No preview available
HomeMy WebLinkAboutRESPONSE - BID - 5909 DEICING FACILITYAPR-13-05 WED 12:45 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P,03/06 Attachment A Addendum N3 SECTION 00300 BID FORM PROJECT.: DEICING FACILITY; BID NO. 5909 Place Collins CO. A ril 19, 2005 Date 1. In compliance with your Invitation to Bid dated (4 2005 and subject to all condit' thereof, the undersigned Delta Constr.of NO.CO,InC a ** Corporat o Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed or, the following Bid Schedule or aid Schedules. 2_ The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other Person or persons Bidding for the same Work, and that it is made in Pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of _Five percent of total bid amount ($ Instruors to Bidders. in accordance with the Invitation To Bid and cti 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: United Fire & Casualty,8310 S.Valley Hwy,Englewood, CO 80112 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment fer work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 1. The undersigned Bidder hereby acknowledges receipt of Addenda No. one through.-ii�ree- -- 4700 Innovation Drive New Cytomation Bldg I Fort Collins, CO 38,000 Construction $2,135,888 Feb-01 4715 Innovation Dr. Hercules Industries Fort Collins, CO 24,000 New Addition $1,162,760 Sep-00 148 E. Foothills Pkway Retail Goodyear Tire Center Fort Collins, CO 8,000 rennovation $604,328 Oct-00 201 W. 67th Court New Vi-Per Vet Clinic Loveland, CO 20,000 Construction $1,792,645 Aug-00 2330 East Prospect New Veeco/Ion Tech Fort Collins, CO 24,000 Construction $800,163 Apr-00 Projects completed by year Page 2 PROJECT EXPERIENCE CONSTRUCTION, INC. ADVANCED MANUFACTURING TECHNOLOGY Client: AMT Building Size: 25,000 SF Architect: RJ Architects Construction Start: February 2003 Location: Loveland, CO Completion Date: October 2004 Building Features: • Manufacturing facility for two -pressure sequencing damper air conveyance systems ♦ Two-story pre-engineered metal building Project Delivery: Design Build Situation Analysis: The site did not have enough room for an on -site storm water detention pond. Delta Response: Delta worked with the civil engineer, Tait & Associates, to devise the most cost effective solution to detain water on site. After evaluating three concepts, the best solution was to oversize the pipes and detain water in the pipes underneath the parking lot. PROJECT EXPERIENCE !-DELTAJ1 CONSTRUCTION, INC. LARIMER COUNTY COMMUNITY CORRECTIONS FACILITY Client: Larimer County Building Size: 32,000 SF Architect: GSG Architecture Location- Fort Collins, CO Building Features: Construction Start: September 2003 Completion Date: April 2004 ♦ 176-bed halfway house located on the Larimer County Detention Center Campus ♦ Security system with a central monitoring station to control ingress/egress and provide video monitoring of all client areas • Emergency power back-up for facility use during extended power outages • Kitchen with the capacity to serve 176 clients three times per day Project Delivery: Competitive Design -Build based on fixed budget established prior to RFP solicitation. Delta was successful against eight other Design -Build teams. Situation Analysis: • Larimer County needed to add 96 beds to relieve pressure on the jail Delta Response: ♦ Guaranteed the price and schedule at the schematic design phase ♦ Started construction on a fast -track schedule prior to completion of all the construction documents ♦ Finished construction of the building 15 days early and on budget PROJECT EXPERIENCE CONSTRUCTION, INC. WYOMING TECHNICAL INSTITUTE HOT ROD SHOP Client- Wyoming Technical Institute Architect: Hawk Architecture Location: Laramie, WY Building Features: Building Size: 71,600 SF Construction Start- May 2002 Completion Date: December 2002 ♦ Pre-engineered metal building