HomeMy WebLinkAboutRESPONSE - BID - 5909 DEICING FACILITYAPR-13-05 WED 12:45 PM
CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P,03/06
Attachment A
Addendum N3
SECTION 00300
BID FORM
PROJECT.: DEICING FACILITY; BID NO. 5909
Place Collins CO. A ril 19, 2005
Date
1. In compliance with your Invitation to Bid dated (4 2005
and subject to all condit' thereof, the undersigned
Delta Constr.of NO.CO,InC a ** Corporat o Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed or, the following Bid Schedule or aid
Schedules.
2_ The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
Person or persons Bidding for the same Work, and that it is made in
Pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of _Five percent of total bid amount ($
Instruors to Bidders. in accordance with the Invitation To Bid and
cti
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
United Fire & Casualty,8310 S.Valley Hwy,Englewood, CO 80112
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment fer work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
1. The undersigned Bidder hereby acknowledges receipt of Addenda No. one
through.-ii�ree- --
4700 Innovation Drive New
Cytomation Bldg I Fort Collins, CO 38,000 Construction $2,135,888 Feb-01
4715 Innovation Dr.
Hercules Industries
Fort Collins, CO
24,000
New Addition
$1,162,760
Sep-00
148 E. Foothills Pkway
Retail
Goodyear Tire Center
Fort Collins, CO
8,000
rennovation
$604,328
Oct-00
201 W. 67th Court
New
Vi-Per Vet Clinic
Loveland, CO
20,000
Construction
$1,792,645
Aug-00
2330 East Prospect
New
Veeco/Ion Tech
Fort Collins, CO
24,000
Construction
$800,163
Apr-00
Projects completed by year Page 2
PROJECT EXPERIENCE
CONSTRUCTION, INC.
ADVANCED MANUFACTURING
TECHNOLOGY
Client:
AMT
Building Size:
25,000 SF
Architect:
RJ Architects
Construction Start:
February 2003
Location:
Loveland, CO
Completion Date:
October 2004
Building Features:
• Manufacturing facility for two -pressure sequencing damper air conveyance systems
♦ Two-story pre-engineered metal building
Project Delivery: Design Build
Situation Analysis:
The site did not have enough room for an on -site storm water detention pond.
Delta Response:
Delta worked with the civil engineer, Tait & Associates, to devise the most cost
effective solution to detain water on site. After evaluating three concepts, the best
solution was to oversize the pipes and detain water in the pipes underneath the
parking lot.
PROJECT EXPERIENCE
!-DELTAJ1
CONSTRUCTION, INC.
LARIMER COUNTY
COMMUNITY CORRECTIONS FACILITY
Client: Larimer County Building Size: 32,000 SF
Architect: GSG Architecture
Location- Fort Collins, CO
Building Features:
Construction Start: September 2003
Completion Date: April 2004
♦ 176-bed halfway house located on the Larimer County Detention Center Campus
♦ Security system with a central monitoring station to control ingress/egress and
provide video monitoring of all client areas
• Emergency power back-up for facility use during extended power outages
• Kitchen with the capacity to serve 176 clients three times per day
Project Delivery: Competitive Design -Build based on fixed budget established prior to
RFP solicitation. Delta was successful against eight other Design -Build
teams.
Situation Analysis:
• Larimer County needed to add 96 beds to relieve pressure on the jail
Delta Response:
♦ Guaranteed the price and schedule at the schematic design phase
♦ Started construction on a fast -track schedule prior to completion of all the
construction documents
♦ Finished construction of the building 15 days early and on budget
PROJECT EXPERIENCE
CONSTRUCTION, INC.
WYOMING TECHNICAL INSTITUTE
HOT ROD SHOP
Client- Wyoming Technical Institute
Architect: Hawk Architecture
Location: Laramie, WY
Building Features:
Building Size: 71,600 SF
Construction Start- May 2002
Completion Date: December 2002
♦ Pre-engineered metal building with masonry and storefront office and hot rod
showroom
♦ Includes classrooms, engine shops, auto work bays, auto show room, and offices
• Classrooms convert to 8,400 square foot teaching shop
Project Delivery: Design -Build
Situation Analysis:
• In early April 2002, the Wyoming Technical Institute realized they needed a new
facility due to the extraordinary level of interest in their "Hot Rod Class"
Delta's Response:
♦ A fast -track project that followed an aggressive schedule including full planning,
design, construction and owner fit -up in seven and a half months
♦ Completed the project on time and on budget allowing WyoTech to hold classes in
their new facility by January 2003
PROJECT EXPERIENCE
CONSTRUCTION, INC.
THE RANCH
AT LARIMER COUNTY FAIRGROUNDS
Client:
Latimer County/ Neenan Co.
Building Size:
230,000 SF
Architect:
Bullock Smith and Partners
Construction Start:
July 2002
Location:
Loveland, CO
Completion Date:
June 2003
Building Features:
♦ 5 Pre-engineered metal buildings:
• Exhibition Building (55,000 SF)
• Maintenance Building (7,000 SF)
• Indoor Arena (77,000 SF)
• East & West Livestock Pavilions (48,000 SF each)
♦ Large clearspans—require extensive coordination with other trades, the arena clearspans
reach 250 feet
Project Delivery: Competitive Bid
Situation Analysis:
♦ Latimer County required a competitive process for the acquisition of the pre-
engineered metal buildings
Delta Response:
• Developed a complex matrix to evaluate nine subcontractors based on: price, quality,
experience, schedule and local ties to Latimer County
PROJECT EXPERIENCE DELTA
CMWRUCTIOK INC.
SCION INDUSTRIES
Client:
Scion Industries
Architect:
R.J. Architects
Location:
Fort Collins, CO
Building Features:
Building Size: 22,000 SF
Construction Start: March 2001
Completion Date: March 2002
• Research and development, and production of Carbon Fiber Products
• Pre-engineered metal building
• Interior was designed and built for future clean room environment and includes a
private residence on the second floor
Project Delivery: Design -Build
Situation Analysis:
• Dual purpose facility of residential and commercial that did not meet zoning
Delta's Response:
• Biweekly meetings with the city to rezone the land and address neighborhood
concerns
PROJECT EXPERIENCE
CONSTRUCTION, INC.
CHEYENNE TECHNOLOGY CENTER
Client-
CTC, LLC .
Architect:
W. Stashak & Associates
Developer
Casey Partners, LTD.
Location:
Cheyenne, WY
Building Features:
Building Size: 22,000 SF
Construction Start: March 1999
Completion Date: July 1999
♦ Multi -tenant building constructed for manufacturing assembly, high-tech operations
associated business space, and distribution
♦ Butler Pre-engineered Metal Building with office and warehouse space
Project Delivery: Design -Build
Situation Analysiss
• CTC needed more space for their manufacturing and distribution center with easy access
to the Interstate
DeltWs Response:
♦ By using a Butler Pre-engineered Metal Building with a CMU veneer, we were able to
provide the Owners with a facility that was both cost-effective, flexible and appealing
PROJECT EXPERIENCE
CONSTRUCTION, INC.
LEGACY COUNTERS
Client: Legacy Counters Building Size:
Architect: Hawk Architecture Construction Start:
Location: Windsor, CO Completion Date:
Building Features:
• Office and warehouse for countertop fabrication company
♦ Pre-engineered metal building
♦ Designed to add 4,000 square foot if needed
Project Delivery: Design -Build
11,775 SF
February 2003
June 2003
GREG ORR
PRESIDENT
CONSTRUCTION, INC.
EXPERIENCE:
2000 — PRESENT
DELTA CONSTRUCTION, INC.
President
1992 — 2000
NEENAN COMPANY
Senior Project Manager
1991-1992
ADOLFSON & PETERSON
Field Engineer
MAJOR PROJETS INCLUDE:
• Kids' Harbor Day Care: 11,200 SF day care facility constructed of wood frame
with EFTS and timber architecture —Loveland, Colorado.
• Obermann Dental Office: 12,000 SF dental office with the latest in technology and
innovations —Fort Collins, Colorado.
• Vision Graphics: 22,000 SF tilt up structural addition to existing production floor —
Loveland, Colorado.
DakoCytomation Phase I and II: Two buildings totaling 80,000 SF of
storage/lab/R&D/office space, Fort Collins, Colorado.
• Union Medical Campus Phases I and II: $6.5 million, 145,000 SF, medical office
buildings —Colorado Springs, Colorado.
