Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 25807SECTION 0095 " CHANGE ORDER N PROJECT TITLE: CHILDREN'S GARDEN AT SPRING PARK CONTRACTOR: WALSH CONSTRUCTION INC. PROJECT NUMBER: PO#5507466 DESCRIPTION: 1. Reason for change: 7.) Moss Rock Boulders 855.00 FTVf..' aIV i t Zoos 2.) Labor & Matt to excavate, form & place concrete for water table fountain 2275.00 3.) Elimate Water Tap (1,500.00) 2. Description of Change: 3. Change in Contract cost: Add $1,630.00 4. Change on Contract time: Add 2 days ORIGINAL CONTRACT COST $295,211.00 TOTAL APPROVED CHANGE ORDER $0 TOTAL PENDING CHANGE ORDER $0 TOTAL THIS CHANGE ORDER $1,630.00 TOTAL % OF THIS CHANGE ORDER .0055 TOTAL C.O. % OF ORIGINAL CONTRACT .0055 ADJUSTED CONTRACT COST ;Z9bg841.UU (assuming all change orders approved) Contractor's Repres ntative AC:CEP 1 EU by: `'d 1 %I L 't, Ltwl t / ri IO(o UH I E:-1-�fiitl[� P oject Manager CC: City Clerk Contractor Project File ArQbItect Engineer urc I 7�, 9 �- PROJECT TITLE: CONTRACTOR: PROJECT NUMBER DESCRIP I ION: 1. Reason for change: SECTION 0095 CHANGE ORDER CHILDREN'S GARDEN AT SPRING PARK WALSH CONSTRUCTION INC. PO#5507466 l.) tiectncal circuits trom the pull box to Muh $605.00-add 1 day 2.) Add (2) seat rocks $709.00-add 1 day 3.) Winter Protection $915.00 backup attached 2. Description of change: 3. Change on Contract cost: Add $2,429.00 4. Change on Contract time: Add 2 days ORIGINAL CONTRACT COST $295,211.00 TOTAL APPROVED CHANGE ORDER $1,630.00 TOTAL PENDING CHANGE ORDER $0 TOTAL THIS CHANGE ORDER $2,429.00 TOTAL % OF THIS CHANGE ORDER .0082 TOTAL C.O. % OF ORIGINAL CONTRACT .0137 ADJUSTED CONTRACT G0511 *Zgg,Z/U.uu (assuming all change orders approved) Contractor's Representati e ACCEP I ED BY: P DA I E:Project Manager CC: City. Clerk Contractor Project File itect Engineer Pl'JEF5 0 12/30/06 08920r r.007 Diamond Cam Inc. 1041 Tupelo Drive Loveland, CO $0538 BILL TO walsh Conmucdon , lnc. 5828 N. Saint Louis Ave. Loveland , Co. 80538 QUANTITY DESCRIPTION GRASSLANDS to GLACIERS PATH 4 EXTRA Labor to remove and replaoe fine grade material; Forman, one hour @ 18.75 X 43'/e labor burden + 15 % rG EXTRA Labor to remove and replace fine grade material : One men one Hr. j@ 513.50 + 43% labor burden + 15% prose. I winter proteWon : Concrete blankets ($0.04 per aq fL per day minimum $100.00) Invoice DATE INVOICE 0 1=7=5 2452. PROJECT �41,1191 4 RATE 30.0 222s 392.00 AMOUNT 123.40 356.00 392.00 Total $871.40 Add Walsh Construction 5% +43.60 $915.00