with masonry and storefront office and hot rod showroom ♦ Includes classrooms, engine shops, auto work bays, auto show room, and offices • Classrooms convert to 8,400 square foot teaching shop Project Delivery: Design -Build Situation Analysis: • In early April 2002, the Wyoming Technical Institute realized they needed a new facility due to the extraordinary level of interest in their "Hot Rod Class" Delta's Response: ♦ A fast -track project that followed an aggressive schedule including full planning, design, construction and owner fit -up in seven and a half months ♦ Completed the project on time and on budget allowing WyoTech to hold classes in their new facility by January 2003 PROJECT EXPERIENCE CONSTRUCTION, INC. THE RANCH AT LARIMER COUNTY FAIRGROUNDS Client: Latimer County/ Neenan Co. Building Size: 230,000 SF Architect: Bullock Smith and Partners Construction Start: July 2002 Location: Loveland, CO Completion Date: June 2003 Building Features: ♦ 5 Pre-engineered metal buildings: • Exhibition Building (55,000 SF) • Maintenance Building (7,000 SF) • Indoor Arena (77,000 SF) • East & West Livestock Pavilions (48,000 SF each) ♦ Large clearspans—require extensive coordination with other trades, the arena clearspans reach 250 feet Project Delivery: Competitive Bid Situation Analysis: ♦ Latimer County required a competitive process for the acquisition of the pre- engineered metal buildings Delta Response: • Developed a complex matrix to evaluate nine subcontractors based on: price, quality, experience, schedule and local ties to Latimer County PROJECT EXPERIENCE DELTA CMWRUCTIOK INC. SCION INDUSTRIES Client: Scion Industries Architect: R.J. Architects Location: Fort Collins, CO Building Features: Building Size: 22,000 SF Construction Start: March 2001 Completion Date: March 2002 • Research and development, and production of Carbon Fiber Products • Pre-engineered metal building • Interior was designed and built for future clean room environment and includes a private residence on the second floor Project Delivery: Design -Build Situation Analysis: • Dual purpose facility of residential and commercial that did not meet zoning Delta's Response: • Biweekly meetings with the city to rezone the land and address neighborhood concerns PROJECT EXPERIENCE CONSTRUCTION, INC. CHEYENNE TECHNOLOGY CENTER Client- CTC, LLC . Architect: W. Stashak & Associates Developer Casey Partners, LTD. Location: Cheyenne, WY Building Features: Building Size: 22,000 SF Construction Start: March 1999 Completion Date: July 1999 ♦ Multi -tenant building constructed for manufacturing assembly, high-tech operations associated business space, and distribution ♦ Butler Pre-engineered Metal Building with office and warehouse space Project Delivery: Design -Build Situation Analysiss • CTC needed more space for their manufacturing and distribution center with easy access to the Interstate DeltWs Response: ♦ By using a Butler Pre-engineered Metal Building with a CMU veneer, we were able to provide the Owners with a facility that was both cost-effective, flexible and appealing PROJECT EXPERIENCE CONSTRUCTION, INC. LEGACY COUNTERS Client: Legacy Counters Building Size: Architect: Hawk Architecture Construction Start: Location: Windsor, CO Completion Date: Building Features: • Office and warehouse for countertop fabrication company ♦ Pre-engineered metal building ♦ Designed to add 4,000 square foot if needed Project Delivery: Design -Build 11,775 SF February 2003 June 2003 GREG ORR PRESIDENT CONSTRUCTION, INC. EXPERIENCE: 2000 — PRESENT DELTA CONSTRUCTION, INC. President 1992 — 2000 NEENAN COMPANY Senior Project Manager 1991-1992 ADOLFSON & PETERSON Field Engineer MAJOR PROJETS INCLUDE: • Kids' Harbor Day Care: 11,200 SF day care facility constructed of wood frame with EFTS and timber architecture —Loveland, Colorado. • Obermann Dental Office: 12,000 SF dental office with the latest in technology and innovations —Fort Collins, Colorado. • Vision Graphics: 22,000 SF tilt up structural addition to existing production floor — Loveland, Colorado. DakoCytomation Phase I and II: Two buildings totaling 80,000 SF of storage/lab/R&D/office space, Fort Collins, Colorado. • Union Medical Campus Phases I and II: $6.5 million, 145,000 SF, medical office buildings —Colorado Springs, Colorado. • Boston Chicken Corporate Headquarters: 92,000 SF ($9.6 million) Phase II of Boston Chicken/ Einstein Bagels Headquarters —Golden, Colorado. • Triad West: 105,000 SF spec warehouselo fice/production facility —Golden, Colorado. Balzers Thin Films: $1.2 million tenant finish with classroom and clean rooms — Golden, Colorado. Quantum SSPG: 460,000 SF office, warehouse, and production facility including a 700-person full service cafeteria --Colorado Springs, Colorado. • 1899 Wynkoop: 270,000 SF, $17 million office, retail and underground parking — Denver, Colorado. EDUCATION: 1992 COLORADO STATE UNIVERSITY, FORT COLLINs, COLORADO Bachelors of Science, Construction Management 1996 Primavera training courses including P3 scheduling and expedition Cleanroom Design Build workshop, Arizona State University. 1997 Alliance for Construction Excellence Clean room Taskforce hosted by Arizona State University's Del E. Webb School of Construction. Greg Orr, President Page 1 JOHN BAKER CONSMX-rION, INC. CONSTRUCTION MANAGER/ ESTIMATOR EXPERIENCE: 1999 - PRESENT DELTA CONSTRUCTION, INC. Construction Manager/Estimator 1992 -1999 THE NEENAN COMPANY, FORT COLLINS, COLORADO Preconstruction Manager/Project Manager 1986 -1992 HENSEL PHELPS CONSTRUCTION COMPANY, GREELEY, COLORADO Project Engineer MAJOR PROJECTS INCLUDE: • Kroll Factual Data: Two-story office building is steel framed with brick and site -cast exterior. The timber -framed entry and lobby create a natural appearance. The building is currently under construction and will be ready for occupancy by May 2005--Fort Collins, Colorado. • The Ranch at Larimer County Fair Grounds: Five pre-engineered metal buildings totaling 230,000 SF. --Loveland, Colorado. • DakoCytomation 1, 11, III: Preconstruction services for three one-story brick buildings totaling 80,000 SF. Consists of storage, lab, and office areas —Fort Collins, Colorado. • Ball Aerospace & Technologies Corp: 117,700 SF, $13 million R&D facility for the development of high tech communication devices. —Broomfield, Colorado. • Quantum Peripherals -Phase 2: An additional 67,000 SF of research facility and approximately 20,000 SF of two-story office space —Louisville, Colorado. • Quantum Peripherals -Phase 1: 190,000 SF facility with 60,000 SF of two-story office and cafeteria space and 130,000 SF of high bay research and utility support spaces at a total project cost of $49 million —Louisville, Colorado. • Longmont United Hospital: Five -story patient bed tower located on the existing LUH campus. Facility includes two floors of patient recovery rooms, NICU, cafeteria, meeting rooms, conference rooms, lobby and administrative space —Longmont, Colorado. • Poudre Valley Hospital -A, B and C Wing Remodel and Additions: $18 million addition of fourth and fifth floors to existing wing and new construction of B Wing and C Wing —Fort Collins, Colorado. • Colorado Convention Center: $95 million convention center constructed in a fast track, Design -Build format in eighteen months —Denver, Colorado. EDUCATION: DECEMBER 1985 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Bachelor of Science, Industrial Construction Management John Baker_ Construction Manager/Estimator Page Submitted by: Delta Construction of Northern Colorado, Inc. SECTION 00430 SCHEDULE OF SUBCONTRACTORS Dist all subcontractors for the work items listed below and all subcontractors performing over 201 of the contract. ITXM P6 LAL _ —M kay- Ga ( (AV4-c,)- . P(VtiY 6Y SU$CONTRAC'1"OR1 j Olt &-ro . o't N.o. AMz.V-;e AhAes P+ J4 4►ie�-fti-t� �f((VeAn P¢ N rro-►'+ Pre P 4 7/96 Section 00430 Page 1 DAN TWEETON CONSTRUCTION, INC. PRE -CONSTRUCTION MANAGER/ ESTIMATOR EXPERIENCE: 2002 - PRESENT DELTA CONSTRUCTION, INC., FORT COLLINS, COLORADO Estimator/Pre-Construction Manager 1997 - 2001 THE NEENAN COMPANY, FORT COLLINS, COLORADO Project Manager 1995 - 1997 MIDCON, INC. — ALBUQUERQUE, NEW MExlco Project Manager/Estimator 1993 -1995 ROCKWOOD CONSTRUCTION, INC. — DURANGO, COLORADO Owner/President 1990 -1993 KNICKERBOCKER & ASSOCIATES — TORRANCE, CALIFORNIA Construction Manager 1987 -1990 TMI CONSTRUCTION MANAGEMENT — BRENTWOOD. CALIFORNIA Construction Manager MAJOR PROJECTS INCLUDE: • Colorado Community Bank: 11,241 SF, two-story, bank building constructed using a combination of steel and wood frame with a stucco and stone exterior —Greeley, Colorado. • Trihydro Corporate Headquarters: This Design -Build project consists of 23,000 SF of office space —Laramie, Wyoming. • WyoTech Hot Rod Shop: 71,000 SF pre-engineered building designed for educational and industrial purposes. This building includes classrooms, engine shops, auto work bays, an auto showroom, and offices —Laramie, Wyoming. • Larimer County Community Corrections: 32,000 SF Design -Build project consisting of one-story of office space and three stories of residence area located in Fort Collins, Colorado. • 1890 Wynkoop: A mixed -use building totaling 166,000 SF of luxury lofts/parking/retail space —Denver, Colorado. • American Water Works Association: 45,000 SF office addition and 25,000 SF renovation —Denver, Colorado. • Chadwick School Sports Complex: 27,000 SF gymnasium and locker facility —Palos Verdes, California. • Malibu Creek Shopping Center Renovation: 50,000 SF shopping plaza renovation — Malibu, California. • Citicorp Plaza: 42-story office building, subterranean shopping center, and 750-car parking structure —Los Angeles, Califomia. • Dana Point Resort: 350-room resort and conference center —Dana Point, California. EDUCATION: JULY 1985 UNIVERSITY OF NEBRASKA, LINCOLN Bachelor of Science, Construction Management TIM STERN CONSTRUCTION, INC. PROJECT MANAGER EXPERIENCE: 2003-PRESENT DELTA CONSTRUCTION, INC. Project Manager 1995 - 2002 THE NEENAN COMPANY Project Manager MAJOR PROJECTS INCLUDE: • Front Range Internet: 15,000 SF tenant finish including office area and data center. The data center includes back up power generator, Liebert computer room air conditioning, redundant fiber optic utility service, raised flooring, Network Operation Center, and support area —Fort Collins, Colorado. • Earth Engineering Consultants: 6,000 SF Design -Build office building with lab space along with a special curing room with humidity and temperature control for testing materials — Windsor, Colorado. • Larimer County Community Corrections Facility: 32,000 SF Design -Build project consisting of one-story of office space and three stories of residence area —Fort Collins, Colorado. • Atrix Laboratories, Inc.: 23,000 SF Design -Build pharmaceutical research and manufacturing facility. This $6 million facility required USDA quality requirements including HVAC system, high -purity water, compressed air, and nitrogen systems and pharmaceutical level interior finishes —Fort Collins, Colorado. • First Baptist Church: Remodeled the existing kitchen and serving area to allow for more efficient food preparation and distributions —Fort Collins, Colorado. • Hunter Douglas #5: 170,000 SF office and manufacturing building for window shade manufacturer —Broomfield, Colorado. • DPC Genesee Point Office: 52,000 SF office building in Genesee Office Park. This building included finished office space —Genesee, Colorado. • Quantum SSPG: 440,000 SF research and manufacturing facility constructed for the tape drive business unit —Colorado Springs, Colorado. • Union