• Boston Chicken Corporate Headquarters: 92,000 SF ($9.6 million) Phase II of
Boston Chicken/ Einstein Bagels Headquarters —Golden, Colorado.
• Triad West: 105,000 SF spec warehouselo fice/production facility —Golden,
Colorado.
Balzers Thin Films: $1.2 million tenant finish with classroom and clean rooms —
Golden, Colorado.
Quantum SSPG: 460,000 SF office, warehouse, and production facility including a
700-person full service cafeteria --Colorado Springs, Colorado.
• 1899 Wynkoop: 270,000 SF, $17 million office, retail and underground parking —
Denver, Colorado.
EDUCATION:
1992 COLORADO STATE UNIVERSITY, FORT COLLINs, COLORADO
Bachelors of Science, Construction Management
1996 Primavera training courses including P3 scheduling and expedition
Cleanroom Design Build workshop, Arizona State University.
1997 Alliance for Construction Excellence Clean room Taskforce hosted by
Arizona State University's Del E. Webb School of Construction.
Greg Orr, President
Page 1
JOHN BAKER
CONSMX-rION, INC. CONSTRUCTION MANAGER/
ESTIMATOR
EXPERIENCE:
1999 - PRESENT DELTA CONSTRUCTION, INC.
Construction Manager/Estimator
1992 -1999 THE NEENAN COMPANY, FORT COLLINS, COLORADO
Preconstruction Manager/Project Manager
1986 -1992 HENSEL PHELPS CONSTRUCTION COMPANY, GREELEY, COLORADO
Project Engineer
MAJOR PROJECTS INCLUDE:
• Kroll Factual Data: Two-story office building is steel framed with brick and site -cast
exterior. The timber -framed entry and lobby create a natural appearance. The building is
currently under construction and will be ready for occupancy by May 2005--Fort Collins,
Colorado.
• The Ranch at Larimer County Fair Grounds: Five pre-engineered metal buildings
totaling 230,000 SF. --Loveland, Colorado.
• DakoCytomation 1, 11, III: Preconstruction services for three one-story brick buildings
totaling 80,000 SF. Consists of storage, lab, and office areas —Fort Collins, Colorado.
• Ball Aerospace & Technologies Corp: 117,700 SF, $13 million R&D facility for the
development of high tech communication devices. —Broomfield, Colorado.
• Quantum Peripherals -Phase 2: An additional 67,000 SF of research facility and
approximately 20,000 SF of two-story office space —Louisville, Colorado.
• Quantum Peripherals -Phase 1: 190,000 SF facility with 60,000 SF of two-story office
and cafeteria space and 130,000 SF of high bay research and utility support spaces at a
total project cost of $49 million —Louisville, Colorado.
• Longmont United Hospital: Five -story patient bed tower located on the existing LUH
campus. Facility includes two floors of patient recovery rooms, NICU, cafeteria, meeting
rooms, conference rooms, lobby and administrative space —Longmont, Colorado.
• Poudre Valley Hospital -A, B and C Wing Remodel and Additions: $18 million
addition of fourth and fifth floors to existing wing and new construction of B Wing and
C Wing —Fort Collins, Colorado.
• Colorado Convention Center: $95 million convention center constructed in a fast track,
Design -Build format in eighteen months —Denver, Colorado.
EDUCATION:
DECEMBER 1985 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO
Bachelor of Science, Industrial Construction Management
John Baker_ Construction Manager/Estimator
Page
Submitted by: Delta Construction of Northern Colorado, Inc.
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
Dist all subcontractors for the work items listed below and all subcontractors
performing over 201 of the contract.
ITXM
P6 LAL _
—M kay- Ga ( (AV4-c,)-
.
P(VtiY 6Y
SU$CONTRAC'1"OR1 j
Olt &-ro . o't N.o. AMz.V-;e
AhAes P+ J4
4►ie�-fti-t�
�f((VeAn P¢ N
rro-►'+ Pre P 4
7/96 Section 00430 Page 1
DAN TWEETON
CONSTRUCTION, INC. PRE -CONSTRUCTION MANAGER/
ESTIMATOR
EXPERIENCE:
2002 - PRESENT DELTA CONSTRUCTION, INC., FORT COLLINS, COLORADO
Estimator/Pre-Construction Manager
1997 - 2001 THE NEENAN COMPANY, FORT COLLINS, COLORADO
Project Manager
1995 - 1997 MIDCON, INC. — ALBUQUERQUE, NEW MExlco
Project Manager/Estimator
1993 -1995 ROCKWOOD CONSTRUCTION, INC. — DURANGO, COLORADO
Owner/President
1990 -1993 KNICKERBOCKER & ASSOCIATES — TORRANCE, CALIFORNIA
Construction Manager
1987 -1990 TMI CONSTRUCTION MANAGEMENT — BRENTWOOD. CALIFORNIA
Construction Manager
MAJOR PROJECTS INCLUDE:
• Colorado Community Bank: 11,241 SF, two-story, bank building constructed using a
combination of steel and wood frame with a stucco and stone exterior —Greeley,
Colorado.
• Trihydro Corporate Headquarters: This Design -Build project consists of 23,000 SF of
office space —Laramie, Wyoming.
• WyoTech Hot Rod Shop: 71,000 SF pre-engineered building designed for educational
and industrial purposes. This building includes classrooms, engine shops, auto work
bays, an auto showroom, and offices —Laramie, Wyoming.
• Larimer County Community Corrections: 32,000 SF Design -Build project consisting of
one-story of office space and three stories of residence area located in Fort Collins,
Colorado.
• 1890 Wynkoop: A mixed -use building totaling 166,000 SF of luxury lofts/parking/retail
space —Denver, Colorado.
• American Water Works Association: 45,000 SF office addition and 25,000 SF
renovation —Denver, Colorado.
• Chadwick School Sports Complex: 27,000 SF gymnasium and locker facility —Palos
Verdes, California.
• Malibu Creek Shopping Center Renovation: 50,000 SF shopping plaza renovation —
Malibu, California.
• Citicorp Plaza: 42-story office building, subterranean shopping center, and 750-car
parking structure —Los Angeles, Califomia.
• Dana Point Resort: 350-room resort and conference center —Dana Point, California.
EDUCATION:
JULY 1985 UNIVERSITY OF NEBRASKA, LINCOLN
Bachelor of Science, Construction Management
TIM STERN
CONSTRUCTION, INC. PROJECT MANAGER
EXPERIENCE:
2003-PRESENT DELTA CONSTRUCTION, INC.
Project Manager
1995 - 2002 THE NEENAN COMPANY
Project Manager
MAJOR PROJECTS INCLUDE:
• Front Range Internet: 15,000 SF tenant finish including office area and data center. The
data center includes back up power generator, Liebert computer room air
conditioning, redundant fiber optic utility service, raised flooring, Network Operation Center,
and support area —Fort Collins, Colorado.
• Earth Engineering Consultants: 6,000 SF Design -Build office building with lab space along
with a special curing room with humidity and temperature control for testing materials —
Windsor, Colorado.
• Larimer County Community Corrections Facility: 32,000 SF Design -Build project
consisting of one-story of office space and three stories of residence area —Fort Collins,
Colorado.
• Atrix Laboratories, Inc.: 23,000 SF Design -Build pharmaceutical research and
manufacturing facility. This $6 million facility required USDA quality requirements including
HVAC system, high -purity water, compressed air, and nitrogen systems and pharmaceutical
level interior finishes —Fort Collins, Colorado.
• First Baptist Church: Remodeled the existing kitchen and serving area to allow for more
efficient food preparation and distributions —Fort Collins, Colorado.
• Hunter Douglas #5: 170,000 SF office and manufacturing building for window shade
manufacturer —Broomfield, Colorado.
• DPC Genesee Point Office: 52,000 SF office building in Genesee Office Park. This building
included finished office space —Genesee, Colorado.
• Quantum SSPG: 440,000 SF research and manufacturing facility constructed for the tape
drive business unit —Colorado Springs, Colorado.
• Union Medical Campus Phase II: 55,000 SF mufti -tenant surgical and diagnostic facility,
which houses MRI and related equipment --Colorado Springs, Colorado.
• Quantum PSG: 50,000 SF computer tape storage manufacturing facility —Colorado Springs,
Colorado.
• Edora Pool Ice Center: An addition of a second sheet of ice at EPIC, which included a new
ice sheet, dasher board system, spectator area, new locker rooms, and a heated ice dumping
pit —Fort Collins, Colorado.
