Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 25694Cite of Fort Collins CHANGE ORDER NO. 01 PROJECT TITLE: PFA Station 5 Addition & Remodel CONTRACTOR: Sinnett Builders, Inc. PROJECT NUMBER: DESCRIPTION: See Attach Changes In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: See Attachments 2. Description of change: See Attachments 3. Change in contract cost: Add $7,788.00 4. Change in contract time: Time to remain the same (Attach additional sheets as required) ORIGINAL CONTRACT COST ....... ............ .................................................... ..$594,906.00 TOTAL APPROVED CHANGE ORDERS........................................................... 00.00 TOTAL PENDING CHANGE ORDERS.............................................................. 00.00 TOTAL THIS CHANGE ORDER........................................................................7,788.00 ADJUSTED CONTRACT COST ............... ............. ..................................... ....... $602,694.00 TOTAL % OF THIS CHANGE ORDER .................. ...... 1.3% TOTAL C.O. % OF ORIGINAL CONTRACT...................1.3% ADJUSTED CONTRACT COST.............................................................$602,694.00 ACCEPTED BY: Iff e04' -SIJWN BUIL S, INC DATE REVIEWED BY: .. T.W.4 9 0G V G GARY ENN T�n ACCEPTED BY: I / � ///� STEVE WHITE, PROJECT MANAGER DATE APPROVED BY: -/D -6>& PFA, GARY N K L DATE APPROVED BY: PURCHASING AGENT OVER $30,000 DATE cc: Project File, Contractor, Purchasing, Engineer Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 5 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER Mechanical SUB -TRADE Site Utilities I REQUEST BY: mechanical to meet code DESCRIPTION OF REQUEST: Replace sewer main to legal pipe type inside bay addition. This work was done in the sewer line for the new interceptor. This work was shown in A.S.I. #2, SK-1 TRADE- Martin & Sons Excavating TRADE TRADE TRADE BOND, INSURANCE SBI FEE TOTAL AMOUNT FOR PROPOSED CHANGE: ARCHITECT n AN Date: $212 $200 $4 $8 $212 Additional to Contract BY: Date: OWNER FROM : FRX NO. : 2234376 Nov. 29 2005 02:2SPM P1 Martin & Sons Excavating, Inc. 18868 Weld Cty. Rd. 3 Berthoud, CO 80513 Office: (970) 632-2010 or (970) 223-7500 Fax: (970) 223-4376 Steve:(970)223-7345 NAMEIADDRESS Sinnett Builders PO Box 1969 Fort Collins, CO 80522 JOB NO. Add. Utilities DESCRIPTION Estimate DATE ESTIMATE NO, 11129f2005 200785 JOB ADDRESS Firo Station r 5 OTY COST TOTAL Install Fire Hydrant Per Plans 8,395.00 8,395.00 Change 3/4" Water Ser. to 1" Water Ser. 80.00 80,00 Install 1" Irrigation Ser. 95' 44D.00 440.00 Rework Sewer Ser. to Pass Code 200.00 200.00 TOTAL. $9,115.OD Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER CIVIL SUB -TRADE Site Utilities REQUEST BY: Owner DESCRIPTION OF REQUEST: ADD FIRE HYDRANT PER FINAL SITE DRAWINGS AND P.F.A. TRADE -Martin & Sons Excavating $7,865 TRADE TRADE TRADE BOND, INSURANCE $157 SBI FEE $321 TOTAL $8,343 AMOUNT FOR PROPOSED CHANGE: $8,343 Additional to Contract ARCHITECT BY: BY: Date: Date: OWNER I 970a2343fo d TO:482453T - 02P FROM: MRRTINI&150NSNew -Sa b r V �.e►.d � �'�::tt N rs. ------------ too 3.a 7 WL�Ffr l� o� -r.4 -- 0-0 1 ---Do (o O, vD °CrD - 2.0 1.15- 8. 7 3-5 j' ?" L o Ad r ,nd d u.� I w 5- . 29s 7y 41 S " St4. Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 7 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER SUB -TRADE ELECTRICAL REQUEST BY: Per Contract DESCRIPTION OF REQUEST: ADD COST OF ELECTRICAL PERMIT TRADE- Northwest United Electric $850 TRADE TRADE TRADE BOND, INSURANCE $17 SBI FEE $35 TOTAL $902 AMOUNT FOR PROPOSED CHANGE: $902 Additional to Contract ARCHITECT OWNER BY: BY: Date: Date: uNov 17 2005 3:011"M Northwest United Electric 970-482-3866 p,1 NORTHWEST UNITED ELECTRIC, INC. 800 Stockton Avenue - Unitl Fort Collins. CO 80524 (970)484-4699 Fax (970) 482-3866 To: Sinnett Builders, Inc. 4557 Denrose Ct. Fort Collins, CO 80524 Attention: Scott Steel CHANGE ORDER PROPOSAL Date: 11/17/05 Page: 1 of 1 NUE #: 2 Location: Poudre Fire Authority Station 5 4615 Hogan Dr. Fort Collins, CO Description: Electrical Permit Listed below Is the description and quantity of items included in this Change Order Proposal. State Electical Permit that was excluded in the amount of our original Quotation and Work Scope. Add: $850.00 Authorized: 1�0Accepted: (Signature) (Signature) Title: Estimator Title: Note: This Proposal may be withdrawn by Northwest Date: United Electric, Inc. it not accepted within 30 days. PNov 17 2005 3.01PM northwest United Electric 970-482-3866 P,2 Ynrrt Permut Page 1 of 2 COLORADO STATE ELECTRICAL BOARD ELECTRICAL PERMIT NUMBER: 571351 Date Paid: 10-NOV-05 Expires On: 10-NOV-06 NORTHWEST UNITED ELECTRIC, INC. 800 STOCKTON AVE 1 FORT COLLINS, CO 80524 Daytime Phone: (970) 484-4699 Power Supplier: XCEL - FT. COLLINS Owner Name: POUDRE FIRE AUTHORITY Address: 4615 HOGAN DR. City: FORT COLLINS,;CO. 80525 COMMERCIAL ADDITIOtII Registration Number: 2620 Trim Permit: N FAX: (970) 482-3866 Driving Directions: East on Harmony Road from College Avenue to Hogan Drive, turn south. The fire station is on corner. Installation InstrUCtion; Building additions and service upgrade. Inspector: Rod Roberts For inspection, Call: 970-223-9838 Cost of work: $49,565.00 Fee Amount: $850.00 Paid COLORADO STATE ELECTRICAL BOARD DEPARTMENT OF REGULATORY AGENCIES 1550 Logan St. Suite 550 https:/./www.dora. state.co.us/pls/reaUep_web_permit_gui.print_permit?p_session_id=653... 11 /17/2005 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970)482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 8 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/2/2005 ARCHITECT/ENGINEER ELECTRICAL SUB -TRADE ELECTRICAL REQUEST BY: OWNER, ARCHITECT DESCRIPTION OF REQUEST: ADDITIONAL WORK PER A.S.I.#3 TRADE- Northwest United Electrical TRADE TRADE TRADE BOND, INSURANCE SBI FEE TOTAL AMOUNT FOR PROPOSED CHANGE: $1,018 ARCHITECT BY: $960 $19 $39 $1,018 Additional to Contract r."v Date: Date: OWNER Nov 23 2005 2:50PM Northwest United Electric 970-482-3866 P.1 CHANGE ORDER PROPOSAL NORTHWEST UNITED ELECTRIC, INC. ' Date: 11/23/05 800 Stockton Avenue - Unit1 rage: 1 of 1 Fort Collins, CO 80524 NUE #: 3 (970) 4844699 Fax (970) 482-3866 To: Sinnett Builders, Inc. 4557 Denrose Ct. Fort Collins, CO 80524 Attention: Scott Steel Description: ASI #3 Location: Poudre Fire Authority Station 5 4615 Ho an Dr. Fort Colli s, CO Listed below Is the description and quantity of items Included /n this Chang Order Proposal: Fumis and install additional items as included the Engineer's drawings SK11 and SK-2 bothe dated 11 /08/05. Add: $960.00 Authorized:_ .� (Signature) Title: Estimator Note.- Th Is proposal may he withdrawn by Northwest United Electric, Inc. it not accepted within 30 days. Accepted: Title: Date: (Signature) Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 9 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 1/2/2005 ARCHITECT/ENGINEER MECHANICAL SUB -TRADE PLUMBING, SITE UTILITIES REQUEST BY: OWNER, ARCHITECT DESCRIPTION OF REQUEST: ADDITIONAL WORK PER A.S.I.#2, SK-1 (NEW INTERCEPTOR), SK-2 OLD INTERCEPTOR) TRADE- R.P.M. Mechanical, SK-2 $1,879 T&M NOT TO EXCEED TRADE- R.P.M. Mechanical, SK-1 $350 TRADE TRADE BOND, INSURANCE $45 SBI FEE $91 TOTAL $2,365 AMOUNT FOR PROPOSED CHANGE: $2,365 Additional to Contract ARCHITECT M. Date: Date: OWNER <re,.ft. CHANGE WORK REQUEST RECORD Project: P.F.A. STATION 5 I s1NNsrT CWR# DESCRIPTION Date Cost Ce.wo,&,v Approved 8 1 ADD HIGH STRENGTH CONCRETE TO EXTERIOR PAVING PER P.F.A. 12/01/2005 $3,46 2 DELETE DEMO AND NEW CONCRETE PAVING ALONG STREET PER P.F.A. 12J1912005 ($8,665.00 3 INCREASE SIZE OF WATER LINE FROM IRR. TAP FROM 314" TO 1" PER P.F.A. 12/0112005 $85.00- ~ G.D.@V.F. 4 CHANGE SCOPE OF ELECTRICAL WORK PER ASI If 1 12/01/2005 $3,574.00 G.D.@V.F. 5 REWORK SEWER TO MEET CODE 12/01/2005 $212.00 G.D. V.F. 6 ADD FIRE HYDRANT PER P.F.A. (REVISED 12.21-05 $562.00 LESS THAN ORIGANL) 12/01/2005 $8,343.00. G.D.@V.F. 7 ADD ELECTRICAL PERMIT PER CONTRACT 12/01/2005 $902.00 G.D.@V.F. 8 ADD ADDITIONAL COMIDATA AND SOUND PER ASI #3 1210112005 $1,018.00 9 ADD WORK AT EXISTING SAND INTERCEPTOR PER ASI #2, SK-1 & 2 (N.T.E.) 1210112005 $2,365.00, 10 ADD NEW WATER LINE FROM NEW DOMESTIC METER PIT R.F.I. #3, OPTION 3 12/0112005 $1,174.00 G.D. V.F. 11 ADD ADDITIONAL COSTS TO OVERHEAD DOORS 12/D112005 $1,041.00' G.D.@V.F. 12 REWORK ELECTRICAL FEED TO OUTLETS AT SOUTH PROPERTY 12/0112005 $219.00 G.D. V.F. 13 CHANGE UNIT BIKE RACK TO UNIT BIKE RACK 12/0112005 ($376.00 ✓ G.D.@V.F. 14 ADD PIPE INSULATION PRE R.F.I.#5 12/19/2005 $1,089 15 ADDITIONAL STRUCTURAL WORK PER R.F.I. #4 12/19/2005 $493 16 ADD 110V POWER OUTLETS TO NEW POLE LIGHTS AT BACK PARKING OUT FOR PRICING 17 MOVE WALL BETWEEN CLASSROOM AND OFICE T EAST OUT FOR PRICING 18 MOVE FURNACE TO TRUSS AREA OUT FOR PRICING 19 MOVE WH-1 FROM TRUCK BAY TO FRONT OF RES. GARAGE, & HB-1 TO SAME LOCATION OUT FOR PRICING CWR TOTALS $7 788 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482.4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 872 10 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER MECHANICAL SUB -TRADE SITE UTILITIES, PLUMING REQUEST BY: OWNER, ARCHITECT DESCRIPTION OF REQUEST: ADDITIONAL WORK PER R.F.I. # 3, (option # 3) TRADE- R.P.M. Mechanical $667 TRADE- Martin & Sons Excavating $440 TRADE TRADE BOND, INSURANCE $22 SBI FEE $45 TOTAL $1,174e' AMOUNT FOR PROPOSED CHANGE: $1,174 Additional to Contract ARCHITECT BY: 'A� Date: OWNER BY: Date: - [-a MECHANICAL uC PLUMBING PROPOSAL Fire Station #5 Addendum to proposal 11/30/05 Changes