Medical Campus Phase II: 55,000 SF mufti -tenant surgical and diagnostic facility, which houses MRI and related equipment --Colorado Springs, Colorado. • Quantum PSG: 50,000 SF computer tape storage manufacturing facility —Colorado Springs, Colorado. • Edora Pool Ice Center: An addition of a second sheet of ice at EPIC, which included a new ice sheet, dasher board system, spectator area, new locker rooms, and a heated ice dumping pit —Fort Collins, Colorado. EDUCATION: DECEMBER 1993 COLORADO STATE UNIVERSITY Bachelor of Science, Mathematics Tim Stern, Project Manager Page 1 ACORD� CERTIFICATE OF LIABILITY INSURANCE 04/30//i 0 ' PRODUCER (303)939-9921 FAX (303)939-9926 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Herbert -Leavitt Longmont ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 275 S th M ai' St HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXT n END OR ou reet ALTER THE COVERAGE AFFORDED BY THE POLICIES BEL LSIite 208 mont , CO 80501 I U S AFFORDING COVERAGE NAIC # INSURED Delta Construction, Inc co s A: Travelers 209 Raquette Dr INSURB: Pinnacol Assurance Fort Collins, CO 8OS24 INSURER C: INSURER D: INSURER E: COVERAGES I THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTW ITHSTANDINI ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR D' TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATIONLTR LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE FX OCCUR DTC0384P7423IND03 04/30/2004 04/30/2005 EACH OCCURRENCE $ 1, 000 00 DAMAGE PRFmiqrTO RENTED $ 300,000 MED EXP (Any one person) $ S,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO LOC JECT El PRODUCTS - COMP/OP AGG $ 2,000,000 AUTOMOBILE LIABILITY ANY AUTO DT810384P7423TIL03 04/30/2004 04/30/200S COMBINED SINGLE LIMIT (Ea accident) $ 1,000,00 X BODILY INJURY (Per person) $ A ALL OWNED AUTOS SCHEDULEDAUTOS BODILY INJURY (Per accident) $ HIRED AUTOS NON -OWNED AUTOS PROPERTY DAMAGE (Per accident) $ - GARAGE LIABILITY AUTO ONLY -FA ACCIDENT $ ANY AUTO OTHER THAN FA ACC $ AUTO ONLY: AGG $ EXCESSIUMBRELLA LIABILITY X OCCUR CLAIMS MADE DTSMCUP384P7423TIL03 04/30/2004 04/30/200S EACH OCCURRENCE $ 3,000,000 AGGREGATE $ 3,000,000 A $ DEDUCTIBLE nx RETENTION $ 10,00 $ WORKERS COMPENSATION AND 3298114 07/01/2003 07/01/2004 X I WC STATU- oTH- EMPLOYERS' LIABILITY E.L. EACH ACCIDENT $ 500,000 B ANY PROPRIEfORIPARTNERIEXECUTIVE OFFICERIMEMBER EXCLUDED? S ECIAL yes, AL PROVISIONS below PRunder SPO E.L. DISEASE - EA EMPLOYEE $ S00, 00 E.L. DISEASE - POLICY LIMIT $ S00, 0D OTHER _DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS _ertificate holder is named as additional insured, but only as repects liability arising out of work erformed by the named insured (Excluding Workers' Compensation). General Liability coverage is rimary and Non -Contributory. City of Fort Collins Attn: Building & Zoning Dept 281 N College Ave Fort Collins, CO 80524 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WALL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABIUTY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Kelly McNair/KDM r ACORD 25 (2001/08) ©ACORD CORPORATION 1988 APR-13-05 WED 12:45 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P.04/06 ADDRESS: Delta Construction of No.Colorado, Inc. CONTRACTOR BY:�L G'I-ecy trrr, President 208 Racquette Dr. Fort Collins, CO 80524 8. BID SCHEDULE( (Base Bird) ( f (1 `i�B►��((i�^TWokcAb�cwtes?�C�'4'� ttr2 `Dollars ($3IMSA040.cXD ) Alternate 1 - Vapor Emission Contro3. Treatment: (s(a,s 00 _ } a C$¢cfio►t 094G2 '( (,��,�.Resis Fa 4 6Poky) ep Alternate 2 - oncrete Hardener and Sealer: an Unit Price - Vapor Control Treatment F ) 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECT LLY SUS •T� _ April 19, 2005 Si natu Greg Orr bate President • 1 A-99 License Number (If Applicable.) (Sea'- - if aid is by oration) Attest: — Address 208 Racquette Drive Fort Collins, CO 80524_ Telephone 970.498.8766 - BID BOND KNOW ALL BY THESE PRESENTS, that we, the undersigned Delta Construction of Northern Colorado, Inc., 208 Racquette Fort Collins, CO 80524 as Principal, and ed Fire & Casualty Company, 8310 S. Valley Highway, 3rd Floor, Englewood, CO 80112 as Surety, are hereby held and firmly bound unto the City of Fort Collins, rado, as Owner, in the penal sum of Five Percent of the Bid Amount for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. :1 THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the (accompanying bid and hereby made a part hereof to enter into a Contract Agreement for the construction of City of Fort Collins Project, Deicing Facility; Bid No. 5909. WHEREAS, the Owner, as a condition for receiving said bid, requires the Principal to deposit with the Owner a Bid Guaranty equal to jfive percent (5% ) of the amount of said bid. -i NOW, THEREFORE, (a) If said bid shall be rejected; or in the alternate, (b) If said bid shall be accepted and the Principal shall execute and deliver a Contract Agreement (properly completed in accordance with said bid) and shall furnish a Performance and Payment Bond upon the forms prescribed by the Owner for the faithful performance of said Agreement; and shall in all other respects perform the agreement created by the acceptance of said bid; J then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability tof the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. i The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired ! or affected by any extension of the time within which the Owner may accept such bid; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 19th day of April 2005 and such of them as are corporations have caused their corporate seals to be hereto affixed and these i presents to be signed by their proper officers, the day and year first set forth above. t Delta Construction of Northern Colorado, Inc., 208 Name: Racquette Dr., Fort Collins, CO 80524 Address: By: i Grt�G-� o fLR. Title: i�(CESI�EnIT r ,r (&-EAL) NL 1 4i S-2747/GEEF 2/98 v ." SURETY United Fire & Casualty Company, 8310 S. Valley Highway, 3rd Floor, Englewood, CO 80112 Attorney -in -Fact: (SEAE) Uvice deritzrid its and U -e me per'gdft#, WW'-V-AJ'u'e Randy A. did depose and say; that he resides in h6l revoked by UN.1 TEO FIR8,&c :f th own 0.. -Y�LAw :d adopted To �. u yo i g , Oy Board of SECTION 00420 STATEMENT •DF BIDDER'S QUALIFICATIONS All question$ must be answered and the data given must be clear and comprehensive. This statement .must be notarized, If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires, 1. Name of Bidder: j)plta Conatrnctjnn of mnrtherp Cnlnl-adnr Tnc. 2. Permanent main office address:208 Racquette Drive, Fort Collins 80524 13. When organized: 1975 4. If a corporation, where incorporated: Colorado on May 1998 S. How many years have you been engaged in the contracting business under your present firm or trade name? 7 Years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of .completion.) See attached "Work Under Contract" 7. General character of Work performed by your company: Supervision, Project Management, Carpentry, Labor S. Have you ever failed to complete any Work awarded to you? NC) If so, where and why? 9. Have your ever defaulted .on a contract? NO If so, where and why? 10. Are you debarred by any gavernment agency? No If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Sae attached "Major Project List" 12. List your majpr equipment available for this contract. Skidster, 1-ton dump trailer 13. Experience in construction Work similar in importance to this project: _.See attached "Related Prnjec+ FXDeriencc" 14. Background and experience of the principal members of your organization, including officers: See attached resumes I$. Credit available: $ 19250,000 16. Bank reference: First Na ional Bank, Todd Camobpj], (970) 4R2-4R61 1?. Will you, upon request, -fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes. 18. Are you licensed as a General CONTRACTOR? Yes. If yes, in what city, county and state? Fort Collins & -Denver, !;"at class, license and numbers? Fort colling—class A #A29 Denver Mass B #235536 19. Do you anticipate subcontracting Work under this Contract? vP� If yes, what percent of total contract?