HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 25077CHANGE ORDER NO. 1
PROJECT TITLE: Northside Aztlan Center (PO. No. 55505679)
CONTRACTOR: Pinkard Construction Co.
DESCRIPTION:
1. Reason for change Owner Request
2. Description of Change: Re -configure site plan for playground
access safety; reduce gym equipment
3. Change in Contract Cost: $ 70,586.00
4. Change in Contract Time: 0 calendar days
ORIGINAL CONTRACT COST $ 8,093,502.00
TOTAL APPROVED CHANGE ORDER $
TOTAL PENDING CHANGE ORDER $
TOTAL THIS CHANGE ORDER $ 70,586.00
TOTAL % OF THIS CHANGE ORDER 0.87%
TOTAL C.O. % OF ORIGINAL CONTRACT 0.87%
ADJUSTED CONTRACT COST $ 8,164,088.00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Co tracto representative
ACCEPTED BY:AJ_4� ( DATE: a
Project'Manager
ACCEPTED BY: DATE: Z l�
r hasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer z 2 u sing -
GENERAL CONDITIONS/ADMININSTRATION @ 7.7%: 1 0.00
SUB TOTAL:
BOND @ 0.66%: 1 672.43 I[''.'^e„b's 1. Prouty Property will do landscaping, concrete etc. East of Drive Curb
2. No lining of the pond is included
SUBTOTAL: 1 102,556.381I?? a %v? A 3. Any Hazardous Material haul of will be covered with Allowance
FEE @ 4.75%: 1 4,871.43
TOTAL THIS COST PROPOSAL: 1 $107
'QI:kPinkard .
RA rS INC• TRE�STANDARD. .
CHANGE ORDER REQUEST
Date: November 10, 2005 No. 003
To: Steve Seefeld cc: Dave Lingle, Aller Lingle
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
Revise Scope of Basketball Backstops
7 This quotation is valid for ten (10) days whereafter it may be withdrawn unless stated otherwise.
2 We will require that a fully executed copy of this COB be returned to our office by "Approval Date" noted above to avoid construction schedule
delays not accounted for in our pricing.
3 This quotation is also qualified in accordance with notes listed on attached cost breakdown summary.
Method of determining change in the Contract:
0 Fixed
❑ Estimated } Change in Contract Sum
of DEDUCT ($36,842.00)
❑ Maximum
Approved: Authorized
Architect Owner
By: By:
Architect Date
Owner
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
❑� Fixed
❑ Estimated } Change in Contract Time
of 0 days
❑ Maximum
Confirmed:
Pinkard Co struction Co.
B -/a-
y:
Date
Date
PINI. D CONSTRUCTION CO.
RC #: 03
COR#: 03
REF:
PROJECT: of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Aller Lingle
SUBJECT: Revise Scope of Basketball Backstops
PRICED BY:
RC
REVIEWED BY:
SB
APPROVED BY:
SB
DATE PRINTED:
10-Nov-05
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
COST
COST
COST
COST
COST
1
Delete Operable Backstops
(2)
EA
6,900.00
(13,800.00)
0.00
0.00
0.00
6,900.00
(13,800.00
2
Delete Fixed Backstops
(8)
EA
2,850.00
(22,800.00)
0.00
0.00
0.00
2,850.00
(22,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1
0.0011
SUB TOTAL:
(36,600.00
0.00
0.00
0.00
(36,600.00
GENERAL CONDITIONS/ADMININSTRATION @ 7.7 /o:
00.00
2tl \wry ice}`: $W{ :$` i}"+jv 1 Y'' : ff'Yry`Jfry 4
}`t`F q }i. o ' �!t`° �`YY t '"�p� Xr
n
K�t„%',.j,P,ry•.4Y'yf �..Y�L�....�+.*.+`}..Q"O`�
(36,600.00)
SUBTOTAL:
0
NOTES: �•::�'��c°''�%' f¢,w�'%
�iY'C:•<'?S: tjt;:>.:7.
..ryry oY.!6.2;e"}�4�'<;ri:§�.:o
BOND @ 0.66%:
(241.56
�''e::"S:F:�t'!�''3,� 1. y;}�,y;,+'?�;o:;i{%-:t}.•y4r>.�.�#
2, $y}r:iG.,.F4.:f• lx` O
a tr u<3.
SUB TOTAL:
36,841.56
�$I>ry,+'0Y':},O,J'
FEE @ 4.75%:
/}„�. i:i`j�9,�.2L:<tiF•gry?:`f:Y
TOTAL THIS COST PROPOSAL:
($36 842)
`ryv "�Y :�fi .y+�S�,L; 1:::•nY':tov.;y.:`.L'�'w. "ry.6 hv'y>4 ^.>R� f. }...: >.:... ^%/^�h-�''�':'?S
.?SCa?m?S$iJ:i$:...rylv.:,�h"?.'.+''#�ry,`:.::o:}.(%F.•}:.:.::'}'+t..i ✓n.,.+_c6.CY':ryit.: .::,ti\.":..c>'oi'::3irw;}:9K.. .rF.:C� "C}. ::':3tv'?tcY[t;.! $
..^.::.::::::::::n.::-s.};:•}.:.:_na}-:S::i>z2�5::
fwryfo-'::�.tipu}:.;.�•i::iFX.'41F}:°.c$;jB�C;a}Sf.+Yi,G:7aifs';6iYf:X9k'e'u::`Iihd,�,t::3�"„a.^.'.n,G'c.�SYNK7f,') aC�ia•kYr°::19il$?9':Gk.G:36:f:'•:i+`9i �',�'%�:�hjt:
CHANGE ORDER NO. 1
PROJECT TITLE: Northside
Aztlan Center
(PO.
No. 55505679)
CONTRACTOR: Pinkard Construction Co.
DESCRIPTION:
1. Reason for change
Owner Request
2. Description of Change:
Re -configure site
plan
for playground
access safety; reduce gym
equipment
3. Change in Contract Cost:
$
70,566.00
4. Change in Contract Time: 0 calendar days
ORIGINAL CONTRACT COST $ B4O93,502.00
TOTAL APPROVED CHANGE ORDER $ -
TOTAL PENDING CHANGE ORDER $ -
TOTAL THIS CHANGE ORDER $ 70,586.00
TOTAL % OF THIS CHANGE ORDER 0.87%
TOTAL C.O. % OF ORIGINAL CONTRACT 0.87%
ADJUSTED CONTRACT COST $ 8,164,088.00
(Assuming all change Orders approved)
ACCEPTED BY: DATE: !Z 0 v 5_
ontra is representative
ACCEPTED BY: _ lV &L� DATE: /A 1I S-•
Project Manager
ACCEPTED BY: �Y J ✓` DATE:
urc asing Agent over $30,000
cc: City Clerk Contractor
ro�ect FIB Architect
Engineer Purchasing
RAISING THE STANDARD
Date: November 30, 2005
To: Steve Seefeld
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
CHANGE ORDER REQUEST
No. 002
cc: Dave Lingle, Aller Lingle
Revise Site to bring Playground and Basketball Court adjacent to the building (See RCN #027, Atta
Proposal Qualtfiaations:
I This quotation is valid for ten (10) days whereafter it may be withdrawn unless stated otherwise.
2 We will require that a filly executed copy of this COR he returned to our office by "Approval Date"noted above to avoid construction schedule
delays not accounted for in our pridng.
3 This quotation is also qualified in accordance with notes listed on attached cost breakdown summary.
Method of determining change in the Contract:
❑v Fixed
❑ Estimated } Change in Contract Sum
of ADD $107,428.00
❑ Maximum
Approved:
Architect
By:
Architect
Authorized
Owner
_By:
Date Owner
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
0 Fixed
❑ Estimated } Change in Contract Time
Of 0 days
❑ Maximum
Date
Confirmed:
Pinkard Co ction Co.
By.
Contractor Date /-J-0S,
PINKARD CONSTRUCTION CO.
RC #: 02
COR#: 02
REF: -
PROJECT: City of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Aller Lingle
SUBJECT: Revise Site Design
PRICED BY:
RC
REVIEWED BY:
SB
APPROVED BY:
SB
DATE PRINTED:
30-Nov-05
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
COST
COST
COST
COST
COST
l
New Asphalt Area
8,895
SY
15.20
135,204.00
0.00
0.00
0.00
15.20
135,204.00
2
Old Asphalt Area
-10,594
SY
15.20
(161,028.80)
0.00
0.00
0.00
15.20
(161,028.80
3
New C&G
4,575
LF
10.00
45,750.00
0.00
0.00
0.00
10.00
45,750.00
4
O1dC&G
-4,710FL
10.00
(47,100.00
0.00
0.00
0.00
10.00
(47,100.00
5
New Concrete paving
4,198
SF
3.75
15,742.50
0.00
0.00
0.00
3.75
15,742.50
6
Old Concrete paving
.4,500
SF
3.75
(16,875.00)
0.00
0.00
0.00
3.75
(16,875.00
7
New Concrete Walks
8,595
SF
3.00
25,785.00
0.00
0.00
0.00
3.00
25,785.00
8
Old Concrete Walks
-5,802
SF
3.00
(17,406.00
0.00
0.00
0.00
3.00
(17,406.00
9
New Patio/Plaza Grey Cone.
