HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2525512/19/2005 MON 11:17 FA% 970 221 6586 CITY OF FT COLLINS CLRS [a001/001 CHANGE ORDER NO. #2 PROJECT TITLE: Old Town Alleyways CONTRACTOR: Technology Constructors PROJECT NUMBER: 5912 PURCHASE ORDER NO.: 970205.8283 DESCRIPTION: Extended Height Building curbs 1. Reason for change: Elevation of pavers is below finished edge of building frontage. Adding curb to bottom edge of building finish. 2. Description of Change: Install two types of curb a) 8-12" curb at $23/If with 55 If of curb needed. B) 14-18" curb at $29/if wish 601f of curb needed. -oS 3. Change in Contract Cost. $3,005-00 4. Change in Contract Time: 0 TOTAL APPROVED CHANGE ORDER $14,565-00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $3,005.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.32% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 1.88% ADJUSTED CONTRACT COST > 8 4,48 .00 (Assuming all change orders approved) ACCEPTED Contractors Representative f _ ACCEPTED BY: .�� Project Manager REVIEWED BY: Title: APPROVED BY:' f� Title: APPROVED BY: Purchasing Agent over $3 ,000 cc: city Clerk Architect Contractor Engineer ProjectFile Purcheaft DATE: ,Z p DATE: 11 Z ! • �S DATE: DATE: I Z-1S 6 S- DATE: