City of Fort Collins ADDENDUM No. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 5909 Deicing Facility
Opening Date (Revised): Opening Date has been changed to April 14, 2005, 3:00p.m.
(Our Clock).
To all prospective bidders under the specifications and contract document described
above, the following changes are hereby made.
Structural:
a. Revise the concrete mixes for all concrete within the Dome structure,
including mix types A, C, D and E, to be in compliance with the Colorado
Department of Transportation (CDOT) Class "P" mix with the following
additional limits:
i. Type I/II Cement .......... 658 lb.
ii. Type F Fly Ash ............ 132 lb.
iii. W/C Ratio..................0.42
iv. Air Entrainment ............ 6% +/- 1 %
b . Minimum compressive strength of the mixes shall remain as indicated in
the contract documents.
2. Door Schedule & Door Types on drawing AT I & Elevations A2.1 & A2.2:
Coiling Doors I I I & 113 (Type 3) are 16' wide x 16' high. These are shown
and noted correctly on the Door Schedule and Door Types, but they are
incorrectly drawn too tall on the elevations. (Note that the walls that these
doors are in are shown obliquely on the elevations, which further distorts their
apparent height vs. width.)
3. Section 08710 Door Hardware par. 2.02 Security Card Key Reader Locks:
LeFebure Corporation has gone out of business. Add HID as an acceptable
manufacturer. The Keypad/Card Reader system for this facility must be
compatible with the existing system at the Fort Collins Streets Facility, which
is an HID system. HID's web site is http://www.hipeorp.com/Liroducts.
4. Civil Design Drawings:
a. Drawing C-2: Modify truck loading pavement design per the
Supplemental Pavement Thickness Report from Terracon dated March 7,
2005, per Attachment A.
b. Drawing C-2: Clarified protective bollards at the ends of the liquid
dispensing island, per Attachment B.
c. Drawing C-7: Added bollards detail, per Attachment C.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
I,
SEE ELECT. I
� ONE -LINE —
NEW PAD I
MOUNTED 2
TRANSFORMER
BY FT. COLLINS
LIGHT &
POWER
TTB 4
MDC
CONTROL
'EXISTING PAD B0G.
MOUNTED
TRANSFORMER
PARTIAL SITE POWER PLAN
SCALE: 1" = 20'-0"
EMaNOM �n DATE: RN °°°°""°"""'� 4/5/2005 DE-ICING FACILITY
SCALE: „
(C) Copyright 2005 1 -20-0 CITY OF FT. COLLINS STREETS DEPT.
File Name E1.2.dwg RMJob Nwbw.15213 �T'SKE-01 ADDENDUM #2
T
CT CABINET FURNISHED MAIN BREAKER IN
AND INSTALLED NEMA 4 ENCLOSURE
BY E.C. 50K AIC. - - - - - - - - - - -
I
a.
r T8 0TV1 00. I < oc
NEW PAD MOUNTED
TRANSFORMER BY I
FORT COLLINS LIGHT 00.4G
AND POWER. L — L — J I
00.4G 80OA4P DOUBLE- ROW
G1 G1 SWITCH NEMA 4.
G1 �
800.4 APPLETON NO. ADJA20044-200
RECEPTACLE FOR PORTABLE
GENERATOR CONNECTION.
200A, 4P, 4W.
CWP LIFER GND.
ROD
PARTIAL ELECTRICAL ONE -LINE DIAGRAM
SCALE: NONE
BKi�®ie M iw aw ra DATE:
�N�-; 4/5/2005 DE-ICING FACILITY
OX SHEET: SCALE
=20-o CITY OF FT. COLLINS STREETS DEPT
R Copyright 25 00
Flle Name E7.7.dwg RM ,an Numee: 1e913 SKE-02 ADDENDUM 2
;a-27-81 09S43 AM MATTHEW
_y
i o zer;zx
R�Y�h�sc7
s 1"k-`C,)
TO i)
WALL nwmft IV 2 0.39r
��I/_Y.-303-C3q-C3
1210 "r WAP a RVCTURE
_ND1ES, An
1 SMUMU LL LAM ANALY9s.
Cq - ply VIL E "I RERroRG(LwW 0.033'
co • CHOP 21X C sLms wlwilalCfY7Nf 6.