13,277
SF
4.00
53,108.00
0.00
0.00
0.00
4.00
53,108.00
10
Old Patio/Plaza Grey Cone.
-6,875
SF
4.00
(27,500.00)
0.00
0.00
0.00
4.00
(27,500.00
11
Additional Earthwork (Cut/Fill)
3,735
CY
2.50
9,337.50
0.00
0.00
0.00
2.50
9,337.50
12
HC Crosswalks/Ramps/Pavers
10
EA
350.00
3,500.00
0.00
0.00
0.00
350.00
3,500.00
13
New Outlet Structure
1
EA
9,525.00
9,525.00
0.00
0.00
0.00
9,525.00
9,525.00
14
New valley pans
1,388
LF
12.00
16,656.00
0.00
0.00
0.00
12.00
16,656.00
15
New Landscaping Area
129,257
SF
1.75
226,199.75
0.00
0.00
0.00
1.75
226,199.75
16
Old Landscape Area
-108,436
SF
1.75
(189,763.00)
0.00
0.00
0.00
1.75
(189,763.00
17
Walkway over Bio Swale
1
EA
2,000.00
2,000.00
0.00
0.00
0.00
2,000.00
2,000.00
18
Deign Fees Aller Lingle
I
LS
1,497.00
1,497.00
0.00
0.00
0.00
1,497.00
1,497.00
19
Design Fees North Star
1
LS
2,200.00
2,200.00
0.00
0.00
0.00
2,200.00
2,200.00
20
Design Fees EDAW
1
LS
11,752.00
11,752.00
0.00
0.00
0.00
11,752.00
11,752.00
21
PCC Preconstruction Fee
20
HR
65.00
1,300.00
65.00
1,300.00
0.00
0.00
0.00
0.00
22
Contingency
I
LS
2,000.00
2,000.00
1 0.00
0.00
0.00
2,000.00
2,000.00
SUB TOTAL:
101,983.95
1
1,300.00 1
0.001
1
0.00
100,583.95
GENERAL m_TIOmemrNSIRAz ,4l7 o
SUB TOTAL:
101,883.95
p ns
BOND 4o %
tProuty Property will _ landscaping, concrete etc. East « Drive Curb
p
> k >!w mk of the pond isIncluded
SUB TOTAL:
s #
A 3. Any Hazardous Material haul __be covered with Allowance
FEE as %
4,871431
4.
TOTAL THIS COST PRooAL: 1 $l7n
fi
I! w Pinkard r.._ ...: ',:::..J
�dr RA.SINC- TEE STANDARD.
CHANGE ORDER REQUEST
Date: November 10, 2005 No. 003
To: Steve Seefeld cc: Dave Lingle, Aller Lingle
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
Revise Scope of Basketball Backstops
Approval Date:
.rropuw, vuaaj,cauuns:
I This quotation is valid for ten (10) days whereafter it may be withdrawn unless stated otherwise.
2 We will require that a fully executed copy of this COR be returned to our office by "Approval Date"notcd above to avoid ronstrudion schedule
delays not accounted for in our pricing.
3 This quotation is aim qualified in accordance with notes listed on attached cost breakdown summary.
Method of determining change in the Contract:
2 Fixed
❑ Estimated } Change in Contract Sum
of DEDUCT ($36,842.00)
❑ Maximum
Approved: Authorized
Architect Owner
By:
Architect
Date
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
❑� Fixed
❑ Estimated } Change in Contract Time
of 0 days
❑ Maximum
Confirmed:
Pinkard Co:
By: By:
Owner Date
Co.
/-ld-o3'*�
Date
PINT. .D CONSTRUCTION CO.
