HomeMy WebLinkAboutCH2M HILL - CONTRACT - RFP - AMENDMENT NINE TO CONTRACTAMENDMENT: 9- CH2M HILL PROJECT N0. 334833
A.I.P. PROJECT NO.3-08-0023-20
Amendment No. Nine to Contract
Dated October 31, 2000
Between
CH2M HILL, INC.
and
The Cities of Fort Collins and Loveland
The Cities and the Engineer agree to amend their engineering services contract dated
October 31, 2000 for improvements to Fort Collins -Loveland Municipal Airport, by adding
the following list of improvements to Section I. Exhibit A:
Services During the Bidding Phase -Rehabilitate and Reconstruct Taxiway A
The Scope of Services and Cost Proposal for this Amendment No. Nine are attached hereto
as Attachments A and B respectively and incorporated herein by reference. The Cities agree
to pay the Engineer for the engineering services related to these additional improvements in
the following manner:
PART B - SPECIAL SERVICES (BIDDING SERVICES)
The maximtun estimated SPECIAL SERVICES engineering is as follows:
BIDDING SERVICES
The Engineer shall be reimbursed on a Fixed Unit Rate Basis. The Engineer's costs
shall be determined on the basis of time (i.e., the number of hours worked),
multiplied by the Engineer's standard hourly rates for each applicable employee
classification, which includes overhead, general administrative costs, and profit.
Overhead costs are based on the most recent audit on the Engineer's records. The
Engineer shall also be reimbursed for any direct expenses incurred as a result of his
or her duties, including but not limited to, auto mileage, meals, reproduction cost,
postage and freight, communication charges and computer charges.
The estimated maximum for FIELD ENGINEERING is:
Maximum Not to Exceed Item No. 1..................................................$9,987,00
The Maximum Not to Exceed for BIDDING SERVICES is based on the attached
CH2M HILL labor rate proposal.
Method of payment shall be as follows:
For services rendered sunder PART B - SPECIAL SERVICES, the Sponsor agrees to
make monthly payments based upon the work performed by the Engineer up to 100
percent.
AMENDMENT; 9 - CH2M HILL PROJECT NO. 334833
A.I.P. PROJECT NO. 3-08-0023-20
All Other terms and Conditions Of the origina, Contract shall remain in effeCt.
IN WITNESS WHEREOF, the parties hereto have affixed their signatures this
% > day of `�� - a �J 2006.
SPONSOR:
CITY OF LOVELAND, COLORADO
By k4� �
City Manager
SEAL
Attest. c'7i.7 /2 l ��'. �,/t �0'4OLOR0
CITY OF FORT COLLINS, COLORADO
By r --N 7
—
City Manager
Attest _ )h4�
(-;,i I Clef k
Er
CI -
Los
Project Delivery Leader
AS TO FORM
Attachment A
SCOPE OF SERVICES - SERVICES DURING THE BIDDING PHASE
FORT COLLINS - LOVELAND MUNICIPAL AIRPORT
SCHEDULE I - REHABILITATE AND RECONSTRUCT TAXIWAY A
SCHEDULE II - RE -PACKAGE COMMERCIAL APRON EXPANSION
AIP 3-08-0023-20
This is an Appendix attached to, made a part of and incorporated by reference with the
Agreement between CH2M HILL, Inc. and The Cities of Fort Collins and Loveland, dated
10-31-00, for professional services. For the remainder of this scope of services, Fort Collins -
Loveland Municipal Airport is indicated as "Airport" and CH2M HILL, Inc. is indicated as
"Consultant".
The Engineer shall be reimbursed on a Fixed Unit Rate Basis. The Engineer's costs shall be
determined on the basis of time (i.e., the number of hours worked), multiplied by the
Engineer's standard hourly rates for each applicable employee classification, which includes
overhead, general administrative costs, and profit. The Engineer shall also be reimbursed
for any direct expenses incurred as a result of his or her duties, including but not limited to,
auto mileage, meals, reproduction cost, postage and freight, communication charges and
computer charges.
1. PROJECT DESCRIPTION
General. The work will be performed and constructed under a Federal Aviation
Administration (FAA) Airport Improvement Program (AIP) grant to the airport.
This scope of work will encompass Airport assistance during the bidding period.
2. SCOPE OF SERVICES
2.1. Scope Development. Consultant shall develop the project scope for the bidding
services to ensure all necessary aspects of the project are included. The scope
development task includes:
1. Scope Development
2. Cost Proposal Development
3. Negotiations
2.2 Project Administration. Consultant shall provide project management services
to ensure the completion of this agreement. Internal management duties shall
include:
1. Project Budget setup
2. Weekly budget review/projections
3. Monthly Billing
2.3 Bidding Phase
23.1 After reproduction of the bid documents, as required in the subject design
scope of services for the project, the Consultant shall proceed with the
performance of the services called for in the Bidding Phase.
2.3.2 Bid Assistance. The Consultant shall:
2.3.2.1 Assist Airport and City of Loveland Purchasing in advertising the project
by preparing and submitting an advertisement for the local newspaper.
Airport will be responsible for payment of any advertising costs.
2.3.2.2 Prepare pre -bid agenda and conduct Pre -Bid conference and Pre -Bid site
visit at the Airport, to include a detailed discussion of the project
including:
• Phasing (including preparation of visual aids)
• Discussion of liquidated damages.
• Safety on the airport, contractor staging and access/communication
control
• Federal Bidding requirements, including bid bond, Davis Bacon Wage
Rates, Insurance requirements
• Description of work, including discussion of technical specification
updates in materials and mix designs for asphalt, PCC, ATPB, etc...
• Conduct site visit and answer Contractor Questions
2.3.2.3 Answer all Contractor questions and supply trade magazines with
information on project, such as bid date and time, quantities and type of
work, federal requirements, and plan holders list. Coordinate this
information with City of Loveland Purchasing.
23.2.4 Maintain a plan holders list and a list of submitted Contractor questions
for clarification in the written addenda. Coordinate with City of Loveland
Purchasing.
23.2.5 Issue written addenda as appropriate to interpret, clarify or expand the
bidding documents, including allowable substitutions of materials and
equipment. Send written addenda to all plan holders.
2.3.2.6 Assist Airport in evaluating bids or proposals for each separate prime
contract for construction, materials, equipment and services.
23.2.7 Assist Airport in preparing a bid tabulation following the bid opening.
23.2.8 Consultant shall consult with and advise Airport as to the acceptability of
subcontractors, DBE subcontractors, and other persons and organizations
proposed by the prime contractor(s)- (hereinafter called " Contractor[s]")
for those portions of the work as to which such acceptability is required
by the bidding documents. Consultant shall make recommendations for
award and assist in assembling and awarding the contracts for
constniction, materials, equipment and services. Work includes a written
notice of contractor award recommendation.
23.2.9 Where Bids Exceed Budget: Consultant shall advise the Airport of
possible action should the lowest responsible, responsive bid received
from a contractor exceed the Airport's budget for the work to be
performed by that contractor.
23.3 Construction Drawing Reproduction. Consultant shall conform bidding
documents to incorporate all addenda and reproduce five full-size drawing
sets for the Contractor and one full-size and three half-size drawing sets for
the Airport.
PERIOD OF PERFORMANCE
3.2 All work required in this Scope of Services shall be completed within 2 weeks of
the bid opening, scheduled for February 23, 2006.
ATTACHMENT B - APPROVED RATE SCHEDULE
COSTPROPOSAL
FORT COLINS - LOVELAND MUNICIPAL AIRPORT
AIP 3-08-0023-20
TAXIWAY A AND COMMERCIAL APRON - SERVICES DURING THE BIDDING PHASE
Summary
Inl
to,
.1
NI
1 IM INcI.1
M,aun,
Trzvel/Pcr
$pocial
Amelml
InUapentlenl
N �Iia1aN
Taxiwa A / Commercial A roe Biddim Services
Lahor
E%tenses
Diom
Sarvicos
R upSlEtf
Mal si
royal
$9.026.00
...11 r
$9 986.90
Totals
39,026
3961
$9.96T
vuy ,eemry era vannercxe Harry Keyes Joel Harry enan Bartlett Sleigh Kramer Cheryl Derrick Ramc Dookol
so Ens I PM -Lozd Enu I Elora. Eri I Mkt. Eng Sr Trch I CAD Tach I Conlrans Tsurc,ecalmn�
2, Task No.
Taxiway A Relocation (West Central) BiddingTotal
SR En
PM -Lard En
Elml. En
Mid. En
Sr. Tech
25 2 1
Scope Development
(burs
6IM.
SI15.00
5150-00
seem
S97,00
CAD Tech
Do
Conlo"Is
s65.00
SraA¢almns
56000
M...
Cgsls
lotnl C.I.
,nr Ilan
26 22
Project Administration
3
4
2
p
-
1
$300
J 2.32.1
Bid lnvilalionS/Advenisement
-
_-- - ----
---
----
2
$300
29 2.322
Pre -Bid Conference/Site Visit
6
---
1
'-
—���
----
--
$11
Ts 'L 3
Answer Contractor Questions
3
8
$900.2.3
30 2,324
Maintain Plan Holders List and List of Con lrQuestions
5
- -
- 2
1
$380
al 2.32.E
Issue Addenda
2aclor
- -
- 1
--
- -
2
$540
32 2.3. 2.6
Bid Evaluation
29
1
_ 6
6
6
4
6
$3,036
332. 3.2.7
Bid Tabulation
3
-----
-2
- ----
-- -...
$408
34 2.3
Prepare Recommendation nl Award
5
2
$275.2.8
as 2 3 29
Advise Mode when1d Bids Exceed Budget
3
1
- t
4
p
--
$G38
TC 2 °� 3
Construction Crowing
wing Preparation and Reproduction
$63
408
21
2
_ _- 1
2
121
it,
Computer Resources
2. 1 3 Production Copier
2'1 3 Outside Reproduction (Pull -Size Drawings)
2 3 3 Postage and Freight
8 3 2.,: Vehicle IMiloanel
531
r\v q B�41in1 G,vIbu.� Mle Prry,rrn I y CH: M dill
Fade t of t 12Re:005