EDUCATION:
DECEMBER 1993 COLORADO STATE UNIVERSITY
Bachelor of Science, Mathematics
Tim Stern, Project Manager
Page 1
ACORD� CERTIFICATE OF LIABILITY INSURANCE 04/30//i 0 '
PRODUCER (303)939-9921 FAX (303)939-9926 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Herbert -Leavitt Longmont ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
275 S th M ai' St HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXT
n END OR
ou reet ALTER THE COVERAGE AFFORDED BY THE POLICIES BEL
LSIite 208
mont , CO 80501 I U S AFFORDING COVERAGE NAIC #
INSURED Delta Construction, Inc co
s A: Travelers
209 Raquette Dr INSURB: Pinnacol Assurance
Fort Collins, CO 8OS24 INSURER C:
INSURER D:
INSURER E:
COVERAGES
I THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTW ITHSTANDINI
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
D'
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
POLICY EXPIRATIONLTR
LIMITS
A
GENERAL LIABILITY
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE FX OCCUR
DTC0384P7423IND03
04/30/2004
04/30/2005
EACH OCCURRENCE
$ 1, 000 00
DAMAGE PRFmiqrTO RENTED
$ 300,000
MED EXP (Any one person)
$ S,000
PERSONAL & ADV INJURY
$ 1,000,000
GENERAL AGGREGATE
$ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PRO LOC
JECT El
PRODUCTS - COMP/OP AGG
$ 2,000,000
AUTOMOBILE
LIABILITY
ANY AUTO
DT810384P7423TIL03
04/30/2004
04/30/200S
COMBINED SINGLE LIMIT
(Ea accident)
$
1,000,00
X
BODILY INJURY
(Per person)
$
A
ALL OWNED AUTOS
SCHEDULEDAUTOS
BODILY INJURY
(Per accident)
$
HIRED AUTOS
NON -OWNED AUTOS
PROPERTY DAMAGE
(Per accident)
$
-
GARAGE LIABILITY
AUTO ONLY -FA ACCIDENT
$
ANY AUTO
OTHER THAN FA ACC
$
AUTO ONLY: AGG
$
EXCESSIUMBRELLA LIABILITY
X OCCUR CLAIMS MADE
DTSMCUP384P7423TIL03
04/30/2004
04/30/200S
EACH OCCURRENCE
$ 3,000,000
AGGREGATE
$ 3,000,000
A
$
DEDUCTIBLE
nx
RETENTION $ 10,00
$
WORKERS COMPENSATION AND
3298114
07/01/2003
07/01/2004
X I WC STATU- oTH-
EMPLOYERS' LIABILITY
E.L. EACH ACCIDENT
$ 500,000
B
ANY PROPRIEfORIPARTNERIEXECUTIVE
OFFICERIMEMBER EXCLUDED?
S ECIAL yes, AL PROVISIONS below PRunder
SPO
E.L. DISEASE - EA EMPLOYEE
$ S00, 00
E.L. DISEASE - POLICY LIMIT
$ S00, 0D
OTHER
_DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
_ertificate holder is named as additional insured, but only as repects liability arising out of work
erformed by the named insured (Excluding Workers' Compensation). General Liability coverage is
rimary and Non -Contributory.
City of Fort Collins
Attn: Building & Zoning Dept
281 N College Ave
Fort Collins, CO 80524
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WALL ENDEAVOR TO MAIL
30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABIUTY
OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
Kelly McNair/KDM r
ACORD 25 (2001/08) ©ACORD CORPORATION 1988
APR-13-05 WED 12:45 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P.04/06
ADDRESS:
Delta Construction of No.Colorado, Inc.
CONTRACTOR
BY:�L
G'I-ecy trrr, President
208 Racquette Dr.
Fort Collins, CO 80524
8. BID SCHEDULE( (Base Bird) ( f (1
`i�B►��((i�^TWokcAb�cwtes?�C�'4'� ttr2 `Dollars ($3IMSA040.cXD )
Alternate 1 - Vapor Emission Contro3. Treatment: (s(a,s 00 _ } a
C$¢cfio►t 094G2 '( (,��,�.Resis Fa 4 6Poky) ep
Alternate 2 - oncrete Hardener and Sealer:
an
Unit Price - Vapor Control Treatment F )
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESPECT LLY SUS
•T� _ April 19, 2005
Si natu Greg Orr bate
President
• 1
A-99
License Number (If Applicable.)