RC #: 03
COR#: 03
REF:
PROJECT: of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Aller Lingle
SUBJECT: Revise Scope of Basketball Backstops
PRICED BY: RC
REVIEWED BY: SB
APPROVED BY: SB
DATE PRINTED: 10-Nov-05
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
COST
COST
COST
COST
COST
1
Delete Operable Backstops
(2)
EA
6,900.00
(13,800.00)
0.00
0.00
0.00
6,900.00
(13,800.00
2
Delete Fixed Backstops
(8)
EA
2,850.00
(22,800.00)
0.00
0.00
0.00
2,850.00
(22,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
_
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.001
0.00
0.00
0.00
1 0.0011
SUB TOTAL:
(36,600.00
0.00
0.00
1
0.00
j
(36,600.00
GENERAL CONDITIONS/ADMININSTRATION @ 7.7%:
0.00
•'ri:yti::=}n•�.v.�.v.}: C?f..:. ...4'y4 n.4Yv'n .v
. ifi. l:� .„i:;}:.:$SY•.. 9'h�t
4vx::}u•Yv.•.4:5 Ri„ :`4.w�4'f" 4f•C. f %:F `Wi, eX%���C:.+�M.. .i'h. 6JG f"'
SUB TOTAL:
(36,600.00
.:..:i',i :�.t}!f
.. :.:::. i.:x:,k:: in.. S'..il,.:f.iv}..Yx,y:}:w'.{:,':.: i:,'?•:vC::.Aiv... ............4.....:.n.{?1.:.IlliK.,r��'iY J..:{iG"Yy'{n'.Y`k.':.
Nv,v:-:::.:::..
�3:>.}�.wm•':NOTES: %<;,^,r°:�;sf,,,dp•�.,:>;;�;
:n4',ii+�': �`:A.4iq��ii}i!:,: )�j}�,• �f�y+.kF.
:{: O} ,f^C: Y.}¢:nQ` 2Y1.:.. :t •4F;}\+J.
°
BOND t� 0.66 /o:
- (241.56
yriy�;}i:,<a'n'>{ 1. �%of&?:3ui�.aJWr;S;.K
2.
i:i'.-•k`.'(: ih�{
��':.�ih%;::?3.
SUBTOTAL:
(36,841.56
xse;'y`Yx< F ,/r:cr.,::.i
FEE @ 4.75%:
0.00
.:>;Q'bmy,9.:;�fi^.4. >.<..FJizyri:fr�.
CF'%%':iJi::n4:Cn::iii
Y:i9%::
''))'L V .kvv... umv%:U F.Pn'. .G...a;:?%,ryi' 'YY::h ^v.C}♦y.:.i• ivGcltt :r{f-'-o- v.Yi}P' .i...v .§'il\_.n.
}Y:ry{}.:ry.:il::::M1..�.•.'+.::.^�.m{v i:C:i::4.:i`.?h.::<>}i�.:: $' .iiv:>�: >f \fC}fY`:.Qii.9
..•S.r.
THIS COST PROPOSAL:
36,842)TOTAL
($
..:n:in::n;...ch.- ..":::':
J... .i:is n n
a
PinkardG)mbuction
RAISING THE STANDARD.
Date: November 30, 2005
To: Steve Seefeld
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
CHANGE ORDER REQUEST
No. 002
cc: Dave Lingle, Aller Lingle
Revise Site to bring Playground and Basketball Court adjacent to the building (See RCN #027, Atta
1 This quotation is valid for ten (I0) days whereafter it may be withdrawn unless stated otherwise.
2 We will require that a fdly executed copy of this COR be returned to our offs by "Approval Date"noted above to avoid construction schedule
delays not accounted for in ourpricing.
3 This quotation is also qualified in accordance with notes listed on attached cost breakdown sammary.
Method of determining change in the Contract:
❑rr Fixed
❑ Estimated } Change in Contract Sum
of ADD $107,428.00
❑ Maximum
Approved:
Architect
By:
Architect
Authorized
Owner
_By:
Date Owner
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
0 Fixed
❑ Estimated } Change in Contract Time
of 0 days
❑ Maximum
Date
Confirmed:
Pinkard Co truction Co.
By
Contractor are
3v_
PINKARD CONSTRUCTION CO.
