HomeMy WebLinkAboutAddenda - BID - 5932 MASON STREET HARMONY ROAD SPRING CREEK BIKE PSPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 5932 Mason Street/Harmony Road/Spring Creek Bike/Pedestrian Trail
OPENING DATE: 3:00 P.M. (Our Clock) August 30, 2005
To all prospective bidders under the specifications and contract documents described above,
the following changes are hereby made.
I. Clarification on Railroad Safety and Security Training for Material Suppliers and
Sub -Contractors: It is not necessary for Material Suppliers to have the Railroad Safety
and Security Training. Sub -contractors do not need Railroad Safety and Security
training so long as there are Primary Contractor employees (that are required to have
the Railroad Safety and Security Training) on the job site.
11. Railroad Flagging will be arranged and paid for by The City of Fort Collins. Page
71 of the Contract in the Special Provisions will be revised as follows: under "Railroad
Flagging":
a. "The Contractor shall notify the Railroad in writing 10 days prior to beginning and
48 hours prior to stopping any work that will require protective services. The
Contractor shall notify the Railroad five days prior to canceling protective
services." is revised to read: The City of Fort Collins shall notify the Railroad
in writing 10 days prior to beginning and 48 hours prior to stopping any
work that will require protective services. The City of Fort Collins shall
notify the Railroad five days prior to canceling protective services.
b. " The Railroad will bill the Contractor monthly at the current rates of pay for
flagging services furnished and the Contractor shall pay the Railroad within 30
days after the receipt of bills. The Department will reimburse the Contractor
under the planned force account item "Railroad Flagging" is revised to read: The
Railroad will bill the City of Fort Collins monthly at the current rates of pay
for flagging services furnished and the City of Fort Collins shall pay the
Railroad within 30 days after the receipt of bills. The Department will not
reimburse the Contractor under the planned force account item "Railroad
Flagging"
III. Item 607 — Fence (Plastic) shall be 48" high lightweight orange safety "crowd control"
plastic (high density polyethylene) fencing (Resinet SL24-48100-0, or equal). The post
shall be metal studded "tee" line post spaced at 16 feet. The fencing shall be securely
tied to the post, and shall be removed as directed by the engineer.
IV. Pedestrian Bridge #1 Wingwall Elevation Correction: There is a discreprency on the
top of the East wing wall elevations for Pedestrian Bridge #1 on plan sheets 11 and 12.
The correct eastside wing wall elevation is: 5041.54'. The appropriate correction to
sheet number 12 should be made and noted on your construction plan sets.
2l5 Rbrth-4lason Sti-eet * 2"" Floor. • i'.0. Box 580 • For•t Collins. C'0 80522-0580 • (970) 221-0775 • Fax (9701 221-6707
wv«v.fceov.com
V. Sheet #10 Summary of Quantities Correction: The table on sheet 10 of the plan set
incorrectly references Pedestrian Bridge 3 as being the 42'0" structure and Pedestrian
Bridge 4 as being the 50'0" structure. Pedestrian Bridge #3 is the 50'0" structure and
Pedestrian Bridge 4 is the 42'0" structure.
VI. Sheet #10 Structure Descriptions Revisions: The "Structure Descriptions" incorrectly
describe Pedestrian Bridge 3 and Pedestrian Bridge 4 as being a 59'8" Prefabricated
Steel Truss Bridges. The correct descriptions are:
Pedestrian Bridge 3
50'0" PREFABRICATED STEEL TRUSS BRIDGE, CONCRETE DECK, ON CAST
IN -PLACE ABUTMENTS OVER NEW MERCER DITCH, FORT COLLINS,
COLORADO 14'0' WIDTH, RAILING TO RAILING (15'0" OUT -TO -OUT)
Pedestrian Bridge 4
42'0" PREFABRICATED STEEL TRUSS BRIDGE, CONCRETE DECK, ON CAST
IN -PLACE ABUTMENTS OVER LARIMER COUNTY NO.2 DITCH, FORT COLLINS,
COLORADO 11'6' WIDTH, RAILING TO RAILING (12'6" OUT -TO -OUT)
VII. Clarification on Safety Fencing along Easements: Revisions of Section 104 in the
Specifications Book states under the "Limits of Construction" that all easements and
work areas need to be fenced. This only applies to locations where the trail comes into
contact with existing sidewalks and roadways. You will also need to safety fence any
holes and drop-offs with safety fence. All these uses should be covered by your traffic
control line item.
VIII. Clarification on Interim Milestone Dates: There are no interim milestone dates, as the
contract is written. On a side note, the successful bidder will have to time his
construction so that it coincides with the New Mercer Channel and Larimer County Ditch
#2 shut-off date of October 15 and turn on date of March 15.
IX. Clarification on Health and Safety Management in the event that hazardous
material are encountered: In the event of encountering hazardous materials on the
jobsite, the City of Fort Collins will overrun Item 250 -Health and Safety Officer (HSO)
quantity for Health and Safety Management. An argument would need to be made for
us to justify force account work for the HSO. However, upon encountering hazardous
materials onsite, we would need to look at the problem and there may very well be
legitimate force account work related to moving and/or disposing of the material. Based
on the environmental report that was done, we are not anticipating hazardous materials
onsite.
X. Clarification on Note 23 in the General Notes on the plans: The primary contractor
will keep track of all changes on a master set of drawings in red ink. It will be The City of
Fort Collins' responsibility to coordinate it's surveying services with Felsburg, Holt and
Ullvig to get the storm sewer verification and any other as -built field elevations/locations
and make electronic as -built updates to the plans.
XI. Clarification on Note 36 in the General Notes on the plans: Note 36 states: "In
Streets where more than one cut is made, an overlay of the entire street width, including
the patched are may be required." This provision is for locations where there are more
than utility crossings in close proximity to each other. This situation does not occur on
this project and therefore the statement does not apply to this project.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.