HomeMy WebLinkAboutCHANGE ORDER - RFP - MAIL CREEK STABILIZATION PROJECTCHANGE ORDER NO. 1
PROJECT TITLE: Mail Creek Stabilization Project
CONTRACTOR: TST, Inc.
P.O. NUMBER: 623865
VENDOR NUMBER: 111694
CHARGE NUMBER: 504-323000-528180-51225
DESCRIPTION
In preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change.
3. Change in contract cost.
2. Description of change.
4. Change in contract time
1. and 2. Additional design services to complete the construction administration services
for Reach 2, additional fees for the final design of Reach 2, and the final design
for Reach 1 according to the attached letter, dated January 24, 1997, from TST, Inc.
3. $13,000.00 (Thirteen Thousand Dollars)
4. N/A
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
all change orders
ACCEPTED BY:
REVIEWED BY:
REVIEWED BY:
APPROVED BY:
APPROVED BY;
(TST
(Water Utilities
CC: City Clerk Purchasing
Contractor Project File
Stormwater Finance Manager
mlakchAs
$16,000.00
$0.00
$0.00
$13,000.00
$29,000.00
DATE:
DATE:-4-'C1�
DATE: 2 S
DATE:'
DATE:;;?-- d _ y 7
Manager)
NOTE: Signature of Contractor maicates
agreement herewithin, including any adjustment
in contract sum or contract time.
{j 1161 '� 3
n
Ft
JAN 2 91997 `{ .
G
CITY OFF . T_COLUNS
Mr. Jack Gianola
Facilities Division
117 N. Mason Street
P.O. Box 580
Fort Collins, CO 80522-0580
Re: Mail Creek Channel Improvements
Project No. 10-041-212
Dear Jack:
January 24, 1997
This letter is to summarize our recent phone conversation pertaining to our Purchase Order for the
engineering and surveying services related to the Mail Creek Channel Improvements. We propose to
provide the following additional services for the noted fees.
1. Additional services pertaining to the Final Design of Reach 2
2. Construction staking services for Reach 2 including:
• Rough stake top of slope with offset to toe of slope.
• Rough stake bench locations.
• Fine stake top and toe of slope, and bench locations.
• Stake grade control structures.
• Stake toe protection limits.
• Stake siltation pond and erosion control measures.
3. Construction consultation, periodic site visits and field meetings
4. Final Design of Reach I improvements
Total
$ 2,000.00
$ 3,500.00
$ 4,000.00
3 500.00
$13,000.00
Please feel free to contact me if you should require additional information to finalize a Change Order, or if
you should have any questions or concerns.
Respectfully,
TST, INC. CONSULTING ENGINEERS
Steve F. Humann, P.E.
SFH/Ir
TSTINC.748 Whalers Way — BuildingD
102 lnvemess Terrace East
! Fun Colliu, CO 80525
Consulting Engineers (970) 226-0557
Suite 105
Englewood, CO 80112
Metro Denvu (303) 595-9103
(303) 792-0557
Fax (970) 226-0204
Fax (303) 792-9499
PAGE NO:
1
m
111694
TST INC. CONSULTING ENGINEERS
748 WHALERS WAY BLDG D
FT COLLINS CO
80525
000047
STORMWATER UTILITY
CITY OF FORT COLLINS
235 MATHEWS
FORT COLLINS, CO.
REQ NO: 121614
80524
is it i<ic is is is icic it>tiir i<i<it i<it is it ie �4 icicicic i<i<* iric iricicir is is �Y is ie �Ytic it is ic�tir icic icie i<iric ir�i irir icir icic it icir �Fic icic�F icic is it i<ir icic is i<
BID # BUYER DEPT DATE CREATED DATE NEEDED STATUS EMP ID
is is it i<ic it is iris �Yie �Fic is icie icic fr icicicicir i<ici<ic is i<it icinF is k it �Y it icic is iric is ieic>ti is icir icir �Y i<* iris is i<ic ic>E �Fic i<ic is is is it is is is is it iric is i<
OFD 320000 08/26/96 09/10/96 3 DMN
SUGGESTED VENDORS
SHIP VIA..
SHIP INST.
TERMS.....
FOB.......
SPECIAL INSTRUCTIONS:
(PURCHASING USE ONLY)
is iric is it is icic is ic�Y it is is icit icir is kici<ic it is it ir'c is k is �k is i<icicie is i<iciricic icir icicic is is is icicic is it k ir>tiir>E it it is is is is i<ic is is ici� it is is is i<i<ir
LINE QUANTITY UNIT ACCOUNT NUMBER UNIT COST TOTAL COST
is is icit is irir ic:Fie i<it is is is is is it iciciciri: it is is it is is iriricicic is ie icicic is it is �Y is icfic is a it iris icicic it is it it it is is is ici; iricicic is is is i; i; i<ic is irisrt
1 1.00 EA 504-323000-528180-512�5-000000 16000.0000 16000.00
PROFESSIONAL DESIGN SERVICES FOR MAIL CREEK
STABILIZATION PROJECT.
