Previously Invoiced:
Total Invoiced to Nate:
Amount Paid to Date:
Total Due:
December 31, 2005
S . 832.90
S 832.90
S
S 832.90
7550 West Yale Avenue • Suite l_130 • Denver, Colorado 80227 - 303.988.9305 - 303.984.8603 Fox
Jan. 25. 2006 12:08PM
No.6547 P. B
INVOICE
January 17, 2006
Mr. Dave Lingle
Aller Lingle Architects
712 Whalers Way
Building B, Suite 100
Fort Collins, Colorado 80525
RE: Aztlan Recreation Center
Fort Collins, Colorado
LEER Silver to Gold Analysis
SUSTAINABLE DESIGN &
RESOURCE EMCM%)CY
CONSULTING
8201 Dark Horst Road
P.D. Box 7114
,Missoula, Monum 59807
p: 4%.721.7077
f 406.727,3035
email: intAdcsign-balanee.com
wom.design-Uhmet.com
Invoice for the period December 15 —January 13, 2005
Consultant Tax ID number. 310-58-3665
Work completed during this. period includes; research into what would be necessary to increase
the score of the project to a Gold L1rED rating; coordination with A.11er Lingle, Pinkard and
representatives from the City of Fort Collins; creating a revised scorecard; composing a
summary of the revisions needed to attain Gold, in particular the technical and budgetary
impacts
Fee: 6.25 hours @$1001hr $ 625.00
Total amount due: $ 623.00
AZr 011306x.inv
Jan. 25. 2006 12:08PM
' No.6547 P. 9
wz
INVOICE
ARCHITECTURAL ENERGY
g! r o[ A I 10 N
lntcgreted Engineered Selntio.s
Architectural Energy Corporation
2540 Frontier Avenue, Suite 201 Client
Boulder, CO 80301 Aller-Lingle Architects PC
Phone: 303.444-4149 Attn: Mr. David Lingle, AIA, Principal
Fax: 303-444.4304 712 Whalers Way
Building B, Suite 100
Fort Collins, CO s0525
Date: January 20, 2006
Invoice No. 0 05449-03
Reference: Northside Aztlan Community Center - Fort Collins, Colorado
For Services for December 15, 2005 through January 16, 2006
7L16/0 $-1/16/06 0.00 185.00
12116/0 5-1/16/06 2.00
- N
12/18/0 5-1/16/06�25
1.
0• A
»
12/1610 5-1/16/O6 2.2595.00
TOTAL LABOR THIS PHASE
213.75 K.
'�546:46
�+lr,L- AMOUNT DUE THIS INVOICE
$520.25
Originated By
Change Order Number
Design Builder
Change Order Date
Proposal #(s)
x City
Proposal Dates
Design Builder & City
Amount
MIncrease
Decrease
No Change
Time Extension
BYes (SEE BELOW)
x No
Enter description of work This CO Value
in field below Previous Increases by C
Previous Decreases by
State Form SC-6.31
Rev. 2/2000
,Pinkard p , ..
•, RP.l5iNG THE STANDARD.
CHANGE ORDER REQUEST
Date: November 10, 2005 No. 001
To: Steve Seefeld cc: Dave Lingle, Aller Lingle
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
Add Topographic and Boundary surveys
Approval Date:
Proposal Qualifications:
1 This quotation is validjor ten (10) days % ereq ter it maybe nithdrawn unless stated otherwise.
2 We will require that a jdiy erecured copy of this COR be returned to our office by "Approval Date" noted above to avoid construction schedule delays
not accountedjor in ourpricing.
J This quotation is also qualified in accordance s &h notes fisted on attached cost breakdown summary.
Method of determining change in the Contract:
® Fixed
❑ Estimated Change in Contract Sum
of ADD $5,065.00
❑ Maximum
Approved: Authorized
Architect Owner
By: By:
Architect Date Owner
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
0 Fixed
❑ Estimated Change in Contract Time
of 0 days
❑ Maximum
Confirmed:
Pinkard Construction Co.
_ By:-/*
Date Contr for ate
PINKARD CONSTRUCTION CO.
RC M 01
CORM 01
REF: -
PROJECT: City of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Aller Lingle
SUBJECT: Boundary and Topographic Surveys
PRICED BY:
RC
REVIEWED BY:
SB
APPROVED BY:
SB
DATE PRINTED:
26-Jan-06
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
O
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
COST
COST
COST
COST
COST
1
Boundary Survey (See Attached)
0.50
LS
2,040.00
1,020.00
0.00
0.00
0.00
2,040.00
1,020.00
2
Topographic Survey (See Attached)
0.50
LS
6,880.00
3,440.00
0.00
0.00
0.00
6,990.00
3,440.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL:
4,460.00
0.00
0.00
0.00
4,460.00
a
GENERAL CONDITIONS/ADMININSTRl�ATION a 7.7 /o.
