HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 24639SECTION 00950
CHANGE ORDER NO. 02
PROJECT TITLE: NIX FARM LOAFING SHED, BID NO. 5906
CONTRACTOR: WALSH CONSTRUCTION, INC.
PROJECT NUMBER: 5906
DESCRIPTION:
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Design error of beam and log column connections
2. Description of change: Revised beam and log column connections
3.
4. Change in contract cost: $2,562.20
5. Change in contract time: This Change Order will bank additional 3 days with a total of 8 days in
bank. No change at this time
(Attach additional sheets as required)
ORIGINAL CONTRACT COST..................................................$107,711.00
TOTAL APPROVED CHANGE ORDERS..........................................5,849.00
TOTAL PENDING CHANGE ORDERS.................................................00.00
TOTAL THIS CHANGE ORDER.......................................................2,562.20
TOTAL % OF THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT ... 8%
ADJUSTED CONTRACT COST.................................................$116,122.20
(Assuming all change orders approved)
ACCEPTED BY
REVIEWED BY
APPROVED BY
cc: City Clerk Project File
Contractor Purchasing
Engineer
6 v`
Date
T ze r
Date
5?1W -
Date
Thu, Aug 25, 2005
Potential Change Orders
Detailed (with Cost Info), Grouped by Each Number
Nix Farm Loaflng Shed
Project # 10405
Tel: 720-234.7651 Fax:
PCO #: 004 812612005 Added Framing Connections
Pe
Category Reason
Reference
COR Number
PCCO Number
Change Order Owner Directive
Notes
Task Name
Revenue Code
This Chance order Is gar Weeks 8 Associates, Inc. Letter dated August 17, 2005. Inoludinp the revised beam to lap connection and
Beam to foundation connection. Please note that Ian $huff has requested that we use rough sawn western cedar #2 or better instead
of the oraasura treated 2x8'a as noted by Weeks & Associates.
Summery:
Estimate Proposed
Approved
Al
Requested Days: 3 Budget:
0
�•s 7.
0
0
Approved Days: 0 Cost:
—�sw GS 0
Itemized Details:
General Description Quote Due Quote Reed
Allocation Estimated
Proposed
Approved
Al
001 — 9/1/2005
Budget;
392
0
0
Beam to Post Connection -114 Thick Plates and bolts (7 each) $54 per
Cost;
392
0
0
connection 7 connections
002- - 911/2005
Budget:
58
0
0
MelerlaLCM&for previous beam to column connection (4 boas) 7
Cost:
56
0
0
connections $2 each
003- - 9/1/2005
Budget:
770
0
0
Additional labor for revised beam to column connection 2 hours each
Cost:
770
0
0
connection 3551perhour
004- - 9/1/2005
Budget:
462
0
0
Prolog Manager Printed on: 8/25/2005 pm6database
J,..
Thu, Aug 25, 2005
Potential Change Orders
Detailed (vAth Cost Info), Grouped by Each Number
Western Cedar #2 or better 8 Bolts for Beam to foundation Connection.
Cost:
462
0
0
005- - 9/1/2005
Budget:
660
0
0
Labor to Install revised Beam to Foundation (3 Hours each connection) 12
Cost:
660
0
0
xS55/hour
006 - - 9/1/2005
Budget:
351
0
0 ) 5/
r t'�
Overhead and Profit
Cost:
351
0
0
Prolog Manager Printed on: 8.!25/2005 pm6database
2005 12:06PM
ALLER * LINGLE
ARCHITECTS �� s
P.C. rs
DATE:
August 17, 2005
TO:
Sieve White /Trent Asbury
FAX NO:
221-65U / (720) 221a1772
FROM:
Ian Shuff
7AX NO.:
(970) 223-1833
PROJECT NAME:
Nix Farm Loafing Sheds
PROJECT NO.:
0437.03
NUMBER OF SHEETS FOLLOWING THI:> SHEET: 4
Attached are details for column to beam
both beams let in to it.
i hanks,
Ian Shuff, Assoc., AIA
Aller-Lingle Architects P.C.
No. 541:3 P. 1 /5
FAX COVER SHEET
checking on the bracket type for the column
712 WHALERS WAY • BLOC. 8, SUITE 100 - PORT COLLINS • COLORADO • 80325
(970) 223-1820 phone (970) 223-1833 fax - o5ice@alter-lingle.com - www.allealingle.com
0
EAU;, i7• 20051 12:07IV WEEKS & Msc;cc.
19-20i 22S-2No. 5413 °. 2%5e, 2
August 17, 2005
Aller-Lingle Architects
712 Whalers Way
Building B. Suite 100
ort Collins, Colorado 80525
Re: Nix Farm Loafing Shed
Fort Collins, Colorado
Project No. 24433
Gentlemen:
Weeks & Associates, Inc.
Structural Engineers
On August 12, 2005 Weeks & Associates observed sorne wood connections at the referenced
project. Enclosed are additional framing connections to be used.
'rf we can be of further assistance please contact us.
Sincerely,
i
Po
Weeks & Associates,
r, s...N
o�
� 382i}7
Wendy S. Thomas, P.
9
p % r�r
structural Engineer
S�oN^�,
,�g,,.
'.
N-•
n
'3012
tural r er
Weeks &: Associstav, leo,
300 Boardw91k Drive, Building 3, Unit D. fort Collins, CO 80525
phone 97012s- Z422, Fax 9701225.2622
7. 2005:12:07PM WEEKS & ASSOC. (970) 2?5-2No. 5413 P. 3%>>.3
BEAM CONN. TO LQG POST
fi 0 LOG -� .— 5 10. x 13
F457 1/2 GLU{AM
BEAM
? /a THICK PLATE
`,1;rJUGM BOLT TO TOP
GLULAM BEAM w/
(4) 1/2"0 BOLTS
i
F
BEAM GL
1 , THROUGH BOL TO
7HICK PLATE LUG POST w/ (J)
THROUGH BOLT TO 1/2"0 BOLTS
GLULAM BEAM W/
(4) 1/2"0 BOLTS 9.d LOG
POST
g
FRONT
NIX FARM
FORT COLLINS. COLORADO
PROJECT NO. 24433
AUGUST 17, 2005
WEEKS & ASSOCIATES
NROUGH BOLT TO
3LULAM BEAM w/
:4) 1/2.0 BOLTS
THROUGH BOLT TO
LOG POST w/ (3)
1/2"0 BOLTS
Pot � s
ON;1l a _nw�
'. 2005:12:07PM WEEKS & ASSOC.
BEAM C( N N TO FOUNDATION
2ViERS PER PLAN /
-0 THROUGH BODE J
C BEAM 0 3-26 TRIMMERS
a
A
2-2x8 TREATED BOLTED TO
GLULAM BEAM, TRIMMERS
AND FOUNDATION AS SHOWN
(2) 1/2"0 x 7" HILTI KWIK
BOLT II EXPANSION ANCHORS
() BOLT. IIZLT
EXPANSION ANCHORS
S1/8"x13
1/2" GLULAM
3&1M
3-2x6
3TUDS
is?oi22s-2No. 5413 ?. 4%5:..4
2x6 TREATED
TOP PLATE
cV
CONCRUE
FOUNDATION
/ WALL
NIX FARM
FORT COLI.INS. COLORADO
PROJECT NO- 24433
AUGUST 17, 2005
WEEKS 84 ASSOCIATES
17. 2005 12:07PM
No. 541 3 P - -),, 5
5fRAC<ET ELEVATION
SCALEz 1-1/2' 6- V-04