Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5934 CITY HALL ACCESS CONTROL UPGRADEDHL: Prepare a shipment: Print waybill Page 1 of 1 O � I GI T CTQ�tuGfh Z O + eMR � nTOFao q $, E Ole) -�� ice' rMr W N Iq O o g 1 rn z C rn W � �t7 e� 3 = �• �- � T r� W -4, m 0 N 4 - ;a w co A � � Oo� N S N CD G 00 Q 0to 0p a 2 oy (� ML m Noy L N "c — — — — — — — — — — — — Please fold or cut in half --------_ DO NOT PHOTOCOPY Using a photocopy could delay the deiyery of your package and will result in additional shipping charge SENDER'S RECEIPT Waybill A 8823881 5DO Rate Estimate: 0 Protection: Not Repaired T°( yCampFor s Description: Oid # 5934 2nd North Mason Street VYeT (Ibs.): Letter FORT COLLINS CO W522 Dimensions: O x O x n UNITED STATtS Attention Tor. DO (Next Phone#: Ph` Cre _ aybill https://webshil —�...,its/iat)e1doc.asp 8/17/2005 SHOWERS WKE aura aFna aFNa wNa ma nKfpNSMANONG 012 BmM1IIPM El 0 CaNFfPENa J11.�JJ� 0KNOFFIa T VAl1LT ELEV. NM Oil nU.NM 00z ,;® — FF]aM _ VII 0 'W CO U.sTaNAaf cawneLwn U LONER ELEC mI 015 NEtWOWFVA `� r --- u FlfS ❑ EAa . 014 Po A Imwm O. City of Fort Collins 010 Facilities 004 caamaN 005 i� - 013 EamFa 117 Notth Mason -- Fort Collins, CO 80522 (303) 221 - 6611 mNfENRIa NNFE FOiIAE GMEN/ aFRa Onla FMAREA p, ❑ y SSW, mmm T Sheet Data Wow" WOR"TATwNS Date lure 26,1989 oFna ®® Orwn DFG ❑ ❑ Chkd Revisions CONIM 0 Date oFNa ama aura OFFia reNa UPDATED 2-1.96 aaa oFFta O Sheet Title: rmth Al OFFICE OFFICE OFFICE OFFICE N L -- OFFICE O cOIEICN.[OKERENCE RM 0 STORAGE 022 ILL ❑ ❑ V 4-0 MID � C 027 O CONFERENCE RM ENM _ V 075 to COMPUTER ROOM ❑ ca 025 . 026 C u In Buem TeleFho e Cloxt ASSISTANT CITY 024 MANAGERS _. TELEPIIOPE ROOM OFFICE h`V' OFFICE 1AFNT L��'p City of fort Collins H LANDING `FacilitiesA ASSSTAN C Y ATr0NEY OFFICE 117 North Mason Fxes Fort )221- 661 80522 (303)]]t 1 CORRIDOFI OFFCE OFFICE aw MANAGER ENTRY CONFERENCE OFFICE OFFICE OFFICE - 023 OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE Sheet Title: ACCESS SYSTEM DOOR / AFTER HRS. LOCK DOWN LOCATIONS A2 L-em N Sheet Data Dar! 1uY/ I1, 19a9 Drvm DFG Chkd Revisions 0 Date UPDATED nO-1695 UNDATED 7•i-96 uNDATEDa1e-oo UPDATED 62607 Bid Proposal:# 5934, City Hall Access Control Upgrade Enter quantities, unit costs, and indicate whether proposing 4-door or 8-door controllers. Qty Description Unit Cost Ext. Cost Continental Superterm 8 controllers, installed and wired. Supplied 4 with dual chip (CA495-CA3000) capability. $4,455 $17,820 Hardware = $2925 per unit Labor = $1530 per unit (installed & wired) 0 Continental Superterm 4 controller, installed and wired Supplied 0 0 with dual chi (C495-CA3000) capability 1 Continental Controls CA3000 software 976.50 976.50 5-workstation license 0 New door position switched, installed and wired 0 0 0 New Request to Exit devices, installed and wired 0 0 1 Existing Early Lock -down Reader wired 270 270 Lantronics LIDS-10 installed and configured 1 Hardware = $150 per unit 240 240 Labor = $90 per unit (installed and configured) Documentation & Drawings 1 1 set of documentation & drawings is included free with 0 0 installation. Additional sets requested in the future are $125 each. 4 1 Securitron Power Supplies: 24VDC 4Amp 495 1,980 Cable Package 1 Cable = $830 2,750 2,750 Labor = $1920 Total 1$24,036.50 Additional Submittals: Submit information detailing the relevant experience for the lead technician who will be assigned to this project, if awarded to your company. See Attachment A Describe briefly the training and skills of other personnel who would be assigned to the project. See Attachment A Provide the name, title and phone number for the company employee primarily responsible for coordination with the City on any issues involved in this project. Name Allie Grenier Title Project Manager Phone_(720)227-0372 For technical questions, contact Steve Strickland, Operations Services, (970) 221-6536. For questions co ing biMocedures, contact Jim Hume, Buyer, 970-221-6776. � J Signature: Title: Project Manager Co m any Name: Vizer "P Date: 8/16/05 Street: 10855 Dover St., Sdite 1000 Phone #: 303-439-0372 x 372 City: Westminster Fax #: 303-439-0414 StateM : Colorado, 80021 Email: AllieG@vizer ou .com Attachment A Submit information detailing the relevant experience for the lead technician who will be assigned to this