Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESPONSE - BID - 5912 OLD TOWN SQUARE AND ALLEYS PROJECT
SECTION 00300 BID FORM PROJECT: OLD TOWN SQUARE AND ALLEYS ENHANCEMENT PROJECT; BID NO. 5912 Place row GULL/ Date AV p o� 1. In compliance with your Invitation to Bid dated 7 2 0o-g� , and subject to all conditions thereof, the ' undersigned i�woLGGY Gp�STRU(iYvRS SivC: a * (Corporation Limited Liability Company, Partnership, Joint Ven ure, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of -16TP — 4JOQUNT 13/9 ($ $% ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: EMC Insurance Companies, PO Box 712, Des Moines, IA 50303-0712 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersiqned Bidder hereby acknowledges receipt of Addenda No through_. 7/96 Section 00300 Page 1 xV, TECHNOLOGY C0NSTI2UCTC>QS INCOPPORATED 6. Contracts on hand Project Completion JOB Owner Gross Amount Date IFB 34-DD-002 Platte Site Improvements - Trench Drain and CRegional Transportation Dis $746,965.68 04/29/05 Parking Lot Construction at The Cherry Creek Cherry Creek Vista Park & R $103,228.30 05/21/05 University Physicians Median Closure Project University Physicians, Inc.c $59,755 04/15/05 SHE R600-240 R-6 Signal Project CDOT-DKS Enterprises Inc $59,904.00 04/30/05 Littleton Historical Museum Walkway City of Littleton $60,066.22 04/30/05 13. Recently completed contracts: (also see #11) Project name Project Gross Completion Job Location 2506 Taft Park Bridge Replacment Owner City of Lakewood Amount $44,478 Date 01/21/05 Location 2951 Simms Drive Type of construction Replace concrete deck panels and abutements on FL04-01-004 8th Avenue Improvements -Greeley CO City of Greeley $827,201 09/17/04 8th Avenue, 7th to 10th pedestrian bridge Streetscape-concrete curbs, median cover, pavement, FL04-01-047 South 11th Avenue Entryway Landscape- City of Greeley $470,929 07/27/04 Street Avenue, sidewalk, landscaping & irrigation, street lighting, signs Greeley, CO 11th Hwy 34 to 25th Streetscape-concrete curbs, median cover, pavement, P 08-03-6 Messina Park Improvements City of Federal Heights $91,697 05/21/04 Street 2020 West 90th Avenue sidewalk, landscaping & irrigation; street lighting, signs Recreation site improvement inc. benches, pavilion, 2429 Lakewood Link Skate Feature Development City of Lakewood $168,796 05/13/04 W. Mississippi and Reed St. landscaping Skatepark with bowls, walks, ramps, drainage system S. Windermere Street Bridge Highline Emergency Bridge Repair Project City of Littleton $87,460 01/17/04 Windermere St. S. of Bridge repair and approach to bridge Breckenridge Transit Center -Phase I Town of Breckenridge $306,382 11/01/03 Ridgeview Dr. N. Park Avenue & Watson- Curb, gutter, walk,& ramps, HDPE pipe, storm & sanitary Breckenridge sewer 2003 Traffic Signal Construction City of Littleton $160,517 10/23/03 Belleview Avenue/Lowell Concrete wall, curb & gutter, walk, pavement, bus pad, Boulevard traffic signalization Bega Park Site Improvements South Suburban Parks & $75,432 06/20/03 W Main SUS Rio Grande St Earthwork, colored concrete, concrete design work Recreation GLPF 207 Dahlia Street Landscaped Median Project City of Glendale $95,331 02/01/03 1000 Dahlia Street Concrete curb, gutter, sidewalk, pavement CE20232 Downing/Cherry Creek D-11 Bike Ramp Improvements City & County of Denver $264,199 11/21/03 Downing/Cherry Creek Bike ramps and trails, box culvert and retaining wall MTCE 04-012 R-4 Concrete Slab Replacement CO Dept of Transportation $304,880 07/25/02 Various- hwy 85-Greeley; Concrete pavement panels 125-Loveland SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Terhnology_Constructors, Inc. 2. Permanent main office address: 5636 Kendall:Ct., Unit A, Arvada, CO 80002-2747 3. When organized: 11/09/79 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 25 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) see attache 7. General character of Work performed by your company: Demolition, excavation, concrete flat work, and misc. site improvements. 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have your ever defaulted on a contract? If so, where and why? 01 Are you debarred by any government agency? No If yes list agency name. t 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. see attached 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 15. Credit available: $ 300.000+ 16. Bank reference: Colo. State Bank & Trust, 1600 Broadway, Carlton Hamm Denver, CO (303) 861-2111 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? City & County of Denver What class, license and numbers? see attached 19. Do you anticipate subcontracting Work under this Contract? If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? No If yes, DETAIL 7/96 Section 00420 Page 2 19 TECHNoLCX5y