Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5921 CHILDRENS GARDEN (2)No Text 21. What are the limits of your public liability? DETAIL What company? T G �QQ _�o� 22. What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated this GA day of �Tyj"- 2O�6. county of Lf3R f J�E� �V h�-.ing duly sworn deposes and says that he is of �O and that (name of organization) 0A p�OtJ �t�� . the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed a d sworn to before me this day Cj e-�4:t P. (�i12.2 Not ryo�� �. {�y-y", l�u� (1"""' N�, � � � •Qs My commission expires OMISDE PIRES1111912005 Fomilli ` 7/96 Section 00420 Page 3 r SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 200 of the contract. 7/96 ITEM SUBCONTRACTOR Section 00420 Page 1 THE AMERICAN INSTITUTE OF ARCHITECTS 0 AIA Document A310 KNOW ALL MEN BY THESE PRESENTS, that we WALSH CONSTRUCTION, INC. 5828 North St. Louis Avenue, Loveland, CO 80538 as Principal, (Here insert full name and address or legal title of Contractor) hereinafter called the Principal and Westchester Fire Insurance Company 140 Broadway, 41st Floor, New York, New York 10005 (Here insert full name and address. or legal title of Surety) a corporation duly organized under the laws of the State of New York as Surety, hereinafter called the Surety, are held and firmly bound unto City of Fort Collins 215 North Main Street, Fort Collins, N.Y. 80524 (Here insert full name and address or legal title of Owner) as Obligee, hereinafter called the Obligee, in the sum of Five Percent of the Total Amount of Bid-------- Dollars ($5% for the payment of which sum well and truly to be made, the said Principal and the said Surety bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for (Here insert full name, address and description of project) Constructing institutional Garden Landscaping, Concrete, Pavers NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract With.. another party to perform the Work covered by said bid, then this obligati.ofi,ghgk� be null and void, otherwise to remain in full force and effect. Signed and sealed June 3, 2005 WALSH CONSTRUCIO, ING` (PrincijYA (Witness) Wneln6nc4nr Fi'a Incuronrrn .fihmns nv< , l.rsj (Witness) DianaP.AleSdiAtit'arney in Each. AT nOr YIMSMM 7%01 n . DTT1 DMIn . AT VIVVDTITDV 1 Q'70 T'TI , TUP TMRDTf AM ACKNOWLEDGMENT OF PRINCIPAL IF A CORPORATION STATE OF (!V� CO } COUNTY OF 104� (VYW ,//� / , % f On this 6 ' day of �u�e, Zb� before me personally came d U 14,e� `f %vt f IA, � to me known, wwh�o being by duty ord did depose and say that he/she resides at 58ola "`�SY- Jzul S fk- 1 Dvc/r♦�d, L'O SQ irk, and that he/she is the e)eAC5Kl'E tsT of iAjrF%S the corporation d th and I said corporation; he of eaf$ of the directors o � ¢• co83o �rf,� s ACKN STATE OF COUNTY OF }ss.: uted the for ing instrument! that he/she knows the seal of t to said in ments such seal, that it was so affixed by order he sign s na7th,,.eto b�yjlike�Mer. NOTARY PUBLIC MYCOMMISSD14 ans MR IT OF PRINCIPAL IF A PARTNERSHIP On this day of I before me personally appeared to me known and known to me to be one of the members of the firm of described in and who executed the foregoing instrument and he acknowledged to me that he executed the same anf or the act and deed of said firm. NOTARY PUBLIC ACKNOWLEDGMENT OF PRINCIPAL IF AN INDIVIDUAL STATE OF } COUNTY OF }s"" On this day of I before me personally appeared to me known and known to be to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same. NOTARY PUBLIC ACKNOWLEDGEMENT OF SURETY STATE OF New York}ss • COUNTY OF Nassau } On June 3, 2005 before me personalty came Diana P. Alesci to me known who, being by me duly sworn, did depose and say that he/she resides at 255 Executive Drive Plainview, New York 11803, that he/she is the Attorney in Fact of Westchester Fire insurance Company the corporation described in and which executed the foregoing instrument; and that he/she signed his/her n thereto ty order of the Board of Directors of said corporation. n ,, e-„�---�" NY No Text WESTCHESTER FIRE INSURANCE COMPANY FINANCIAL STATEMENT December 31, 2004 ADMITTED ASS BONDS $1,363,863,132 SHORT -TERM INVESTMENTS 24,549,145 STOCKS 0 REAL ESTATE 0 CASH ON HAND AND IN BANK 5,338,440 PREMIUM IN COURSE OF COLLECTION* 117,395,478 INTEREST ACCRUED 15,349,513 OTHER ASSETS 365,657�0.96 TOTAL ASSETS 1,892,152,803 LIABILITIES RESERVE FOR UNEARNED PREMIUMS $415,496,923 RESERVE FOR LOSSES 1,150,554,701 RESERVE FOR TAXES 5,413,537 FUNDS HELD UNDER REINSURANCE TREATIES 0 OTHER LIABILITIES (1 79,492; 174) TOTAL LIABILITIES $1,391, CAPITAL: SPECIAL SURPLUS $187,300,000 CAPITAI:. 928,592 SHARES, $4.86 PAR VALUE 4,503,671 CAPITAL: PAID IN 129,098,600 SURPLUS (UNASSIGNED) 179,277,545 SURPLUS TO POLICYHOLDERS 500,179,816 TOTAL $1,892,162,803 ('EXCLUDES PREMIUM MORE THAN 90 DAYS DUE,) STATE OF PENNSYLVANIA COUNTY OF PHILADELPHIA John P. Taylor, being duly swom, says that he is Vice President of Westchester Fire Insurance Company and that to the best of his knowledge and belief the foregoing is a true and correct statement of the said Company's financial condition as of the 11 st day Of December, 2004, Sworn before me INS 27th day of April, 2005. 01 79 President Notary Public /short forms 2003AAct zt:#j L :�F' ,�.j aizu fig p1j;2=1; Maw, Penneytvanis Assodaflon Of Not8flem My commiftion expires POLICYHOLDER DISCLOSURE NOTICE OF TERRORISM INSURANCE COVERAGE Named Insured Walsh Construction Inc. Endorsement Number Policy Symbol Policy Number Policy Period Effective Date of Endorsement TO Jute 3 2005 ssue y (Name c ce nsuranompany [+rESTCfiF IIIt FIRE UZURANCE OWANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. You should be aware that under the Terrorism Risk Insurance Act of 2002_ ("The Act") effective November 26, 2002, any losses caused by certified acts of terrorism under your existing coverage may be partially reimbursed by the United States under a formula established by federal law (applicability is subject to the terms and conditions of each individual policy). The Act was specifically designed to address the ability of businesses and individuals to obtain property and casualty insurance for terrorism and to protect consumers by addressing market disruptions and ensure the continued availability of terrorism coverage. Under the terms of The Act, you may now have the right to purchase insurance coverage for losses arising out of acts of terrorism; as defined in Section 102(1) of the Act: The term "act of terrorism" means any act that is certified by the Secretary of the Treasury, in concurrence with the Secretary of State, and the Attorney General of the United States -to be an act of terrorism; to be a violent act or an act that is dangerous to human life, property; or infrastructure; to have resulted in damage within the United States, or outside the United States in the case of an air carrier or vessel or the premises of a United States mission; and to have been committed by an individual or individuals acting on behalf of any foreign person or foreign interest, as part of an effort to coerce the civilian population of the United States or to influence the policy or affect the conduct of the United States Government by coercion. Responsibility for Compensation under The Act is shared between insurance companies covered by The Act and the United States. Under the formula set forth in The Act, the United States pays 90% of covered terrorism losses exceeding the statutorily established deductible, which is paid by the insurance company providing the coverage. We are providing you with the terrorism coverage required by The Act. We have not established a separate price for this coverage; however the portion of your annual premium that is reasonably attributable to such coverage is: JQ.n Authorized gent TRIA12 (5/03) No Text SECTION 00510 NOTICE OF AWARD Date: September 15, 2005 TO: Walsh Construction, Inc. PROJECT: 5921 Children's Garden at the Gardens on Spring Creek OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated June 6, 2005 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 5921 Children's Garden at the Gardens on Spring Creek. The following reductions in scope of work have been agreed upon by the Customer (City of Fort Collins) and the General Contract (Walsh Construction, Inc.): 1.) Eliminate all concrete staining indicated in drawings/specifications and convert all concrete flatwork indicated on drawings to (1) one integral color added to concrete mix. All concrete scoring to remain as shown on drawings. All concrete to have a light broom finish. Cost reduction equals $30,000.00 2.) Eliminate the "Walk of Extremes" ramp, stairs & railing, and overlook revetment boulders, however, maintain grades as shown on drawings. See attached mark-ups (numbers 2 and 3 on zip drive) indicating which boulders are to be eliminated. Cost reduction equals $10,000.00. 3.) Replace underwater boulder wall with Versalok product. Architect to provide alternate design details as necessary. Stepping stones and pea gravel to remain a part of this feature. See attached mark-up (number 1 on zip) for underwater wall. Cost reduction equals $3,000.00. 4.) Eliminate sandblasted drain pan. See drawings sheet # LS501: "Site Details - Paving". Cost reduction equals $4,500.00. 5.) The Customer does not accept Bid Alternate #1. Walsh Construction bid price $342,711.00 Total cost reductions 47,500.00 new contract price $295,211.00 The Price of your Agreement is Two Hundred Ninety Five Thousand Two Hundred Eleven Dollars $295,211). 9/12/01 Section 00510 Page 1 Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by September 30, 2005. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions OWNER to consider your Bid abandoned, declare your Bid Security forfeited. within the time specified will entitle to annul this Notice of Award and to Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By: James B. O'Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management SECTION 00300 BID FORM PROJECT:�i�jZEtJSGAR�E11 ^ I of i E Place" - atti M5 Date �i W-r (o( Zop- 1. In compliance with your Invitation to Bid dated ,#q4 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)" authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond. in the sum of S � ($ ) in accordance with.the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through —I- 7/96 Section 00300 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the 15th day of September in the year of 2005 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and Walsh Construction, Inc. (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 5921 Children's Garden at the Gardens on Spring Creek and is generally described in Section 01010. ARTICLE 2. ENGINEER The Project has been designed by Edaw, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Complete within 95 calendar days after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within 95 calendar days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. Section 00520 Page 1 1) Substantial Completion: Five Hundred Dollars ($500) for each calendar day or fraction thereof that expires after the Ninety Five (95) calendar day period for Substantial Completion of the Work until the Work is Substantially Complete. ARTICLE 4. CONTRACT PRICE 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: Two Hundred Ninety Five Thousand Two Hundred Eleven Dollars $295,211), in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 900 of the value of Work completed until the Work has been 50o completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 1000 of the Work completed. 900 of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount Section 00520 Page 2 sufficient to increase total payments to CONTRACTOR to 950 of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. Section 00520 Page 3 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of "Contract Documents" in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3Lien Waiver Releases 7.2.4Consent of Surety 7.2.5Application for Exemption Certificate 7.2. 6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: DRAWING INDEX: to include all drawing sheet numbers. SHEET TITLE Cover Construction Document Package GI 101 Abreviations and Graphic Symbols GI 102 Existing Site Survey GI 103 Irrigation As-Builts GI 104 Sheet Reference Plan LD 101 Demolition Plan LG 101 Site Grading LS 101 Hardscape Layout and Jointing Plan LS 102 Site Development Call Out Plan Section 00520 Page 4 LS 401 Entry Plaza Plan Enlargement LS 402 Boulder Layout Plan Enlargement LS 501 Site Details - Paving LS 502 Miscellaneous Elements LS 503 Site Details - Watering Cans (CDB) LS 504 Site Details - Boardwork LS 505 Site Details - Pond LS 505 Site Details - Stream LS 507 Site Details - Amphitheater LS 508 Site Details - Steps and Shelter LS 601 Design Build Details (NIC) LS 601 Design Build Details (NIC) LS 603 Design Build Details (NIC) LP 101 Planting Plan (NIC) LP 102 Perennial/Annual Planting Plan (NIC) LP 501 Planting Details (NIC) LI 100 Irrigation Legend and Notes (NIC) LI 101 Irrigation Plan (NIC) LI501 Irrigation Details (NIC) LI 502 Irrigation Details (NIC) E 101 Schematic Electrical Plan MW 100 Schematic Mechanical and Piping Plan MW 101 Mechanical Details The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers 1 to 2, inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the Section 00520 Page 5 written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. OWNER: CITY OF FORT COLLINS By: JAMES B. O'NEILL II, CPPO, FNIGP DIRECTOR OF PURCHASING AND RISK MANAGEMENT Date: Attest: City Clerk Address for giving notices: P. 0. Box 580 Fort Collins, CO 80522 Approved as to Form Assistant City Attorney CONTRACTOR: By: Matthew T. Walsh President Walsh Construction, Inc. Date: (CORPORATE SEAL) Attest: Address for giving notices: LICENSE NO.: Section 00520 Page 6 SECTION 00530 NOTICE TO PROCEED Description of Work: 5921 Children's Garden at the Gardens on Spring Creek To: Walsh Construction, Inc. This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20_ The dates for Substantial Completion and Final Acceptance shall be , and , 20 , respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20 . CONTRACTOR By: Title: Section 00530 Page 1 CHANGE ORDER NO. 1 PROJECT TITLE: Children's Gardens at GOSC CONTRACTOR: Walsh Construction, Incorporated PROJECT NUMBER: BID# 5921 DESCRIPTION: The following is an administrative Change Order: The Owner will compensate the Contractor for additional expenses incurred due to the implementation of cold weather concrete construction measures requested on the project and as directed by the Owner; excluding the use of insulation blankets to cover either prepared ground or newly placed concrete to protect from freezing. Any additional costs must be documented by the Contractor. The Owner will allow an unlimited quantity of weather delay days to the construction schedule subject to the conditions specified in the contract documents as defined in Article 12, General Conditions of the Construction Contract, Section 00700 in the project manual. In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Allowances for cold weather concrete construction measures 2. Description of change: see description above 3. Change in contract cost: TBD - none at this time. 4. Change in contract time: TBD - none at this time. (Attach additional sheets as required) ORIGINAL CONTRACT COST (as budget adjusted) $ 295,211.00 TOTAL APPROVED CHANGE ORDERS .00 TOTAL PENDING CHANGE ORDERS .00 TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST $ 295,211.00 (Assuming all change orders approved) ACCEPTED BY: APPROVED BY: REVIEWED BY: MattheW'Mish, President 5�- Stephen Seefeld, CC A John SteDhen. CPPB cc: City Clerk Project File Contractor _- —,Purchasing Engineer < -1------_ Walsh Construction, Inc. Project Manager Senior Buyer Co Date I ala4 to S Date (Q-Zo�oS�' Date Walsh Construction, Inc. 5828 N. St. Louis Ave. Loveland, CO 80538 CONTRACTOR BY: -1 " T- ADDRESS: WSW Uonstruction, Inc. 5828 N. t. Louis Ave. 8. BID SCHEDULE Loveland, CO 80538 Base Bid Lump Sum $ �J, ��—�00 In Words 11,. �cj �yotu.f+�TWo hel�.hc Alternate #1 Lump Sum $ 1 lt? to C-� . Alternate No 1: (Entry Plaza Pool) The footings, cast -in -place walls, mortared sandstone veneer, and spigot details associated with the Entry Plaza Pool are to be part of this bid alternate. This area and related details are noted "BID ALTERNATE" in the construction drawings. All area drains and piping noted on the plans, as well as the transfer pump, associated with the watering can detail is not part of the bid alternate and should be calculated for the base bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECTFULLY SUBMITTED: 11C �// .y SnatDate ' Title Q License Number (If Applicable) 5 fits '"if Bid is b co o lion) Attest : t� Walsh Construction, Inc. Address 5828 N. St. Louis Ave. Love an Telephone �j 1( gc� q a�pc3- 7/96 Section 00300 Page 2 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. Walsh Construction, Inc. 5828 N. St. Louis Ave. 1. Name of Bidder: La'�eTarrQ—G61--8953E Walsh Construction, Inc. 5828 N. St. Louis Ave. 2. Permanent main office address: Loveland, CO 805RR 3. When organized: IV) 4. If a corporation, where incorporated: �ioln p—& 5. How many years have you been engaged in the contracting business under your present firm or trade name? r-T paw 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) «o-c"a , 7 0 CO General character of Work perf med � your company: 1 A ..,ff Have you ever failed to complete any Work awarded to you? NO If so, where and why? Have your ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? NO If yes list agency name. 7/96 Section 00420 Page 1 6/6/2005 Walsh Construction, Inc. 5828 N. St. Louis Ave. Loveland, CO 80538 Current Jobs in Progress #10405 Project: Nix Farm Storage/Loafing Shed Bonded Tax Exempt# 107,711.00 PURCHASE ORDER#5503313 10% Owner. City of Fort Collins Steve White Start-06/01/05 117 N. Mason 970-221-6273 End -(120 days) �� ��Z\t��Y :`��m..t'+L.`..�. •\. ...r #10205 .�.`:\..�� 'R, �:. l\:� 'i •f : � S.. Project: Fort Collins, CO 80524 970-221-6534 O.•�T.�vty,`liC\ Q:>?.J.: A;�2/i: •;�+\Ki\� trY@ ti C �. _.. Y�'i�Y�L:' \Y \ :\�Y�Y, ..;h�.�t...-0,:�: Y+?, .Y )eS., Yrt2Tn Yiir vl.A. )}:..... eii`ij'Jv:'i+ .y:}:::..:«:: A.:..:e::. r:. «e}:.. �} �.. t.. J•n{.. ...t...: viU.n:.v:: rR:ii??: S:.anl: �<!}.t..???:::........ ... .. ..t...... Kanemoto Park Irrigation Pump House Replacement Y YY ti (Y.. hh\O.�UY Jv'i:t A*� Y.Y�Y� Y.:::.::, r: ::}*::. : $n^`A1..Y. lit}::}\•1 nttette..:Y:v .... ...::.{ t,...:...{.:::1.. no bond Tax Exempt#89-12280-0017 Trent720-234-7651 33,711.00 PURCHASE ORDER#502126 10% Owner: City of Longmont Terry Herbert, P.M. Start-4/11/05 Purchasing Dept. 303-651-8451 End 1100 S. Sherman St. Fax 303-651-8759 96% complete Longmont CO 80501 Parks & Forestry ..L \ '\�. Y•:.. �: ak,�: #10105 .ti�:.?'iii..�....}}}:.:':::L.}tiC•:Li.:Ciyv-.Yit: � \ $ \� b r'Y\2i�' .� v:'yY Y^:. '+.R`"2�::�,.'..\Y�`:.Y:C..3...it:\..::i,. Project: 303-651-8349 - Fax 651-8588 1747 Coffman St., Longmont 80501 ti.,'\.}4 n:w' �$k .:+$`i :{Y.v :: a:'.Fn:: .:#S .a#t ':ti �':':::itoy.` i}:.v ..�,�:., � k. .4 Y�Y:.'Y�,: YtK�Yf{I:YT.{{Sit w1Q. n,Ji;4nt>iiitYttY:i?�{..:.:i\......\:lYC?::": C�\�.4Y.Y.\:C :y. Y :nQ\:1. Y\Yti..:.Y. ':�.: ,::�$ti?.:;:\N\v..' ,Y.:A. i. 1, �?. v,Jy:ltl,vYS,. 1: �}C.�•..�.�,Y``. ��. .��}$`.:..1 kt'♦ 4\SCnKk ti�:: `i('•? n�:i: M:i }:.