Y -i1CS a AAwOFLI iIRIwD WWUN ) a�•
V . av1'n` pp C� RQyWc 0.03.1'
2. =Icw /Aw SMP IIDOL%WRT[R Turf, bill
3, rW TAWS PCR THIS GNAWING.
GATE RELEWD_ / ,/
REL.fASED 9Y__
PuRcmu ORDER t,—Ness
4-0 E01MOMENT
NOW Al mm ME 1' okwo
W-11 WNWW-4
PVC MAE we
4 2- CL '^— T' kw
MEIN Cul ` ry ](w) 6tlmil _
PVC Sohm DETNL
Km
303 571 5626 P.02
N+l.nt K Or u PAGE' 02102
_9 1 .
a� io
14942 16A43
16944 16940
SEAYL 169"
rrxn2ol
ckm.., NNQE
Pa&17 1f MFG. t TANK INC.
04R0EN cl'". x^NvAs.
CITY OF FT. COLLINS
)l -. DY 12'0 X 25' STD AG TANK 4 `ys
d. Drawing C-3: Modified sewer service alignment. Extended'/ inch water
service to the Break Building. Relocated the fire hydrant to the South end
of the liquid dispensing island. Added Notes 7 and 8. See Attachment D.
e. Drawing C-5: Revised concrete encasement of waterline, Attachment E.
5. Section 16482 Electrical:
a. The Motor Control Center should be a NEMA 4 enclosure. Re: Section
16482.2.02.A.1: Change NEMA type 3R to type 4. Drawings: Sheet E1.7.
Electrical One -Line Diagram. Change the notation on the motor control
center from NEMA type 4R to type 4.
b. Sheet E1.2 — Site Power Plan: Delete the electrical service shown from
the existing pad mounted transformer on the CDOT site. Add a new pad
mounted transformer, by Fort Collins Light and Power, on the east side of
the drain pan, along the West property line. Service to the De -Icing
Facility shall be from the new transformer. See Attachment F.
c. Sheet E1-7 —Electrical One -Line Diagram: Change the note at the pad
mounted transformer to read: "New pad mounted transformer by Fort
Collins Light and Power". Change the note at the CT cabinet to read:
"CT cabinet furnished and installed by E.C.". Change the enclosure type
on the 800A main breaker and the 800A4P double -throw switch to NEMA
4. See Attachment G.
6. Thickness of cone. slab in Compressor Room: Detail 3/A3.2 notes this slab as
4". Dome Foundation Plan on S 1 notes it as 6". Structural drawing is correct;
3/A3.2 is incorrect. Slab should be 6" thick, and reinforced per S 1.
7. Detail 7/A3.2 shows the curb at the east side of the concrete drive extending
below the bottom surface of the concrete drive, which it shows as 12" thick
max. This is incorrect. The correct concrete drive (ramp) detail is shown in
Section A -A on Civil sheet C-2. Drive is 7" thick. Bottom of curb is flush w/
bottom of drive. Curbs are poured integrally w/ the drive.
8. The liquid storage tanks in the Tank Yard are to be furnished by the Owner
(City) and installed by the Contractor. Contractor shall arrange delivery
schedule for the tanks with the Owner. The weight of the tanks (empty) is
approx. 5,500 lbs. Lift eyes and tie -down flanges are provided on the top and
sides of the tank. Tanks are to be placed on the level, 12'-6" diameter pads at
elevation 100'-0" in the tank yard. (Re. Arch. Drawing Al.1 and Dome
Foundation Plan S 1.) Contractor shall coordinate anchorage requirements
with the tank manufacturer, including type of cast -in anchors, their locations
and connections between anchors and tie -downs. The tanks are manufactured
by Palmer Mfg. & Tank Inc., Garden City, Kansas. A drawing of the tank is
provided as Attachment H. Five of the tanks are currently in the Streets
Department's yard, and can be inspected by Bidders, upon request.
9. Pipe supports shown on M2.4 and M2.6 shall be furnished and installed by the
Subcontractor installing the piping.
10. The concrete drain pan on the west side of the site is existing. It is incorrectly
noted as new on AS.1.
11. Re: AS. I : "New" vinyl covered chain link fence is noted at the north and
south property lines. This is incorrect. All chain link fencing shown is
existing. No new chain link fencing is required for this work. Note that the
existing chain link fencing along the east property line is to be removed as
part of this work.
12. Section 13800 Operator Interfaces and Operator Control Sequences: The
entire control system and all its components including the operator interface
equipment and workstations are to be furnished and installed as part of this
Contract. As noted, the Contractor shall coordinate specific details, design,
and requirements for the system with the Owner.
13. Section 03100 Concrete Forms and Accessories: Note that paragraph 2.01-A-
2 requires HDO plyform sheets or plastic form liner for the Dome Building
concrete walls. This requirement will apply to exposed portions of both
interior and exterior faces of all the Dome Building concrete walls, including
the Tunnel, Stair and Conveyor Shelter. Section 03300 Cast -In -Place
Concrete par. 3.08-F requires a "grout cleandown" for exposed concrete
surfaces of the Dome Building. This procedure will be required only for the
exposed portions of the exterior faces of the exterior concrete walls of the
Dome Building.
14. Section 03365 Concrete Sealer and Hardener & Section 01230 Alternates Alt.
No. 2: Sealer Hardener is to be applied to all exposed concrete surfaces on the
interior of all parts of the Dome Building. This would include the tunnel,
including the underside of the concrete floor slab that forms the ceiling of the
tunnel, all exposed concrete surfaces inside the Stair enclosure and the
Conveyor Shelter and the Compressor Room. Note that per Section 07192,
the exposed exterior faces of the concrete walls at the Dome Building are to
receive a Silane-type Water Repellant, which is to be applied over the "grout
cleandown" treatment described in section 03300. Concrete Sealer Hardener
per 03365 will also be required on all the exposed interior concrete surfaces of
the Conveyor Pit. No Sealer Hardener or Water Repellant will be required on
other exposed exterior concrete surfaces such as the Tank Yard slab &
containment curb or the concrete drive that approaches the Conveyor Pit.
15. Re: Plumbing drawing P1.1 and Civil drawings C3/C4/C5: Note that the civil
drawings show the pit for the sump pump located further away from the
building than the plumbing drawings. The location shown on the Civil
drawings is correct.
16. Section 08710 - 2.02 Security Key Card Reader Locks: Par. C notes
Electronic Locks as being supplied under Division 16 Electrical. This is
incorrect. Electronic Locks are to be furnished installed as part of the Security
Key Card/Card Reader System. Note that per electrical drawings, 120v power
is to be provided to the Card Readers. Coordinate exact location(s) required
for power with supplier of the Card Readers. All low voltage wiring including
wiring to electronic locks is to be furnished and installed by the installer of the
Security Key Card/Card Reader System.
17. Re: S1 Dome Foundation Plan: The tie rods in the slab shall be smooth 36
KSI rods. Coupling splices will be allowed.
18. Re: S1 Dome Foundation Plan and detail 3/A3.2: The 8" concrete sidewalls at
the north and west sides of the 6" flat slab in the Compressor Room shall be
reinforced with #4 rebar @ 12" o.c. ea. way @ the outside face of the wall.
Attachments:
A - Civil Modification to C2
B - Civil Modification to C2(2)
C - Civil Modification to C3
D - Civil Modification to C5
E - Civil Modification to C7
F - Electrical Sketch SKE-01 E 1.2
G - Electrical Sketch SKE-02_E1.7
H - Tank
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-
6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A
WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING
THAT THIS ADDENDUM HAS BEEN RECEIVED.
UGE
LOT 1
ADDENDUM
CIVIL DRAWING MODIFICATIONS 4-5-05, SHEET C-2
u
EXIST
SHED
PAVEMENT TABLE LEGEND
PASSENGER CAR PARKING
ASPHALT CONCRETE
AGGREGATE BASE COURSE
3"
g :......::. .:..
DRIVEWAYS, TRUCK LOADING, & TRUCK PARKING AREAS
ASPHALT CONCRETE S OR SX 2"
ASPHALT CONCRETE SG 3"
AGGREGATE BASE COURSE 7"
NONREINFORCED CONCRETE 7" °
ADDENDUM
CIVIL DRAWING MODIFICATIONS 4-5-05, SHEET C-2
- " I I , - " , v
)�NEdT
TANKER- TRUCK,
64,� p6ml "(UNLO'AIDING)
'PROPOSED /
T
ANK
Z-1 /-Fij',TQRE -TAN Z
�TRUCK,'ii
UNLOADING,
CO
6`6J:LA R b 8
SEE D AIL E T
CONTROL-
DISPENSING
DISPEN fNG-
ISLAND -'
or
"', LINES
. I I
ur
BREAK RPS�.