CONSTRUCTC) INCORPORATED 11. Previous projects with similar work CONTACT OWNER PHONE TITLE PHONE PROJECT NUMBER PROJECT NAME START DATE ADDRESS FAX EMAIL LOCATION COMPLETE AMOUNT ESTCOMP __ D CONSTRUCI70N DESCRIPTION City of Greeley 1000 10th Street (970) 350-9333 (970) 350-9328 John Briggs Project Manager FL04-01-047 07/27/04 $470,929 06/24/04 Streetsca pe concrete curbs, median cover, Greeley, CO 80631 (970) 336-4156 South 11th Avenue Entryway Landscape 07/27/04 pavement, sidewalk, landscaping & irrigation, street lighting, signs City of Greeley 1000 10th Street (970) 350-9333 (970) 350-9328 Joe Marcisofsky Project Manager FL04-01-004 09/17/04 $827,201 07/16/04 Streetscape-concrete curbs, median cover, Greeley, CO 80631 (970) 336-4125 8th Avenue Improvements 09/17/04 pavement, sidewalk, landscaping & P P 9 Marcisoj@ci.greeley.co.us irrigation, street lighting, signs Greenwood Village, Colorado 303-708-6135 Rich Weyman 10001 E. Costilla Avenue 303-708-6137 Project Manager 2000 Capital Improvement 08/15/01 $1,451,363 12/08/00 Construction of traffic calming medians with Greenwood Village, CO 80112-3730 (303) 708-6137 Program -Orchard Rd Traffic $1,507,357 07/31/01 signalization. Work included concrete curb, Calming gutters, and walk, asphalt repaving, associated storm water pipe and inlets, and thevillage@greenwoodvillage.com Orchard Road extensive landscaping and irrigation and retaining wall. City & County of Denver 201 W. Colfax, Box No. 509 720-865-3100 720-913-4543 Larry Grauberger Asst. Dir of Const-Projects PZ22099 169 8th 11/13/01 $1,807,618 08/07/00 Complete streetscape including concrete Denver, CO 80202 720-913-4524 Avenue, Federal Blvd. to Knox Ct. & Federal & Evans $2,106,481 07l03/01 curb, gutter, ramps, landscaping and Intersection irrigation, traffic signalization and asphalt pavement. larry.grauberger@ci.denver.co.us Denver, CO City of Wheat Ridge 7500 West 29th Avenue 303-235-2828 303-235-2857 Randy Young City Manager S-01-01 11/14/02 $1,140,759 09/03/02 Complete streetscape including concrete (303) 235.2828 Harlan St. Sidewalks/Pedestrian Harlan St. from 38th Ave to 44th $1,236,165 Ave curb, gutter, ramps, landscaping and irrigation, traffic signalization and asphalt pavement. Other References: Jeff Simmons Jim Barwick Senior Land Architect Chief Construction Engineer Robert Stewart David Flaig City of Arvada City and County of Denver Senior Construction Engineer Architect (720) 898-7391 (720) 913-4535 City and County of Denver City of Littleton (720) 913-4533 303-795-3766 �r7 jj TECHNOLOGY U�J CONSTRUCTORS INCORPORATED 12. EQUIPMENT OWNED OR LEASED AVAILABLE FOR USE 1999 Melroe 873 Loader (Bobcat) 1999 Melroe 873 Loader (Bobcat) 1999 Melroe 873 Loader (Bobcat) 1998 Melroe 863 Loader (Bobcat) 1996 John Deere 310D Backhoe/loader 1996 Bomag Roller 1997 Ford F700 Flatbed Dump Truck 1988 Ford F700 Flatbed Dump Truck Stanley Breaker 1999 Dodge Ram 3500 Truck 44 1999 Dodge Ram 3500 Truck 1999 Dodge Ram 2500 Truck 2000 Chevrolet Tahoe 2000 Ford Excursion 2001 Chevrolet Tahoe 1998 Wacker Trench Roller (6) Demolition & Slab Saws Meiho Vibratory Roller (1) Storage Containers on wheels (2) 40 foot Van Trailers (6) Utility Trailers 30 foot Office Trailer (1) Meiho Compactors (3) 1998 Mikasa Compactors (4) 1999 Mikasa Compactors (3) Generators Concrete forms 5636 Kendall Court, Unit A, Arvada, CO 80002-2747, (303) 431-2961, (303) 431-0091 fax TECHNOLOGY CONSTRUCTORS INCORPORATED 14. Qualifications of Management PRESIDENT: Richard Lee Employment with Technology Constructors, Inc. since June 1, 1978 Degree: Bachelor of Science in Civil Engineering The State University of New York, Buffalo Graduated 1976. Certifications/Training: Class B License - Supervisor for Building Construction City & County of Denver Journeyman Drainlayer City and County of Denver Excavations and Confined Space Erosion Control Current responsibilities with Technology Constructors, Inc. include: 1. Overall company operations (a) Relationship with bonding & insurance company (b) Relationship with banker (c) Other relationships vital to Technology Constructors, Inc.'s operation (d) Company policy and procedures (e) Company budgets 2. Office operations 3. Oversee contracting (a) Preparation of bid (b) Preparation of subcontracts (c) Negotiations (d) Purchase of major material items (e) Compilation of job cost control information Experience prior to Technology Constructors, Inc. In the Denver area, Richard Lee worked as an Estimator and Project Manager for a small commercial construction company involved with: windmill tower erection, waste water treatment plant construction, diversion dam construction, park construction, commercial building, and commercial remodeling. He also worked as a Design Engineer for an engineering firm. Prior to graduation, he worked summers and part time as an electrician's helper, sheet -metal worker, and general laborer. 