�:ii: ?::ti:::}: �T�i:::%}\:.:Yu.k?:-F.A't.�f.. \:n�} n n• •1:`\ Y hY YYI:.vv4%�.::: x:..:.. v:.cic 4, h2Y tY�{ Yn .S.}.LS'h+?.c}.._.:.::..�.. .}h. n4:-... }.O`..iJ::'.C.«o::},::.:.:..AY:�Y::i:R:J;::::�ix:..:.:::...:::.}. �\ ....:... Water Quality Vaults Permit#COG71873 Bonded Tax Exempt#89-12280-0016 74,711.00 10% Owner: City of Loveland Dan Evans, P.E. Start 3/15105 Public Works Storrnwater 962-2773 End - 410 East Fifth St. Cell 290-3222 99% complete Loveland, CO 80537 It ��. •M+{\ #10304 Y. ? ?�, � ��vYY. Project: 970-962-2627-Fax 962-2908 i{iiv'\,K `JY:(}. L4YYl �`v.�.�*y. .i::il•,-�K\�`.\4:\tip::?.•\Yuin}ri?it'q::\iYti.??`??i'N±Cv':\2\.:'-?:}yY\U'.;y:.nn:.iV\.}:??:QY ni.Y�.4. � :,�,Y.. .��: }t'C•:yti, t;.. ��. `ri�,?�.ti l?j`�.:. �}.:N: >..:,O:JY.}..:..v n4. �. �,4i..:�:�t C•. Yi'}vYY:,•:�: �L?�} ,'.tl� ?:'4i' :.i.4. Z�::J+tn'.:Yti'�Y�` \+iY'•v Y+hl^' 4 i{( :L iO. .. t��:Ci��}:24nv J.}:�.� : h P: n?�\YY�YA2:Cnvq�, r}n^S; � \vYR: vivitJYYX,9 YYY..:.\Yvh\.n..4':;1C.:vn��mT�:i.M\';i}ivLL,\\: ntlri:ll.\$;Y*..il0i:�:�v:; i�'2i}A::vc�':}li�}v Reynolds Ranch Open Space House Rehabilitation tl\::V.C;\C:"tiiiY4 '\\v \K:'AtL:'\}:v�`I '.�,♦ .1 , �, ''�\i. ��:•. � Yv,"� �� . )Y }} *':• y���yy�y�[Y� �\$, •Y Y;�' ikLC� �In\�'Yi�}'AVC♦W1d}}W ��iaJ+1:Y.,`. }• Permit #BP041435 10117 Magnolia, Nederland, CO 80466 Bonded Tax Exempt# 89-12280-0015 48,711 Owner: Boulder County Bid#4577-04 2020 13th St. Mailing: PO Box 471 Start -11101104 Boulder, CO 80302 Boulder, CO 80306 End -03115105 303-441-3605 - Fax 441-4594 Jenny Olberding, Punch agent Glenda Rowe 303-441-4957 303-441-3525 99% complete .� : d"*`Y: ♦'y`Y'•: q-0a "4+ . \��!�y jilt YFv``Y:n4??. ?v`t rlT vh BFI/Jacklyn 303-286-6489 "'�......v:::., CL � �+`t4{\t;i�.ty i.. ti\nY j�+J\ ~ yyvA .�} v'ni}vY..:\::i:.S+':S•N':Y::.�'ii: <'3L:k\C JK..} i:nW,:v tlti.An�fiit `i i:.J:'.Y'v; Y:ti::ti' v}'�,': {•'4\\Y,�:t�i* ti �,Y : "lC' 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, 12. moist your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: efv�RC� 14. Background and experience of the principal members includi g officers: of your organization, 15. 16. 17. Credit available: $ Bank reference ��1.iiEt1Nirlj�� Will you, upon request, fill furnish any other information /^ Pteta out a detailed that may be p� JQ a�o7� Inc financial statement and required by the OWNER? 18. Are you licensed as a General CONTRACTOR? IEJ If yes, in what city, county and state? �J class, license and numbers? 01 _ I Iq L=A ti:..e- What 19. Do you anticipate subcontracting Work under this Contract? L If yes, what percent of total �contract? O p and to whom? R*M ltodSCAK) o Sre-gmfco UL +rot�S LL6 20. Are any lawsuits pending against you or your firm at this time? 00 IF yes, DETAIL 7/96 Section 00420 Page 2 Walsh Construction, Inc. 5828 N. St. Louis Ave., Loveland, CO 90539 (970) 622-8227 . 1►/211 1 T Name of Project: Eagleview Park Owner: City of Loveland Parks and Rec Dent. 500 East Third St., Loveland, CO 80537 Contract Amount: $418,711. Date of Completion: Dec. 2002 Class of Work: Public Works Percent of Work Self -Performed: 75% Name of Project: 22"d Street Park Owner: City of Boulder General Contractor: City of Boulder, Parks & Recreation 3198 N. Broadway, Boulder, CO 80304-2644 Drew Horton (303) 413-7223 Contract Amount: $90,711.00 Contract Date: February 2001 Date of Completion: October, 2001 Class of Work: Public Works Percent of Work Self -Performed: 90% Name of Project: Sheldon Lake Retaining Wall, Fort Collins, CO Owner: City of Fort Collins, 256 W. Mountain Ave., Fort Collins, CO 80521, Contact: Janet Meisel -Bums, (970) 221-6367 Architect: City of Fort Collins, 256 W. Mountain Ave., Fort Collins, CO 80521 Contract Amount: $39,051.00 Contract Date: May 11, 1999 Date of Completion: July 31, 1999 Class of Work: Public Works - Civil Percent of Work Self -Performed: 100% TRENT WILHELM ASBURY PROJECT MANAGER rf ent Asbury has over 