made as stated on Request #3, Option 3: 1"copper L installed overhead in garage from point of entry to water heater room. Additional: '667.00 Rick Giunta 970.308.3002 • Chapman Rose 970.308.2391 • Kelly Clifton 970.566,7792 • www.rpmmechanical.net FROM Martin & Sons Excavating, Inc. 18868 Weld Cty. Rd. 3 Berthoud, CO 80513 Office: (970) 632-2010 or (970) 223-7500 Fax: (970) 223-4376 Steve: (970) 223-7345 NAME/ADDRESS Sinnett Builders PO Box 1969 Fort Collins, CO 80522 DESCRIPTION Install Fire Hydrant Per Plans Change 3/40 Water Ser. to 1" Water Ser. Install 1" Irrigation Ser. 95' Rework Sewer Ser. to Pass Code FAX NO. : 2234376 JOB NO. Add, Utilities Firc Station If QTY Nov. 29 2005 02:25PM P1 Estimate UA I E ESTIMATE NO. 11/292005 200785 JOB ADDRESS COST 8,395.00 80.00 440.00 200.00 TOTAL TOTAL 8,395.00 80.00 440.00 200.00 $9.115.00 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: ARCHITECT/ENGINEER SUB -TRADE OVER HEAD DOOR SUPPLIER, S.B.I. 872 11 1/2/2005 REQUEST BY: Change needed due to actual location of new structure. Not shown on plans DESCRIPTION OF REQUEST: CHANGE DOOR TRACK SYSTEM, OPERATORS, AND ADD OPERATOR SUPPORTS TO COLUMNS TRADE- Front Range Raynor $831 TRADE-S.B.I.(additional supports for new operators) $150 TRADE TRADE BOND, INSURANCE $20 SBI FEE $40 TOTAL $1,041 AMOUNT FOR PROPOSED CHANGE: $1,041 Additional to Contract ARCHITECT OWNER i BY: BY: Date: `?/ 'f, / Date: Nov 09 05 03:01p 9702239555 p.l FRONT MANGE RAYNOR PStOOUCTS FOR A LIFETIME To: Sinnett Builders Attn: John Sinnett Page #: 1 Date: August 9, 2005 Revised: November 9, 2005 Fax #: 970-482-4537 QUOTATION Re: Poudre Fire Authority Station 5 Addition and Remodel Door No. 101, 102 & 103: 3 12'-0" x 14'-0" Raynor TriCore with Full View Window Section in 3rd and new RBT-211 1/2 Hp motors with timer to close system to match existing stations Door No. 106• 1 10'-0" x 8'-0" Raynor TriCore with Full View Window Section in 3rd and new RBT-211 1/2 Hp motor with timer to close system to match existing station Optional: $12,601.00 $3,150.00 Furnished and Installed Total $15,751.00 - 3 New Red/Green Signal Light Indicators, please add $ 2,880.00 Revision One November 9th 2005 Change 3 12x14 Sectional doors from standard 2" track system to high lift with jack shaft motor operation_ $277/Door Add $ 831.00 and accessory Front Range Raynor, Inc. is not affiliated with Raynor Door Authority of Denver others. Peter J. 0847 SOUTH MASON STREET FORT COLUMS, COLC RA00 80525 Fort Collins:223-9555 Greeley:353-2558 Cheyenne:638-6621 Toll Free:(800) 527-6319 Fax: (970)223-9558 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 12 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER I SUB -TRADE ELECTRICAL i REQUEST BY: Unknown Condition I DESCRIPTION OF REQUEST: Re-route electrical feeding the "post" outlets along the south property line TRADE- Northwest United Electric TRADE TRADE TRADE BOND, INSURANCE SBI FEE TOTAL AMOUNT FOR PROPOSED CHANGE: BY: Date: $206 $4 $8 $219 $219 Additional to Contract BY: Date: OWNER iyov ;�8 2005 11:11AM Northwest United Electric 970-482-3866 p.1 CHANGE ORDER PROPOSAL NORTHWEST UNITED ELECTRIC, INC. Date: 11/28/05 800 Stockton Avenue - unit1 Page: 1 of 1 Fort Collins, CO 80524 1vL7E #: 4 (970) 484-4699 Fax (970) 482-3866 To: Sinnett Builders, Inc. Location: Poudre Fire Authority Station 5 4557 Denrose Ct. 4615 Hogan Dr. Fort Collins, CO 80524 Fort Collins, CO Attention: Scott Steel Description: Underground Listed below is the description and q Reroute and repair existing undergr Add: $206.00 !y of Items included In this Change Order Proposal: conduits to post receptacles. Authorized; �L / �.