(Sea'- - if aid is by oration)
Attest: —
Address 208 Racquette Drive
Fort Collins, CO 80524_
Telephone 970.498.8766 -
BID BOND
KNOW ALL BY THESE PRESENTS, that we, the undersigned Delta Construction of Northern Colorado, Inc., 208 Racquette
Fort Collins, CO 80524 as Principal, and
ed Fire & Casualty Company, 8310 S. Valley Highway, 3rd Floor, Englewood, CO 80112
as Surety, are hereby held and firmly bound unto the City of Fort Collins,
rado, as Owner, in the penal sum of Five Percent of the Bid Amount
for the
payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns.
:1
THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the
(accompanying bid and hereby made a part hereof to enter into a Contract Agreement for the construction of City of Fort Collins Project,
Deicing Facility; Bid No. 5909.
WHEREAS, the Owner, as a condition for receiving said bid, requires the Principal to deposit with the Owner a Bid Guaranty equal to
jfive percent (5% ) of the amount of said bid.
-i
NOW, THEREFORE,
(a) If said bid shall be rejected; or in the alternate,
(b) If said bid shall be accepted and the Principal shall execute and deliver a Contract Agreement (properly completed in
accordance with said bid) and shall furnish a Performance and Payment Bond upon the forms prescribed by the Owner
for the faithful performance of said Agreement; and shall in all other respects perform the agreement created by the
acceptance of said bid;
J
then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability
tof the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
i
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired
! or affected by any extension of the time within which the Owner may accept such bid; and said Surety does hereby waive notice of any such
extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 19th day of
April 2005 and such of them as are corporations have caused their corporate seals to be hereto affixed and these
i presents to be signed by their proper officers, the day and year first set forth above.
t Delta Construction of Northern Colorado, Inc., 208
Name: Racquette Dr., Fort Collins, CO 80524
Address:
By:
i
Grt�G-� o fLR.
Title: i�(CESI�EnIT
r
,r
(&-EAL)
NL
1 4i
S-2747/GEEF 2/98 v ."
SURETY
United Fire & Casualty Company, 8310 S. Valley Highway,
3rd Floor, Englewood, CO 80112
Attorney -in -Fact:
(SEAE)
Uvice deritzrid its
and U
-e me per'gdft#, WW'-V-AJ'u'e Randy A.
did depose and say; that he resides in
h6l revoked by UN.1 TEO FIR8,&c :f
th own 0.. -Y�LAw :d adopted
To �. u yo i
g ,
Oy Board of
SECTION 00420
STATEMENT •DF BIDDER'S QUALIFICATIONS
All question$ must be answered and the data given must be clear and
comprehensive. This statement .must be notarized, If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires,
1. Name of Bidder: j)plta Conatrnctjnn of mnrtherp Cnlnl-adnr Tnc.
2. Permanent main office address:208 Racquette Drive, Fort Collins 80524
13. When organized: 1975
4. If a corporation, where incorporated: Colorado on May 1998
S. How many years have you been engaged in the contracting business under your
present firm or trade name? 7 Years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of .completion.)
See attached "Work Under Contract"
7. General character of Work performed by your company:
Supervision, Project Management, Carpentry, Labor
S. Have you ever failed to complete any Work awarded to you? NC)
If so, where and why?
9. Have your ever defaulted .on a contract? NO
If so, where and why?
10. Are you debarred by any gavernment agency? No
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Sae attached "Major Project List"
12. List your majpr equipment available for this contract.
Skidster, 1-ton dump trailer
13. Experience in construction Work similar in importance to this
project:
_.See attached "Related Prnjec+ FXDeriencc"
14. Background and experience of the principal members of your organization,
including officers:
See attached resumes
I$. Credit available: $ 19250,000
16. Bank reference: First Na ional Bank, Todd Camobpj], (970) 4R2-4R61
1?. Will you, upon request, -fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Yes.