8 years experience In construcdon operations, project management, supervision, estimating and pre - construction activities for commercial, retail, technical TI, biopharmaceutical, residential and large mu/d-family projeccts Trent provides a broad range of management services for complex systems, from preconstruction to project kick-off through closeout for large and small-scale projects Pmfessionai Data ■ Bachelor of Science in Construction Management Colorado State University 1999 ■ Certified Associated Constructor - AIC Constructor Certification Commission AIC Constructor #800 =t w: • $10M T-Mobile Kirefess, Small Format Retail Rollout (highly branded 300-1000 square foot ground up slick framed buildings), Program Management of over 100 sites responsible for everything from Lease thru Design and receipt of C of O. locations indude TX UT, MA, IN, NV, G4, IL, NH, CO, PA, • $300k Robeks Fruit Smoothies and Healthy Eats, 1000 square foot food services TI, 160' street mall Denver, CO, ■ $2M Convergent Group, 70,000 square foot ofnce facility with 2,500 square foot computer room, Greenwood Vl/age, CO. ■ $3.5M YIPES Communications, 10,000 square foot facility with 4,000 square foot colocation space and state of the art network operation center, Denver, CO. $39M Regional Transportation District; Elad Light Rail Maintenance Facility, 100,000 square foot structural steel maintenance building, fight rail specific tools Induding (wheel truing lathe, sanding system, vehide figs) as well over S miles of fight rail track., Denver, CO • $40M Greystar Real Estate and Development; 12 story high-rise apartment complex comprised of 267 High end apartment units, induding a 3 story parking garage. Denver, CO Biopharmaaeutica/ ■ $6M IDEC Pharmaceuticals, 70,000 sf. R & D laboratory space, San Diego, CA. Green Fie/d Pro&= ■ $8M Alexandria Technology Center, two-story shelf and core building, designed for research and laboratory space induding a 40, 000 sfsub grade garage, San Diego, CA. Matthew Walsh 5828 N. St. Louis Ave., Loveland, CO 80538 (970)635-1928 EDUCATION B.S. - Construction Management, Colorado State University, Fort Collins, CO 80521 Major GPA: 3.0/4.0 May 1997 Course Content: Construction Project Administration, Scheduling & Planning, Construction Contracts, Construction Estimating, Safety Management, Labor Relations, Elementary Structural Design WORK EXPERIENCE Walsh Construction, Inc. Loveland, CO. July 1998 - Present General Contractor • President/Owner R.D. Stewart, Inc. Loveland, CO. August 1997 - July 1998 General Contractor; Contact: Dave Hall (970) 669-1500 • Project Manager • Oversaw project operations for commercial and multi -family construction • Project estimating, budgeting, scheduling, cost control, general administration • Negotiated, wrote and organized all subcontracts • Performed on -site supervision • Reported to Divisional Operations Manager Amma Construction Corp. Huntington Station, N.Y. Summers/Winters 1988-1997 Civil Construction, Contact: Prescott Ammarell (516) 351-6124 • Supervised operations related to concrete, sitework and steel fabrication • Assisted in project estimating • Modified company's job cost control system • Diagnosed possible. managerial problems in company • Assisted office engineer in everyday duties • Assisted in organizing and maintaining companies shops and yard • Operated wide range of heavy equipment • Drove tractor/trailer combinations to move equipment and materials to various jobs • Performed general labor duties Self- Employed, Walsh Contracting, Northport, N.Y. Summers 1993 - 1995 Residential Landscape Construction • Initiated company's existence • Contracted work related to residential landscaping • Planned, organized and supervised everyday operations end Use Environmental Corp. Paiting Hollow, N.Y. Summer 1993 • Performed general tasks in accordance with marsh and wetland renovation