� Accepted: 1 ■ture) (Signature) Title: Estimator Title: Note: This Proposal may be withdrawn byNorthwest Date: United Electric, Inc. If not accepted jvlthin 30 days. Nov 28 2005 11:11SM Northwest Un.ited Electric 970-482-3866 1 p.2 REASON FOR -WORK: Va>T, ❑ THIS CHANGE EFFECTS ITEMS PREV jif-XHIS WORK IS IN ADDITION TO THAT ❑ THIS WORK WILL PROCEED AFTER A 4THI : S WORK., HAS BEEN COMPLETED COST IUSLYINSTALLEID IN THE PROJECT PLANS AND SPECIFICATIONS ED ABOVE: V MAT fr ATA 60D ern SIGNATURE TITLE DATE Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodle & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 13 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER SUB -TRADE SITE SPECALTIES REQUEST BY: Owner DESCRIPTION OF REQUEST: CHANGE FROM A 7 UNIT BIKE RACK TO A 3 UNIT BIKE RACK TRADE -EXEL WEST TRADE TRADE TRADE BOND, INSUANCE SBI FEE TOTAL AMOUNT FOR PROPOSED CHANGE: $376 $384 $8 -$16 $376 DEDUCTED FROM CONTRACT ARCHITECT i BY: BY: Date: 7i 4 Date: OWNER Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 14 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1912005 ARCHITECT/ENGINEER mechanical SUB -TRADE plumbing REQUEST BY: mechanical engeneer DESCRIPTION OF REQUEST: insulate water piping per R.F.I.#5 TRADE- R.M.M. Mechanical $1,027 TRADE TRADE TRADE BOND, INSURANCE $21 SBI FEE $42 TOTAL $1,089 AMOUNT FOR PROPOSED CHANGE: $1,089 Additional to Contract ARCHITECT lv 116-YA Date: Date: �]►PIa�e7 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodle & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 1 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER SUB -TRADE SITE CONCRETE REQUEST BY: Owner DESCRIPTION OF REQUEST: INCREASE STRENGHT OF SITE CONCETE FROM 3500psi TO 4000psi At v-pan, site paving, & truck bay floor TRADE CONRETE 5440sf @.60 $3,264 TRADE TRADE TRADE BOND, INSUANCE $65 SBI FEE $133 TOTAL $3,462 AMOUNT FOR PROPOSED CHANGE: $3,462 ADDITIONAL TO CONTRACT ARCHITECT BY: Date: Date: OWNER DEC-12-2005 16:52 UAUGHT FRYE ARCHITECTS S70 _24 1662=.Q*21.2= REQUEST FOR INFORMATION / INTERPRETATION Sinnett PROJECT NO. 672 CONTRACTOR: SINNETT BUILDERS, INC. REQUEST NO. 5 REQUEST REVIEWED BY: Scott Steel DATE: 11/22/2005 (General Contractors superintendent, prof. mgr, or purl. once • only) SUB -TRADE: plumbing REQUEST BY: Sinnett Builders Disciplines involved: ,Architectural Structural xx Mechanical _Electrical _Civil _Kitchen _Landscaping _Other Drawing no. and / or specification section reference: none shown QUESTION OR DESCRIPTION OF REQUEST: (provide / attach sketch as necessary to fully explain). Most of the existing water piping in the bay area is insulated. I can not find any references in the plans as to whether we should insulate any of the new water piping. Is