RC #: 02
COR#: 02
REF: -
PROJECT: City of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Aller Lingle
SUBJECT: Revise Site Design
PRICED BY:
RC
REVIEWED BY:
SB
APPROVED BY:
SB
DATE PRINTED:
30-Nov-05
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
COST
COST
COST
COST
COST
I
New Asphalt Area
8,895
SY
15.20
135,204.00
0.00
0.00
0.00
15.20
135,204.00
2
Old Asphalt Area
-10,594
SY
15.20
(161,028.80)
0.00
0.00
0.00
15.20
(161,028.80
3
New C&G
4,575
LF
10.00
45,750.00
0.00
0.00
0.00
10.00
45,750.00
4
OldC&G
-4,710FL
10.00
(47,100.00)
0.00
0.00
0.00
10.00
(47,100.00
5
New Concrete paving
4,198
SF
3.75
15,742.50
0.00
0.00
0.00
3.75
15,742.50
6
Old Concrete paving
-4,500
SF
3.75
(16,875.00)
0.00
0.00
0.00
3.75
(16,875.00
7
New Concrete Walks
8,595
SF
3.00
25,785.00
0.00
0.00
0.00
3.00
25,785.00
8
Old Concrete Walks
-5,802
SF
3.00
(17,406.00)
0.00
0.00
0.00
3.00
(17,406.00
9
New Patio/Plaza Grey Cone.
13,277
SF
4.00
53,108.00
0.00
0.00
0.00
4.00
53,108.00
10
Old Patio/Plaza Grey Cone.
-6,875
SF
4.00
(27,500.00)
0.00
0.00
0.00
4.00
(27,500.00
11
Additional Earthwork (Cut/Fill)
3,735
CY
2.50
9,337.50
0,00
0.00
0.00
2.50
9,337.50
12
HC Crosswalks/Rarnps/Pavers
10
EA
350.00
3,500.00
0.00
0.00
0.00
350.00
3,500.00
13
New Outlet Structure
I
EA
9,525.00
9,525.00
0.00
0.00
0.00
9,525.00
9,525.00
14
New valley pans
1,388
LF
12.00
16,656.00
0.00
0.00
0.00
12.00
16,656.00
15
New Landscaping Area
129,257
SF
1.75
226,199.75
0.00
0.00
0.00
1.75
226,199.75
16
Old Landscape Area
-108,436
SF
1.75
(189,763.00)
0.00
0.00
0.00
1.75
(189,763.00
17
Walkway over Bio Swale
l
EA
2,000.00
2,000.00
0.00
0.00
0.00
2,000.00
2,000.00
18
Deign Fees Aller Lingle
1
LS
1,497.00
1,497.00
0.00
0.00
0.00
1,497.00
1,497.00
19
Design Fees North Star
1
LS
2,200.00
2,200.00
0.00
0.00
0.00
2,200.00
2,200.00
20
Design Fees EDAW
I
LS
11,752.00
11,752.00
0.00
0.00
0.00
11,752.00
11,752.00
21
PCC Preconstruction Fee
20
FIR
65.00
1,300.00
65.00
1,300.00
0.00
0.00
0.00
0.00
22
Contingency
1
LS
1 2,000.00
1 2,000.00
0.00
1
0.00
1
1 0.00
1 2,000.00
1 2,000.00
SUB TOTAL:
101,883.95
1,300.00
0.00
0.00
100,583.95
am»# m TIOmym_TRAz «4 yv, .0.00
SUB TOTAL: 101,883.95 ores
-=
BOND 4o % # /tomA��%_a_mom concrete etc. �.___cb
i� ! » lining _ the pond . Included
SUB TOTAL: .4s » IN
AnyHazardous�m_�_ m_� __.with �_e
FEE as w a !¥ a
TOTAL THIS COST PRooAL: 1 S107
U.01 ,,0*-j-*Pi9nkard
pp RAISINV THE STANDARD.
CHANGE ORDER REQUEST
Date: November 10, 2005 No. 003
To: Steve Seefeld cc: Dave Lingle, Aller Lingle
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
Revise Scope of Basketball Backstops
I This quotation is valid for ten (10) days whereafter it maybe withdrawn unless stated otherwise.
2 We will require that afully executed copy of this COR be returned to ourofflice by "Approval Date" noted above to amid construction schedule
delays not accounted for in oar pricing.