COMMODITY CLASS: 0000000000
16000.00
p6 6��w��
CHANGE ORDER NO. 1
PROJECT TITLE: Mail Creek Stabilization Project
CONTRACTOR: TST, Inc.
P.O. NUMBER: 623865
VENDOR NUMBER: 111694
CHARGE NUMBER: 504-323000-528180-51225
DESCRIPTION
In preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change.
3. Change in contract cost.
2. Description of change.
4. Change in contract time
1. and 2. Additional design services to complete the construction administration services
for Reach 2, additional fees for the final design of Reach 2, and the final design
for Reach 1 according to the attached letter, dated January 24, 1997, from TST, Inc.
3. $13,000.00 (Thirteen Thousand Dollars)
4. N/A
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
all change orders
ACCEPTED BY:
REVIEWED BY:
REVIEWED BY:
APPROVED BY:
APPROVED BY;
(TST
(Water Utilities
CC: City Clerk Purchasing
Contractor Project File
Stormwater Finance Manager
mlakchAs
$16,000.00
$0.00
$0.00
$13,000.00
$29,000.00
DATE:
DATE:-4-'C1�
DATE: 2 S
DATE:'
DATE:;;?-- d _ y 7
Manager)
NOTE: Signature of Contractor maicates
agreement herewithin, including any adjustment
in contract sum or contract time.
March 6, 1997
Mr. Jack Gianola
Facilities Division
117 North Mason Street
PO Box 580
Fort Collins, CO 80522-0580
Re: Mail Creek Channel Improvements - Phase 2 Construction
Project No. 10-041-212
Dear Jack,
This letter is to request a Change Order to our Mail Creek Stabilization Project, PO Number 623865. As
you are aware, the construction phase of Reach One (Phase Two) is about to begin. I am proposing to
provide the following additional services for the noted fees:
Construction staking services for Reach One including:
• Rough stake top of slope with offset to toe of slope
• Rough stake bench locations
• Fine stake top and toe of slope and bench locations
• Stake grade control structures
• Stake toe protection limits
• Stake siltation pond and erosion control measures
Fee: TST, Inc. = $ 3,000.00
2. Construction consultation, periodic site visits and field meetings.
Fee: TST, Inc. = $ 3,000.00
TOTAL = $ 69000.00
Please feel free to contact me if you should require additional information to finalize this Change Order, or
if you should have any questions or concerns.
Respectfully,
TST, INC. CONS TING ENGINEERS
S� �I
teve F. Humann, P.E.
SFH/nr
TSTINC.748
Whalers Way— Building D
102 Inverness Terrace East
!
Consulting Engineers
Fort Collins, CO 80525
(970) 226-0557
Suite 105
Englewood, CO 80112
Metro Denver (303) 595-9103
(303) 792-0557
Fax(970) 226-0204
Fax (303) 792-9489
F`
M(
CHANGE ORDER NO. 1
PROJECT TITLE: Mail Creek Stabilization Project
CONTRACTOR: TST, Inc.
P.O. NUMBER: 623865
VENDOR NUMBER: 111694
CHARGE NUMBER: 504-323000-528180-51225
DESCRIPTION
In preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change.
3. Change in contract cost.
2. Description of change.
4. Change in contract time
1. and 2. Additional design services to complete the construction administration services
for Reach 2, additional fees for the final design of Reach 2, and the final design
for Reach 1 according to the attached letter, dated January 24, 1997, from TST, Inc.
3. $13,000.00 (Thirteen Thousand Dollars)
4. N/A
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
all change orders
ACCEPTED BY:
REVIEWED BY:
REVIEWED BY:
APPROVED BY:
APPROVED BY;
(TST
(Water Utilities
CC: City Clerk Purchasing
Contractor Project File
Stormwater Finance Manager
mlakchAs
$16,000.00
$0.00
$0.00
$13,000.00
$29,000.00
DATE:
DATE:-4-'C1�
DATE: 2 S
DATE:'
DATE:;;?-- d _ y 7
Manager)
NOTE: Signature of Contractor maicates
agreement herewithin, including any adjustment
in contract sum or contract time.
03/26/1997 08:18
9702260204
TST INC FC
PAGE 02
Mr. Jack Oianola
Facilities Division
117 North Mason Street
PO Box 580
Fort Collins, CO 90522-0580
Re: Mail Creek Channel Improvements - Phase 2 Construction
Project No. 10-041-212
Dear Jack,
February 26, 1997
This letter is to request a Change Order to our Mail Creek Stabilization Project, PO Number 623865. As
you are aware, the construction phase of Reach One (Phase Two) is about to begin. I am proposing to
provide the follo%%ing additional services for the noted fees:
1. Construction staking services for Reach One including:
• Rough stake top of slope n7th offset to toe of slope
• Rough stake bench locations
• Fine stake top and toe of slope and bench locations
• Stake grade control structures
• Stake toe protection limits
• Stake siltation pond and erosion control measures
Fee: TST, Inc. =
S +seezeo Jracr&o0
2. Construction consultation, periodic site visits and field meetings.
Fee: TST, Inc. = S —54300 00 3iWa°o
TOTAL =
S 995, 00.09 &,asoxcl
Please feel free to contact me if you should require additional information to finalize this Change Order, or
if you should have any questions or concerns.
Respectfully, n�
TST, INC. CONSULTING ENGINEERS S (�
.900 �►' ,
Steve umann, .E. G`
SFN/nr
TST E NC. 146 Whalm N•ay- RUJIdln6 D 102 Imemeie Tenam Fan
Consulun En ineCrs For, ewhn,. Co 9oR5 Suite fos
8 8 010•::e•ms7 HnFit�•md. CO 80112
Ntvv Demur t70d15959103 110?7192.OS37
Fea .9'Ol ::E-O.a Am 003)?9:.9489
03/26/1997 08:18 9702260204 TST INC FC PAGE 01
TST, INC. FAX TRANSMITTAL
Consulting48WhEngineers
7748 whaler: way • BuAding D • Fort Comru, CO 80525
1970) 226-0557 • Fax (970) 226-0204
DATE: �Z —1°!' 7
TIME: 6 CD
TO: % C—t.l71 "W04AI
COMPANY: 41E FvRT C!044,IAJS
FAX NO: ZZI-- (v7o-7
FROM: �fic1 m J4 N
COMPANY: TST INC. CONSULTING ENGINEERS
FAX NO: 970-226-0204
REMARKS: Q Urgent For your review Q Per your request
0/EPO ' FCN CN P/0 623865 VENDOR 111694 ST CH-NP-PART CONT =
STOCK NO ................STOCK DESCRIPTION................. QUANTITY
PERS C.O. #1: MAIL CREEK STABILIZATION PROJECT. 1.00
ACCOUNT NO 504 323000 528180 51225 $$$$$$ PRICE 13000.0000+ A/I $
ITEM 0002 UM EA CT/BID $/$$$$$$$$ CLASS $$$$$$$$$$ TAX $$.$$ REQ 124286
EXTENDED DESCRIPTION: ADDITIONAL SCOPE OF WORK PER JAN. 24, 1997 LETTER,
PURSUANT TO ALL TERMS & CONDITIONS OF CONTRACT OF
AUG. 309 19969 PER RFP NO. P-312.
INVOICING TO BE ON TIME & REIMBURSABLE DIRECT COST
BASIS, PER CONTRACT, NOT TO EXCEED INDIVIDUAL LINE
ITEM AMOUNTS DETAILED IN JAN. 249 1997 LETTER.
FEES DETERMINED PER AUG. 301 1996 CONTRACT.
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
--------------------------------------------------
00140 END OF PURCHASE ORDER DISPLAY
111694
TST INC. CONSULTING ENGINEERS
748 WHALERS WAY BLDG D
FT COLLINS CO
80525
000047
STORMWATER UTILITY
CITY OF FORT COLLINS
235 MATHEWS
FORT COLLINS, CO.
BID # BUYER DEPT DATE CREATED DATE NEEDED STATUS EMP ID
OFD 320000 02/06/97 02/28/97 3 DMN
SUGGESTED VENDORS
SHIP VIA..
SHIP INST.
TERMS.....
FOB.......
PAGE NO:
1
REQ NO: 124286
80524
SPECIAL INSTRUCTIONS:
(PURCHASING USE ONLY)
i�ic �k ic�t is icirit �'c44ti�ia�4 is icic ': it Y �4 ir�Yic�k;c icic�Y�'t is it �Y icia �c�ic �Y 4c�'c%�c i�ic4c icic is �>4ie �4 4 Y*a'ci��Y iti��c it iiic icAckiciic*ic is i4 is
LINE QUANTITY UNIT ACCOUNT NUMBER UNIT COST TOTAL COST
1 1.00 EA 504-32 -528180-51225-000000 13000.0000 13000.00
CHANGE ORDER 1 T P.0.623865.
COMMODITY CLASS: 0
13000.00
�,-9
CHANGE ORDER NO. 1
PROJECT TITLE: Mail Creek Stabilization Project
CONTRACTOR: TST, Inc.
P.O. NUMBER: 623865
VENDOR NUMBER: 111694
CHARGE NUMBER: 504-323000-528180-51225
DESCRIPTION
In preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change.
3. Change in contract cost.
2. Description of change.
4. Change in contract time
1. and 2. Additional design services to complete the construction administration services
for Reach 2, additional fees for the final design of Reach 2, and the final design
for Reach 1 according to the attached letter, dated January 24, 1997, from TST, Inc.
3. $13,000.00 (Thirteen Thousand Dollars)
4. N/A
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
all change orders
ACCEPTED BY:
REVIEWED BY:
REVIEWED BY:
APPROVED BY:
APPROVED BY;
(TST
(Water Utilities
CC: City Clerk Purchasing
Contractor Project File
Stormwater Finance Manager
mlakchAs
$16,000.00
$0.00
$0.00
$13,000.00
$29,000.00
DATE:
DATE:-4-'C1�
DATE: 2 S
DATE:'
DATE:;;?-- d _ y 7
Manager)
NOTE: Signature of Contractor maicates
agreement herewithin, including any adjustment
in contract sum or contract time.