_gn% and to Whom? m„ j,o r mined by the hid precess 20. Are any lawsuits pending against you or your firm at this time? no. If DETAIL yes, 7/96 Section 00420 Page 2 21, What are the limits of your public liability? DETAIL See attached insurance certificate. What company? 22. (ghat are your company's bonding limitations? Agg reaate = S12,000,000 Single project = 58,000,000 23, The undersigned hereby authorizes and requests any person, firm or corporation to furnish an'y information requested by the OVNER in verification of the recital comprising this Statement of Bidder's Qualifications, Dated at 12 p.m. this 19th day of April , 2005. Delta Construction of Northern Colorado Inc. Name of H' der By 4 s w Lei Cs6 enL Title: PYPC111} State of Colorado County of Larimer rr, President being duly sworn deposes and Says that he is nt ofDelta Construction of NC and that iname of organization) the answers to the foregoing .questions and all statements therein contained are true and .correct. Sub cri ed and sworn to before me this 114 day of 6 1 20 05.', al, Notary Public My commission expires 74 7/96 1 , Og -01- Section 00420 Page 3 WORK UNDER CONTRACT CONSTRucnoN, INC. UW McIntyre and Orr Halls Renovation University of Wyoming GSG Architects Education, interior renovation $6,303,691 50% Aug-06 ...__...__.._................_............ _._ . _—......... DAKO Oakrid' a Innovation LLLP Greg Fisher Architect Commercial, steel &concrete $3,337,000 75% A r-05 4 _ � g m .�.._.........__._.$3,3 p ���.......�.mm. �.mm� .. ColoradoCommunityBankinFirestone BankofYuma Dauer Haswell Commercial, wood frame $840,000 50% lun-05 .__.._ ._. __.._._._____...-.._._............._.................._._.._............_......._...___... _ _ ____..._.._.....-. ___........._._..._,._ - _._._.-._.._._.._. - ____._......_..__�......___. FDC IV McWhinney Enterprises Vaught Frye Commercial, site cast concrete $3,723,000 90% Apr-05 !stone Canyon, LLC Tani �I CONSTRUCTION, INC. Name Earth Engineering Major Project List by Year Final Square Contract Address Footage Facility Type Amount 4396 Greenfield Drive Finish Date Consultants Windsor, CO 80550 6,000 Office/Lab $774,600 Oct-04 6222 W. 9th Street Commercial Colorado Community Bank Greeley, CO 11,000 Bank $911,566 Jul-04 7350 Greendale Road MinitMan Supply Windsor, CO 80550 6,000 Office $409,893 August Commerce Drive T ihydro Corporation Laramie, WY 23,200 Commercial $2,182,225 May-04 Larimer County 2555 Midpoint Drive Community Corrections Fort Collins, CO 5225 Yellowstone Blvd. New 32,000 Construction New $4,200,008 Cool River Wine & Spirits Cheyenne, WY 5,000 Construction $465,724 Jun-03 Crossroads Blvd. New Larimer County Fair ounds Loveland, CO 230,000 Construction $3,232,900 Jun-03 Patton Avenue in New Advanced Manufacturing Loveland, CO 25,000 Construction $1,236 470 Oct-03 7320 Greendale Road New Counters Windsor, CO 11,775 Construction $527,301 Jun-03 1220 Oakpark Drive New ToothZone Fort Collins, CO 12,000 Construction $1,171,255 Mar-02 New Cathedral Home for Children Laramie, WY 11,300 Construction $1,264,488 Dec-02 4373 N. Street New WyoTech Hotrod Shop Laramie, WY 71,600 Construction $5,302,332 Dec-02 1801 Piney River Drive New Kids' Harbor Daycare Loveland, CO 80538 11,200 Construction $1,007,725 Aug-02 3745 E. Lincolnway Commercial Econo Foods Deli Remodel Cheyenne, WY Remodel $98,478 Feb-03 7250 Greenridge Rd New Schmidt Earthbuilders Windsor, CO 9,830 Construction $689,640 Mar-03 Projects completed by year Page 1