:;p�}.::: {:"5 iso:ri::i�:t:'�$%J?:,;'.i..,.}.,,tM......o..,..,..::-: ::.,c,+55^o::f .y::.a:..i: ;•Cc'R:'.'::... .,rr•:. ..f.. :..a:Y.,+•:..:..... :.t-:::-..
343.42 r.;,,.x:'�'c%w.'''-:f.:._.o.}::T.i:,..::E...::.i5 i..}}::fv.}} .}ia:o:::.. ,•:.}:.c:;<.:� ; •�<.•::tr5.:}::.}:o:5?:m:,x5ni;a,::ii.I"we}:i.>::::.::::.�. ..:}.i;.;..
$v{
..00`:::na:;>:::�
?yc..�. <{k;7.�y
........e.........�.5:o:^ia}»rta;:•kt•:t .; r: •^:St A:. •:;.:•.�A, i...,r. ,.,.;.,;;:`
y.:c .,.: ,. �,:....:.,r.,tr,,..;..:::«:.,oi'<:.,y':»�.¢,: .n.^-$y3:.:'":
ti`.�..;.{..;.}.;ji."O$.��i ..w n..0.'...n..n.vnm................n.$i:'vr:.::?6iin iY:.SA.vvn:.Frv::#.t.4.n,..v:..n:::.v:{iinf{:$�{•ri.{}.rtrGyfa`':,�`:JiC•i:iC.02
SUB TOTAL'
4,903.42 NOTES:
- s},a,.ti;
BOND 0.66%:
(�
3 :
I.70 i�c>.. y.�.gis�.�' 1.
2.
SUBTOTAL:
4,835.12
FEE @ 4.73 U /a.
..4�ytsppj$p
229.67 �.ei:> .}:.:,q.;::::}:d.
4'O$A.'•}F..:i. �v (j
..} ii"iv4.:$"':;{:il.v.?n;
S5,065'.5:05't.:i}iiii�:%:$::::.}}�:
TOTAL THS COST PROPOSAL:
vri }: •: ...i.i :A}}.M.tr: vtr: �:::: n::: �h.:::: :.: :.:::.: v:::: ::�.'
.u:?J:: ..:}...-.-x.ia
Pinkard RA!5!116 THE 57ANDAR27,
CHANGE ORDER REQUEST
Date: January 26, 2006 No. 004
To: Steve Seefeld cc: Dave Lingle, Aller Lingle
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
Provide Feasiblity Report of changing Project from LEEDTM Silver to Gold.
Approval Date:
Proposal Qualifications:
I This quotation is vaWfor ten (10) days whereafter it may be wilbdrmin unless stated otherwise.
2 We will require that a fu* executed copy of this COR be returned to our g(jcs by "Approval Date" noted above to avoid construction schedule delays
not accoumedfor in our pricing.
3 This quotation is also qualified in accordance with notes Listed on attached cost breakdown summary.
Method of determining change in the Contract:
0 Fixed
❑ Estimated Change in Contract Sum
of ADD $21,753.00
❑ Maximum
(Lamp Sum, Unit Prices, Cost Plus Fee, Other)
© Fixed
❑ Estimated Change in Contract Time
of 0 days
❑ Maximum
Approved: Authorized Confirmed:
Architect Owner Pin4Coction Co.
By:By: By:Architect Date Owner Date Date
PBVKARD CONSTRUCTION CO.
PROJECT: City of Fort Collins Aztlan Center
PRICED BY: SB
RC #:
LOCATION:
REVIEWED BY: SB
COR#: 04
ARCHITECT: Aller Lingle
APPROVED BY: SB
REF: -
SUBJECT: Revise Site Design
DATE PRINTED: 26-Jan-06
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
O
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
COST
COST
COST
COST
COST
Design Consultant Hourly rates (See
Attached Aller Lingle letter, dated
1
1/24/06)
1
LS
12,598.00
12,599.00
0.00
0.00
0.00
12,599.00
12,598.00
2
AEC Daylighting Study for Gold
I
LS
4,356.00
4,356.00
0.00
0.00
0.00
4,356.00
4,356.00
2
PCC - Project Manager
52.5
HR
65.00
3,412.50
65.00
3,412.50
0.00
0.00
0.00
3
PCC - Sr. Estimator
3
HR
79.00
237.00
79.00
237.00
0.00
0.00
0.00
4
PCC Mileage
300
mi
0.55
163.50
0.00
0.55
163.50
0.00
0.00
5
0.00
0.00
0.00
0.00
0.00
0.00
6 1
10.00
0.001
1
0.00 1
10.00 1
1
0.00 1
1
0.00
SUBTOTAL:
20,767.00 3,649.50
0.00 r w } ofi fi
163.50
� 'e ° x, <x \# q{
xx`t�.
0.00
.{ o
¢ } cth"}ae {
16,954.00
ADMBdIIdSTRATION 7.7%:
GENERAL CONDTTIONS/ (p3
•}:ry
::�{;{S::nc.... ..:+�.... ...i:{n<.; .a. � . y} . oo}. o{...{{.:f%.�.vr:;.:t:•;:.}fy{.
rc.I:
SUB TOTAL:
20,767.00' c°t��: .}NOTES.