any pipe insulation required? RESPONSE: The following information is provided as an interpretation of the requirements of the Contract Documents and / or is intended as supplemental information. It is not an authorization to change the Contract Amount or Time. If the Contractor believes that this response necessitates such a change, he must comply with procedures described in the General Supplementary Conditions and receive the required approval before implementing the subject work. Provide pricing for evaluation as follows: Provide and install insulation for all HW & HWC piping. Insulation shall be fiberglass type with 0.5" walls, all service jacket. Architect By: Consultant: Integrated Mechancial, LLC By: Thomas Segelhorst Date: 8 Dec 2005 TOTAL P.02 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 15 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/19/2005 ARCHITECT/ENGINEER STRUCTURAL SUB -TRADE STEEL STUD FRAMING REQUEST BY: STRUCTURAL engeneer DESCRIPTION OF REQUEST: ADD CONECTIONS PER R.F.I.#4 TRADE-STEE STUD FRAMING $465 TRADE TRADE TRADE BOND, INSURANCE $9 SBI FEE $19 TOTAL $493 AMOUNT FOR PROPOSED CHANGE: $493 Additional to Contract ARCHITECT BY: BY: Date: Date: OWNER Nov 22 05 06:56p WEEKS & RSSOC. t97uj225-2622 p.2 REQUEST FOR INFORMa,TION / INTERPRETATION PROJECT: PFA Station 5 Architect PROJECT NO, 2004-57 __. Sinnett PROJECT NO. 22 CONTRACTOR: SINNETT BUILDERS, INC. REQUEST NO. 4 REQUEST REVIEWED BY: Scott Steel DATE: 1112212005 (General nontractoes superintendent. pro), mgr, or pro). engr . only) SUB -TRADE: structural steel stud framing REQUEST BY: Sinnett Builders Disciplines involved: _Architectural xxStructurat Mechanical _Electrical Civil Kitchen _Landscaping _Other Drawing no, and I or specification section reference: none shown QUESTION OR DESCRIPTION OF REQUEST: (provide / attach sketch as necessary to fully explain). How does the steel stud framing that is above the block attach to the building at the roof line, and or at the structural beam elevation at the south side of the bay addition? Provide piece of 6" 18 gage stud welded on top of bottom flange of edge beam (1/8" z I" weld ea. side of stud piece) and screw to wall stud with (2)-#10 screws - typical ea. stud on east wall. RESPONSE: The following information is provided as an interpretation of the requirements of the Contract Documents and I or is intended as supplemental information. It is not an authorization to change the Contract Amount or Time. If the Contractor believes that this response necessitates such a change, he must comply with procedures described in the General Supplementary Conditions and receive the required approval before implementing the subject work. AI cl theta GurtsultanC Weeks S Assodat I By: —Gary Weeks Date:_11-22-05 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodle & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 2 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 1211/2005 ARCHITECT/ENGINEER SUB -TRADE SITE DENOLITION, SITE CONCRETE REQUEST BY: Owner DESCRIPTION OF REQUEST: DELETE REMOVAL AND REPLACMENT OF SITE CONCRETE AND DIRECTED BY P.F.A. 2336sf. TRADE -site concrete $7,549 TRADE- site demo $1,300 TRADE