3 This quotation is also qualified in accordance with notes listed an attached cost breakdown summary.
Method of determining change in the Contract:
2 Fixed
0 Estimated Change in Contract Sum
of DEDucT ($36,842.00)
0 Maximum
Approved: Authorized
Architect Owner
By: By:
Architect Date Owner
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
Fixed
❑ Estimated ) Change in Contract Time
of 0 days
0 Maximum
Confirmed:
Pinkard Co
By:
Date
Date
va - 0.r
PINI. _D CONSTRUCTION CO.
RC #: 03
COR#: 03
REF:
PROJECT: , of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Aller Lingle
SUBJECT: Revise Scope of Basketball Backstops
PRICED BY:
RC
REVIEWED BY:
SB
APPROVED BY:
SB
DATE PRINTED:
10-Nov-05
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
COST
COST
COST
COST
COST
I
Delete Operable Backstops
(2)
EA
6,900.00
(13,900.00)
0.00
0,00
0.00
6,900.00
(13,800.00
2
Delete Fixed Backstops
(8)
EA
2,850.00
(22,800.00)
0.00
0.00
0.00
2,850.00
(22,900.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00r0m�
0.00
0.00
0.00
0.00
SUB TOTAL:
(36,600.000.00
0.00
0.00
(36,600.00
GENERAL CONDITIONS/ADMININSTRATION ([�t 7.7 /°:
0.00�,
.u.N. S": =5.';`iv::Y}}:%p .�R,:.A' N".,.,..::.:2
#3y:,,}.s w} i.
?+!:.h`o?� a f.::'.s: h.° s�'; :? . ' i ".... 'tany Yo
. F"4':ii LYSUB
„......,.
TOTAL:
(36,600.00��
n;�fNOTES:BOND
(
0.66%:
'w: �.e.:-.. 1,}:
�W�+,S:.X:%M' i
2.
SUB TOTAL:
(36,841.56
�sy:^4s�k3.
FEE @ 4.75%:
0.00
':4;i 4 4
5.
i}'./:. •4'. �'::t::::p, RY}}{<.;<::%}.ry::L:isin?t:.'t:a':.;'.?q.2:'ni:�:':''�N.:
y/�iiFw{<- S
:`�4':v.•n`,+.
xaw:3.:},::a« :a �«.:}>>.>. ,.., .
TOTAL THIS COST PROPOSAL:
$36 842 �
l �
<> .
l:.vti.:5 .3}!�, f...h.`$y: �.: iYiY%SA 3::':: `•,�[,ORY ..[ 5
.:}$C:2G:''ki�`4'A61ttN:�;,f.5:.w.:..'S:.�ilYn.�.(1`�`�vv..�.�..v..:,,:3.e..&,fvtrt.�C'i�Q`+�:'��: #:...J:-n:Y..i�?�`
PROJECT TITLE
CONTRACTOR:
CHANGE ORDER NO. 1
Northside Aztlan Center
Pinkard Construction Co.
DESCRIPTION:
1. Reason for change
2. Description of Change:
3.
Change
in
Contract
Cost:
4.
Change
in
Contract
Time:
(PO. No. 55505679)
Owner Request
Re -configure site plan for playground
access safety; reduce gym equipment
$ 70,586.00
0 calendar days
ORIGINAL CONTRACT COST $ 8,093,502.00
TOTAL APPROVED CHANGE ORDER $
TOTAL PENDING CHANGE ORDER $ -
TOTAL THIS CHANGE ORDER $ 70,586.00
TOTAL % OF THIS CHANGE ORDER 0.87%
TOTAL C.O. % OF ORIGINAL CONTRACT 0.87%
ADJUSTED CONTRACT COST $ 8,164,088.00
(Assuming all change orders approved)
ACCEPTED BY:
kovll�DATE:
41
C is representative
1/ntrac
L.�,�CX�ii
ACCEPTED BY:
IIL[M DATE:
Proj ec Manager
� D a V,
S
ACCEPTED ACCEPTED BY:
� DATE:
Pu cha ing Agent over $30,000
VZ
20
cc: City Clerk
ntractor
Project File
Architect
Engineer
Purchasing
RASING THE STANDARD.
CHANGE ORDER REQUEST
Date: November 30, 2005 No. 002
To: Steve Seefeld cc: Dave Lingle, Aller Lingle
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: City of Fort Collins Aztlan Center
Description:
Revise Site to bring Playground and Basketball Court adjacent to the building (See RCN #027, Atta
Approval Date:
I This quotation is valid for ten (10) days whereafter it maybe withdrawn unless stated otherwise.
