PROJECT TITLE: Trilby Rd. & Ziegler Rd. Improvements
PROJECT NUMBER: 30523286.6 (Sid 05927)
CONTRACTOR: Gerrard Excavation (PO #5505947)
CHANGE ORDER NUMBER: 3
n preparing. change or ers show in order as separate numbered paragraphs the o owing;
1. Reason'for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract cost will Increase by $ 23,117.90
4. There Will be no change in contract time.
ORIGINAL CONTRACT COST
$841,372.43
TOTAL APPROVED CHANGE ORDERS
($10,237.15)
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$23.117.90
TOTAL % OF THIS CHANGE ORDER
2.75%
TOTAL C.O. % OF ORIGINAL CONTRACT
1.53%
ADJUSTED CONTRACT COST
$864,253.18
(Assuming all change orders approved)
ACCEPTED BY: ,T, � AAJ& .
DATE: t
cll b L�
Contractors Representative)
REVIEWED BY:
DATE:
(Pro'act ngineer)
ACCEPTED BY: Lam/,
DATE:G
(Project M ger - Engineering)
ACCEPTED BY: _,r�: 7 vs 46« _
DAT5= ^0/
(Department Head - Engineering)
•
APPROVED BY: _ DATE:
(Purchasing Agent over $30,000)
cc; Contractor
Purchasing
Projact File
Engineering Department - 281 North College Avenue • P.O. Box 5W - Fart Collins, CO 80522-0580 • (970) 221-6605
JAN-05-2006 THU 10:58 AM CFC ENG, FAX NO. 9702216378 P. 02
♦�.. c^„ ^r„a•: �'Y,^•r ..., rr�+...%'wn:;k ^k n,liv �; ;• ANQ
n ,.kwn (,� .,��...�.., :.w•+��' v,'; �.r{"f+�" I 'M
h,�.•, ,.,ti .. '(o-. rr.-�5.`'!"'�,".,+W n. 4� I ,Q . � <y r,y,•••w,%•;^l.«.,^,hxh.�.�• .. ti.\..,,,'i„^„•h
TRILBY ROAD AND BEGLER ROAD IMPROVEMENT PROJECT
\,i�. yi' •1,.. �.�.. �Rh,n YY. � �w�'!ti �M.` 'Y �A I.n V. �, •1.
Gerrard Excavating
Additional Items for the project.
- Spa attached submittal -
The message boards wern used to inform the public of the final paving operations.
The initial scope had this work taking place under a closure, but Instead it was done under traffic.
The 60140 topsoil is for additional topsoil that was not a part of the original estimate -
Hosted to Pay Estirmfe N 3