CHANGE ORDER NO. #2
PROJECT TITLE:
Old Town Alleyways
CONTRACTOR:
Technology Constructors
PROJECT NUMBER:
5912
PURCHASE ORDER NO.:
970205.8283
DESCRIPTION:
Extended Height Building curbs
1. Reason for change: Elevation of pavers is below finished edge of building frontage. Adding curb to bottom
edge of building finish.
2. Description of Change: Install two types of curb a) 8-12" curb at $23/If with 55 If of curb
needed. B) 14-18" curb at $29/if wish 601f of curb needed.
-oS
3. Change in Contract Cost. $3,005-00
4. Change in Contract Time: 0
TOTAL APPROVED CHANGE ORDER $14,565-00
TOTAL PENDING CHANGE ORDER $0.00
TOTAL THIS CHANGE ORDER $3,005.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.32%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 1.88%
ADJUSTED CONTRACT COST > 8 4,48 .00
(Assuming all change orders approved)
ACCEPTED
Contractors Representative
f _
ACCEPTED BY:
.��
Project Manager
REVIEWED BY:
Title:
APPROVED BY:'
f�
Title:
APPROVED BY:
Purchasing Agent over $3
,000
cc:
city Clerk Architect
Contractor Engineer
ProjectFile Purcheaft
DATE: ,Z p
DATE: 11 Z ! • �S
DATE:
DATE: I Z-1S 6 S-
DATE: