SECTION 00300
BID FORM
PROJECT:5929 City of Fort Collins and Colorado state University Transit Center.
Place City of Fort Collins
Date Auutst 23. 2005
1. In compliance with your Invitation to Bid dated August 23, 2005 , and
subject to all conditions thereof, the undersigned
a (Corporation, Limited Liability company, Partnership, Joint Venture,
or Sole Proprietor)** authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been examined by the undersigned.
3. Accompanying this Hid is a certified or cashier's check or standard Bid
bond in the sum of 5% of total bid (S )
in accordance with the Invitation To Bid and Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Casualty Company
P.O. Box 172, Des Moines, IA 50303
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRACTOR under one of the items listed in the Bid Schedule,
irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
1 through 3
Addenda No. 1- Dated: August 4`h, 2005
Addenda No. 2- Dated: August 81h, 2005
Addenda No. 3- Dated: August 17`h, 2005
R.C. Heath Construction Co.
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
See Attached "Recently Completed Projects"
12. List your major equipment available for this contract.
Dump trucks, boom trucks, flatbed trucks, bobcats, forklifts, tractor,
backhoe and additional equipment leased as needed.
13. Experience in construction Work similar in importance to this
project:
See Attached "Similar Municipal Projects"
14. Background and experience of the principal members of your organization,
including officers:
See Attached Kev Personnel Resumes
15. Credit available: $800,000
16. Bank reference:
Home State Bank, 303 E. Mountain Ave. Fort Collins, CO 80524
Contact: Suzanne Pullen, V.P., (970) 613-2170
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the Owner? Yes
18. Are you licensed as a General Contractor? Yes
If yes, in what city, county and state? Fort Collins, CO, Larimer, Colorado
What class, license and numbers? Class A, License #A-1
19. Do you anticipate subcontracting Work under this Contract? Yes
If yes, what percent of total contract? 90o
And to whom? See Subcontractor List.
20. Are any lawsuits pending against you or your firm at this time? No
If yes, DETAIL
7/96 Section 00420 Page 2
R.C. Heath Construction Co.
21. What are the limits of your public liability? Detail:
Public Liability: $1,000,000
Property Damage: $1,000,000
Employer's Liability: $ 500,000
What Company? Travelers Insurance
22. What are your company's bonding limitations? $10,000,000+.
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at 141 Racquette Drive this 23rd day of August, 2005
R.C. Heath o struction Co.
Name of..,,Bic - A' j
By . d 1 J. DeMario /� -w
'Iritlq, �). re�ayterEt
Sty 0, C`9l-6rado
�Couritr'.of u' Larimer
RandaAl J. DeMario being duly sworn deposes and says that he is President
of R.C. Heath Construction Co. and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to befo
f�Y9✓Sf 20O5-. .d
Notary Public
My commission expires
.?3d day of
3.2Wa
7/96 Section 00420 Page 3
e.C.. R.C. HEATH CONSTRUCTION CO.
H EATH P.O DRAWER H • RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
Current Projects
Completion
Date
Project Name/Type
Location
Contract $
Owner/Contact
Phone
Architect/Contact
Phone
08/05
Evangelical Covenant Church Sanctuary
Fort Collins, CO
1,278,045
Evangelical Covenant Church
970-266-9888
RB + B Architects
970-484-0117
Facility Renovation
Randy Bremmer
Ken Field
08/05
Alta Vista Elementary School
Cheyenne, WY
1,200,000
Larimie County SD #1
307-771-2108
Pouppirt Architecture
307-778-8236
Facility Renovation
Neil Whitehead
Rande Pouppirt
09/05
Weld County School District 6, Group 3 Schools
Greeley, CO
6,786,550
WCSD 6
303-349-3089
Klipp Architects
303-893-1990
Facility Additions and Renovations
Marsh Ragland
Sam Miller
09/05
D&L Office Building #2
Fort Collins, CO
188,000
Doberstein Lemburg Commercial
670-221-1965
The Architects Studio
970-484-8125
New Facilitie
Dan Bemth
Carr Bicker
10105
Irish and Moore Elementary Schools
Fort Collins, CO
437,800
Poudre School District
97-0-490-3610
Aller-Lingle Architects, P.C.
970-223-1820
Multipurpose and Classroom Additions
Greg McGaffin
Chris Freeland
12/05
Ft Collins Oral Maxillofacial Surgery Medical Office
Fort Collins, CO
1,050,260
Dr. Mark & Mrs. Catherine on
970-481-1067
Aller-Lingle Architects, P.C.
970-223-1820
New Medical Facility
Catherine Orr
Mike Rush
12/05
Dayspring Christian School
Greeley, CO
2,056,400
Dayspring Christian Scheele
970-339-3151
Robert Shreve Architects
970-346-0151
New Gymnasium
Don Tapp
Bob Shreve
01/06
City of Fort Collins Deicing Facility
Fort Collins, CO
2,601,800
City of Fort Collins
970-221-6805
Vaught -Frye Architects
970-224-1191
New Storage Facility
Ron Kechter
Joe Frye
02/06
Homestate Bank/Raintree Facility
Fort Collins, CO
1,000,000
Home State Bank
970-622-7188
RB+B Architects
970-484-0117
New Bank Facility
Steve Fobes
David Kress
02/06
Clear Channel Com rnication
Loveland, CO
1,916,269
Erdmann Land Management
970-493-3137
Thorp Associates P.C.
970-586-9528
New Office Facility
Todd Erdmann
Roger Thorp
03/06
Ram Crossing Apartments
Fort Collins, CO
1,468,400
Cheryl DePanfilo
303-588-8994
The Architects Studio
970484-8125
New Apartment Building
Chuck Cower
303-5304065
Carr Beiker
www.HEATHCONSTRUCTION.com
R.C.
HEATH
CONSTRUCTION MANAGEMENT
R C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
Current Projects
Completion
Date
Project Name/fype
Location
Contract S
Owner/Contact
Phone
Architect/Contact
Phone
04/06
Fox Run Senior Apartments
Greeley, CO
8,000,000
Evangelical Lutheran
605-362-3195
Basis Architecture
970-586-9140
Senior Apartment Building
Good Samaritan Society
Steve Lane
Leonard Kemnitz
05/06
Centenial Supportive Housing Center
Brush, CO
2,500,000
Alcom Development
970-667-6286
Landmark Engineering
970-667-6286
HUD Assisted Living Facility
Ray Donaldson
Ray Donaldson
CSU BioEnvironmental Research Building
Fort Collins, CO
7,339,000
Colorado State University
970-491-0160
FWA Group
704-332-7004
Facility Expansion Project
Steve Keiss, Tom Moss
Randy Larsen
xx/04
Phase I - AIDL Remodel
09/05
Phase H - Discovery Suites Expansion
2006
Phase III - ASL 2 & ASL 3 Lab Expansion
2007
CSU Regional Biocontainment laboratory
Fort Collins, CO
17,417,000
Colorado State University
970491-0160
FWA Group
704-332-7004
(A Joint Venture with Hensel Phelps Construction)
Tom Moss, Steve Keiss
Randy Larsen
New Facility
v .HEATHCONSTRUCTION.com
R.C. ass"an
HEATH R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 2214195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
Selected Recently Completed Projects
Actual
Contract
Corm.
Project Na errype
Location
Amount $
Owner/Contact
Phone
Architect/Contact
Phone
08105
Fort Collins Panora Bread
Fort Collins, CO
458,700
Breads ofthe World
614457-8500
Fredrick Goglia Architect
314428-3500
Retail Tecam Finish
Kieth Willis
Frederick Goldia
08/05
Custom Blending, Inc.
Fort Callms,CO
244,765
Custom Blending, Inc.
970482-8845
Freeman Architects
970-667-3939
Facility Addition
John Conway
John Freeman
2005
A.1. Truck Storage Warehouse
Loveland, CO
1,299,914
A.1. Warehousing
970663-21W
Hauser Architects
970-669-8220
New Facility
Jay Howell
AI Hausa
2005
EPURA Riverspointe Riverwalk
Saks Park, CO
498,472
EPURA
970-577-3704
Design Studios West, Inc
303-623-3758
River Containment & Pedestrian Walkway
Wit Smith
Terry Stone
2005
Fort Collins Commerce Bank
Fort Collins, CO
448,312
Fort Collins Commerce Bank
970-204-1010
Vaught -Frye Architects
970-224-1191
Retail Tenant Finish
Germd Nalemy
Rebecca Olsen
2005
Boardwalk Plaza - Buildings & Tenant Finishes
Fort Collins, CO
2,203,866
Doberocin Lemburg Commercial
670-2214965
The Architects Studio
970494-9125
Two New Facilities
Dan Bemth
Cart Bicker
2005
D&L Office Buildings & Tenant Finishes
Fort Collins, CO
574,742
Dobe skin Lemburg Commercial
670-221-1965
The Architects Studio
970494-8125
Two New Facilities
D. Bemth
Carr Bicker
2005
City of Fort Collins Vehicle Storage Facility
Fort Collins, CO
1,923,318
Cityof FortCollins
970-2216805
Aller-Lingle Architects
970-223-1820
New Facility
Ron Kcwher
Chris Freeland
-
2005
CuNces Restaurant
Cheyenne, WY
743,468
Komfeld Koslosky Properties
303-777-0386
Wyatt & Assocuta
303698-1717
New Facility
Joe Koslosky
Dennis Wyatt
2005
Palmer Flowers
Fort Collins, CO
768,755
Palmer Properties
970-2044000
Vaught Fryc Architects
970-224-1191
Total Facility Renovation
Spiro Palmer
Louis Hinalasa
2005
First United Methodist Church Sanctuary
Fort Collins, CO
650,000
First United Methodist Church
800-888-0170
Lyman, Davidson & Dooley, Inc.
970-223-0683
Facility Renovation
Gary Gramlick
Lori Darling
2004
Community ofChrisl Gym
Fort Collins, CO
530,569
Communityof Christ
970-282-0969
M. Torgerson Architects
970416-7431
Facility Replacement
Dave Simons
Mika] Torgerson
2004
Anheuser-Busch
Fort Collins, CO
184,736
Anheuser-Busch Inc.
970-416-4611
Anheuser-Busch Inc.
970-416-4611
Facility Renovation
Eric Omer
Eric Omer
2004
Loveland Good Samaritan Kitchen
Loveland, CO
791,867
Evangelical Lutheran
605-362-3195
EIDOS Architects, LLC
970498-8400
Facility Addition & Renovation
Good Samaritan Society
Don Watkins
Leonard Kemnitz
2004
Boardwalk Plaza - Phase I
Fort Collins, CO
934,945
Doberstein Lemburg Commercial
970-221-1965
The Architects Studio
970484-8125
New Facility
Dan Bemth
Glenn Konen
2004
Boltz Junior High School
Fort Collins, CO
354,162
Poudre School District
970490-3617
Aller-Lingle
970-223-1820
Facility Addition
Tommie Simpson
Mike Rush
2004
Heritage Christian School
Fort Collins, CO
1,223,561
Heritage Christian School
970412-9605
RB+B
97048"117
Facility Improvements
John Sailer
Ken Field
2004
Thunder Mountain Harley Davidson
Loveland, CO
5,490,000
Thunder Mountain Harley Davidson
970493-3137
Thorp Associates P.C.
970-586-9528
New Retail Facility
Todd & Shelley Erdman
Roger Thorp
www.HEATHCONSTRUCTION.com
R C R.C. HEATH CONSTRUCTION CO.
HEATH P.O.DRAWER H • CORACQUETTE
(8052) DR.
FORT COLLINS, O 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
5
Actual
Contract
Comp.
Project NamwType
Location
Amount S
Owner/Contact
Phone
ArtAitect/Contact
Phone
2004
Fort Lupton Fire Station & Training Center
Fort Lupton, CO
3,469,609
Fort Lupton Fire Protection District
303-877-2258
Fisher Associates
303-795-1643
New Facility
Mark Davis
Chris Fisher
2004
Supply Cache
Fort Collins, CO
793,623
Scorched Tree, LLC
970-4724161
Architectural Resource Group
970-484-0126
New Facility
Jim Felix
Larry Trampe
2004
Ridgeview Classical Charter School
Fort Collins, CO
819,035
Ridgeview Classical Charter School
970-4944620
Architectural Resource Croup
970-484-0126
Facility Addition
Kim Miller
Larry Trampe
2004
CSU Equine Orthopedic Lab
Fort Collins, CO
367,771
Colorado State University
970-491-0159
Colorado State University
970491-0164
Facility Addition
Brian Hood
Per Hogestad
2004
Jimmy John's Sandwich Shops
Fort Collins, CO
192,401
Hynds Brothers
970-226-1071
Casco
314-821-1100
Facility Renovation
John Hynds
Frank Evans
2004
Maplewood Middle School
Greeley, CO
1,261,645
Weld County School District 6
970-377-1267
Robert Shreve Architects
970-346-0151
New Gymnasium Addition
1. W. Nelson
Bob Shreve
2004
Eastman Park Remounts
Windsor, CO
353,604
Town of Windsor
970-674-2434
Architects Studio
970482-8125
New Facility
Wade Willis
Glenn Konen
2004
National Association for Interpretation
Fort Collins, CO
931,231
Nall Association for Interpretation
970484-8283
Hauser Architects, P.C.
970-669-8220
New Office Facility
Tim Merriman, Ph.D.
Alan Hauser
2004
Tam John's - Good Times Restaurant
Cheyenne, WY
192,179
Taco John's International, Inc.
800-854-0819
Fisher Group Architects
937-224-3344
Facility Renovation
Jim Nichols
Doug Fisher
2004
Redeemer Lutheran Church
Fort Collins, CO
3,808,318
Redeemer Lutheran Church
970-225-9020
Mark Belford Architects
970407-0070
New Facility
Pasant Tim Rurmch
Mark Belford
2004
Estes Park Medical Center
Estes Park, CO
109,798
Estes Park Medical Center
970-586-2317
H&L Architecture
303-295-1792
Heart Center Renovation
Doug Faus, CEO
Daniel DiMarco
2004
Deaver Brass & Coppper Warehouse
Loveland, CO
440,690
AdJac Construction Co., LLC
970-356-511
Architectural Resource Group
970-484-0127
New Facility
Terry Jaccaud
Larry Trampe
2004
Taco John's Restaurant Spring Creek
Fort Collins, CO
566,003
Taco John's International, Inc.
800-854-0819
Fisher Croup Architects
937-224-3344
New Facility
Jim Nichols
2004
Akron Prairie Vista Apartments
Akron, CO
1 j 16,563
Housing Authority ofthe
970-345-6538
Hauser Architects, P.C.
970-669-8220
New Assisted Living Facility
Town of Akron
Al Hauser
Donna Butz
2003
Loveland Fire and Administration Building
Loveland, CO
1,040,339
Cityof Loveland
970-962-2635
Kenney & Associates
970-663-0548
Facility Renovations
Ken Cooper
Catherine Scott
2003
East Morgan Community Hospital
Brush, CO
1,309,314
Fast Morgan City Hospital District
970-842-6200
H & L Architecture Ltd, AIA
303-295-7192
Facility Emergency Addition
Anne Platt
Russell Veazey
w .HEATHCONSTRUCTION.coM
R.C. R.C. HEATH CONSTRUCTION CO.
H H P.O. DRAWER • RACQUETTE DR.
EAT
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
Actual
Contract
Camp.
Project Name/Type
Location
Amount S
OwnedContact
Phone
Architect/Contact
Phone
2003
CSU Lory Student Center
Fort Collins, CO
2,020,631
Colorado State University
970-491-0160
Oz Architecture
303-861-5704
Food Service Renovation
Tom Moss
Kelly Yamasaki
2003
Windsor Field House & Bus Bam
Windsor, CO
1,033,227
Weld County School Dist RE4
970686-5695
Hauser Architects, P.C.
970-669-8220
Two New Facilities
RLH Engineering (Ownds Rep)
AI Hauser
2003
Yancey's Food Service Company
Loveland, CO
7,179,380
Yanceys Food Service Company
9706134333
Bozich Architects
913-342-8120
New Office/Distribution Facility
Greg Yancey
Don Bunch
2003
EPURA Performance Park/Whitewater Park
Estes Park, CO
1,328,637
Estes Park Urban Renewal Authority
970-577-3704
Thorp Associates P.C.
970-58&9528
New Amphitheater and Park Facility
Will Smith
Roger Thorp
2003
Poudre Fire Authority
Fort Collins, CO
1,373,824
Poudre Fire Authority
970-416-2895
Vaught -Frye Architects
970-224-1191
New Fire Station #14
Bob Poncelow
Joe Frye
2002
Morgan Community College
Fort Morgan, CO
3,854,046
Morgan Community College
970-542-3127
DLR Group
303-778-0904
Auto Program Relocation & Spruce Hall Repairs
Susan Clough
Tim Christensen
2002
Ridgeview Classical School
Fort Collins, CO
1,073,517
Ridveview Classical School
303-589-5511
Zeiler -Pennock Architects
303-455-3322
Facility Addition
Michael Tashman
Jeanne Fielding
2002
Front Range Community College
Fort Collins, CO
4,593,325
Front Range Community College
303-46&8811
Davis Partnership Architects
303-861-8555
Mt AntemBlanca Peak Buildings Renovations
Bob Rizzuto
Edward Ehrramr
2002
Poudre Health Services Dental Offices
Fort Collins, CO
1,618,653
Poudre Health Services
970-224-5209
CCMK
970-493-1220
New Facility
Chris Sheafor
Sylvie Glass
2002
Interstate Honda Motorsports
Foil Collins, CO
1,004,715
Loveland Motor Sports
970-667-0224
Architectural Resource Group
970484-0126
New Dealership Facility
Marshall Van Thorne
Larry Trampe
2002
First United Presbyterian Church
Greeley, CO
1,895,453
First United Presbyterian Church
970-3526565
Lec Architects
303-9894500
Facility Addition
John Trull
Scott Boduch
2002
Adams County Parks/CSU Extension Building
Henderson, CO
2,088,600
Adams County, CO
3036546002
Bley & Associates
970-330-3322
New Facility
Pat Myers
Lauren Bley
2002
Windsor/Severence Fire Station
Windsor, CO
1,719,241
Windsor/Severmce Fire
970686-95%
Vaught -Frye Architects
970-224-1191
New Facility
Protection District
Joe Frye
ChiefJcmy Ward
2002
Ogallala High School
Ogallala, NE
1,090,807
Ogallala School District
308-284-6751
Baker & Associates
308632-3123
Facility Addition
Don Bantling
Clint Taylor
2002
Good Samaritan J/P. Martinez Apartments
Greeley, CO
2,577,069
Evangelical Lutheran
605-362-3193
Landmark Engineering Ltd
970-6676287
New Facility
Good Samaritan Society
Bruce Meyer
Leonard Kemnitz
2001
Timberline Branch, Home State Bank
Fort Collins, CO
1,234,133
Home State Bank
970622-7188
RB+B Architects
970-484-0117
New Facility
Steve Fobes
George Brelig
w W W . HE A THCON STRUC TION.coM
R.C.
HEATH R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
Municipal Projects
Date
Contract
Comp.
Project NamNrype
Location
Amount S Owner/Contact
Phone
Architect/Contact
Phone
City of Fort Collins
I of4
01/06
City ofFon Collins Deicing Facility
Fat Collins, CO
2,601,800 City of Fan Collins
970-2216805
Vaught -Frye Architects
970-224-1191
New Storage Facility
Ron Kechter
Joe Frye
2005
Vehicle Storage Facility
Fort Collins, CO
1,923,318 CityofFort Collins
970-2216805
Aller-Lingle Architects, P.C.
970-223-1820
New Pre -Engineered Steel Bldg & Site work
Ron Kechrer
Mick Alter
2004
Boxelder Sanitation District Maintenance Building
Fat Collins, CO
183,690 Boxetder Sanitation District
970498-0604
Architectural Resource, Group
970-084-0126
Office Teran Finish
Patricia Mathena
Larry Trampe
2003
Downtown Enhancement Project
Fort Collins, CO
828,265 City of ort Collins
970-2216798
bha design, inc.
970-223-7577
Streetscape Project
Rick Richter
Jennifer Torrey
2003
Padre Fire Audxmity
Fort Collins, CO
1,373,824 Padre Fine Authority
970-4162895
Vaught -Frye Architects
970.224-1191
New Fire Station #14
Bob Poncelow
Joe Frye
2002
Bmclder Sanicnion District Maintenance Building
Fort Collins, CO
310,909 Boxelder Sanitation District
970-498-0604
Architectural Resonce Group
970484-0126
New Facility
Ra"bft Srivastava
Larry Trampe
2002
Souduidge Golf Course Storage Building
For Collins, CO
161,173 City of Fort Collins
970-2216273
Alter -Lingle Architects, P.C.
970-223-1820
New Facility
Steve White
Mick Aller
2000
Clearview Cbanacl Phase I
FM Collins, CO
402,942 City ofFort Collins Utilities
970-221-6884
Anderson Consulting Engineers
970-226-0120
Flail Control Structure
Keith Meyer
Ceeg Koch
1999
Colorado Some Patrol Building
Fat Collins, CO
1,010,357 State ofColaado
303-239-4646
Rah & Shepard Architects
303-5344007
New Facility
Robert Dimberger
Suranne Lanyi
1998
Fire Station No 12
Fat Collins, CO
1,025,924 Padre Fire Authority
970-2216581
Vaught -Frye Architects
970-224-1191
New Facility
Mel Carlson
Aubrey Carson
1998
FRCC Harmony Lary
For Collins, CO
3,418,294 City ofFat Collis Public Library
303404-5408
Davis Partntrit* PC
303-861-8555
New Facility
David Besel
Curtis Cox
1999
Ponds: Fire Station No. 9
For Collins, CO
430,048 Paudre Fire Audxmity
970-2216273
Vaughn -Frye Architects
970-224-1191
New Facility
Slew White
Joe Frye
1995
Padre Fire Authority Training Center
Fort Collins, CO
1,755,233 Padre Fire Authority
970-221-6273
Architecture Plus
970-493-1220
New Facility
Steve White
Tan Kden
wow. HEATHCONSTRUCTION.coM
R.C.
HEATH R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970)221-4195 FAX(970) 221-2907
CONSTRUCTION MANAGEMENT
Municipal Projects
Date Contract
Comp. Project Name/Type Location Amount $ Owner/Contact Phone ArchitectfContact Phone
1994
Fire Station No. 10
New Facility
1992
Water Treatment Plant M2
New Facility
1991
Water Quality lab Expansion
Facility Addition
1991
Rogers Park
Ncw Park
1984
Old Town Plaza/Square
Town of Estes Park
2005
EPURA Rivcrspomtc Riverwalk
River Containment & Pedestrian Walkway
2004
EPURA Restroams
New Facility
2003
EPURA Performance Park/Whitewara Park
New Amphitheater and Park Facility
2002
Estes Park Municipal Building
FacilityRemodel and Addition
2002
Estes Park Public Library
Facility Audition
2000
Estes Park Medical Center Imaging Expansion
Facility Improvements
2000
Estes Pack HydroElectric Plant
Historic Renovation
1996
Darnels Fire Station
New Facility
1995
Estes Park Walkway Phase B
Streetscape Renovation
Fat Collins, CO
714,646 Poudre Fire Authority
Steve While
Fore Collins, CO
942,934 City of Fat Collis
Jim O Ne01
Fat Collins, CO
718,000 CityofFat Collins
Terry Robinson
Fat Collins, CO
515,615 City ofFort Collns
Leslie Bryson
Fat Collins, CO
528,355 Dowmown Development Authority
Estes Park. CO
498,472 Estes Park Urban Renewal Authority
Will Smith
Estes Party CO
170,320 Estes Park Urban Renewal Authority
Will Smith
Estes Park, CO
1,328,637 Estes Park Urban Renewal Authority
Will Smith
Estes Park, CO
816,123 TownofPstes Park
Richard Widmer
Estes Park, CO
689,205 Estes Vallcy Public Library District
Ed Volz
Estes Park, CO
440,600 Estes Park Medical Center
Andrew Wills
Estes Park, CO
415,597 Town of Estes Park
Michael Mangelsen
Estes Park, CO
1,012,105 Town of Estes Park
Richard Widmer
Estes Park, CO
170,451 Estes Park Urban Renewal Authority
Art Anderson
970-212-6611 VaughNFrye Architects PC
Joe Frye
970-221fi775 P-B+B Architects
George Brelig
970-221-6500 Black &Veatch
John Ezell
970-221-6500 City ofFort Collins Engineering
IusBe Bryson
970484-2020 SLP, A ProfessiaW Corp.
970-577-3704 Design Studios West, Inc.
Terry Stale
970-577-3704 Tharp Associates P.C.
Roger Tharp
970-577-3704 Thorp Associates P.C.
Roger Thorp
970-5864464 Thorp Associates, PC
Roger Thorp
970-586-8116 Thorp Associates, PC
Roger Thorp
970-586-2317 H&L Architecture Ltd, AIA
Rob Davidson
970-586-5331 Jung HceRArchitects
Cray Long
970-5864464 Thorp Associates, PC
Roger Thorpe
970-586-5331 Design Studios West, Inc.
Jeffrey Joyce
970-224-1191
2 of4
970484-0117
303-6714200
970-221-6500
303-623-7031
030-623-3759
970-5869528
970-SW9528
970-586-9528
970-586-9528
303-244-9350
303-569-2456
970-586-9528
303.623-3465
W W W.HEATHCONSTRUCT[ON.coM
R.C.
HEATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221.4195 FAX (970) 221-2907
Municipal Projects
Date
Contract
Comp.
Project NarnoType
Location
Amount S Owner/Contact
Phone
Archftect/Contact
Phone
Town of Estes Park Continued
3 of4
1995
Estes Park Finishes
Estes Park, CO
156,557 Estes Park Unborn Renewal Authority
970-586-5331
Design Studios Wal, Inc
303-623-3465
Rwerwalk Extension
Art Anderson
Jeffrey Joyce
1994
Estes Park Medical Center
Estes Park, CO
1,796,006 Estes Park Medical Center
970-586-9513
Fischer, Reece & Johnson
303-777-0407
Facility Addition
Andrew Wills
John Reece
1991
EPIIRA Parking to
Estes Park, CO
111,383 Estes Park Urban Renewal Authority
970-586-5331
Estes Park Urban Renewal Authority
970-586-5331
New Parking La
An Anderson
An Anderson
1990
Big Thompson Rwerwalk Phase B
Estes Park, CO
4%,681 Estes Park Urban Reomal Authority
970-586-5331
Design Studios West, Ice,
303-623-3465
Rwerwalk Extension
An Anderson
Jeffrey Joyce
1990
Estes Park Medical Center
Estes Park, CO
577,960 Estes Park Medical Center
970-586-9513
Fischer, Reece & Johnson
303-777-0407
Addition
Andrew Wills
Jahn Race
t990
Estes Park Medical Center
Estes Park, CO
577,960 Estes Park Medical Center
970-586-9513
Fischer, Race & Johnson
303-777-0407
Addition
Andrew Wills
Jim Reece
1989
Estes Park Strevocape 4
Estes Park CO
83,721 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Ice.
303-623-3465
An Anderson
Jeffrey Joyce
1998
ConRuenee Rwffkaa Park
Estes Park CO
755,873 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, her.
303-623-3465
An Anderson
Jeffrey Joy"
1987
Estes Park Padndg Lot Improvements
Estes Park, CO
200,134 Fares Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
An Anderson
Jeffrey Joyce
1997
Estes Park Streetscape, Phase 3
Estes Park, CO
489,609 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc
303-623-3465
An Anderson
Jeffrey Joyce
1985
Estes Park Streetscape, Phase 2
Esw Patk, CO
590,809 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, ha
303-623-3465
An Anderson
Jeffrey Joy"
www.HEATHCONSTRUCTION.com
t
ADDRESS:
B. BIO SCHEDULE:
A. WISE BID (LUMP SUMS 3 (O DO 1O .Y
BASE BID IN WORDS �YQ Wl,\t�`L `Dollars
B. ALTERNATES
$ 135,600 1. Exterior stair canopy: ADD to base bid
$ 0 600 2. Skylights at entry vestibule: Use Stone in lieu of
stucco and plaza level new addition pending acceptable match:
ADD to base bid
S 00p 3. Provide roll down grilles ! plaza a lover level: ADD to base
bid
S yid. Use stone in lieu of Stucco, and plaza level new addition
pending acceptable match: ADD to base bid
$ 000 5. Interior electrical fixture upgrade: ADD to base bid
$ '7 S� iiW 6. Extend Elevator to upper floors and provide all upper level
renovation as noted: AM to base bid
Electric door openers at handicapped restroom, Lower Level as
noted: ADD to base bid
$ Deleted a. Eire Main upgrade pending flow test report, as noted: ADD to
base bid
R.C.annan
HEATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
Municipal Projects
Date
Contract
Comp, Project NameiTyoe
Location
Amount S Owner/Contact
Phone
Architect/Contact
Phone
City of Loveland
4 of4
12/03 Loveland Fire and Administration Buildmg
Loveland, CO
1,040,339 Ciry 0f LoveWd
970-962-2635
Kenney & Associates
970663-0548
Facility Renovations
Ken Cooper
Catherine Scott
1998 Fire Station No 5
Loveland, CO
567,285 City of Loveland
970-962-2670
Architecture One
970669-9060
New Facility
Dun Williams
Al Hauser
1996 Loveland Public Library
Loveland, CO
379,147 City of Loveland
970-962.2670
Architecture One
970-6696090
Facility Addition
Don Williams
AI Hauser
Town of Windsor
2004 Fasonan Park Public Resnomnt
Windsor, CO
347,521 Town of Windsor
97"9&7476
The Architects' Studio, Int.
970-482-8125
New Facility
John Voulo
2002 Windsor/Severence Fire Swim
Windsor, CO
1,709,633 Widsor/Severenee Fire
970696-9596
Vaught -Frye Architects
970-224-1191
New Facility
Prolectim District
Joe Frye
1998 Windsor Joint Use Maintenance Facility
New Facility
1988 Windsor Municid Pool
New Facility
City of Golden
1992 Golden Surcuscape
Sheelscape Renovation
Chieflerry Wand
Windsor, CO 1,200,604 Weld Co. School Dist. RE-4
Jdm Moore
Windsor, CO 713,833 Town of Windsor
John Voulo
Golden, CO 1,701,000 City of Golden Public Works
Dan Hammon
970-686-2963 Architeenue One 970669-9060
At Hauser
970686-7476 ARJX Cosporatim P.C. 970-356-3930
Bob Shreve
303-279-5602 TST Inc. Consulting Engineers 303-792-0557
John Cotton
www. HEATHCONSTRUCTION.coM
RANDY DEMARIO
PRESIDENT
Randy is a graduate of Southern Illinois University with a degree in Structural Engineering.
Eight years in the aerospace industry with Rockwell International and McDonnell Douglas
were instrumental in Randy's abilities to deal with complex systems and schedules. With
Heath Construction since 1992, Randy has managed a variety of complex projects and has
developed an intimate knowledge of the processes necessary to move from a conceptual plan
to actual construction. As President, Randy oversees and guides all strategic and operational
functions of the company.
EDUCATION
1988 — 1992 University of Southern California. Los Angeles, California
Classes toward Master of Science. Civil Engineering
1981 — 1985 Southern Illinois University, Carbondale, Illinois
Bachelor of Science, Structural Engineering
PROFESSIONAL EXPERIENCE
1992 - Present R.C. Heath Construction Co._ Fort Collins. Colorado
President
1988 - 1992 McDonnell Douglas Corporation, Huntington Beach, California
Manager - Structural Analysis, Advanced Launch Vehicles
1985 - 1988 Rockwell International. Downey_ California
Structural Dcsign/Analysis, US Space Station
RC. HEATH C0NS"rR11C"r10N CO.
P O DRAWER 11 • 141 RACQUET-1-I:, DR
FO RT COLI.INS. CO 80S22 (80S24)
n)NI IHt,( I1N 11 1N V,FMI N1 (97()12214195 I;AX(97(1)221 2907
DORAN GEISE
PRE -CONSTRUCTION
Doran's extensive background in business is highlighted by his national and international
project management and business development experience. As an experienced administrator
and negotiator Doran will efficiently and effectively move your project through all stages of
preconstruction and ensure all preparations are completed for construction.
EDUCATION
1981 — 1984 Iowa State University, Ames, Iowa
College of Design, BLA — Planning and Landscape
Architecture
1979 — 1981 University of Northern Iowa, Cedar Falls. Iowa
School of Business, Classes toward Bachelor of Arts, Business
Management & Accounting
PROFESSIONAL EXPERIENCE
2005 — Present R.C. Heath Construction Co., Fort Collins. Colorado
PreConstruction
2000 — 2005 Spatial Sciences & Imaging, Fort Collins, Colorado
President, Remote Sensing and GIS Services
1998 — 2000 3131 LLC, Easton, Maryland and Fort Collins, Colorado
Manager, Western Region, Geospatial Services
1991 — 1998 Earth Information Systems Corporation, Austin, Texas and
Fort Collins, Colorado
Owner, Vice President, Manager — Oil & Gas Services Group
1984 — 1991 Richardson Vcrdoorn, Inc.
Vice President — Senior Development Consultant, Pro_icct
Manager
R.C. HEATH CONSTRUCTION Co.
Fk"�`
�°
P.o_ DRAWER 11 • 141 RACQUE 1" FP. DR.
FOR r ��o1.1.tNs. Co 801,22 (805214>
(9701221-419> FAX(970)221 2907
(I)WA (Tit)\ at-NVXN1C�T
CHRIS W. CLAFLIN
CHIEF ESTIMATOR
Chris brings a wealth of knowledge to any construction project. His work was critical to
the early success of Heath Construction. Chris brings hands on management, estimating
and construction expertise to every project_ As Chief Estimator, Chris is responsible for
all -estimating activities and staff.
EDUCATION
1966 — 1972 Colorado State UniversitN, Fort Collins, Colorado
Bachelor of Science in Civil Engineering
PROFESSIONAL EXPERIENCE
2000 — Present R.C. Heath Construction Co., Fort Collins, Colorado
Chief Estimator. Operations Manager
1989 — 2000 HBE Corporation, Rocklin, California
Regional Manager, Senior Estimator
1978 — 1989 R.C. Heath Construction Co.. Fort Collins, Colorado
Vice President, Chief Estimator, Project Manager
1976 — 1978 Reid Burton Construction Co., Fort Collins, Colorado
Estimator, Assistant Project Engineer
R.C. Hr A'm CONSTRUCTION CO.
41., ` F-O DRAWER H. 141 RACOUl (IT DR.
ORT CO 1 AS, CO 40522 (80' 224)
�t)A�IHt (il�w +tav �Gf ar�i ('>Ni 221-4195 1WK (970) 22} '2907
KNOW ALL MEN
as principal, and
hereby held and
OWNER, in the sum
truly to be made,
and assigns.
SECTION 00410
BID BOND
BY THESE PRESENTS;
mployers Mutual Casualty
R. C. Heath
that we,
.firmly bound unto the City or
of $ 5% of Bid Amount for thi
we hereby jointly and severally
Construction Co.
the undersigned
as Surety, are
.ins, Colorado, as
payment of which, well and
bind ourselves, successors,
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and
hereby made a part hereof to enter into a Construction Agreement for the
construction of Fort Collins Project, City of Fort Collins and Colorado State
University TFansit Center
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Aid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remain
in force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that: the
obligations of said Surety and its BOND shall be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in
the State of Colorado and be accepted by the OWNER.
7/96
Section.00410 Page 1
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 18th day of August_ , 20 05, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set
forth above.
PRINCIPAL
Name:R. C. Heath Construction Co.
Address: PA Drawer H
Fort Collin,, CO
By:
Title:
SURETY
Employers Mutual Casualty Compaq
P.O. Box 370010
Denver, CO 80237
By:
Title: Attorney -in -Fact
7/96 Section 00410 Page 2
No Text
7.0 Bid Security
Alliance Construction Solutions, LLC has provided a bid bond in
accordance with the Invitation to Bid and Instruction to Bidders.
Please see section tab "Bid Bond".
Alliance
CONSTRUCTION SOLUTIONS
R.C. Heath Construction Co.
C. UNIT PRICER
1. S ADD Trash/Ash Receptacle:
$
DEDUCT ADD or DEDUCT, one trash/ash receptacle per specifications,
install complete.
2. $AP
DD Flagstone veneer per specifications:EDUCT ADD or DEDUCT, one square foot of 4" flagstone veneer
per specifications, installed complete.
3. S 3Y ADD Thin veneer flagstone veneer (approved match):
$ DEDUCT ADD or DEDUCT, one square foot of thin veneer flagstone
veneer (approved match), installed complete.
4 $ Xr ADD Electrical outlets:
v;0$4$�DEDUCT ADD or DEDUCT, on electrical outlet per spec, complete.
5. $ pis ADD Data outlets:
S—�Y—DEDUCT ADD or DEDUCT, one data outlet par spec. complete.
S. b ✓3rQADD ADD or DEDUCT, one LF of upper and lower rAbinet p. lam
$DEDUCT millwork *pee, complete
7. $ ADD ADD or DEDUCT per sf of interior wall demolition
$
DEDUCT
8. $ ADD ADD or DEDUCT per of of new gyp. bd. studs interior wall
$ DEDUCT
9. $ ADD ADD or DEDUCT per of of interior painting
b # DEDUCT
10.6 11ADD ADD or DEDUCT each typical 6" X 6" room sign
$ DEDUCT
11.61&LLADD 41 ADD or DEDUCT per s£ carpet, Types 11 2, 3, and 4.
S DEDUCT #1
$ D #2
$ DEDUCT b2
$ S AAADD $3
s DEDvcT *3
$ ADD #4
$ #soOEDUCT #4
12.$ 20 ADD ADD or DEDUCT per of ceramic tile 2" X 2" installed price
$ =DEDUCT-
13.$_IPCLAbD ADD or DEDUCT each 2ft X 2ft terrazzo the
$ DEDUCT
24.$ 4ADD ADD or DEDUCT per square yard concrete paving
R.C. Heath Construction Co.
$SILDEDUCT
15.$ 7q ADD
$DEDUCT
1641 ADD
$__Lo__-DBDUCT
17.6 41SADD
$ d* DEDUCT
18.$ 91�ADD
3 �OSDUCT
19.5 sZ ADD
$ DED=
20 4.4MADD
$ �DEDOCT
21. $ ,2S0 ADD
$�DEDDCT
22.$ IsbOADD
$ Ti� DEDUCT
23.5_/_S ADD
$ ) DEDUCT
ADDorDEDUCT per square yard colored concrete paving
ADD or DEDUCT per sf stucco reveals
ADD or DEDUCT TYPE A-1 Pendant fixture installed- complete
ADD or DEDUCT TYPE N-2 Downlight installed cosplete
ADD or DEDUCT per sf sealed stained concrete
ADD or DEDUCT one 3070 SCRD Door and XK frame complete with
hardware
ADD Or DEDUCT one LF of stonefaced knee wail
ADD or DEDUCT one LF of rubber base
ADD Or DEDUCT one LF of the base
24.$ S ADD ADD or DEDUCT one LF of granite base
S-&DEDUCT
*Contractor Clarification: All art pricing is NOT included in the base bid. Reference Addenda #2, General Item Note 10.
Per David Griggs, the artwork is provided to the project under separate contract.
* D. ART PRICINGS
Artist David Griggs (303) 446-3030, 715 Galapago St. Denver, CO 80204
I. Etched glass railing panels - Detail #12 - Sheet A-7.1 - delivery of
glass from railing mfg to Great Panes Glass works Inc. - 4410
Washington Ave. - Denver, Co 80216 - 303-294-0927 - artist vendor
will provide the photo emulsion etch k deliver to site upon
completion for installation by General Contractor.
SIN BASE BID (photo emulsion price by other)
2. Layered wall board - Detail I13 - Sheet A7.1 - Has Relief - Layered
4"MDF. Pre -assembled machine cut panels, typically 294m x V, to be
delivered to site as panels by artist with placeaent instructions for
installation. Contractor to install per instructions - artist will
supervise installation. Contractor to paint after installation.
R.C. Heath Construction Co.
$ 6 sO Cost of installation and painting
3. Exterior rail panels - Detail N3 - sheet A3.2- cut steel and copper
sheet - pre -assembled and painted panels, typically 206" x 4*5", to
be delivered to site by artist for installation by contractor. Artist
will provide placement instructions. Panel weight to be confirmed
and installation approved by structural engineer and architect.
Contact artist for panel weights.
$ 0� _Cost to inatall(Cut panels by other)
S �f of Q Credit to delete horizontal rails as indicated on
elevations
4.Floor Pattern - Detail #2 - Sheet A1.5 - saw -cut design- additional
design work on floor as shown on plans to be installed by Contractor.
Artist will provide scaled detail drawings and supervise
installation.
S 1,000 Cost to install
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dawatering, overhead, profit, insurance, etc., to cover
the complete Mork in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole, discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twentysf#ve percent (M) of the total Agreement Price.
,rew'.t
RES "(ILLY I
"""N
AAA)
N "A / August 23.2005
Signature Ra all J. beMario Date
_ "
title
Fort Collins A-1
r
License Number (If Applicable)
\Bid~ is
by corporation)
Attest:
Ronald S. Erickson,
Asst. Secretary
Address P.O. Drawer H
Fort Collins Colorado 90522
Telephone (970)-221-4195
COLORADO DEPARTMENT OF TRANSPORTATION PROJECT NO. 5929
ANTI -COLLUSION AFFIDAVIT r.ocATwN
Fort Collins
I hereby attest that I am the person responsible within my firth for the final decision as to the price(s) and amount of this
bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on
his or her behalf and on behalf of my firm.
I further attest that:
t. The price(s) and amount of this bid have been arrived at independently, without consultation, communication or
agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder
or potential prime bidder.
2A. Neither the price(s) nor the amount of this bid have been disclosed to any other fine or person who Is a bidder or
potential prime bidder on this project, and will not be so disclosed prior to bid opening.
2B. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on
this project have been disclosed to me or my fine.
3A. No attempt has been made to solicit, cause or induce any fine or person who is a bidder or potential prime bidder to
refrain from bidding on this project, or to submit a bid higher than the bid of this fine, or any intentionally high or non-
oompefitive bid or other form of complementary bid.
3B. No agreement has been promised or solicited for any other firm or person who Is a bidder or potential prime bidder
on this project to submit an intentionally high, noncompetitive or other forth of complementary bid on this project
4. The bid of my fine is made in good faith and not pursuant to any consultation, communication, agreement or
discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom-
petitive or other form of complementary bid.
5. My firth has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or
services from any firm or person, or offered, promised or paid cash or anything of value to any firm or person,
whether in connection with this or any other project, to consideration for an agreement or promise by any firm or
person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid
or agreeing or promising to do so on this project.
6. My fine has not accepted or been promised any subcontract or agreement regarding the sale of materials or
services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person,
whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high,
noncompetitive or other foim of complementary bid, or agreeing or promising to do so, on this project
7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities
relating to the preparation, approval or submission of my firm's bid on this project and have beenadvised by each of
them that he or she has not participated in arty communication, consultation, discussion, agreement, collusion, or
other conduct inconsistent with any of the statements and representations made in this affidavit.
8. 1 understand and my firth understands that any misstatement in this affidavit is and shall be treated as a fraudulent
concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this
contract
1 DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMEyT-AtiE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE.
c«noamrs amt or oompmy nmo
R.C. R
Wm or oomp"
Construction Co.
By
Ta.
Swornto before me this .�3 day of, �P' ' I 20 p -
Nobly PybYe
co
my �ffdsww
NOTE: This document must be signed In ink.
Dw
com roan wa utn
1.
.COLORADO DEPARTMENT OF TRANSPORTATION Project No.:
UNDERUTILIZED DBE (UDBE) BID 5929
CONDITIONS ASSURANCE Location:
Fort Collins
Instructions: Contractor — Complete and submit this form with your bid. Report only Underutilized DBE (UDBE) participation percentages which
qualify under the contract goal specification for this project.
POLICY
It Is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have maximum opportunity to
participate In the performance of contracts financed with federal state or local entity funds.
UNDERUTILIZED DBE PARTICIPATION COMMITMENT
1) Will your company's Underutilized DBE (UDBE) participation commitment meet contract goals? ❑ Yes 5?"ONo
2) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below: Ojm%
3 list the UDBE firma committed work items, and el1WQlble UDBE percent of your bid that are committina to each
UDBE FIRM NAME
CERTIFICATION
COMMITTED
SUBCONTRACT
ELIGIBLE
EXP. DATE
WORK ITEM(S)
CATEGORY
UDBE %
❑ Subcontractor
��•�•
❑ Supplier ❑ Broker
❑ Subcontractor
2'
❑ Supplier ❑ Broker
%
❑ Subcontractor
3.
❑ Supplier ❑ Broker
%
❑ Subcontractor
❑ Supplier ❑Broker
❑ Subcontractor
❑ Supplier [I Broker
❑ Subcontractor
6.
!
❑ Supplier ❑ Broker
yO
BOX A. TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT:
Round percentage amounts to the nearest hundredth
' Additional instructions on how to calculate the actual eligible amounts and percentages for the subcontractor, supplier, and broker categories
are available on the CDOT Forth #715 and In the *Counting DBE Participation Toward Contract Goals and CDOTs annual DBE goat section of the
WE — Definitions and Requirements' in the Standard Special Provisions.
I understand that, If my company is determined to be the low bidder for the contract on this project. I must submit a completed
CDOT Forth #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed on this form to the .
Transportation Department by 4:00 pm the day after the bids are opened. The actual amounts submitted on each CDOT Form
#715 must equal or exceed the percentage commitments documented on this form. In addition, If my company does not
meet the DBEIUDBE goal for this project. I must submit a completed CDOT Form 9718 DBE GOOD FAITH EFFORT
DOCUMENTATION before the above stated deadline. CDOT Forth #715s submitted for firms not included on this form, OR
for amounts exceeding those listed on this form, will be accepted but NOT counted as Good Faith Efforts. Only the efforts
the contractor made g j,Qj to the bid opening will count as Good Faith Efforts.
I understand my obligation to abide by the policy stated above. I shall not discriminate on the basis of race, color, age, sex, national
origin, or handicap In the bidding process or the performance of contracts.
I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY
KNOWLEDGE.
Company Name: Date:
R.C. Heath Cp9truct' n Co. 8 / 23 /2005
Company Officer Signature: / Title:
Randall J. DeMario President
P ous editions may not be used CDOT Form 714 08164
R eat ons ct' n Co.
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM SUBCONTRACTOR
7/96 Section 00430 Pagel
R.C. Heath Construction Co.
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: R.C. Heath Construction Co.
2. Permanent main office address: 141 Racquette Drive, Fort Collins, CO
3. When organized: July 29, 1977
4. If a corporation, where incorporated: Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 28 years
6. Contracts on hand: {Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
See Attached "Selected Current Protects"
7. General character of Work performed by your company:
Job Site Supervision, Structural Concrete, Rough and finish Carpentry,
General Field Labor, Steel Erection
8. Have you ever failed to complete any Work awarded to you? No
If so, where and why?
9. Have your ever defaulted on a contract? No
If so, where and why?
10. Are you debarred by any government agency? No
If yes list agency name.
7/96 Section 00420 Page 1