Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 24786DEC-02-2005 FRI 10:12 AM CFO ENG, FAX NO, 9702216378 1=111 Change Order Form ityo#Fork conins $ati sneering Departmeat PROJECT TITLE: Lemay Avenue Widening Project PROJECT NUMBER: 30523250.6 (Bid#5914) CONTRACTOR: Korby Landscaping (PO #5505914) CHANGE ORDER NUMBER: t 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will Increase by $10,824.89 4. There will be no change in contract time. ORIGINAL CONTRACT COST $75,915,31 TOTAL APPROVED CHANGE ORDERS $0.00, TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $10,824,89 TOTAL eA OF THIS CHANGE ORDER 1*26% TOTAL C.0, % OF ORIGINAL CONTRACT 14.26% ADJUSTED'CONTRACT COST $86,740.20 (Assuming all change orders approved) At ACCEPTED BY: �DATE: ( ntractoes Representative} ACCEPTED BY: _ ��_ DATE: (Project Manageer) REVIEWED BY: (Engineer) f APPROVED BY: +^ [ DATE: 2-,Id/ (Department Head) APPROVED BY: _ DATE: (Purchasing Agent over $30,D00) oc: Contraclor Purchasing Project Re Engineering Department - 231 North Collage Avenue • P.O. Box 580 � Fort Collins, CO W522-0580 • (970) 221-6605 NOV-18-2005 FRI 02:01 PM CFO ENG, FAX NO. 9702216378 P. 01 LEMAY AVENUE LANDSQ p ►tt cT e t _�. Korby Landscape Topsoil and Compost Mix - See attached submittal - RMNFORCHANGE, Post•ItO Fax Note 7671 pate 11 - /� PdA 01 TO Co. phone A Phone A _ Fax A Fax A The grade in the median was down a foot too low throughout the landscaped area, soave needed extra material to be brought to the site. NOV-18-2005 FRI 02:02 PM CFC ENG, FAX N0, 9702216378 P, 02 Korby Landscape Tall Fescue Grass CKANR.hr ORpER' �'��'' ,r LEMAY AVENUE LANDSAPING PROJECT See attached submittal - RMONT6RCHANGE The lanscaping plans called for the parkway along the Fossil Creek Park to be landsaped with seed. After meeting w ith the Parks Department, their request was to change this area to sod instead, NOV-18-2006 FRI 02:02 PM CFO ENG, FAX NO, 9702216378 P. 03 FIANGE.ORDER'- LEMAY AVENUE LANDSAPING PROJECT Korby Landscape Excavation in Center Median - See attached submittal - AFMON FOR CHANGE,, We had asked Korby's to locate a water hook-up in the center median. NOV-18-2005 FRI 02:02 PM CFO ENG. FAX N0, 9702216378 P. 04 �. � . �;��. �-•GkIANti�••QRD�it �0. tl: , ��;: ' > ,: °' LEMAY AVENUE LANDSCAPING PROJECT Korby Landscape Erosion Control for the Fossil Creek Channel at Paragon Point - See attached submittal - This work was done to repair the slopes along the Fossil Creek ditch that Intersects the Paragon Point Subdivision. The slopes were disturbed with the widening of Lemay Avenue and as a part of that project, we needed to make sure that the slopes were not eroding.