HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2579001/18/2006 WED 15:27 FAX 970 221 6586 CITY OF FT COLLINS CLRS
R 001/001
01/09/06 16:21 FAZ 3034310091 TECHNOLOGY CONST
of/09/2006 VON ^12:52 PAZ 970 221 QS86 CITY OF FT COLLINS CLR9
OHANN R NO. S4
PROJECT TITLE: Old Tovrn AdoyYnWs
99MYRA9TOR: TemhnolOgy Canst:ycbors
PROJECT NUMBER: 511P12
PURCHME OROOR NO.: HTOZOSmo
DF.ECRIPTION: Gabe & Plere
IM 002
9 003/008
1. Reawn far them ehenga comb for rwtrrs ft a rm p km design in front of childmn's mermffiile, costs for
■ddrdami curbing stong face of buildings, mob for removing a light pore from front of
chilcirWa menmMila. wasther delays • S days, caste Tor eltartpe b iokimbr light Tbdurae-
a. Deeedp on of On9mg1" Add sandstone pavers on concrVa bs % iNdd granite pavers on
aonexde base, add 9" dwftd wab, add ties of cancult and
tear WA is run at ilsisting pft delft fight pole, ddebe ramp and
handrail, Smoother days, add boKstielr 119M upcharge, *dd mounting
pteia and hand holes for t*LwAw btansfpffw&
3. Cherrge in Contract OWL =1616.415
4. Chew in CoMraot Turret add 5 days
ORH31MAL CONTRACT tom$ f'
TOTAL APPROVED CHANGE ORDER
TOTAL. PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THEs C.v.
TOTAL % OF ORIGINAL OONTRACT. ALL C.O.'S
ADJWTW GONTRA&r COST
fAssunine all chance orders approved)
ACCEPTED
Contracloes
ACCEPTED
PM)rct Mara
REVIEWED 15Y:
Tide;
APPROVED BY. eT -
T1<le: tti1
APPROVE) BY:
Pwsheslnp Agent aver WO.000
am cxy cw* AresOd
CanlrA w Enp mr
Praieawe pavhuslnp
DATM J o 6
DATE:
DATE.
o.j�
DATE: /' Q
DATE: