Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2579001/18/2006 WED 15:27 FAX 970 221 6586 CITY OF FT COLLINS CLRS R 001/001 01/09/06 16:21 FAZ 3034310091 TECHNOLOGY CONST of/09/2006 VON ^12:52 PAZ 970 221 QS86 CITY OF FT COLLINS CLR9 OHANN R NO. S4 PROJECT TITLE: Old Tovrn AdoyYnWs 99MYRA9TOR: TemhnolOgy Canst:ycbors PROJECT NUMBER: 511P12 PURCHME OROOR NO.: HTOZOSmo DF.ECRIPTION: Gabe & Plere IM 002 9 003/008 1. Reawn far them ehenga comb for rwtrrs ft a rm p km design in front of childmn's mermffiile, costs for ■ddrdami curbing stong face of buildings, mob for removing a light pore from front of chilcirWa menmMila. wasther delays • S days, caste Tor eltartpe b iokimbr light Tbdurae- a. Deeedp on of On9mg1" Add sandstone pavers on concrVa bs % iNdd granite pavers on aonexde base, add 9" dwftd wab, add ties of cancult and tear WA is run at ilsisting pft delft fight pole, ddebe ramp and handrail, Smoother days, add boKstielr 119M upcharge, *dd mounting pteia and hand holes for t*LwAw btansfpffw& 3. Cherrge in Contract OWL =1616.415 4. Chew in CoMraot Turret add 5 days ORH31MAL CONTRACT tom$ f' TOTAL APPROVED CHANGE ORDER TOTAL. PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THEs C.v. TOTAL % OF ORIGINAL OONTRACT. ALL C.O.'S ADJWTW GONTRA&r COST fAssunine all chance orders approved) ACCEPTED Contracloes ACCEPTED PM)rct Mara REVIEWED 15Y: Tide; APPROVED BY. eT - T1<le: tti1 APPROVE) BY: Pwsheslnp Agent aver WO.000 am cxy cw* AresOd CanlrA w Enp mr Praieawe pavhuslnp DATM J o 6 DATE: DATE. o.j� DATE: /' Q DATE: