Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5929 CSU TRANSIT CENTERSECTION 00300 BID FORM PROJECT:5929 City of Fort Collins and Colorado State University Transit Center Place Ft. Collins Date 8/23 05 1. In compliance with your Invitation to Bid dated 7/ 21/05 , and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)" authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% bid amount ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: EMC Insurance 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through % _. COLORADO DEPARTMENT OFTRANSPORTATION Project UNDERUTILIZED DBE GOOD FAITH EFFORT Location DOCUMENTATION Date The Contractor who is the apparent low bidder on a CDOT construction project and has failed to meet the Underutilized DBE (l contract goals shall use this form to document good faith efforts made to date by said Contractor to attempt to meet these goals. FAILURE TO FULLY COMPLETE THIS FORM MAY RESULT IN REJECTION OF THE BID. Each portion of this form is to be addressed in the space provided, or on supplemental sheets. Attach supporting documentation as required. This completed form and required attachments are to be submitted to the Business Programs Office in the Center for Equal Opportunity prior to 4:00 p.m. on the day after the day bids are opened. This form may be submitted by FAX (303-757-9019) with an original copy to follow. An extension may be granted by the DBE Liaison. Solely at its discretion, CDOT may request additional information and accept additional UDBE participation at any time and prior to the final decision concerning Good Faith Efforts. I. List sufficient bid items (including portions of bid items) identified as subcontract work to be performed by UDBEs to achieve the established UDBE participation goal. Indicate the total percentage of work identified for UDBE participation. The total percentage of subcontract items identified for UDBE participation must equal or exceed the percentage goal established by CDOT. II. For each subcontract item identified, contact by mail, FAX and/or telephone a minimum of two currently CDOT-certified UDBEs whose work and function codes match the type of work being solicited. For projects in areas of the state where there are more than two UDBEs capable of performing identified subcontract items, contact at least two thirds of those UDBEs. If soliciting by telephone, provide a telephone log of calls, including topic of discussion, date, time, name of person contacted, and the response received. If soliciting by mail, provide copies of letters to UDBEs and theirresponses. Letters and FAXes must specifically identify the project, the items to be subcontracted, and the bid date. Letters and "FAXes must provide an address and phone number where specific quantities or details will be available to bidders. The Contractor shall provide sufficient time to allow the UDBEs to participate effectively in the bidding process. Submit a detailed explanation addressing failure to provide any of the above. Original -Business Programs Office, Copy -Contractor OVER Previous editions are obsolete and may not be used CDOT Form 0718 3199 III. List all UDBE and non-UDBE bidders, bid dollar amounts for each bid item, and the name of the successful bidder. Describe how bid items were broken down to increase opportunities for specific UDBE bidders. If the UDBE bids were rejected, give reasons for each case. Cost alone may not be adequate justification for failure to use a UDBE bid. If the work is to be counted as a potential UDBE subcontract item, the Contractor cannot elect to perform that work itself when a UDBE bid is competitive or only UDBE bids are received. When a non-UDBE bid is significantly lower than a UDBE bid, the Contractor may choose to perform the item itself. Whether a bid is "competitive" or "significantly lower" will be determined by CDOT. Provide a detailed explanation for failure to provide any of the above. IV. The efforts required herein are not exhaustive or exclusive. Other factors or types of efforts may be relevant in appropriate cases. In determining whether Good Faith Efforts have been made, the quantity and intensity of the efforts made as well as kinds of efforts made may be considered. List any additional efforts to increase UDBE contract participation, such as requesting subcontractors to assist with providing UDBE participation. Note the results of such efforts. SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS Ail questions must be answered and the data giver, must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Growling Bear Co., (Inc.) 2. Permanent main office address 3. When organized: May 1974 2330 4th Ave. Greeley, CO 80631 4. If a corporation, where incorporated: Greeley, CO 5. How many years have you been engaged in the contracting business under your present firm or trade name? 31 Yrs. 6. Contracts on hand: (Schedule these, show_ng the amount of each contract and the appropriate anticipated dates of completion.) See Attached current proiects list 7. General character of Work performed by your company: Demolition,Concrete, Casework 8. Have you ever failed to complete any Work awarded to you? NO If so, where and why? 9. Have your ever defaulted on a contract? NO If so, where and why? 10. Are you debarred by any government agency? NO If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See Past projects list 12. List your major equipment available for this contract. Front end loader, Genie 60 ft lift, Skytrak 13. Experience in construction Work similar in importance to this project: See Past projects 14. Background and experience of the principal members of your organization, including officers: See Resumes Kelp Credit available: $ '500),000 Bank reference:Union Colony Bank, Mike Enarav - (970)336-6082 Wiil you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Are you licensed as a General If yes, in what city, county class, license and numbers? CONTRACTOR? and state? Yes Ft. Collins, CO What Do you anticipate subcontracting Contract? Yes If yes, what percent of total contract? 95% and to whom? Work under this Are any lawsuits pending against you or your firm at this time? NO IF yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL 3,000,000 what company? EMC Insurance 22. What are your company's bonding limitations? $25,000,000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at this day of 200 Growling Bear Co.(.Inc) Name of B' der By: evin S i onaka Title: President State of Colorado ) County of Weld Kevin Shironaka being duly sworn deposes and says that he is President of Growling Bear Cn_,(Tnc-_}and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of �- 2005. ' Notary Public �� �'•.••O7• My commission expires fi i 10111�00,`� 7/96 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM SUBCONTRACTOR 7/96 Section 00430 Page 1 Growling Bear Co. Inc. Kevin Shironaka Owner / President Equal Employment Opportunity Officer Education: 1970 University of Northern Colorado Bachelor of Science in Business Finance Greeley, CO Work History: 1974-Present Growling Bear Co. Inc. - Greeley, CO 1968-1974 Everitt Lumber Company - Greeley, CO Purchasing Agent, Cost Accountant Construction Salesman Manager - Fencing Dept. Kevin Shironaka, a Colorado native and long-time Weld County resident, born in Denver and raised in Ordway, graduated from University of Northern Colorado with a Bachelor of Science Degree in Business Finance. He originally founded and has been the owner and president of Growling Bear Co. Inc. since its inception in 1974. Over the years, Kevin expanded his general contracting construction business to include not only Colorado but other states as well, but has chosen to concentrate his and the company's efforts in the Colorado Front Range.....our "neighborhood". Kevin not only has expert personal knowledge as to the management of the overall company but also extensive field experience in the construction of the various projects undertaken by Growling Bear. He has negotiated commercial projects and has been the successful bidder on many other projects, both public and private, along the Front Range from Cheyenne to Pueblo ranging in price from $50,000.00 to $8,000,000.00. Kevin has been operating his business, hiring locals, and contracting with neighborhood businesses for 30 years. Under his leadership, the company has grown from a few employees to sometimes as many as 60 employees. His long history and solid reputation in the construction arena has afforded Kevin the ability to recruit the most experienced and capable construction team in Colorado and he is continually expanding that team. Growling Bear Co. Inc. Gary Shironaka Corporate Secretary/Senior Estimator/Project Manager Education: Colorado State University, Ft. Collins, CO Bachelor of Science Construction Management Degree Greeley Central High School Greeley, CO OSHA 10 hour class CPR and First Aid Training Work History: 2000-Present Growling Bear Co. (Inc.), Greeley, CO Estimator/Project Manager Member, Building Trades Advisory Committee, Weld Board of County Commissioners, 2001 through 2004 1996 -2000 Growling Bear Co.(Inc.) Greeley, CO Carpenter, Assistant Project Manager 1994-1995 Growling Bear Co. (Inc.) - Greeley, CO Carpenter Owner/Architect References: Ann Yates, Director Colorado State University 970.491.4939 Toby Trijillo, Project Manager WAPA US Dept. of Energy 970.461.7286 Cass Beitler, Project Manager Colorado State University 970.491.0158 Ken Field, Architect RB+B Architects 970.484.0117 Growling Bear Co., Inc. Gary Shironaka, continued Selected Projects: Centennial Bank Restoration $ 5,754.00 Windsor, CO CSU Podiums $ 17,495.00 Fort Collins, CO New East Elementary School $ 8,034,433.00 Greeley, CO Cheyenne Substation Modifications $ 596,306.00 Western Area Power Administration Cheyenne, WY Colorado State University Service Center Remodel $ 223,995.00 Fort Collins, CO I" United Methodist Church, $ 663,000.00 Brighton, CO Centennial Bank of the West $ 2,250,000.00 Windsor, CO Centennial Bank of the West tenant finish $ 54,000.00 Windsor, CO AT&T Regen Huts: Colorado, Wyoming, $ 4,572,000.00 Nebraska, UT City of Greeley Various Projects $ 1,400,000.00 Greeley, CO Growling Bear Co. Inc. Curtis C. Naibauer Vice President/Estimator/Project Manager Education: Aims Community College General Education Greeley, CO Work History: 1995-Present Growling Bear Co. Inc. - Greeley, CO Project Manager/Estimator 1990-1994 Thissen Construction Corp. - Greeley, CO Chief Estimator/Project Manager 1983-1989 Growling Bear Co. Inc. - Greeley, CO Project Manager/Estimator Curtis has been with Growling Bear for 16 years and can provide a range of pre - construction service that includes cost estimating, value engineering, scheduling, budget updates, and project coordination. Curtis would be responsible for working closely with the Project Architect to determine the most cost effective method to accomplish the goals that the Owner has set for his project. Owner/Architect References: Hope Cassidy, Director Greeley Center for Independence 970.339.2444 Diane Norgren, Owner Town of Platteville 970.785.2231 Robert Shreve, Architect Robert Shreve Architects and Planners 970.346.0151 Bob Warren, Mayor Town of Garden City 970.351.0041 I CONTRACTOR BY: Growling Bear Co., (Inc.) 2330 4th Ave. ADDRESS: Greelev. CO 80631 10)353-6964 8. BID SCHEDULE: / A. BASE BID (LUMP SUM)$ BASE BID IN WORDS-H,, _ ,j /-i; ILII„��A, ,_,( Dollars B. ALTERNATES $-J 2,11. Exterior stair canopy: ADD to base bid $2. Skylights at entry vestibule: Use Stone in lieu of stucco and plaza level new addition pending acceptable match: 7 ADD to base bid � $ I�3. Provide roll down grilles @ plaza & lower level: ADD to base bid $,4. Use Stone in lieu of Stucco, and plaza level new addition pending acceptable match: ADD to base bid $ Interior electrical fixture upgrade: ADD to base bid $6. Extend Elevator to upper floors and provide all upper level renovation as noted: ADD to base bid S_ $77. Electric door openers at handicapped restroom, Lower Level as noted: ADD to base bid $�y 8. Fire Main upgrade pending flow test report, as noted: ADD to base bid 7 Curtis C. Naibauer, continued Weld County Social Services — Addition $ 1,275,000.00 Greeley, CO Q-Lube — New Construction $ 250,000.00 Greeley, CO First National Bank of Johnstown — New Construction $ 876,800.00 Johnstown, CO Union Pacific Railroad Depot — Remodel $ 195,700.00 Greeley, CO Weld County Hazardous Waste Treatment $ 275,000.00 Center - Dacono, CO Monfort Portions Office Addition $ 753,000.00 Greeley, CO Hugh M. Woods Contractor Sales Addition $ 94,000.00 Greeley, CO Bonell Good Samaritan Hospital Addition $ 177,000.00 Greeley, CO Sharlyn Court Duplexes - New Construction $ 18500.00 Greeley, CO Highland Daycare Center - New Construction $ 531,500.00 Ault, CO Peterson AFB Building #845 Renovation $ 2,746,000.00 Peterson AFB, Colorado Springs, CO Remodel of Inmate Space - Weld County Jail $ 1,800,000.00 & Communications Center, Greeley, CO Island Grove Regional Treatment Center $ 1,100,000.00 Greeley, CO Mary Blair Elementary Addition $ 1,400,000.00 Namaqua Elementary Addition $ 1,600,000.00 Curtis C. Naibauer, continued UNC Frasier Hall Life Safety Upgrade $ 1,300,000.00 Greeley, CO First Christ Church Addition $ 850,000.00 Greeley, CO Northern Colorado Medical Center Addition $ 750,000.00 Poudre Valley Hospital Addition $ 950,000.00 Fort Collins, CO Platteville Town Hall, Platteville, CO $ 600,000.00 Cameron Elementary School Addition $ 435,000.00 Greeley, CO L Growling Bear Co. Inc. Donald D. Myers Superintendent Education: Work History: 1998-Present Walsenburg High School, CO High School Diploma Growling Bear Co. Inc. - Greeley, CO Superintendent 1978-1998 Whitlock Construction Superintendent (also managed satellite office in Montrose, Colorado for 3 years 1976-1978 University of Southern Colorado Superintendent 1971-1976 Whitlock Construction Carpenter Foreman Don has worked commercial construction for over 30 years. In that time he has amassed a long resume of completed projects including medical buildings, school additions/renovations, banks, assisted living facilities, big box stores, and multi -family projects. Owner/Architect References: B.J Dean, Director Island Grove Treatment Center 970.356.6664 Steve Seefeld, Project Manager City of Fort Collins 970.221.6227 Toby Trijillo, Project Manager WAPA, US Department of Energy 970.461.7286 Shaun Moscrip, Architect Aller-Lingle Architects 970.223.1820 "A, Growling Bear Co. Inc. Don Myers, continued Selected Projects: CU Renovation to Behavioral Genetics $ 375,610.00 Tenant finish 5,00 SF space University of Colorado Boulder Newsom Hall Exterior Fagade $ 116,735.00 Siding and Concrete Restoration Colorado State University Lincoln Center Roof Replacement/ $ 332,226.00 HVAC Upgrade Ft. Collins, CO Cheyenne Substation Modifications $ 596,306.00 Cheyenne, WY Island Grove Treatment Center $ 1,682,726.00 Outpatient Clinic Greeley, CO Warren Air Force Base Youth Center $1,150,000.00 New Construction, Cheyenne, WY Ft. Lupton Community Center $ 1,295,861.00 Ft. Lupton, CO Centennial Bank of the West $ 951,978.00 Ft. Collins, CO. Boone NGLN AT &T $ 975,390.00 Boone, CO The Chateau at Sharmar Village $ 3,500,000.00 Pueblo, CO Willy School 10,OOOsf K-12 School $ 800,000.00 REI-J Schools — Montrose CO $12,000,000.00 Various Schools from 20,OOOsf — 40,000 sf Hoehme School Addition & Gymnasium $ 2,800,000.00 Growling Bear Co. Inc. Don Myers, continued Home Base Stores, New Construction $ 6,000,000.00 Highlands Ranch, CO Centennial High School, Ball Fields $ 1,000,000.00 Home Base, (new construction) $ 4,500,000.00 Track Facility- All new construction Colorado Springs, CO New laundry and Kitchen $ 5,000,000.00 Federal Prison Facility Canyon City, CO Church Addition- Montrose, CO $ 2,500,000.00 Hospital Remodel- Montrose, CO $ 1,500,000.00 Wal-Mart Addition- Montrose, CO $ 1,500,000.00 Wal-Mart- Gunnison, CO $ 9,000,000.00 Fire Station, Peterson Air Base $ 1,500,000.00 Colorado Springs, CO Motor Pool & Resurfacing $10,000,000.00 Ft. Carson, CO Dining Room & Kitchen Renovation, Norad $ 3,000,000.00 Wal-Mart New Construction $2,500,000.00 North Pueblo, CO Wal-Mart New Construction $2,500,000.00 South Pueblo, CO Wilson Almont Mortuary- Canon City, $ 1,200,000.00 Freed Middle School Addition and Kitchen $ 1,300,000.00 Colombian Middle School 2 story Addition $ 1,200,000.00 South Park Elementary Addition $ 1,500,000.00 Monte Vista Schools Remodels/Additions $5,000,000.00 Growling Bear Co. Inc. Don Myers, continued Summitville Gold Mine, $ 1,000,000.00 Summitville CO Abex Rail Mill Addition & Roofing $ 5,000,000.00 Comanche Power Plant $ 3,000,000.00 (metal buildings) Motor Inn & Restaurant, $ 1,500,000.00 Trinidad CO Lathrop Rare Boys Ranch Renovation $ 4,000,000.00 Elementary School Addition, $ 1,900,000.00 La Junta, CO Astoca Apartments, 10-stories $ 6,500,000.00 Pueblo, CO Growling Bear Co. Inc. Glen A. Hoopes Superintendent Education: Paradise High School Paradise, KS Inventory Supply School, Warren AFB, WY, June — Aug. 1956 United States Air Force Airman First Class 1956 —1960 Plan Reading and General Estimating Course Work History: 1997 — Present Growling Bear Co. Inc. - Greeley, CO Superintendent 1989-1997 Clark Construction Co., Loveland, CO Superintendent 1987-1989 Professional Design Builders, Loveland, CO Superintendent 1978-1987 Clark Construction Co., Loveland, CO Superintendent 1974-1978 Professional Design Builders, Loveland, CO Vice-President/Owner 1968-1974 Clark Construction Co., Loveland, CO Superintendent and Foreman 1966 — 1968 Beisner Construction, Loveland, CO Carpenter Growling Bear Co. Inc. Glen Hoopes, continued References: Cass Beitler Joe Ashcraft CSU Project Manager Morganti Group Architects 970.491.158 970.667.4000 Mike Rush Ken Field Aller Lingle Architects RB+B Architects 970.223.1820 970.484.0117 Selected Projects: CSU Chemistry Remodel $264,868.00 Fort Collins, CO CSU Corbett Hall Dining Center $ 675,324.00 Fort Collins, CO CSU Stallion Lab $ 292,911.00 Fort Collins, CO CSU Equine Lab $ 364,901.00 Fort Collins, CO Stephens Center, Assisted Living Facility $ 822,000.00 Greeley, CO New East Elementary School $ 8,034,433.00 Greeley, CO Brentwood Middle School, gym addition $ 995,701.00 Greeley, CO McGraw Elementary School $ 8,000,000.00 Fort Collins, CO Fireside Elementary School $ 5,000,000.00 Louisville, CO Rock Creek Elementary School $ 30,000,000.00 Superior, CO Growling Bear Co. Inc. Glen Hoopes, continued Southwest Elementary School $4,000,000.00 Fort Collins, CO Bennett Elementary School $2,000,000.00 Fort Collins, CO Church of the Latter Day Saints Several Million Greeley, Fort Collins, Longmont, Littleton, and Aurora, CO Quick Lube (New Construction) $ 265,000.00 Evans, CO Bonnell Good Samaritan Center Remodel $ 295,000.00 Greeley, CO John Evans Middle School (Remodel) $ 250,000.00 Greeley, CO Shopko Stores Fort Collins, CO $ 2,500,000.00 Longmont, CO $ 2,500,000.00 North Range Behavioral Health Center $ 1,017,000.00 Greeley, CO Boulder Ranger Station $ 1,135,000.00 Boulder, CO Center for Independence $ 504,680.00 Greeley, CO World Savings Bank $ 835,333.00 Fort Collins, CO Projects in Progress as of 07/19/2005 Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 353-6964 Fax: (970) 353-6974 page 1 WORK ON HAND % Work Contract Scheduled W/Own Project/Location/Description Owner Architect/Engineer Amount Start Completion Forces Johnstown Station Johnstown Station Development Group Wyatt & Associates $ 1,895,578.00 Apr'05 Oct'05 25% Johnstown, CO 19563 East Main Street #202 1865 S. Pearl Street Construction of a 2 story core and shell retail Parker, CO 80138 Denver, CO 80210 building. 32,000 SF. Extensive site work, Pete Wells, Larry Graves Jeff Anderson, Architect structural steel framing and cmu veneer 303.756.5585 303.698.1717 Walter Self Senior Housing Boulder County Housing Authority Manning Architects, Inc. $ 1,405,303.00 June'05 Jan'06 15% Lyons, CO 3182 N. Broadway 2020 20th Street Costruction of 2 new 6 plex houses and 1 Boulder, CO 80302 boulder, CO 80302 community building approx. 11,000 SF. Site Scott Simkus, Development Planner Jim Manning, Architect work, wood framing, plumbing and electrical 303.441.1707 303.442.7042 CU Renovation to Behavioral Genetics PH2 University of Colorado Boulder Coover Clark & Associates $ 146,734.00 May'05 Jul '05 35% Boulder, CO Boulder, CO 455 Sherman Street Suite 205 Tenant finish of a 3000 SF office space Larry Krook, Project Manager Denver, CO 80203 in an existing facility 303.492.4082 John Krieg, Architect 303.783.0040 CU Renovation to Behavioral Genetics University of Colorado Boulder Coover Clark & Associates $ 375,610.00 Jan'05 Jul '05 20% Boulder, CO Boulder, CO 455 Sherman Street Suite 205 Tenant finish of a 4000 SF animal lab Larry Krook, Project Manager Denver, CO 80203 in an existing facility 303.492.4082 John Krieg, Architect 303.783.0040 CSU Chemistry XRD Lab Remodel Colorado State University Slater Paul Architects $ 156,293.00 Aug 05' Nov 05' 25% CSU Main Campus Facilities Management North One Central Park 1515 Arapahoe St Remodel of 3065 Sf of lab space for offices Jon Feiman, Project Manager Suite 400, Denver CO 80202 and new lab. 970.491.0159 303.607.0977 CSU Podiums Colorado State University CSU Classroom Technical Services $ 11,117.00 Jan'05 Dec'05 100% Provide small and large podiums as Purchasing, Alyesworth Hall Office of Instructional Services required for 2005 Larry Bauer, Purchasing Agent Andre Smith, Chief Engineer 6 Large, 2 Small 970.491.6166 970.491.1325 5 C. UNIT PRICES 1. $ GO -ADD Trash/Ash Receptacle: $ 3 'DEDUCT ADD or DEDUCT, one trash/ash receptacle per specifications, install complete. 2. $41,C22�-ADD Flagstone veneer per specifications: $ --O - DEDUCT ADD or DEDUCT, one square foot of 4" flagstone veneer per specifications, installed complete. 3. $4) �j_ADD Thin veneer flagstone veneer (approved match): $ _..p _ DEDUCT ADD or DEDUCT, one square foot of thin veneer flagstone veneer (approved match), installed complete. 4. $ yJ(,- ADD Electrical outlets: $DEDUCT ADD or DEDUCT, on electrical outlet per spec. complete. 5. $ADD Data outlets: $J-s _ DEDUCT ADD or DEDUCT, one data outlet per spec. complete. 6. $ Ny y_ADD ADD or DEDUCT, one LF of upper and lower cabinet p. lam $1?,2• DEDUCT millwork spec, complete 7. $ y ADD ADD or DEDUCT per sf of interior wall demolition $ . ] S DEDUCT 8. $12t�_ADD ADD or DEDUCT per sf of new gyp. bd. studs interior wall $ _O_ DEDUCT 9. $ 3.20 ADD ADD or DEDUCT per sf of interior painting $ •50 DEDUCT 10.$ _gy-ADD ADD or DEDUCT each typical 6" X 6" room sign $_2S-DEDUCT ll.$�=ADD #1 ADD or DEDUCT per sf carpet, Types 1, 2, 3, and 4. $ 2. 5oDEDUCT #1 $ 8 ADD #2 $ 2 _ --2bDEDUCT #2 $ADD #3 $(j DEDUCT #3 $__ADD #4 $2 DEDUCT #4 12.$ 2 y - ADD ADD or DEDUCT per sf ceramic tile 2" X 2" installed price $ L 5"ODEDUCT l3.$,3,2,0- ADD ADD or DEDUCT each 2ft X 2ft terrazzo tile $_`DEDUCT 14.$90' ADD ADD or DEDUCT per square yard concrete paving Projects in Progress as of 07/19/2005 Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 353-6964 Fax: (970) 353-6974 page 2 Work on Hand % Work Contract Scheduled W/Own Project/DescriptioNLocation Owner Architect/Engineer Amount Start Completion Forces Island Grove Village Apartments Island Grove Village Apartments Island Grove Village Apartments $ 131,000.00 May'05 Aug 05' 50% 119 14th Ave. 119 14th Ave, Greeley, Co 119 14th Ave, Greeley, Co Greeley, Cc 80631 Craig Allen, Manager 970.356.2808 Craig Allen, Manager 970.356.2808 Replace several doors in the Existing Facility Borge Villumsen, Owners Agent Borge Villumsen, Owners Agent 970.352.2931 970.352.2931 LDS Pavillion Church of Jesus Chrict of Latter Day Saints Krueger Architects and Planners Inc. $ 43,476.00 Apr'05 Aug 06 90% Loveland, CO 3263 Fraser Street, Suite 1 407 North Lincoln Ave, Suite 103 Construction of an 1800 Sf concrete pad, Aurora, CO 80011 Loveland, CO 80537 earthwork, landscaping, and electrical for Jeff Scott, Project Manager Jeff Krueger, Architect the construction of an outdoor shelter 303.798.3970 970.613.1788 Growing Our Co, Inc., 23M 4th Avenue, Greeley, CO finki Plane: (970) 3534M Fax: (970) 353-6974 Page 1 Pralset/DaecrbtbNLocalbn Owner ArchNaeflEnalneer Final Contract Amount Start Cone- lsdon % of work With Own Forces New West Bank New West Bank Colorado, ldc. Robert Shreve Architects & Planners PM: f 1,309,573.00 Nov'04 June'05 25% Eaton, CO 3459 N. 20ah Street Suite 114 801 8t h Street, Suite 120 Kevin Shironaka Design Build of new bank tastily Greeley, CO 80634 Greeley, CO 60631 Superintendent: 10,000 SF New site development and Ph: (970) 356.0703 Robert Shreve, Architect Ride Denning utilities. 2 sexy facility, wood framed Leroy Leavitt, Owner 970.346.0151 Dowdy Lake Vault Tons USDA Forest Service R-21RMRS USDA Forest Service R-2IRMRS PM: f 317,072.00 Sept'04 June'05 80% Red Feathers Lake Area 240 West Prospect Rd 240 West Prospect Rd Kevin Shironaka Construct 7 new SST Vault tontels and Fort Cdnns, CO W526 Fort Collins. CO 80526 Superintendent: remove 7 existing vaults Linda Torgensen COR Christina Scofield Contract Specialist Don Myers 970.498.1174 970.498.1174 Truscott Elementary Cabinet Replacement Loveland, CO Replace cabineoy in Trusoott Elementary with new custom cadnsts, re anwtated tops new book shelves, and new, plain tops Evans Municipal Swimming Pod 3315 15th Ave Evans, CO Remodel Swimming pod area. New Shower Valves, and coiling dais DesignlBuild CSU Chemistry Third Floor Remodel CSU Main Campus Remodel of 16W SF lab space. Laboratory fume hosts, epoxy resin tops, and wood casework. CSU Corbett Dining Han Renovation CSU Main Campus Renovation to existing dining facility new food service equipment and interior design CSU UCA Concert Has Dressing Rooms CSU Main Campus Renovation to 663 SF to add 3 restrooms and 4 dressing rooms to the basement area Evans Carwnntty Center Renhodel 1100 37th St Evans, CO Renhodel Existing 500 Sf space to add 6 Offices. Design Build project Farmers Bank Aull, CO Design Build addition to existing bank 5000 SF wood framed single story taaliy and renovation to existing space Thompson School District 2890 N Monroe Loveland, CO 80538 Tim Mangkha, Project Manager 970.613.5382 Cary of Evans 1100 37th Street Evans, CO Dan Maples, Recreation Supervisor 970.476-1127 Colorado Slate University Facilities Management North Jon Famiar. Project Manager 970.491.0159 Colorado Slate University Facilities Management North Bill Conn, Project Manager 970.491.0145 Colorado State University Facilities Management North Cass Beitler, Project Manager 970.491.0158 Thompson School District PM: f 2890 N Mamoe Curtis Nsibauer Loveland, CO 80538 Superintendent: Tracy Burtnett, CPPO Eric Morehead 970.613.5151 Growling Bear Co. (Inc.) PM: f 2330 4th Ave Gary Shironaka Greeley, Co 80831 Superintendent: 970.363.6964 James Holman Slater Paul Architects PM: f One Central Paris 1515 Arapahoe St Curtis Naibauer Suite 400, Denver CO 80202 Superintendent: 303.607.0977 Glen Hopes CCMK Architecture PM: 31a East Oak Street Curtis Naibauer Fort Collins, CO 80524-2915 Superintendent: Tom Killed, Architect Glen Hopes 970.493.1220 Stater Paul Architects PM One Central Park 1515 Arapahoe St Curtis Naibauer Suite 400, Denver CO W202 Superintendent: 303.607.0977 James Holman City of Evans Growling Bear Co. (Inc.) 1100 37th Street 2330 4th Ave Evans, CO Greeley. Cc W631 Brian Store, Recreation Superintendent 970.353.6964 970-475-1128 Farmers Bank Robert Shreve Architects & Planners 1191st Street 801 60h Street, Suite 120 Aunt, CO Greeley, CO W631 Fred Bauer, Owner Robert Shreve, Architect 970.834.2121 970.346.0151 Projects Completed Last 5 Years PM: Gary Shironaka 49,963.00 May'05 Jul V5 100% 23,721.00 Apr'05 Jun'05 85% 264,868.00 Dec'04 June'05 35% f 752,546.00 Dec'04 Apr'05 35% f 73,606.00 Feb'05 Apr 05' 60% f 22,351.00 Feb'05 Mar'05 85% PM: f 560,871.00 Aug'04 Jan V5 35% Kevin Shironaka Superintendent: James Holman Growlprg Bear Co., Inc., 2330 4th Avarua, Greeley, CO 508311 Phone: (970) 3534964 Fax: (970) 35"974 page 2 Final %of Work Contract Comp- With Own ProlecVDescrbtbNLocatlon Owner AmhttecUEnalnaer Amount Start town Fore" FSV Stairs and Handicap Ramp Fort Saint Main, Platteville, CO Renove old wood stairs and replace with welded aluminum stairs arid ramp CSU Stallion lob Renodel 8 Addition CSU Footfalls Campus Remodel 6400 sf and additon 15M at New entrances bed into existing building new laboratory casework and counter tops CSU Equine Reproduction Lab CSU Foothills Campus Ft. Collins, CO New 3500 SF classroom building 2 story wood framed, new utilities and sitework Island Grove Village Apartments 119 14M Ave. Greeter, Cc 80631 Remodel and Upgrading of existing Facility Design Build Project Atmos Energy 120011th Ave Greeley, Cc W631 Design Build, I0,000 SF facility Interior remodel adding new office spaces Church of Jesus Christ of Latter Day Saints Greeley, CO Sidewalk Replac ents Replace sidewalk and add steel handraits to church entrances GCI Elevator Tower Design Bold 2780 281h Avenue Budd elevator tower and machine room on the exterior of buddklg, includes new handicap elevator and card security system Atinos Energy 1200 110n Ave Greeley, Cc 80631 Remodel skylight system and repair interior drywall, Design Build Flamm Del Sol Greeley, CO Provide rod enclosure over balk in cooler Bechtel BWXT Idaho, LLC (BBWI) Growling Bear Co. (Inc.) 2625 Fremont Ave 2330 4th Ave Who Falls, ID 83415 Greeley, CO 80631 Dave Macdonald, SA, 208.536.9990 970.353.6964 Frederick Borst, STR, Colorado State University Morgenti Group, Inc Facilities Management North 2903 Aspen Dr, Suite B Cass Beider, Project Manager Loveland, CO 80538 970.491.0158 Joe Ashoraft, Architect 970.667.4000 Colorado State University Ader Ungle Architects P.C. Facilities Management North 712 Whalers Way, Suite 8-100 Steve Keiss, Project Manager FL Collins. CO 80525 970.491.0017 Mike Rush, Architect 970.223.1820 Island Grove Village Apartments Island Grove Village Apartments 11914th Ave, Creaky, Cc 11914th Ave, Greeley, Cc Crap Allen, Manager 970.3562808 Craig Allen, Manager 970.356.2808 Borge Villunlsen, Owners Agent Borge ViSumsen, Owners Agent 970.3522931 970.352.2931 Auras Energy Growling Bear Co. (Inc.) 1200 11ti1 Ave 23304th Ave Greeley, Cc 80831 Greeley, Cc 80631 Glen Norman, Operations Manager 970.353,6964 970.304.2077 Lurch of Jesus Christ of Latter Day Saints Bryan Keys and Associates 3263 Fraser Street, Suite 2 417 South Cascade Avenue Aurora. CO a0011 Colorado Springs. CO S0903 Malcom Hum , Project Manager 719.634.3761 303.371.2873 Greeley Center for Independence Growling Bear Co. (Inc.) 2780 280t Avenue 2330 4th Ave Greeley, 00 80634 Greeley, Cc WWI Hope Cassidy, Director 970.353.6964 970.339.2444 Arrtos Energy Growling Bear Co. (Inc.) 1200 11th Ave 2330 41h Ave Greeley, Cc WWI Greeley, Co S0631 Glen Norman, Operations Manager 970.353.6964 970.304.2077 Catholic Charities John Dangler & Associates 480 Linden Center Drive, PO Box 2262 5336 Highcastle Court Ft Collins, CO 80522 Ft. Collins, CO W525 Ernie Gkon, Exec. Director 970-223.1512 970.484.5010 Jahn Dangler, Architect Projects Completed Last 5 Years PM: Kevin Shironaka Superintendent: Jimmy Metcalf PM: Curtis Naibauer Superintendent: Glen Hoopes PM: Curtis Naibauer Superintendent: Glen Hoopes PM: Curtis Naibauer Superintendent: Rick Denning PM: Kevin shironaka Superintendent: James Holman PM: Gary Shironaka PM: Kevin Shironaka Superintendent: wck Denning PM: Kevin Shironake Superintendent James Holman PM: Kevin Shironaka $ 32,352.00 Jan'05 Feb' 05 10% $ 362,667.00 Apr '04 Nov'04 35% $ 399,996.00 Apr '04 Nov'04 35% $ 1,102,877.00 Apr '04 Sept 04' 25% $ 160,496.00 Jul 04' Oct 04' 46% $ 8,959.00 Oct 04' Oct 04' 100% 5 96,914.00 Aug 04' Sept 04' 16% $ 99,961.00 Jul 04' Oct'04 35% $ 11.644.00 Aug 04' Aug 04' 50% Growling Bear Co., Inc., 23M dth Avenue, Greeley, CO 00631 Phone: (970) 3534964 Fax: (970) 3534974 ProlecUDescrlptlOrAAcation Owner Archhact(Engineer page 3 Final % of Work Contract Comp- With Own Amount Start lotion Forces CSU Portable Scull Panels Colorado State University Slater Paul Architects PM: $ 8,587.00 Sept '04 Oct'04 100% CSI1 LICA Conch Hall Facilities Management Noll One Central Park 1515 Arapahoe St Curbs Naibuaer Build 4 - T x 8' portable sound absorbtion Cass Bolder. Project Manager Suite 400, Denver CO 80202 panels for the LICA Concert Hall 970.491.0158 303.607.0977 CSU UCA Concert Hall Restroom Remodel Colorado State University Slater Paul Architects PM: $ 65,743.00 Jul 04' Jul 04' 85% Remodel Existing historic bathroom for Facilities Management North One Central Park 1515 Arapahoe St Curbs Naibauer ADA compliance. 650 SF Electrical Cass Beilkr, Protect Manager Suite 400, Denver CO 80202 Superintendent: upgrades, New plumbing fixtures 970.491.0158 303.607.0977 Don Myers CSU Podiums Colorado State University CSU Classroom Technical Services PM: $ 19,014.00 Feb'04 Sept '04 100% Provide smao and large podiums as Purchasing, Myesworth Hall Office of Instructional Services Gary Shironaka required Larry Bauer, Purchasing Agent Dave James. Telecom Specialist 6 large, 14 small 970.491.6166 970.491.6080 CSU LICA Concert Hall Sound Cabinets Cokxado State University Slater Paul Architects PM: $ 18,259.00 Jul 04' Aug 04' 100% Colorado State University Facilities Management North One Central Park 1515 Arapahoe St Gary Shimnaka Provide new casework cabinets with Cass Beater, Project Manager Suite 400, Denver CO 8=2 sound ebsorbtion panels 970.491.0158 303.607.0977 CSU Newsom Hell Fxlencr Facade Colorado State University Colorado State University PM: $ 124,238.00 June'04 Jul'04 85% Colorado State University Facilities Management North Operation Management Curtis Naibauer Repair exterior concrete and 19,000 SF Bill Conn, Project Manager Ken Maninolich, Project Supervisor Superintendent: of new exterior siding and painting 970.491.0164 970.491.0866 Don Myers Centennial Bank Restoration Centennial Bank of the West Centennial Bank of the West PM: $ 5,754.00 May'04 June'04 100% 4650 Royal Vista Circle 4650 Royal Vista Circle 4650 Royal Vista Circle Gary Shironaka Fort Collins. CO 50525 Fort Collins. CO 80525 Fort Collins, CO B0525 Replace damaged base and trim in (970) 454-4141 (970) 4544141 basement Bill Farr, CEO Bill Fan, CEO MLS Properties Mike Shoop Growling Bear Co. Inc. PM: $ 283.726.00 Dec-'03 Mar'04 15% 928 10m S. Us? w 11 at. 2330 4th Ave Curtis Naibauer Greeley, CO Greeley. CO WWI Greeley, CO Superintendent: Design Build Tenant Finish 970-353-6964 Pick Denning Stephen's Center Greeley Center for Independence Lamy E. Seek Associates PM: $ 845,316.00 Aug'03 Mar'04 15% 277412778 Reservkr RD 2780 28th Avenue 2308 West 298h Street Curtis Naibauer Greeley, CO 80634 - Greeley, CO W634 Greeley, CO 80631 Superintendent: 7000si Indepogenl Living Facility Hope Cassidy, Director Wray Seek, Architect Glenn Hoopes 1500sf activity Center Design Build MEP 970.339.2444 970.353.6363 VA Medical Canter 3rd Floor Re ov. VA Medical Center Tobin & Associates, PC PM: $ 481,992.00 Aug V3 Mar 04' 15% New electrical, mociamieel, medical 2360 E. Pershing Blvd. 209 E. 208h Street Curtis Naibauer gas distribution system, rorse.ab & Cheyenne, WY W001 Cheyenne, WV 82003-2420 code blue system. all finishes. Jane Golding, Contracting Officer Ken Tobin, Architect 307.778.7329 307.632.3144 Projects Completed Last 5 Years Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 00ti31 Plana: (970) 353.6964 Fax: (970) 3534974 page 4 Final %of Work Contract Comp- With Own PrWectlDescrlptbNLoeatbn Owner ArchttectlEnbinot r Amount start lotion Forces Cheyenne Substation Mods. US Dept. of Energy US Dept. of Energy PM: 400 Mc Felond Drive Western Area Power ASSOC. Western Area Power Assoc. Gary Shironaka Cheyenne, WY 5555 E. Crossroads Blvd SW E. Crossroads Blvd Superintendent: New 2500 of control building and Loveland, CO 80538 Loveland, CO 80538 Don Myers demo of existing facility Toby Trijillo 970.461.7286 Virgil Downing 970-461.7267 Uncoln Center City of Fort Collins Alter-t..irgle Architects, P.C. PM: HVAC end Roof Replacanent 215 N. Mason Street 712 Whalers Way, Bldg. B-100 DR Shelton New roof and mechanical platform Fort Collins, CO 80522 Fort Collins, CO 80525 Superintendent: Steve So~, Project Manager Shaun Moscrip, Architect Don Myers 970-221 M7 970-223-1820 Greeley LDS Church LDS Church TSP Five, Mc. PM: Rernove old and install new boiler, 3263 Fraser St., Suite 1 8751 E. Hampden Ave. Suite A-1 DR Shelton Misc. landscaping, concrete and Aurora. CO 80011 Denver, CO 80231 Mechanical room deck Ron Humphries, Representative Jeff Krueger, Architect 303.798.3970 303-695.1997 Plo>a del Sol Farm Labor Housing Catholic Chanties John Dangler 5 Associates PM: Greeley, CO SD631 460 Linden Center Drive, PO Box 2262 5336 Hghcestle Court Kevin Shianaka 42 Farm Housing units Ft Collins, CO 80522 Ft. Collins, CO 80525 Superintendent: and 1 Community Center Ernie Gran, Exec. Director 970-223.1512 Junior Morgan _ 970-484-5010 John Danger, Architect St. Marys Catholic Church St. Marys Catholic Church St Marys Catholic Church PM: Greeley, CO 2222 23rd Ave. 2222 23rd Ave. Junior Morgan Chillerl8ai er replacement Greeley, CO 80631 Greeley, CO 80631 Bank of Colorado Branch Bank Bank of Colorado The Morganti Group PM: 3640 West 10th Street 5628 West 19m Street rig - 2903 Aspen Drive, Suite 8 Junior Morgan Greeley, CO 80634 Greeley, CO 80634 Loveland CO 00538 Superintendent: Tenant Finish Greg Ludlow, Branch Manager Marvin Morganti, President Phil Hershman 970.506.0100 (970) 667.4000 Heath Middle School Weld Cty. Sdad Dist. 06 Kkpp Colussy Jenks DuBois PM: 222316th Avenue 2204 Rh Avenue 1512 Latimer Street Junior Morgan Grossly, CO Greeley, CO W631 Denver, CO 80202 Superintendent: Interior Remodel J.W. Nelson, Facilities Supervisor Sam Miller, Architect Rick Denning 970.348-6400 (303)893.1990 Wyoming Dept. of Transportation Wyoming Dept. of Transportation Wyoming Dept. of Transportation PM: Miaoware Room Renovations 5300 Bishop Blvd. 5300 Bishop Blvd. Kevin Shironska Interior Remodel Cheyenne, WY 82009 Cheyenne, WY 82009 Superintendent: Hans Hehr, Ass t Purchasing Manager Hans Hehr, ASHY Purchasing Manager Dennis Nelson 370.777.4106 370.777.4106 Colorado East Bank and Trust Colorado East Bank and Trust Wedgewood Development Co. PM: 207 1st Ave 207 1st Ave P.O. Box 431 Junior Morgan La Salle, CO La Salle, CO La Salle, CO Superintendent: Interior Demo and Remodel 970-284-0211 Phil Hershman Projects Completed Last 5 Years $ 626,970.00 Mar'03 Mar'04 40% 6 369,502.11 Aug'03 Jan'04 10% $ 111,191.00 Aug'03 Dec'03 10% $ 1,260,800.30 May03 Dec'03 16% $ 26,850.00 Oct'03 Ded03 30% $ 188,241.00 Jun V3 Sep'03 25% $ 127,106.00 Jun'03 Aug V3 15% $ 167,765.00 Mar'03 June'03 10% $ 82,420.00 Feb-03 Jun-03 75% Growling Bear Co., Inc., 2330 4M Avenue, Greeley, CO 90931 Phone: (970) 363.6964 Fax: (970) 353-6974 Page 5 Final %of Work Contract Comp- With Own PMIoct Wacrlo9onnAcation Owner ArchlteeVEnalne it Amount start lotion Forces Bella Romero Elementary School Weld Cty. School Dist. 06 1400 20th St. 2204 5th Avenue Greeley, CO 80631 Greeley, CO 80631 New Construction 72,000 SF J.W. Nelson, Facilities Supervisor 2 Story 970.348.6400 New West Bank Colorado, Inc. New West Bank Colorado, Inc. 3459 N. 20M Street Suite 114 3459 N. 20th Street Suite 114 Greeley, CO 80634 Greeley, CO 80634 Remodeb7enant Fkriah Ph: (970) 356-0703 Construct new Dive thru Leroy Leavitt, Owner Island Grove Regional Treatment Island Grove Regional Trtrnt. Ctr. 1513 11 th Avenue 1140 -M' Street Greeley, CO 80681 Greeley, CO 80631 New Construction Medical Facility Ph: 970.355.6654 2 Story, 15,000 al. B.J. Dean, Exec. Director World Savings Branch Bank World Savings and Loan Assoc. 12100 Washington Street 1901 Harrison Street Thornton, CO 80241 BM Floor New Construction Banc Facility Oakland, CA 94612 Don Gracey 510.446.4008 Fire Station No. 1 Eaton Fire Protection Oistnct 50 S. Maple 224 1 at Street Eaton, CO 80615 Eaton, CO W615 New construction of 12,000 SF Warren Milne, Fire Chief Metal Building 970.454.2115 Plativille Town library Town of Plattev9k 504 Marion Avenue 400 Grand Avenue Platteville, CO Sow Platteville. CO 80851 Design Build Library Addition and Diane Norgren Remodel 970.785.2231 CSU USC 51h Floor Remodel Colorado State University 510 Howes Street Office of Advance Services Ft. Collins, CO 80523 510 University Services Center Remodel 7000 SF Fort Collins, CO 80523.7114 Ann Yates 970.491.4939 John Evans Middle School Weld County School Dist. 06 2900 ISM Ave. Facilities Greeley, CO Swil J.W. Nelson, Facilities Supervisor Drainage Improvements 970348.6400 Edema renovation Dorn 248 Renovation Operational Contracting Division F.E Warren Air Force Base Building JIM Cheyenne, WY F.E. Warren AFB Interior Renovation; to Historic Donn Cheyenne, WY 82005 Building Charles Melvin RUB Architects PM: 315 E. Mountain #100 Gary Shironaks Ft. Collins, CO 80524 Superintendent Ken Field Architect Glen Hoopes 970.484.0117 Clyde L. Schroeder PM: 2000 Wadsworth Blvd. Suite 111 Junior Morgan Lakewood, CO 80214 Superintendent Clyde L. Schroeder Architect Rids Denning (303)814.1350 Roberts Architects PM: 5312 W. gM St. Dr., #100 Dennis Nelson Greeley, CO 80634 Superintendent 970.353.7232 Don Myers Cart Cross. Architect Lane 6 Smart PM: 400 N. Loop 1604 East Junior Morgan Suite 310 Superintendent San Antonio, TX 78232 Dale Graham Charles Benson 210.491.9553 Roberts Architects PM: 5312 W. 9M St. Dr. #100 Junior Morgan Greeley, CO WWI Superintendent Wayne Roberts, Architect Phil Hershman 970.353.7232 Robert Shreve Architects & Planners PM: 80180 Streel, Suite 120 Curbs Nsibauer Greeley, CO WWI Superintendent: Robert Shreve Architect Rids Denning 970.346.0151 Colorado State University PM: Facilities Management Gary Shimnake Colorado State University Superintendent: Fat Collins, CO 80523.6030 Phil Hershman Cass Better Project Manager 970.491 .01 58 Pickett Engineering PM: 808 8th Street JR Morgan Greeley, CO 80631 Superintendent: 970356.6362 Phil Hershman Operational Contracting Division Building SM F.E. Warren AFB Cheyenne, WY 82005 Charles Melvin Projects Completed Last 5 Years $ 8,133,225.00 Jun'-02 Jun'-03 10% $ 301,068.00 Dec.'02 Jun.'03 30% $ 1,760,736.00 Sep.'02 Jun:03 18% $ 818,488.00 Nov' 02 May '03 10% $ 1,479,713.00 Jul'-02 Mar'-03 30% $ 292,403.00 May'02 Sep.'02 35% $ 260,141.00 Mar.'02 Sep.'02 25% 9 118,487.00 Jun -rot Sep-'02 85% PM: S 3,445,274.00 Apr-00 Sep-02 Dennis Nelson Superintendent: Scott Sauer 25% Growling Bear Co, Inc., 2330 4th Avenue, Greeley, CO BOMi Phone: (970) 353.6964 Fax: (970) 3534974 page 6 Final %of Work Contract Comp. With Own Pr0leetrWscrlOtkuJLocatbn Owner Archl ectfEnolneer Amount Start lotion Forces Salvation Army Fence The Salvation Army Greeley, CO Cal60mia Corporation Fence around Early Childhood Ed. Ctr. 180 E. Ocean Blvd. Long Beach, CA 90802 Captains Tim/ Sybil Smith Youth Center Phase If 90 Con s&GCI 7505 Marne Loop 7505 Memo Loop FE Warren AFB, WY 82005.2960 F.E. Warren AFB, WY 82W5 Metal Building -Gym addition Richard.8mn-Flight Chief Brentwood Middle School Weld County Sdvd Dist. aG 2600 24 Ave CT 1025 9th Avenue Greeley, CO 80634 Greeley, CO 80831 Gymnasium Addition and Remodel J.W. Nelson, Facilities Supervisor of Existing Fatetty 970.348-6400 Franklin Middle School Weld County Scholl Dist. 05 818 351h Ave 26W 24th Avenue Greeley, CO SWU Greeley, CO 80634 M Room Addition and Remodel of J.W. Nelson, Facilities Supervisor Existing Facility 970.348-6400 Cheyenne Frontier Days Front Gate Cheyenne Frontier Days 4610 N. Carey Avenue 4610 N. Carey Avenue Cheyenne, WY 82001 Cheyenne, WY WWI New Construction Front Gate Dale VmKrosigk and Sitework 307.778.7200 Outdoor Firing Range Warren Air Force Base F.E. Warren Air Force Base Opeationel Contracling Division New Construction of Shooting Range Building 6208 Cheyenne, WY 82005 Joe Kirkland 307.773.3321 Agriculture Building (steel) Lawrence Case 3179 Western Drive 3179 Western Delve Hudson, CO 80642 Hudson, CO 80642 New Steel Building Our Saviors LUBnem Church Our Saviors Luthem Church Remode0 Addition 1800 21st Ave 18W 21st Ave Greeley, CO 60631 Greeley, CO 80631 Jennifer, Ownees Manager 970352-4816 Earl Childhood Development Ctr The Salvation Amy Location: 1119 6th Saw 1119 6th Street Greeley, CO 80631 Greeley, CO 80831 New Construction, 7,O00 all. Captain Ten Smith 970-346-1161 Salvation Amy PM: $ 59,788.00 Apr-'02 Aug-'02 25% California Corporation JR Morgan 180 E. Ocean Blvd. Superintendent: Long Beach, CA 90802 Phil Hershman F.E. Warren AFS PM: $ 1,186,964.72 Sep•'99 Aug•'02 15% Cheyenne, WY 82005 Dennis Nelson Richard Jkon-Flight Chief Superintendent: 307-773.1006 Don Myers Robert Shreve Architects & Planners PM: $ 1,153,861.00 Feb.'02 Aug.'02 35% 001 8th St., Suite 120 Junior Morgan Greeley. CO WWI Supenntendent Robert Shreve Architect Glenn Hoopes 970.346.0151 Ruben Shreve Architects 6 Planners PM: 801 8th St., Suite 120 Ron Sword Greeley. CO 80631 Superintendent Robert Shreve, Architect Doc Shelton 970.346.0151 Noel Griffith Jr. & Assoc. PM: 2515 Warren Ave., 9425 Dennis Nelson Cheyenne, WY 82001 Superintendent Dan Johnson Audie Wilson 307.632.4375 Warren Air Force Base PM: Operational Contracting Division Dennis Nelson Building 8208 Superintendent: Cheyenne, WY 82005 Billy Holmes Joe l9rkland 307.773.3321 Wemsman Engineering PM: 121010th St. Ron Sword Greeley, CO 80631 Superintendent: Steve Wemsman 970.363.4463 Rids Denning Larry Steel Architects PM: 2308 W. 291 h St. Suite 101 Curtis Naibauer Greeley. CO emi Superintendent: 970353.6363 Glen Hoopes Roberts Architects PM: 5312 W. 91h SI.Dr., 81 W Ron Sword Greeley. CO 80634 Superintendent: Wayne Roberts Junior Morgan 970353-7232 Projects Completed Last 5 Years $ 277.645.00 Apr.=02 Aug=02 15% 6 514,506.00 Mar.=02 Jul.=02 30% $ 1,425,229.00 Jul.-01 Apr.-02 30% $ 62,786.00 Jan.-02 Apr.-02 80% $ 436,539.00 Aug-'01 Feb-V2 25% $ 539,008.00 Aug-'01 Jan•'02 25% Growling Bear Co., Ire„ 23M 4M Avon", Greeley, CO W631 Phone: (970) 3534964 Fax: (970) 353.6974 page 7 Final %or Work Contract Comp- With Own ProlectlDesx:rbtlortlLoutbw n Oner ArchkectlErglnser Amount Start letion Forces Anema Dental Center DR. Mark Anerra OR. Mark Anema PM: 7900 W. 44th Ave 7900 W. 44th Ave 7900 W. 44th Ave Kevin Shironaka Wheatridge, CO Wheytridge , CO wheatrioge. CID Superintendent: Tenant Finish, Medical Facility Rick Denning 9 Cifford Building (Rm 232 & 234) Colorado State University CSU Facilities Management PM: Colorado State University Facilities Management Facilities Services Center N. Ron Sword Remodel of Existing Facility Foil Collins, CO BM3 Fort Collins, CO 80523 Superintendent: Helen Boggs Project Manager Phil Hershman Entomology Wash Rack Operational Contracting Division Operational Contracting Division PM: F.E. Warren Air Force Base Suikfing #M Building 41208 Dermis Nelson Cheyenne, WY F.E. Warren AFB F.E. Warren AFS Superintendent: New Construction Cheyenne, WY 92005 Cheyenne, WY 92005 Whitey Pandil Curt Evan Curt Swan 307-773-6949 307-773-6949 Veteran's Administration Veterans Administration Center Tobin and Associates PM: VA Medical Center 2360 E. Pershing Blvd. 209 E. 20th Street Dennis Nelson Cheyenne, WY Cheyenne, WY 82001 Cheyenne, WY 82003 Superintendent: Remodel Fire Safety upgrades of Jane Jordan Ken Tobin Billy Holmes Medical Facility 307-778.7367 307-632.3144 Renovate Bldg 212 Operational Contracting Division Operational Contracting Division PM: Warren Air Force Base Building #208 Building #208 Dennis Nelson Cheyenne, WY F.E. Warren AFB F.E. Warren AFB Superintendent: Interior Remodel of Historic Building Cheyenne, WY 82005 Cheyenne, WY a2005 Scott Sauer Lt. Mark Adams Lt. Mark Adams 307-773.5916 307-773-5916 Stewart Stevenson Remodel Stewart Stevenson Power, Inc. Roberts Architects PM: 5840 Dahlia Street 5540 DONIS Skeet 5312 W. 9h Street Drive, #100 Ron Sword Commerce City, CO 80022 Commerce City, CO 80022-3707 Greeley, CO W634 Superintendent: Design Build Tenant Finish of Existing 303-287-7441 Wayne Roberts Rick Denning Facility David Roth 970-353.7232 City of Greeley City of Greeley Parks Dept. Robert Shreve Architects & Planner Inc. PM: Monfort Park PicniclResbooms 501 N 14th Ave. 801 Bh St. Suite 120 Curtis Naibauer 47th Ave. & 24h Street Greeley, CO WWI Greeley, CO W631 Superintendent: Greeley, Co. WWI 970-350.9393 970,44"151 Bob Shreve & Will Steel Phil Hershman ShelterlRestroom/Concession Bldg. City of Greeley City of Greeley CCMK Architecture & Planning PM: Design Build Various Projects 1000 10h Street 318 East Oak Street Gary Shironaka Recreation Center. Senior Center, Greeley, CO 80631 Fort Collins, CO 00524-2915 Superintendent: Swimming Pod, & Shoo" Range Terry Greibe (970)350-9293 970-493-1220, Tom KAW Junior Morgan Garden City Town HBO Garden City Town Government Robert Shreve Architects & Planners PM: 62127 Street 621 27th Skeet Road 801 Bth Street, Suite 120 Curtis Nelbauer Garden City, CO 8=11 Garden City, CO Greeley. CO 90631 Superintendent: Design Build New Construction Bob Warren, Mayor Robert Shreve, Architect Cu Nor 3000 of 970.351.0041 970.346.0151 Prajects Completed Last 5 Years $ 135.617.94 Nov -rot Jan=02 20% $ 113,711.00 Jul.-01 Dec.=01 25% $ 346,827.00 Nov-00 Dec.=01 19% 3 S $191,179.00 Jun -rot Deo=01 75% 943,097.00 Nov-00 Dec:'01 19% 89,408.00 Oct.=01 Dec.=01 50% $320,189.00 Feb-'01 Sept'Ot 15% $ 1,400,845.00 Dec.-00 Juy'01 12% $ 296,324.00 Jan.-01 Jun.-01 23% Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO S0631 Phone: (970) 353411994 Fax: 1970) 353-6974 Page 8 Final %of Work Contract Comp- With Own Pro1K:UDSOCII101110111,11LOONtlon Owner ArchilectlEnalneer Amount Start Istion Forces Fort Lupton Community Center 130 S. Mckinney Ave Ft. Lupton, CO S0621 New Construction, 12000SF Steel Building Centennial Bank of Windsor 4660 Royal Vista Circle Fort Collins, CO 80525 New Construction 16000SF, 2 story World Savings Bank Harmony Center Fort Collins, CO 80524 New Construction 4000 SF Brighton United Methodist Church 625 South Brh Avenue Brighton, CO 2500 SF Addition 9000 SF Remodel Vauit Toilets Ansel Watrous Campground USDA Forest Service Moraine Pk Amphitheater Rocky Mountain National Park Estes Park, CO Centennial Bank Lending Offices 4630 Royal Vista Circle Fort Collins, CO 8=5 Tenant Finish 1200 SF Camelot Apartments 17th Street S 8tm Avenue Greeley, CO SO631 Addition and Remodel of Existing Facility Alter Support EquipJVehick Mount. Shop N103 Buckley a'x Not. Guard New Building - Greeley City of Fort Lupton 130 S. McKinley Avenue Ft. Lupton, CO 80621 970.302.4333 John Swallow Centennial Bank or the West 4650 Royal Vista Circle Foil Collins, CO 80525 (970)454-4141 Bill Farr, CEO World Savings Bank Harmony Center Fort Collins, CO 00524 Jerry Kirkpatrick, (610) 446-5030 United Methodist Church 625 South Sth Avenue Brighton. CO Les Fraley, Ovmer Representative 303-294.2153 USDA Forest Service- RMRS 240 West Prospect Rd Fort Collins, CO 80526 Teri Pues Rocky Mountain National Park 1000 HWY 36 Estes Park, CO 80517 Anne M. Vlktora 970576-1271 Centennial Bank of the West 4650 Royal Vista Circle Foil Collins, CO 80525 (970)454.4141 Bill Farr, CEO Greeley Center for Independence 2780 28M Avenue Greeley, CO 80834 970-339.2444 Hope Cassidy, Director USPFO P&C, Stop 66 660 S. Aspen Street. Bldg 1005 Buckley ANG Base Aurora, CO 8011-9551 Michael S Schwamberger Slater, Paull S Associates PM: E 1,295,667.00 Aug-00 June-'01 22% 1515 Arapahoe St., a400 Pete Farquar Denver, CO 00202 Superintendent: 303.607.0977 Don Myers Vaught Frye Architects 401 West Mountain Avenue Foil Collins. CO 80521 (970)224-1191 Matt Rankin, Architect Memel Brendle Architects 1743 Wazee Street, Suite 400 Denver, CO 80202 303-292-6927 CCMK Architecture S Planning 318 Fast Oak Street Fort Collins, CO S0524.2915 Tom Kalert, Architect 970-493-1220 USDA Forest Service 240 West Prospect Rd. Fort Collins, CO 80526 Teri Pues Rocky Mountain National Parks 1000 HWY 36 Estes Park, CO 80517 Anne M. ViMora 970.57&1271 Vaught Frye Architects 401 West Mountain Avenue Fort Collins, CO 80521 (970)224-1191 Mat Rankin, Architect Larry Steel Associates 2308 W 29th Street Suite 101 Greeley, CO a0631 Lamy Steel, Architect 970.353.6363. Air National Guard 660 S. Aspen Street, Bldg 1005 Buckley ANG Base Aurora, CO 50011.9551 Michael S. Schwamberger Projects Competed Last 5 Years PM: Gary Shiruinska Superintendent: Audie Wilson PM: Curbs Naibauer Superintendent: Glenn Hoopes PM: Gary Shironaka Superintendent: Junior Morgan E 2,388,548.00 Oct-00 Jun-01 18% E 838,910.00 Dec. -OD June-'01 16% E 707,284.00 Jan.-W Jun.-01 71% PM: E 78,122.00 Jun.=00 Jun.=01 15% Curbs Nsibauer PM: Curtis Nsibauer Superintendent: Roger Childers PM: Gary Shironaks PM: Curtis Naibauer Superintendent Glean Hoopes PM: Michael Bacidund Superintendent: JR Morgan E 140,462.75 Jul=00 May-'01 20% S 69,761.00 Apr-01 May-01 30% E 504,680.00 Jun-00 14OV-00 20% E 137,000.00 Deo'99 Nov-'00 25% Growling Bear Co, Inc., 2330 4th Avenue, Greeley, CO SM1 Phone: 4970) 353.6964 Fax: (970) 353.6974 page 9 Final %of Work Contract Comp- With Own ProlectlDeserbtbNLocanon Owner ArchOatflErgineer Amount Start lotion Forces Peak View 8 Monfort Parks City of Greeley City of Greeley PM: f 206,120.50 Feb-'OO Oct -DO 100% Sidwalks 1300 A Street 1300 A Street Curtis Naibaw Greeley, CO 80631 Greeley, CO 80631 Steve Augerot Steve Augerot Wyoming Air National Guard Dept. Of On Army 6 Air Farce Noel GrilfiOt, Jr. & Associates PM: f 753,259.00 Mar-00 Oct-00 15% Cheyenne, Wy National Guard Bureau 2515 Warren Avenue, Suite 425 Dennis Nelson RemodelfReplace Hanger Doors US Property d Fiscal Officer Cheyenne, WY Superintendent: 55W Bishop Blvd. 307-632-2705 Scott Sauer Cheyenne, WY 82009-3320 Jon A. Morse 307-772-5968 Construct Vault Toilets Rocky Mountain National Parks Rocky Mountain National Parks PM: f 269,041.95 Dee-439 Oct-100 25% Lake Irene -McGraw Ranch. 1000 HWY 36 1000 HWY 36 John Tripp Rainbow Curve- Upper Beaver Estes Park. CO 80517 Estes Park. CO 80517 Rocky Mountain National Park Anne M.Viktors Anne M. Vildora 970576-1271 970.576.1271 Wed County Training Center Weld County Government Bley Associates PM: f 822,040.00 Feb-00 Oct-00 22% Greeley, CO 91510th Street 2020 Clubhouse Drive Curtis Nsibsuer New S,OOOsf One Story Facility Greeley, CO SD631 Greeley, CO 80632 Superintendent: Colored Concrete Split Faced Block Pat Persichino Loren Bley, Architect Phil Hershman 970356.4000 Ext. 4224 970.330-3322 Vault Toilets USDA Forest Service USDA Forest Service PM: f 110,210.oO Mar -'CO Sept•'00 15% West Lake- Red Feathers 240 West Prospect Road 240 West Prospect Road Curtis Naibauer Fort Collins, CO 80526 Fort Collins, CO 80526 Teri Puss Vault Toilets USDA Forest Service-RMRS USDA Forest Service-RMRS PM: f 95,346.00 Aug-'99 Sep-W 15% Laramie River Road 240 West Prospect Road 240 West Prospect Road Curtis Naibsuer West Branch Trailhead -Rawah Trailhead Ft. Collins, CO 80526 Ft Collins, CO 80526 Clear Lake Fishing Teri Pues Teri Pues Rem del JCP � Company inc. JCPeniW Company ft. PM: f 138.661.00 Jul-00 Sep -DO 20% US Highway Ave Greeley Mal 2000 Greeley Mall Curtis Naibauer Greeley, CO 90634 Greeley, CO 80631 Greeley, CO 80631 Superintendent: Remodel of Existing Facility Jane Anderson Jane Anderson Curtis Naibsuer Hawkstone CluMmouse Payant Real Estate CO Growling Bear Co., Inc. PM: f 374,433.00 Mar-00 Aug•00 18% 1310 Hewkstone Onus 360 Oak Ave. 2330 4th Avenue Curtis Nalbauer Eaton, CO Eaton, CO 80615 Greeley, CO 90631 Superintendent: Design Buld New Construction Barn Payant, Owner John Sold, Architect Glenn Hoopes 970.454.3452 970-353.6964 Trinity Lutheran Church Trinity Lutheran Church Trinity Lutheran Church PM: f 84,392.00 Jun-00 Aug00 35% 3000 35th Ave 3000 35th Avenue 3000 35th Avenue Curtis Nelbouer Greeley, COReinadef �� Greeley, CO 80631 Greeley. CO 110631 Superintendent: Roper Childers Projects Completed Last 5 Years 5 $_.2AJIPEDUCT 15.$.L.Zo-- ADD $ ,. 4b DEDUCT 16 . $ gOt> --ADD $ -{1 _ DEDUCT 17 . $_ADD $ /,:5DQ - DEDUCT 18.$ y/_ADD $ /00- DEDUCT 19.$��ADD $ DEDUCT 20.$ADD $_Lyoo-DEDUCT 21.$ W--ADD $ _.p — DEDUCT 22 . $ 3,. 20 ADD $ 1. ov-DEDUCT 23.$jp.$oADD $DEDUCT ADD or DEDUCT per square yard colored concrete paving ADD or DEDUCT per sf stucco reveals ADD or DEDUCT TYPE A-1 Pendant fixture installed complete ADD or DEDUCT TYPE N-2 Downlight installed complete ADD or DEDUCT per sf sealed stained concrete ADD or DEDUCT one 3070 SCWD Door and NM frame complete with hardware ADD or DEDUCT one LF of stonefaced knee wall. ADD or DEDUCT one LF of rubber base ADD or DEDUCT one LF of tile base 24.$ qO y ADD ADD or DEDUCT one LF of granite base $DEDUCT D. ART PRICING: Artist David Griggs (303) 446-3030, 715 Galapago St. Denver, CO 80204 1. Etched glass railing panels - Detail *12 - Sheet A-7.1 - delivery of glass from railing mfg to Great Panes Glass Works Inc. - 4410 Washington Ave. - Denver, CO 80216 - 303-294-0927 - artist vendor will provide the photo emulsion etch & deliver to site upon completion for installation by General Contractor. $IN BASE BID (photo emulsion price by other) 2. Layered wall board - Detail #13 - Sheet A7.1 - Bas Relief - Layered 4" MDF. Pre -assembled machine cut panels, typically 214" x 41, to be delivered to site as panels by artist with placement instructions for installation. Contractor to install per instructions - artist will supervise installation. Contractor to paint after installation. Growling Baer Co., Inc„ 2330 4th.Avenue, Greeley, CO 80831 Phone: (970) 3536964 Fax: (970) 353.9974 page 10 Final %of Work Contract Comp- With Own ProiectiDesubtbNLoeatlon Owner ArchttectlEnoineer ArWunt Start leflon Forces VA Dental Facility VA Medical Center VA Medical Center PM: f 43,577.00 Nov-99 Jun-00 25% Cheyenne. WY 82W5 Medical 8 Regional Office Center Medical 8 Regional Office Center Dennis Nelson Remodel of Dental Facility 2360 E. Pershing Boulevard 23W E. Pershing Boulevard Cheyenne, WY 82W7 Cheyenne, WY 82001 Centennial Bank of the West Centennial Bank of the West Wyeti and Associates PM: f 951,978.00 Nov-99 May-00 22% Fort Collins, CO 4650 Royal Vista Circle 1065 S. Pear Street Michael Bac fund New C istruction 2 story Facidity Fort Collins, CO 80525 Denver, CO 90210 Superintendent: (970) 454-4141 Dennis Wyatt, Architect Don Myers Bill Fan, CEO 303696.1717 Centennial Bank Eaton Bank Bank Hollings PM: f 141,189.00 Mar-00 May-00 15% Del Camino 2700 47th Ave. Centennial Bank of the West Curtis Naithauer Interior Remodel -Tenets finish Greeley. CO W634 4650 Royal Vista Circle Superintendent: Bill Fair Fort Collins, CO 80525 Glen Hoopes 970-454-4141 970454-4141 Boyd Lake Vehicle Storage Bldg. State of Colorado Parks Division State of Colorado Parks Division PM: f 96,714.00 Feb -DO Apr-00 35% Boyd Lake State Park 3842 South Mason 0202 3842 South Mason 0202 Curtis Naibauer Loveland, CO Fort Collins, CO 80525 Fort Collins. CO W525 New Construction Mr. Ed Holmberg Mr. Ed Holmberg 970-2264Ml 970-2266641 Building 207 Renovation Operational Contracting Division Operational Contracting Division PM: f 1,030,681.00 Aug-99 Apr -DO 19% F.E. Warren Air Force Base Building a206, F.E. Warren AFB Building N208, F.E. Warman AFB Dennis Nelson Cheyenne, WY Cheyenne, WY S2005 Cheyenne, WY 82005 Superintendent: Remodel of Existing Historic Building Ms. Darlene Faulkner Ms. Darlene Faulkner Billy Holmes 307-773.3917 307-773-3917 VA Outpatient 8 Dental Remodel Veterans Administration Center Tobin and Associates PM: f 441,871.00 Dec-99 Apr-00 28% Cheyenne, WY 2360 E. Pershing " P.O. eon Denny Nelson Remodel Medical Facility Cheyenne,82W1 Cheyenne. W WY 82W3 Superintendent Fran FriMauf/Jane Jordan enTobin Ken Tobin, Architect Dennis Nelson 307-778-7367 307632-3144 Corman Mechanical Inc. Carman Mechanical Inc. Growling Beer Co., Inc. PM: f 135,163.00 Dec-99 Mar -DO 22% 1040 36th Steel 1040 36m Street 2330 4th Avenue Curtis Naibauer Evans, CO 80620 Evans, CO 00520 Greeley, CO W631 Superintendent: New Construction Sled Building George Coman 970-3536964 Curtis Naibauer Boulder Ranger Station USDA Forest Service USDA Forest Service PM: f 1,503,624.00 Oct-99 Mar-00 19% Boulder. CO 204 W. Prospect Road 1311 S. College Avenue John Sohl New Construction, 2 Story 15,WOSF Fort COBns, CO OD526.2096 Fort Collins, CO 80524 Superintendent: Dennis Donovan Chris Ida Glenn Hoopes 970498.1024 970498-2742 VA Lobby Renovation .3 Phases VA Medical Center VA Medical Center PM: f 1,326,675.00 Apr-99 Feb-00 22% 1056 Clermont Street 1055 Clemorrt Street 1055 Clemons Street Mike Backlund Denver, CO Denver, CO Denver, CO Superintendent: Remodel of Existing Medical Facility Pat Amidon Pat Amidon Roger Childers 303-3934690 303-3934690 Projects Completed Last 5 Years Growling Bear Co. Inc, 2330 4th Avenue, Greeley, CO 90631 Plane: (970) 353.6964 Fax: 1970) 353-6974 page 11 Final %of Work Contract Comp- With Own Pralacf/DeserlOtloNLoeation Owner ArchitecHEnginser Amount start Ntlon Fours GSA 2nd Floor Renovation General Services Administration RB+B PM: $ 362,162.00 Dec-99 Mar-00 32% Denver, CO Public Buildings Service 315 E. Mountain Ave., Suite 100 Michael Backlund Remodel of Existing Facility P.O. Box 25546, Bldg. 41 Fort Collins, CO 80524-2913 Superintendent: Denver Federal Center Rebecca Spears, Architect Roger Childers Denver, CO 80225-0546 970.484-0117 Walton Building Renovation Weld County Govemment Bley Associates PM: $ 938,462.00 Jan-99 Feb-00 20% 5400 W. 11th Ave 91510th Street 2020 Clubhouse Drive Curtis Nsibauer and O SMI Greeley, CO 80631 Greeley, CO 80632 Superintendent e� of Existing fisting Facility Pat Persichino Loren Bley, Architect Phil Hershman 35,000 SF 970-356-4000 Ext. 4224 970-330-3322 Eaton Country Club Eaton Country Club Growling Bear Co., Inc. PM: $ 480,611.00 Aug-99 Feb-00 22% 37661 weld county Rd 39 P.O. Box 240 2330 4th Avenue Curtis Naibauer Eaton, CO 80815 Eaton, CO 80615 Greeley, CO 80631 Superintendent: Design Build Addition and Remodel Rick Colo, Owner John SON, Architect Junior Morgan 970454-2106 970-353.6964 Construct Vault Tdlels Rocky Mountain National Park Rocky Mountain National Park PM: $ 112,377.85 Jun-'99 Jan200 15% Estes Park 1000 HWY 36 1000 HWY 36 Curtis Naibauer Rocky Mountain National Parks Estes Paris, CO 80517 Estes Park, CO 80517 Anne Vrktore Anne ViWOra Nederland Post OFce Centennial Bank Holdings, Inc. Growling Beer Co., Inc. PM: $ 908,117.00 Jun-99 Dec-99 16% Nederland, Colorado 2700 4m Avenue 2330 4th Avenue Curtis Nsibsuer New Construction 7,000 at, lstory Greeley, CO 80634 Greeley, CO 80831 Superintendent: R.B. Holmes - President John Sohl, Architect Kelly Schimdt 970339-3456 970-353.6964 Rocky Mountain National Park National Park Service Rocky Mountain National Park PM: $ 297,852.98 -� Nov'99 15% Vault Toilets -Various locations Rocky Mountain National Park 1000 ENVY 36 Curtis Naibsuer in Rocky Mountain Nat. Park 1000 HWY 36 Estes Park, CO 80517 Superintendent: Estes Park, CO $0517 Charlie Kum Scott Fabian Charlie Kurt Chateau at Sharmar Village CCMK Architecture iL Planning Growling Bear Co., Inc. PM: $ 3,560,734.24 -� Nov-' 99 20% Pueblo, CO 318 East Oak St. 2330 4th Ave. John Sohl Design Build -New Construction Ft. Collins, CO W524 Greeley, CO 80631 Superintendent: Medical Facility Tom Kakfl, AIA John Sohl Don Myers 970-493-1220 970-353-6964 Forest Service - 6 SSTs USDA Forest Service USDA Forest Service PM: $ 142,645.00 May-99 Nov-99 45% Various Locations in N. Colorado 240 W. Prospect Road 240 W. Prospect Road Curtis Naibauer New construction of 6 Buildings Fort Collins, Co 80526-2098 Fort Collins, Cc 80526.2098 Superintendent: Dennis Donovan Dennis Donovan Junior Morgan 970-498.1024 970498.1024 GSA General Services Administration RS+B PM: $ 818,957.00 Jul-99 Oct-99 28% 3nd 6 4th Floor Renovation Pudic Buildings Service 315 E. Mountain Ave., Ste 100 Michael Backlund Cheyenne Wyoming P.O. Box 25546,BWg. 41 Fore Collins, CO 80624.2913 Superintendent: 12,000 at Remodel 6 HVAC upgrades Denver Federal Center Rebecca Spears Roger Childers Denver, CO 80225-0546 970484-0117 Projects Completed Last 5 Years Growling Bear Co, Inc, 2330 4th Avenue, Greater, CO a0931 Phone: (970) 3534994 Fax: (970) 3534971 page 12 Final %of Work Contract Comp- With Own ProjectlDescriotiordLocation Owner ArchkeeMnakrser Amount Start lotion Forces Rocky Mountain National Pads Rocky Mountain National Park Rocky Mountain National Park PM: $ 149.646.02 Apr-'99 Oct-'99 15% Vault Toilets -Various loca9ons in 1000 HWY 36 1000 HWY 36 John Tripp Rock Cut Estes Park, CO W517 Estes Park, CO 80517 Anne Vktcra Anne Viktora Donn Building 2" F.E. Warren Air Force Base F.E. Warren Air Force Base PM: $ 3,014,352.00 Sep-98 Oct-99 30% F.E. Warren Air Force Base Building 11208 Building a208 Dennis Nelson Remodel of Historic Building Cheyenne, WY 82005,5000 Cneyerare. WY BM550W Superintendent: 44,000 SF Darlene Faulkner Darlene Faulkner Scott Sauer 307-7733917 307.773.3917 Air Force Academy Hospital ADAL US Air Farce Academy U.S. Corps of Engineers PM: $ 1,373,664.00 Oct-96 Sep-99 12% US Air Force Academy 8110 Indusbial Drive, Suite 200 Omaha District Michael Backlund Colorado Springs. CO Cokxado Springs. CO Superintendent: 7000 SF New Addition and 4000 SF Carrot Mohr John Tripp Remodel 719-333-2735 Centennial Bank Centennial Bank of the West J.W. Miller & Associates PM: $ 403,300.00 Jul-99 Sep-99 28% Longmont, Colorado 4650 Royal Vista Circle 230 S. Main Curtis Naihauer 12000 SF Tenant Finish Fort Collins, CO 80525 Longmont, CO Superintendent: (970) 454-4141 303-772-4118 - Glen Hoopes Bill Farr, CEO Jerry Miller, Architect Roads Repair Phase III F.E. Warren Air Force Base Banner Associates, Inc. PM: $ 977,216.00 Jun-98 Sep-99 30% F.E. Warren Air Force Base Building #208 Architects & Engineers Curtis Narbauer Roads Repair & Lifi ity Upgrades Cheyenne, WY 82006.5000 620 Plaza CtkM Superintendent: Phase III -New Roads. Parking leas, orb Sue Nagel Laramte, WY 82070 Dennis Nelson & gutter, corn Ones, utils. & site lighting 307-773-3917 Buckley Air national Guard Buckley Air National Guard Pahl -Pahl -Pahl PM: $ 4,534,944.00 18% Greeley, CO USPFO for Colorado 1900 Grant Street Michael Baddund-�'� High Profile Defense Initiative Mobile 660 S. Allow Street Denver, CO 80203-4321 Superintendent: Defense Facility-29,000 of, Hi Security Aurora, CO 80011.9551 Bob Grubb. Architect Junior Morgan Motion Sensors, Manned Guard Sta's Patty McCauley 303-861-7147 New Construction 303-340-9946 Retaining Wall Rocky Mountain National Pack Rocky Mountain National Packs PM: $ 161.059.03 Jun-'99 Aug-'99 65% Trail Ridge Road -Rock Cut 1000 HWY 36 2000 HWY 36 Curtis Rocky Mountain National Park Estes Park, CO B0517 Estes Pack, CO 80517 Anne Vildors Anne Vadors Building 314 Rergvalion F.E. Warren Air Force Base GrovAirg Bear co., Inc. PM: 9 927,976.00 Apr-99 Jul-99 19% F>E> Warren Air Force Baas Building 0208 2330 4th Avenue Demos Nelson Design/Build Pr0j.-Histaic Remodel Cheyenne. WY 82005.5000 Greeley, CO 80831 Superintendent: HVAC, Elect., Pbg., H.C. Access. Darlene Faulkner John SoN, Architect Whitey Panda Aerobic and Dance Area - 24.000sf. 307-773-3917 970-353-6964 AT & T Upper Midwest Fiber AT&T MCB Architects PM: $ 1,310,887.45 Nov-'98 Jul-199 15% Precast ConcreteP300's 1425 Champs St. Room 100 1790 S. Bellaire St. Suite 800 Curtis Naibauer Denver, CO 80202 Denver, CO 90222 Ben Lough 303-758.7858 303-620.2191 Projects Completed Last 5 Years Growling Bear Co, Inc., 2330 4th Avenue, Gnssley, CO OMI Plane: (970) 353.6964 Fax: (970) 353-6974 page 13 Final - %of Work Contract Camp- With Own _ ProlecllDascrlptbNLoeatlon Owner ArchltectfErainsar Amount Start lotion Forces North Range Behavioral Health North Range Behavioral Health Roberts Architects PM: $ 1,118,92&00 Oct-98 Jun-99 15% 1306 11M Ave 1306 11ih Ave. WO 9th Street Curbs Natbeuer Greeley, Colorado Greeley, CO 50831 Greeley, CO W631 Superintendent: New Construction of Medical Facility Errol E. Wilcox. Director 970-353.7232 Glen Hoopes 15WOSF 970.353.3086 Wayne Roberts, Architect rUnion Croft COH C27t CollegeColleCredit Steel& Associates tesSui PM: $ 471,952.00 Feb-99 Jun-99 18% i 2901 venue 2308 West eet, 10/ CurNaibauer Greeley, CO Greeley, CO 80631 Greeley, CO a0631 Superintendent New Construction of 4000 SF Building, Jody Seestro n 303353-6363 Scott Fabian Drive Thu, and Sitework 970-351-2434 Larry Steele, Architect Rodarte Center Addition City of Greeley Growling Bear Co., Inc. PM: $ 221,450.00 Mar-99 Jun-99 21 % 920 A. Street 1300 A. Street 2330 4th Avenue Curtis Naibauer Greeley, CO a0631 Greeley. CO Greeley, CO 80631 Superintendent: Design Build Remodel of 2500 SF Bill Sterling John Sohl, 970353-6964 Phill Hershman and Addition 970-350-9795 Centennial Area Health Education Centennial Am Health Education Growling Bear Co., Inc. PM $ 403,740. W Jan-99 May-99 25% 4650 W. 20th Street 1024 91h Avenue, Suite 8 2330 4th Avenue Curtis Neibauer Greeley, CO 80634 Greeley, CO 80634 Greeley, CO SMI Superintendent: Design Build New Construction of Dennis Stocker John SON,Architect Scott Fabian 5000 SF Building tl Sitework 970-351-0755 970-353-6964 VA Medical Center VA Medical Center VA Medial Center PM: E 351,479.88 Oct-198 FeV99 15% 2nd Floor Remodel 2360 E. Pershing Blvd 2360 E. Pershing Blvd. Dennis Nelson 2360 E. Pershing Blvd. Cheyenne, WY WWI Cheyenne, WY 82001 Cheyenne, WY SMI Jane Jordan Jane Jordan 307.778.7329 307-778-7329 Platte River Steel Platte River Steel Wall E. Bedinger PM: $ 125,067.00 Oct-98 Jan-99 45% 31455 WCR 391/2 31455 WCR 3912 1011 37th Ave. Ct. #101 B Curtis Natbauer Greeley, Colorado 50631 Greeley, CO 90631 Greeley, CO 80634 1000 Sf New Addition, Steel Building 970356-2326 970-346-0912 Building 9304Renovabon F.E. Warren Air Force Base F.E. Warren Air Force Base PM: $ 629,051.00 Oct-98 Jan-99 27% F.E Warren Air Force Base Building N208 Building #209 Dennis Nelson Remodel 23,000 SF Historic Building Cheyenne, WY 82005-5000 Cheyenne, WY 82W5.5000 Sue Negri Sue Nagel 307-7733917 307-7733917 Projects Competed last 5 Years Curtis C. Naibauer, continued Selected Projects: CU Renovation to Behavioral Genetics, Boulder, CO $ 375,610.00 CSU Corbett Hall, Fort Collins, CO $ 675.324.00 New West Bank, Eaton, CO $ 1,309,573.00 CSU Chemistry Remodel, Fort Collins, CO $ 264,868.00 CSU Equine Lab, Fort Collins, CO $ 364,901.00 CSU Stallion Lab, Fort Collins, CO $ 292,911.00 Island Grove Village Apartments, Greeley, CO $ 1,080,881.00 MLS Properties, Greeley, Co. $ 250,000.00 Stephens Center, Greeley, Co. $ 822,000.00 V A Medical Center, Cheyenne, Wy. $ 467,000.00 Hawkstone Clubhouse, Eaton, Co. $ 375,887.00 Camelot Apartments, Greeley, Co. $ 504,680.00 Weld County Training Center $ 822,040.00 Greeley, Co. Boulder Ranger Station $ 1,130,000.00 Boulder, Co. Weld County Walton Building- Renovation $ 850,000.00 North Range Behavioral Health $ 1,150,000.00 Greeley, CO Upgrade roads and infrastructure $ 1,200,000.00 F.E.Warren Air Force Base, Cheyenne, WY $ dC Cost of installation and painting 3. Exterior rail panels - Detail #3 - Sheet A3.2- cut steel and copper sheet - pre -assembled and painted panels, typically 216" x 41511, to be delivered to site by artist for installation by Contractor. Artist will provide placement instructions. Panel weight to be confirmed and installation approved by structural engineer and architect. Contact artist for panel weights. $_2 R97—_-Cost to install (Cut panels by other) $_0 20 Credit to delete horizontal rails as indicated on elevations 4.Floor Pattern - Detail #2 -- Sheet A1.5 - saw -cut design-- additional design work on floor as shown on plans to be installed by Contractor. Artist will provide scaled detail drawings and supervise installation. $ Cost to install 9. PRICES The foregoing prices shall. include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called. for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY ~CS M D: Signature evin Shironaka Date President Title ` License Number (If Applicable) 44'Nid is by corporatio ,rxt evrt,,Gary ronaka _ Address 2330 4th Ave. Telephone - COLORADO DEPARTMENT OF TRANSPORTATION PROJECT NO. ANTI -COLLUSION AFFIDAVIT LOCATION I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on his or her behalf and on behalf of my firm. I further attest that: 1. The price(s) and amount of this bid have been arrived at independently, without consultation, communication or agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder or potential prime bidder. 2A. Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or potential prime bidder on this project, and will not be so disclosed prior to bid opening. 2B. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on this project have been disclosed to me or my firm. 3A. No attempt has been made to solicit, cause or induce any firm or person who is a bidder or potential prime bidder to refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non- competitive bid or other form of complementary bid. 3B. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder on this project to submit an intentionally high, noncompettive or other form of complementary bid on this project. 4. The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom- petitive or other form of complementary bid. 5. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or services from any firm or person, or offered, promised or paid cash or anything of value to any firm or person, whether in connection with this or any other project, in consideration for an agreement or promise by any firm or person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid or agreeing or promising to do so on this project. 6. My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person, whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high, noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project. 7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or other conduct inconsistent with any of the statements and representations made in this affidavit. 8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this contract. I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. _ Contractor's firm or company name By a' De Growling Bear Co., (Inc.) Title President 2nd contractors firm or company name. (If joint venture.) By Date Title .Sworn to before me this � 5 day of, �� pE ` � ````,Nt t II E.Pr ��i, 2M S '� .`` •• •.'9i a antic �OTgy y Z � yes i (n : `• !✓@LtG My commission expi , '+,Ok ZOLO NOTE: ihis document must be signed in ink. 1,%% r �"4 CDOT Form rreoe 1/02 COLORADO DEPARTMENT OF TRANSPORTATION Project No.: UNDERUTILIZED DBE (UDBE) BID CONDITIONS ASSURANCE Location: Instructions: Contractor — Complete and submit this form with your bid. Report only Underutilized DBE (UDBE) participation percentages which qualify under the contract goal specification for this project. POLICY It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have maximum opportunity to participate in the performance of contracts financed with federal, state or local entity funds. UNDERUTILIZED DBE PARTICIPATION COMMITMENT 1) Will your company's Underutilized DBE (UDBE) participation commitment meet contract goals? ❑ Yes ❑ No 2) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below: % 3 List the UDBE firms, committed work items, and eli ibla UDBE percent of your bid that ou are committing to each UDBE FIRM NAME CERTIFICATION COMMITTED SUBCONTRACT ELIGIBLE EXP. DATE WORK ITEM(S) CATEGORY UDBE %" _ ® Subcontractor 1. ... i, ❑Supplier ❑Broker o /o 2.r (�✓✓U. / / 4 , ^' ��'d''^ Subcontractor ❑ Supplier ❑ Broker p ❑ Subcontractor 3. / ! El Supplier ❑Broker % ❑ Subcontractor 4 / / ❑ Supplier ❑ Broker ❑ Subcontractor 5. 1 / ❑ Supplier El Broker % ❑ Subcontractor ❑ Supplier ❑ Broker BOX A: TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT: % Round percentage amounts to the nearest hundredth ' Additional instructions on how to calculate the actual eligible amounts and percentages for the subcontractor, supplier, and broker categories are available on the CDOT Form #715 and in the "Counting DBE Participation Toward Contract Goals and CDOT's annual DBE goal" section of the "DBE — Definitions and Requirements" in the Standard Special Provisions. I understand that, if my company is determined to be the low bidder for the contract on this project, I must submit a completed CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed on this form to the Transportation Department by 4:00 pm the day after the bids are opened. The actual amounts submitted on each CDOT Form #715 must equal or exceed the percentage commitments documented on this form. In addition, if my company does not meet the DBE/UDBE goal for this project, 1 must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT DOCUMENTATION before the above stated deadline. CDOT Form #715s submitted for Firms not included on this form, OR for amounts exceeding those listed on this form, will be accepted but NOT counted as Good Faith Efforts. Only the efforts the contractor made gEW to the bid opening will count as Good Faith Efforts. I understand my obligation to abide by the policy stated above. I shall not discriminate on the basis of race, color, age, sex, national origin, or handicap in the bidding process or the performance of contracts. I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. Company Name: Date: Growling Bear Co., (Inc.) I Q resit? Title - President Previous editions may not be used CDOT Form 714 08104 COLORADO DEPARTMENT OF TRANSPORTATION CERTIFICATE OF PROPOSED Project No.: UNDERUTILIZED DBE (UDBE) Project Code (SA#): PARTICIPATION Location: Form #: of Prime Contractor — Send completed/signed form to the Business Programs Office (instructions on second page). (Nuit: t: see as LJ-K part 2b.55, and the "DBE -Definitions and Requirements" in the Standard Special Provisions, for further information concerning counting DBE participation of subcontractors, suppliers and service providers toward the project's UDBE goal.) PART 1 a — SUBCONTRACT NAME OF UDBE FIRM TIER CERTIFICATION # EXPIRATION ELIGIBLE UDBE SUBCONTRACTDATE AMOUNT ACTUAL CONTRACT AMOUNT ITEMS OF WORK SUBCONTRACTED: PART 1 b — SUPPLY CONTRACT If the supplier is a UDBE "Manufacturer" of the item(s): • ACTUAL UDBE AMOUNT = Entire expenditure for materials and supplies including co • ELIGIBLE UDBE SUPPLY AMOUNT = I (ACTUAL UDBE AMOUNT) X 100% r= � If the supplier is a UDBE 'Regular Dealer' of the item(s): lg • ACTUAL UDBE AMOUNT = Entire expenditure for materials and su }( co • ELIGIBLE UDBE SUPPLY AMOUNT = (ACTUAL UDBE AMOK If the supplier is neither a "Manufacturer' nor a NAME OF UDBE FIRM MATERIALS SUPPLIED: PART 1 c — CONTRACT by the firm services provided by the firm I - SERVICE / BROKER CONTRACT. NT Transportation service `auling) fees/commissions are to be counted toward contract goals in this section (provided the trucker is NOT classified as a "Manufacturer" or a "Regular Dealer' for the materials supplied). Examples of other services to include in this section would be brokering, bonding, consulting, security guards, and insurance. For a UDBE "Service/Broker Contract": • ACTUAL UDBE AMOUNT = Entire expenditure for services rendered including cost of any materials/supplies provided by the firm ELIGIBLE UDBE SERVICE FEE AMOUNT = [ (ACTUAL UDBE AMOUNT) — (Cost of any materials and supplies) ] (NOTE: The amounts that count toward UDBE goals are limited to the compensation retained by the UDBE broker/agent for services rendered, provided the fee/commission is determined by CDOT to be reasonable and not excessive as compared with fees customarily charged for similar services.) NAME OF UDBE FIRM CERTIFICATION # EXPIRATION ACTUAL UDBE ELIGIBLE UDBE SERVICE FEE DATE AMOUNT AMOUNT SERVICES RENDERED: ,vy101110 wlllw rrevious edmons may not be used CDOT Form 715 05/03 PART 2 - UDBE PARTICIPATION SUMMARY A) What is the total dollar value of this proposed subcontract, supply contract, OR service/broker contract that is eligible for counting toward contract goals? (NOTE: Provide in actual subcontractor dollars and not prime contract prices) A> A = [ TOTAL FROM "ELIGIBLE" COLUMNS IN PART 1 ] B) What is the total dollar value of proposed subcontracts that are eligible for counting towards B> contract goals from prior sheets/forms? C) What is the accumulative value of proposed subcontracts that are eligible for counting towards contract goals? C C=[A + B] D) What is the original contract bid total? D> E) What is the accumulative percent of contract bid total subcontracted to all underutilized DBEs? E=[(C + D) X 100] PART 3 - PRIME CONTRACTOR CERTIFICATION AlkFV certify that: s • my company has met the contracted UDBE goals or h it a DOT Form #718, DBE Good Faith Effort Documentation. • my company has accepted a proposal from In DSu med above. my company has notified the proposed f contracted UDBE commitment. • my company's use of the propose s c . he items of work listed above is a condition of the contract award. my company will invite the pr Cis a to attend the preconstruction conference. • my company will not us a s subc Factor for the proposed UDBE subcontractor's failure to perform under a fully executed subc ny complies with the definitions and requirements section of the DBE Special Provisions. : F *, I understa a to, wit the information shown on this form will be considered grounds for contract termination. I declare under p ty e the second degree, and any other applicable state or federal laws, that the statements made on this doc true and complete to the best of my knowledge. Prime Contractor Name: Growling Bear Co., _JInc.) Date: YV 0457 Officer Signature and Title: FORM INSTRUCTIONS Prime Contractor: 6. Retain a photocopy for your records. 1. An officer of the contractor(s) must complete this form. 7. Send original to: 2. Include only DBE firms which meet the underutilized criteria in Colorado Department of Transportation the contract goal specification for this project (i.e., UDBE firms). Business Programs Office 3. Complete ONLY ONE section for Part 1 (1a, 1b, OR 1c) 4201 E. Arkansas Ave. 4. Complete ALL sections of Part 2 and Part 3 Denver, Colorado 80222 5. Submit a separate CDOT Form #715 for EACH proposed UDBE. FAX: (303) 757-9019 Original — Business Programs Office Previous editions may not be used COOT Form 715 PAGE 2