HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 24640SECTION 00950 CHANGE ORDER NO. 03 PROJECT TITLE: NIX FARM LOAFING SHED, BID NO. 5906 CONTRACTOR: WALSH CONSTRUCTION, INC. PROJECT NUMBER: 5906 DESCRIPTION: In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Owner add recycled asphalts and dumpster concrete pad changed location as revised Site Plan. 2. Description of change: Additional recycled asphalts and cedar fence removed. 3. Change in contract cost: $3,550.00 4. Change in contract time: Change time from Substantial Oct. 11,2005 to Oct. 22, 2005 and Final Acceptance to Oct. 29, 2005. (Attach additional sheets as required) ORIGINAL CONTRACT COST..................................................$107,711.00 TOTAL APPROVED CHANGE ORDERS..........................................8,411.20 TOTAL PENDING CHANGE ORDERS.................................................00.00 TOTAL THIS CHANGE ORDER ............................. .......................... 3,550.00 TOTAL % OF THIS CHANGE ORDER ... 3% TOTAL % OF ORIGINAL CONTRACT ... 11% ADJUSTED CONTRACT COST.................................................$119,672.20 (Assuming all change orders approved) ACCEPTED BY REVIEWED BY APPROVED Bl cc: City Clerk Contractor Engineer Steve White, Project Manager Project File Purchasing Date Date /U Date I UI Poteritiel Gt� rigs C)i dpr W Gu;=rorut!t 4u-J!m:llf' betailed (with Cost Info), Grouped by Each Number 0 m Nix Farm Loafing Shed Project # 10406 Tat: 720-234-7651 Fax: m' Category Reason Reference COR Nurrlbet PCCO Number Change Order Owner Dlrective Notes task Name Revenue Code This change order is based on the revised site plan Issued by Aller•Lingle Architects. Which relocated the dumpster pad to the side of the existing barn, adds adding recycled asphalt where the dumpster pad as originally designed to go as well as behind the now loafing shed and between the sheds, The ceder rence around the dumpster pad has been removed, Summary; F�tit++�te Prcpn..ed AV,'O-Ic Requested hays: 3 Budget: 3,550 0 0 3,550 Approved Days: 0 Cost: 3,550 0 0 3,550 Itemized Datalls: General Description Quote Due Quote Reeld Allocation Estimated Proposed Approved Applied 001 - • — — 10/20/2005 Budget: 2,000 0 0 2,000 WALSH SELF PERFORM Additlonai 6" Recycled Asphalt and rework of Cott: 2,000 0 0 2.000 6ubgrade at old dumpster pad, behind the news red an between the sheds — ---- — _._ w 002 • - D/20l2005 Budget: 300 0 0 — 300 --1 Overhead and profit 15% Cost: 300 0 0 300 006--- 10/20/2006 Budget: 2,000 0 0 2,000 c�Jo A&M LANDSCAPING SUBCONTRACT WORK Addition al 511 Recycled Asphalt Cost: 2,000 tl 0 2,000 O rework of subgrsde at old dumpster pad, behind the new shed and between the sheds 003- 10/20/2006 Budget: 100 0 0 100 Subcontractor 5% Markup cost: too 0 0 100 004- - 10/20/2005 Budget: (850) 0 0 (850) Credit for Cedar Fence Cost:. (850) 0 0 (850) o _ Prolog Manager Printed on: loll612005 prabdatabase Pagel