BLDG. -SEE bE',TAIL'' - .
i I
7,-
EASEMEN,T�,,4,:,/
BEGIN 1' SAWCUT SAWCUT & REMOVE
N 9498.74 APPROX. 1' EXISTING
ACCESS EASEMENT T E 7702.10 ASPHALT PAVEM511-T
T (ITYP
vyl
S 88#18'24" W,�\
\V
20' UTILITY EASEMENT
OMAN
VE141 C LE P Al
ADDENDUM
CIVIL DRAWING MODIFICATIONS 4-5-05, SHEET C-3
La
Z
�.
a
I
/'
W
�
LL
D
�m
BREAK
R
NEW 6'
Z.
BLDG
NEW
Or
/�
/
MANHOLE
FOR SUMP
—'
WATER
DISPENSING
PUMP
00
I
SERVICE
/
LINES
co
w/ CURB
NEW FIRE
NEW
STOP
HYDRANT
8" HDPE
ASSEMBLY
MAIN
—ew
Bw— —e'W— —a"w—
-B"W
r�AN—
NEW 6"
.•�. GA
—
E VALVE
g" DIP WATER
NEW 8"x 8"x 6" NEW
NEW SEWER SERVICE EXISTING SSMH TAPPING SLEEVE w/ RE 2'
A
THRUST BLOCK AREA INLET
EXISTING ELEC. EXISTING EL
EXISTING AREA INLET FUTILITY VAULT FUTILITY VAU
0
C 90 psi. 5. REFERENCE ARCHITECTURAL DRAWINGS FOR LAYOUT LOCATIONS OF
f 1000 GPM, PROPOSED ELECTRICAL, PHONE, CABLE TV, AND GAS UTILTIES.
AT WEST O A T
7. 3/4" WATER METER FOR BREAK BUILDING WILL BE LOCATED INSIDE
BREAK BUILDING W/ REMOTE READER ON BUILDING EXTERIOR.
ALL PROPOSED WATER MAINS SHALL BE DIP WITH POLYWRAP.
4970
E
4950
EXISTING 24" RCP
um
ADDENDUM
CIVIL DRAWING MODIFICATIONS 4-5-05, SHEET C-5
cr
�
W
M
tip
Q
3
CD
0
�v
v
s
00
ocDF
iz0
F F
+
Z
c
Lf)
ZOcr z
F- F-
M ir w
>>
z Z
Fa
X
>>
z z
`�
w EXISTING
U)
GRADE
PROPO
ED
GRADE
.08L
8" H E
°
�—
CONCRETE
I
sl
pi
ENCASEMENT
I
SIDES WATER
INE
E
f
10+00 10+50
k "
ROVIDE FLAT MANHOLE
DP W/ RECTANGULAR
ATCH PER MECHANICAL
ESIGN AND SPECIFICATIONS
ATER—TIGHT
)INTS
iROUGHOUT PIPE
Z" PRECAST
DNCRETE MANHOLE
/ SUMP PUMP FOR
_DG. PERIMETER
RAINAGE
-E MECHANICAL
_ANS FOR SUMP
JMP AND DISCHARGE
=SIGN AND DETAILS
' PVC PERIMETER
?AIN FROM BLDG.
ADDENDUM
CIVIL DRAWING MODIFICATIONS 4-5-05, SHEET C-7
1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN
6" OF THE HEIGHT OF THE FENCE HAS BEEN FILLED. REMOVED SEDIMENT SHALL
BE PLACED IN TOPSOIL PILE.
SEDIMENT CONTROL FENCE
NITS
PAINT TRAFFIC YELLOW
6" DIA. SCH. 40 STEEL PIPE
FILLED WITH CONCRETE
FINISHED GRADE
NATIVE BACKFILL OR
UNDISTURBED GROUND
ti�
DISPENSING o
ISLAND
It
d °a
I ' I
al
I
=
a
41
0
I`
d e
1 I
I
e
a d°
f
2'_6"
BOLLARD DETAIL
N TS