project, if awarded to your company. *Rob Alek has been with Vizer Group for over three (3) years as a lead technician. He has worked on multiple access control systems including Continental Access Systems. He is familiar with CA3000 software and is network certified. Describe briefly the training and skills of other personnel who would be assigned to the project. *All technicians employed by Vizer Group are network certified and have gone through intense manufacturer training as well as on site apprenticeships before being allowed to work on projects independently. Our cable team consists on over 35 years of experience and is known for time -efficient, clean installations that strictly follow all city building codes. u Presented to: Steve Strickland City of Fort Collins City Hall West 300 LaPorte Ave Fort Collins, CO 80522 Access Control Upgrade Value Proposal Presented by: 11 VI ZE C3 FF; CDU F! Defining Solutions for Your Safety, Security and Peace of Mind 10855 Dover Street Suite 1000 Westminster, CO 80021 P 303.439.0372 F 303.439.0414 Project Overview Summary: This value proposal will describe the services that Vizer Group will provide for the City of Fort Collins City Hall West. This proposal is to upgrade the current Johnson Controls access system to Continental Access Systems while connecting 300 LaPorte to 117 North Mason Street via a Lantronix. Project Notes: Building Codes —As discussed in pre -bid walk through on August 11th, 2005; Vizer Group will not be responsible for bringing the current access control system, including locking hardware up to code. Additional bids may be requested in the fu- ture for such work. Also, per Addendum No. 1 no door position switches nor new request to exit switches will be quoted. Door Hardware—Vizer Group will assume that all existing locking hardware is in proper working order and will not need maintenance other than basic cable connec- tions. Cabling—Vizer Group has proposed to run new cable to be spliced at or near the door except for the cable running from the Lobby doors into the basement, this will be spliced in the basement. Any existing cabling that is not needed for the upgrade will be removed to make for one "clean" installation. Power—Vizer Group will provide all new external power supplies and will need to be hardwired in by the City of Fort Collins' electrical vendor. Panel Locations —A floor plan has been included with this proposal to show where each new Continental panel will be located. Please assume that wherever a Conti- nental panel is placed, a Securitron power supply will be as well. Room to grow—Vizer Group will supply Superterm 8 access panels with extra room for future expansion. There will be three (3) available slots in the basement (from the lobby doors panel #2); one (1) additional slot in the garden level (panel #3) and two (2) available slots in the second floor (panel #4). V_;IZE) Page 1 Defining Solutions for Your Safety, Security and Peace of Mind »� Project Overview Cost Estimate: City of Fort Collins City Hall West 300 LaPorte Ave Fort Collins, CO 80522 Pull all cable to 26 doors & 1 lock down reader (most of which will be splices onto existing cable) Terminate existing door hardware and card readers Install access control panels & power supplies Configure Software Upgrade existing CA495 software at 117 building to latest version CA3000-5 (5-workstation maximum). Perform extensive system testing Quantity Product Unit Price Net Price 4 SuperTerm 8 $2925.00 $11,700.00 1 CA3000-5 WS $ 976.50 $ 976.50 1 Lantronix USD-10 $ 150.00 $ 150.00 4 Securitron 24VDC 4A Power $ 495.00 $ 1,980.00 1 Cabling Package $ 830.00 $ 830.00 1 Installation Packaae $7866.00 5 7,866.00 TOTAL Turn -Key System $23,502.50 V1ZE!k." C3 F1 n LJ Page 2 Defining Solutions for Your Safety, Security and Peace of Mind ai Project Overview Project Notes: Installation service —As part of the installation and cabling package, Vizer Group will install conduit, junction boxes, and any related installation item associated with the access control system with the exception of centrally located electrical power required for locks and access panels. Any high voltage power must be supplied by the electrical contractor and is not part of the proposal. All cabling including electronic device fishing and