Z We will require that a fully executed copy of this COR be returned to our oftim by "Approval Date" noted above to avoid construction schedule
delays not amounted for in ourpricing.
3 This quotation is also qualified in accordance with notes listed on attached cost breakdown summary.
Method of determining change in the Contract:
S Fixed
❑ Estimated } Change in Contract Sum
of ADD $107,428.00
❑ Maximum
(Lump Sum, Unit Prices, Cost Plus Fee, Other)
0 Fixed
❑ Estimated } Change in Contract Time
of 0 days
❑ Maximum
Approved: Authorized Confirmed:
Architect Owner Pinkard C onsturuction Co.
By: By: By
Architect Date Owner Date Contracror ate
3a •off
PINKARD CONSTRUCTION CO.
RC #: 02
COR#: 02
REF: -
PROJECT: City of Fort Collins Aztlan Center
LOCATION:
ARCHITECT: Alter Lingle
SUBJECT: Revise Site Design
PRICED BY:
RC
REVIEWED BY:
SB
APPROVED BY:
SB
DATE PRINTED:
30-Nov-05
LABOR
EQUIPMENT
MATERIAL
SUBCONTRACT
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
COST
COST
COST
COST
COST
1
New Asphalt Area
8,895
SY
15.20
135,204.00
0.00
0.00
_
0.00
15.20
135,204.00
2
Old Asphalt Area
-10,594
SY
15.20
(161,028.80)
0.00
0.00
0.00
15.20
(161,028.80
3
New C&G
4,575
LF
10.00
45,750.00
0.00
0.00
0.00
10.00
45,750.00
4
OldC&G
-4,710FL
10.00
(47,100.00)
0.00
0.00
0.00
10.00
(47,100.00
5
New Concrete paving
4,198
SF
3.75
15,742.50
0.00
0.00
0.00
3.75
15,742.50
6
Old Concrete paving
-4,500
SF
3.75
(16,875.00)
0.00
0.00
0.00
3.75
(16,875.00
7
New Concrete Walks
8,595
SF
3.00
25,785.00
0.00
0.00
0.00
3.00
25,785.00
8
Old Concrete Walks
-5,902
SF
3.00
(17,406.00
0.00
0.00
0.00
3.00
(17,406.00
9
New Patio/Plaza Grey Cone.
13,277
SF
4.00
53,108.00
0.00
0.00
0.00
4.00
53,108.00
10
Old Patio/Plaza Grey Cone.
-6,875
SF
4.00
(27,500.00)
0.00
0.00
0.00
4.00
(27,500.00
11
Additional Earthwork (Cut/Fill)
3,735
CY
2.50
9,337.50
0.00
0.00
0.00
2.50
9,337.50
12
HC Crosswalks/Ramps/Pavers
10
EA
350.00
3,500.00
0.00
0.00
0.00
350.00
3,500.00
13
New Outlet Structure
1
EA
9,525.00
9,525.00
0.00
0.00
0.00
9,525.00
9,525.00
14
New valley pans
1,388
LF
12.00
16,656.00
0.00
0.00
0.00
12.00
16,656.00
15
New Landscaping Area
129,257
SF
1.75
226,199.75
0.00
0.00
0.00
1.75
226,199.75
16
Old Landscape Area
-108,436
SF
1.75
(189,763.00)
0.00
0.00
0.0.0
1.75
(189,763.00
17
Walkway over Bio Swale
1
EA
2,000.00
2,000.00
0.00
0.00
0.00
2,000.00
2,000.00
18
Deign Fees Aller Lingle
I
LS
1,497.00
1,497.00
0.00
0.00
0.00
1,497.00
1,497.00
19
Design Fees North Star
1
LS
2,200.00
2,200.00
0.00
0.00
0.00
2,200.00
2,200.00
20
Design Fees EDAW
1
LS
11,752.00
11,752.00
0.00
0.00
0.00
11,752.00
11,752.00
21
PCC Preconstruction Fee
20
HR
65.00
1,300.00
65.00
1,300.00
0.00
0.00
0.00
0.00
22
Contingency
1
LS
2,000.00 1
2,000.00
0.00
0.00
0.00
2,000.00
2,000.00
SUB TOTAL:
101,883.95
1,300.00
0.00
0.00
100,583.95