18. Are you licensed as a General CONTRACTOR? Yes.
If yes, in what city, county and state? Fort Collins & -Denver, !;"at
class, license and numbers? Fort colling—class A #A29 Denver Mass B
#235536
19. Do you anticipate subcontracting Work under this Contract? vP�
If yes, what percent of total contract?_gn%
and to Whom? m„ j,o r
mined by the hid precess
20. Are any lawsuits pending against you or your firm at this time? no.
If
DETAIL yes,
7/96 Section 00420 Page 2
21, What are the limits of your public liability? DETAIL
See attached insurance certificate.
What company?
22. (ghat are your company's bonding limitations? Agg reaate = S12,000,000
Single project = 58,000,000
23, The undersigned hereby authorizes and requests any person, firm or
corporation to furnish an'y information requested by the OVNER in
verification of the recital comprising this Statement of Bidder's
Qualifications,
Dated at 12 p.m. this 19th day of April , 2005.
Delta Construction of Northern Colorado Inc.
Name of H' der
By 4 s w Lei Cs6 enL
Title: PYPC111}
State of Colorado
County of Larimer
rr, President being duly sworn deposes and Says that he is
nt ofDelta Construction of NC and that
iname of organization)
the answers to the foregoing .questions and all statements therein contained are
true and .correct.
Sub cri ed and sworn to before me this 114 day of
6 1 20 05.',
al,
Notary Public
My commission expires
74
7/96
1 , Og -01-
Section 00420 Page 3
WORK UNDER CONTRACT CONSTRucnoN, INC.
UW McIntyre and Orr Halls Renovation University of Wyoming GSG Architects Education, interior renovation $6,303,691 50% Aug-06
...__...__.._................_............ _._ . _—.........
DAKO Oakrid' a Innovation LLLP Greg Fisher Architect Commercial, steel &concrete $3,337,000 75% A r-05
4 _ � g m .�.._.........__._.$3,3 p ���.......�.mm. �.mm� ..
ColoradoCommunityBankinFirestone BankofYuma Dauer Haswell Commercial, wood frame $840,000 50% lun-05
.__.._ ._. __.._._._____...-.._._............._.................._._.._............_......._...___... _ _ ____..._.._.....-. ___........._._..._,._ - _._._.-._.._._.._. - ____._......_..__�......___.
FDC IV McWhinney Enterprises Vaught Frye Commercial, site cast concrete $3,723,000 90% Apr-05
!stone Canyon, LLC
Tani
�I
CONSTRUCTION, INC.
Name
Earth Engineering
Major Project List by Year
Final
Square Contract
Address Footage Facility Type Amount
4396 Greenfield Drive
Finish
Date
Consultants Windsor, CO 80550 6,000 Office/Lab $774,600 Oct-04
6222 W. 9th Street Commercial
Colorado Community Bank Greeley, CO 11,000 Bank
$911,566 Jul-04
7350 Greendale Road
MinitMan Supply Windsor, CO 80550 6,000 Office $409,893 August
Commerce Drive
T ihydro Corporation Laramie, WY 23,200 Commercial $2,182,225 May-04
Larimer County 2555 Midpoint Drive
Community Corrections Fort Collins, CO
5225 Yellowstone Blvd.
New
32,000 Construction
New
$4,200,008
Cool River Wine & Spirits Cheyenne, WY 5,000 Construction
$465,724 Jun-03
Crossroads Blvd. New
Larimer County Fair ounds Loveland, CO 230,000 Construction $3,232,900 Jun-03
Patton Avenue in New
Advanced Manufacturing Loveland, CO 25,000 Construction $1,236 470 Oct-03
7320 Greendale Road New
Counters Windsor, CO 11,775 Construction $527,301 Jun-03
1220 Oakpark Drive
New
ToothZone
Fort Collins, CO
12,000
Construction
$1,171,255
Mar-02
New
Cathedral Home for Children
Laramie, WY
11,300
Construction
$1,264,488
Dec-02
4373 N. Street
New
WyoTech Hotrod Shop
Laramie, WY
71,600
Construction
$5,302,332
Dec-02
1801 Piney River Drive
New
Kids' Harbor Daycare
Loveland, CO 80538
11,200
Construction
$1,007,725
Aug-02
3745 E. Lincolnway
Commercial
Econo Foods Deli Remodel
Cheyenne, WY
Remodel
$98,478
Feb-03
7250 Greenridge Rd
New
Schmidt Earthbuilders
Windsor, CO
9,830
Construction
$689,640
Mar-03
Projects completed by year Page 1