termination will be performed by Vizer Group. Installation schedule —We understand that scheduling and deadlines are critical to a successful construction project. Vizer Group will go above and beyond the nor- mal course of action to ensure that deadlines are achieved. System Testing —With a system of this size and scale, testing is a critical compo- nent to a successful installation. Once all terminations have been made and the conversion switch has been flipped, Vizer Group will run the system through exten- sive trials and tests to ensure that all functionality requirements are met and ex- ceeded in all possible conditions. Project Completion —Once the system has met all testing requirements and is ready to go live, we will turn the system over to the city. ViZEFk, C;FoCDU Page 3 N Defining Solutions for Your Safety, Security and Peace of Mind Company Background Vizer Group was created because a group of technology professionals rec- ognized several opportunities in the security industry. Service, professionalism, and technical experience were just a few of the gaps that we set out to fill. While some of us were attempting to release a new product to the security industry sev- eral years ago, we notice that most companies claiming to be system integrators had little or no technical background or experience to deal with complicated solu- tions offered by security system manufacturers. Based on that need, we've stacked our company with software, hardware, telecom, service, and sales professionals. Our resumes are filled with programming, database, web, communication, and net- work certifications. Don't expect us to follow the industry by outsource our IT ser- vices like most security companies do. We've taken it to the next level by breaking new ground and providing new and innovative solutions to our customers. We've written our own web based access control solution, integrated multiple applications into one security software platform, and created a keyless college dormitory facility using biometric hand geometry readers. We've also taken initiative with video surveillance solutions. After trying several different brands of PC based digital video recorders, our team decided that we could build a better and more reliable system for a fraction of the cost. Secura View, www.securaview.com, is our own line of products which outperforms most DVR's and cameras on the market today. We're also proud to be one of the only full service security solutions companies in the industry. We offer base level door hardware services (keys, locksets, exit de- vices, closers) through multi site and multi solution integration. Not many security companies can match our complete service selection. When we wrote our business plan, we concentrated on clear differentiations be- tween Vizer Group and other companies in our industry. Our ability to solve your security needs in a professional, technical, timely, and complete fashion set us apart. It's simple —we're defining solutions for your safety, security, and peace of mind. VIZE!Z,�3 Page 4 \ Defining Solutions for Your Safely, Security and Peace of Mind r] Name / Address City of Fort Collins P.O. Box 5W Fort Collins, CO 80522-0580 10855 Dover Street VIZE!k, Suite 1000 Westminster, CO 80021 CD R CD U P 303.439.0372 F 303.439.0414 Defining Solutions for Your Safety, Security, and Peace of Mind Ship To City of Fort Collins City Hall West 300 LaPorte Ave Fort Collins, CO 80522 Quotation Date Quote # 8/15/2005 10592 Account # Pending Item Description Oty Rate Total CIC P1800 Supertemt 8 Door Controller 4 2,925.00 11,700.00T CIC CA3000-5 5-Workstation SQLIMSDE Software 1 976.50 976.50T LNX USD-10 Lantronix USD-10 1 150.00 150.00T SEC BPS24-4 Securitron 24VDC 4A Power Supply 4 495.00 1,980.00T CB Cable Package (including all new cabling except to reuse cabling 1 830.00 830.00T from lobby to basement) LB Labor for fully tum-key installation to include cabling, 1 7,866.00 7,866.00T terminations, hardware installation, configuration, programming and training DOCS Original Documentation is included free with package. Additional 1 0.00 Documentation is $125 per package. Thank you for the opportunity to quote your project! Subtotal $23,502.50 This Quote Expires in 30 Days Sales Tax (0.00/6) $0.00 Signature Total $23,502.50 Date