TRADE BOND, INSUANCE $177 SBI FEE -$361 TOTAL $8,665 AMOUNT FOR PROPOSED CHANGE: $8,665 DEDUCTED FROM CONTRACT ARCHITECT MN go Date: Date: OWNER .ir+iti-i,,-2006 09:01P FROM: MARTIN191SONS 9702234376 TO:4824537 P.2 Ci ✓ztt Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT M 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 3 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER MECHANICAL SUB -TRADE Site Utilities REQUEST BY: Owner DESCRIPTION OF REQUEST: Increase size of new water line shown on page C-4 of the plans from 3/4" to 1 ". TRADE- Martin &Sons Excavating $80 TRADE TRADE TRADE BOND, INSURANCE $2 SBI FEE $3 TOTAL $85 AMOUNT FOR PROPOSED CHANGE: $85 ADDITIONAL TO CONTRACT ARCHITECT OWNER BY: BY: Date: ��f/ (�//BGj Date: FROM FAX NO. : 2234376 Nov. 29 2005 02:25PM Pi Martin & Sons Excavating, Inc. 18868 Weld Cty. Rd. 3 Berthoud, CO 80513 Office: (970) 632-2010 or (970) 223 7600 Fax: (970) 223-4376 Steve: (970) 223-7345 NAME/ADDRESS Sinnett Builders PO Box 1959 Fort Collins, CO 80622 JOB NO. Add. Utilities DESCRIPTION Install Fire Hydrant Per Plans Change 3/4" Water Ser, to 1" Water Ser. Install 1" Irrigation Ser. 95' Rework Sewer Ser. to Pass Code Firc Station N5 OTY Estimate DATE ESTuvv\7C: T.O. 11/292005 200785 JOB ADDRESS COST 8,395.00 80.00 440.00 200.00 TOTAL TOTAL 8,395.00 80.00 440.00 200.00 $9.115.00 Change in Work Request SINNETT BUILDERS, INC. P.O. Box 1969 4557 Denrose Court Fort Collins, CO 80522 (970) 493-1770 Fax (970) 482-4537 PROJECT: PFA Station 5 Remodel & Addition PROJECT #: 872 CONTRACTOR: Sinnett Builders, Inc. REQUEST NO. 4 REQUEST REVIEWED BY: Scott Steel / Jeff Sinnett DATE: 12/1/2005 ARCHITECT/ENGINEER ELECTRICAL SUB -TRADE ELECTRICAL / SBI REQUEST BY: Owner/ARCHITECT DESCRIPTION OF REQUEST: A.S.I #1 (SBI and Martins pot holed existing line to verify conduit @ two locations) TRADE- Northwest United Electric $3,850 TRADE- SBI, Martin & Sons Excavating -$200 TRADE TRADE BOND, INSURANCE $73 SBI FEE -$149 TOTAL $3,574 AMOUNT FOR PROPOSED CHANGE: $3,574 Deducted from contract ARCHITECT OWNER BY: BY: Date: Date: Nov 17 2005 2:38PM Northwest United Electric 970-482-3866 P.1 NORTHWEST UNITED ELECTRIC, INC. 800 Stockton Avenue - Unitl Fort Collins, CO 80524 (970) 484-4699 Fax (970) 482-3866 To: Sinnett Builders, Inc. 4557 Denrose Ct. Fort Collins, CO 80524 Attention: Scott Steel Description: Revised Electrical Service CHANGE ORDER PROPOSAL Dab: 11/17/05 Page: 1 of 1 NUE #: 1 Location: Poudre Fire Authority Station 5 4615 Hogan Dr. Fort Collins, CO Listed below is the description and gdandiy of items Included in this Change Order Proposal. Electrical service as included in the Electrical Engineers revised one -line diagram dated 10/07/05. Deduct: $3,850.00 This proposal includes that the existing service entrance conductors can be pulled out of the existing underground conduit and that the underground conduit will allow the installation of the new conductors. Installation of a new underground conduit will be at additional cost. Authorized: ' Accepted: (Signature) (Signature) Title: Estimator Title: Note: This Proposal may be withdrawn by Northwest Date: United $lectrie, Inc. if not accepted within 30 days. -