Change Order Form
ityo#Fork conins
$ati sneering Departmeat
PROJECT TITLE: Lemay Avenue Widening Project
PROJECT NUMBER: 30523250.6 (Bid#5914)
CONTRACTOR: Korby Landscaping (PO #5505914)
CHANGE ORDER NUMBER: t
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract cost will Increase by $10,824.89
4. There will be no change in contract time.
ORIGINAL CONTRACT COST $75,915,31
TOTAL APPROVED CHANGE ORDERS $0.00,
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $10,824,89
TOTAL eA OF THIS CHANGE ORDER 1*26%
TOTAL C.0, % OF ORIGINAL CONTRACT 14.26%
ADJUSTED'CONTRACT COST $86,740.20
(Assuming all change orders approved)
At
ACCEPTED BY: �DATE:
( ntractoes Representative}
ACCEPTED BY: _ ��_ DATE:
(Project Manageer)
REVIEWED BY:
(Engineer) f
APPROVED BY: +^ [ DATE: 2-,Id/
(Department Head)
APPROVED BY: _ DATE:
(Purchasing Agent over $30,D00)
oc: Contraclor
Purchasing
Project Re
Engineering Department - 231 North Collage Avenue • P.O. Box 580 � Fort Collins, CO W522-0580 • (970) 221-6605
NOV-18-2005 FRI 02:01 PM CFO ENG, FAX NO. 9702216378 P. 01
LEMAY AVENUE LANDSQ
p ►tt cT e t _�.
Korby Landscape
Topsoil and Compost Mix
- See attached submittal -
RMNFORCHANGE,
Post•ItO Fax Note 7671
pate 11 - /� PdA 01
TO
Co.
phone A
Phone A
_
Fax A
Fax A
The grade in the median was down a foot too low throughout the landscaped
area, soave needed extra material to be brought to the site.
NOV-18-2005 FRI 02:02 PM CFC ENG, FAX N0, 9702216378 P, 02
Korby Landscape
Tall Fescue Grass
CKANR.hr ORpER' �'��'' ,r
LEMAY AVENUE LANDSAPING PROJECT
See attached submittal -
RMONT6RCHANGE
The lanscaping plans called for the parkway along the Fossil Creek Park
to be landsaped with seed. After meeting w ith the Parks Department, their
request was to change this area to sod instead,
NOV-18-2006 FRI 02:02 PM CFO ENG, FAX NO, 9702216378 P. 03
FIANGE.ORDER'-
LEMAY AVENUE LANDSAPING PROJECT
Korby Landscape
Excavation in Center Median
- See attached submittal -
AFMON FOR CHANGE,,
We had asked Korby's to locate a water hook-up in the center median.
NOV-18-2005 FRI 02:02 PM CFO ENG. FAX N0, 9702216378 P. 04
�. � . �;��. �-•GkIANti�••QRD�it �0. tl: , ��;: ' > ,: °'
LEMAY AVENUE LANDSCAPING PROJECT
Korby Landscape
Erosion Control for the Fossil Creek Channel at Paragon Point
- See attached submittal -
This work was done to repair the slopes along the Fossil Creek ditch that Intersects
the Paragon Point Subdivision. The slopes were disturbed with the widening of Lemay
Avenue and as a part of that project, we needed to make sure that the slopes
were not eroding.