HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 24640SECTION 00950
CHANGE ORDER NO. 03
PROJECT TITLE: NIX FARM LOAFING SHED, BID NO. 5906
CONTRACTOR: WALSH CONSTRUCTION, INC.
PROJECT NUMBER: 5906
DESCRIPTION:
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Owner add recycled asphalts and dumpster concrete pad
changed location as revised Site Plan.
2. Description of change: Additional recycled asphalts and cedar fence removed.
3. Change in contract cost: $3,550.00
4. Change in contract time: Change time from Substantial Oct. 11,2005 to Oct. 22, 2005 and Final
Acceptance to Oct. 29, 2005.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST..................................................$107,711.00
TOTAL APPROVED CHANGE ORDERS..........................................8,411.20
TOTAL PENDING CHANGE ORDERS.................................................00.00
TOTAL THIS CHANGE ORDER ............................. ..........................
3,550.00
TOTAL % OF THIS CHANGE ORDER ... 3%
TOTAL % OF ORIGINAL CONTRACT ... 11%
ADJUSTED CONTRACT COST.................................................$119,672.20
(Assuming all change orders approved)
ACCEPTED BY
REVIEWED BY
APPROVED Bl
cc: City Clerk
Contractor
Engineer
Steve White, Project Manager
Project File
Purchasing
Date
Date
/U
Date
I
UI
Poteritiel Gt� rigs C)i dpr
W
Gu;=rorut!t
4u-J!m:llf'
betailed
(with Cost Info), Grouped by Each Number
0
m
Nix Farm Loafing Shed
Project # 10406
Tat: 720-234-7651 Fax:
m'
Category Reason
Reference
COR Nurrlbet
PCCO Number
Change Order Owner Dlrective
Notes
task Name
Revenue Code
This change order is based on the revised site plan Issued by Aller•Lingle Architects. Which relocated the dumpster pad to the
side of the existing barn, adds adding recycled asphalt where the dumpster pad as originally designed to go as well as behind
the now loafing shed and between the sheds, The ceder rence around the dumpster pad has been removed,
Summary;
F�tit++�te Prcpn..ed
AV,'O-Ic
Requested hays: 3 Budget:
3,550 0
0
3,550
Approved Days: 0 Cost:
3,550 0
0
3,550
Itemized Datalls:
General Description Quote Due Quote Reeld
Allocation Estimated
Proposed
Approved
Applied
001 - • — — 10/20/2005
Budget:
2,000
0
0
2,000
WALSH SELF PERFORM Additlonai 6" Recycled Asphalt and rework of
Cott:
2,000
0
0
2.000
6ubgrade at old dumpster pad, behind the news red an between the sheds
—
---- —
_._
w
002 • - D/20l2005
Budget:
300
0
0
—
300
--1
Overhead and profit 15%
Cost:
300
0
0
300
006--- 10/20/2006
Budget:
2,000
0
0
2,000
c�Jo
A&M LANDSCAPING SUBCONTRACT WORK Addition al 511 Recycled Asphalt Cost:
2,000
tl
0
2,000
O
rework of subgrsde at old dumpster pad, behind the new shed and between
the sheds
003- 10/20/2006
Budget:
100
0
0
100
Subcontractor 5% Markup
cost:
too
0
0
100
004- - 10/20/2005
Budget:
(850)
0
0
(850)
Credit for Cedar Fence
Cost:.
(850)
0
0
(850)
o
_ Prolog Manager Printed on: loll612005 prabdatabase