BOND @0.66%
4 ri:�:NO'{vL
0.00-
�i#JIB nOCYyi:J: is bpi'.
.ir4v
{�v.?'v`iFv6.•n:}j:
OOG�4�"J:.$�.'Q,{"4F%'f
SUB TOTAL:
FEE @ 4.75%:
986.43 '9"v.:•}$%#�,ti:;:;s_, 4,
�:.. },{..�:+:: e.::::.�:.i':}.::.:vl^..�.�.::r,•:'::...:.ryvQ{..v..::H.:pF•:.}:{i::}::n�:>xii;}<:v:{{.�i:
$21.753.........::::.»::.
/_:.:�:.v.J...v./
�:n'kSNn4:4:.._:.
TOTAL THIS COST PROPOSAL.
J411 Z�• zuuo IZ:U/PM
ALLER LINGLE
ARCHITECTS
P.C.
Revised January 25, 2006
Mr. Steve Burns
Pinkard Construction
9195 W. Sixth Avenue
Lakewood, CO 80215
RE: Additional Design Fees and Expenses for LEED Gold Analysis
Northside Aztlan Community Center
City of Fort Collins, Colorado
Project No. 0529
Dear Steve:
No.6547 P. i
At the request of the City of Fort Collins, our design team has completed the review of the various scenarios to
take the Northside Aztlan Community
accumulated fees and expenses for thtoy for Your from LEED Silver to Gold. The following are the
Backup memos/invoices from the various firms areattahed submitting a change order re
quest to the City.
Aller•Lingle Architects:
Fees
Reimbursable E
Sink Combs Dethlefs:
$ 4118900
.
uses
$ 0
EDAW 11:
S 1,827.So
S 0
North Star Design:
$ 1,030.00
$ 0
Martin/Martin:
None
S 0
The Ballard Group:
S 810.00
$ 0
L E. Systems:
$ 2,164.00
S 0
Design Balance:
S 765.00
S67.90
AEC:
$ 625.00
$ 0
SUBTOTAL:
522.50
1�0
5% Markup:
$11,933.00
$67.90
TOTAL:
597.00
N/A
S12,530.00
$67.90
TOTAL CHANGE ORDER: $12,597.90
Please give me a call if you have any questions or need further information.
Sincerely,
ALLER.UNGLE ARCHITECTS P.C.
David B. Lingle, AIA
DBL: us
772 WHALERS WAy BLDC. B, SUITE 100 • FORT COLLINS • COLORADO . 8052S
(970) 223-1820 phone • (970) 223-7833 fax • office"IerfiVacom • www.alfer-Ungle.com
i
r-
9
pan. ��, lUU6 12:07PM
No.6547 P. 2
AI1er-Lingle Architects, P,C.
NOrth
r 2ED r:D lde Aztlan Community Center
LEGold Study Additional Services
Period
1/24/2006
D. Lingle
1.00
$115.00
$115.00
M. Ashworth
0.50
$38.00
1/15/2006
D. Lingle
$19.00
4.00
$115.00
$460.00
S. Moscrip
2.00
$90.00
12/31/2005
D. Lingle
$180.00
8.50
$115.00
$977.50
12/15/2005
S- Moscrip
10.50
$90.00
$945.00
D. Lingle
7,50
$115.00
$882.60
S. Moscrip
Initial Strategy Meetings
.
7.00
$90.00
$H30.00 Initia6
�� strategy Meetings
Total
Amount Due;
U 189 00
K : Add: a n. 25. 2006)12 : 07?*
No.6547 P. 3
Subject: RE: Additional Fees LEED Gold Study
From: "Chris Kastelic" <Kastelic@sinkcombs.com>
Date: Mon, 23 Jan 2006 16:05:22 -0700
To: "David Lingle" <dlingle@aller-lingle.com>
Dave,
Sorry for not responding to your request. We didn't really get very far
on the study, so our hours were kept low.
Gudmundur 11 hours @ $115 hr ''" = ♦ (�Z•
Chris 4.5 hours @ &i59{iW*I4ZG/yt- S �' 562•�
Total cost spent for silver/gold study Sip}&+GG. r yS2�• /�
1 •�
Let me know if you need something more official. Thanks
Chris
-----Original Message -----
From: David Lingle [mailto:dlingle@alter-lingle.com]
Sent: Monday, January 23, 2006 3:37 PM
To: Chris Kastelic; Kurt Friesen; Tricia Kroetch; Mike Ballard
Cc: Steve Burns
Subject: Additional Fees LEED Gold Study
Ok everyone, I am still needing your fees and expenses for the LEED
Silver to Gold study. Please get to me no later than tomorrow, so Steve
Burns can work up a change order for Thursday's 0/A/C meeting.
Dave
1/23/2006 4:08 FM `