5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax W TECHNOLOGY CONSTPUCTOPS INCOPIPOPATED 14. Qualifications of Management VICE PRESIDENT: Mark DeMane SECRETARY/TREASURER Employment with Technology Constructors, Inc. since June 1, 1978 Degree: Bachelor of Science in Civil Engineering The State University of New York, Buffalo Graduated 1976. Certifications/Training: Traffic Control Supervisor Excavations and Confined Space Current responsibilities include: 1. Overall project management (a) Scheduling of work crews, equipment, materials, and subcontractor (b) Administration of job cost budgets(c) supervision of all field personnel (d) Supervision of all field construction activities (e) Procurement of field construction equipment (f) Supervise all equipment maintenance Experience prior to Technology Constructors, Inc. In the Denver area, Mark DeMane worked as a Project Superintendent for a small commercial construction company involved with: windmill tower erection, wastewater treatment plant construction, diversion dam construction, park construction, commercial building, and commercial remodeling. He also worked as a Design Engineer and Field Inspector for an engineering firm. Prior to graduation, he worked summers and part-time in various trades as: iron worker, equipment operator, and general laborer. 5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax TECHNOLOGY CONSTRUCTORS INCORPORATED 14. Qualification of Estimator/Project Manager ESTIMATOR/PROJECT MANAGER: Edward R. Callejo Employment with Technology Constructors, Inc. since April 1, 2001 Degree: Bachelors of Science Degree in Construction Management Colorado State University Graduated 1982 Certifications/Training: Supervisor Certification — City of Aurora Current responsibilities with Technology Constructors, Inc. include: 1. Estimating (a) Preparation of bid (b) Preparation of subcontracts 2. Project Management (a) Preparation of bid for contract changes (b) Purchase of major material items for jobs Experience prior to Technology Constructors, Inc. K.E.C.I. Colorado, Inc. February 1985 — February 2000: Project Manager/Estimator February 2000 — March 2001: Vice President Responsible for site work municipality contracts throughout the state of Colorado. Took on projects as a general contractor in the areas of intersection improvements, short span bridges, concrete box culverts and roadway improvements. As a subcontractor, the responsibilities were to bid and oversee traffic control, permanent signing and concrete flatwork contracts. El Paso Asphalt January 1984 — January 1985: Estimator Responsible for bidding paving projects in the Colorado Springs area. Colorado Dept. of Transportation: March 1983 — September 1984: Engineers Aid Preparing cost estimates for projects under $500,000.00. 5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax TECHNOLOGY CONSTRUCTORS INCORPORATED 14. Qualifications of Superintendent SUPERINTENDENT: Gerald E. Pfirsch Employment with Technology Constructors, Inc. since April 14, 2004 Certifications/Training: CQC Manager, Army Corp -Safety Director for job 1 st Aide/CPR-American Red Cross Current responsibilities include: Project supervision (a) Scheduling of work crews, equipment, materials, and contractors for on site work (b) Supervise job site personnel (c) Supervision of job site construction activities Experience prior to Technology Constructors, Inc. Bear Star Ent. Inc. February, 1996 — April, 2004 Responsible for Project supervision, job site management, oversee safety program, CQC Manager for all Bear Star Army Corp jobs. Experience in: concrete work, walls and flatwork, renovation work of government building, historical renovations. Williams Bros. Construction 1995 —1996, Hanford Washington Safety Director for job in Area 51, Drinking water system. Tracy Cowdrey and Associates June, 1993 — November, 1994, Carpenter Bridge construction — form, place, finish, concrete. Other experience includes project supervision building sewage pumping stations. 5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax ADDRESS A*. eA4A— Go yoc02. 8. BID SCHEDULE (Base Bid) Lump sum for three areas: Tenney Court - WwpW pyo-�y y+.,oa,mg N o Dollars ($ "�3o SS-2 ) Trimble Court - g,,, wg'co •f,4-kary `kz-,64,p �oo Dollars ($ 3�j� Old Town Square - MOOMAV i kVduAj4W-rAyl*yvp.Z-00Dollars T($ 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of an item so long as the deletion or change does not exceed twenty-five ercent %) of the total Agreement Price. SPECTFU SUB ITT y � i Y f, Signa ure ichard Lee Date Title o ill License Number (If Applicable) (Seal - if Bid is by corporation) Attest: �� � Marra; ry Address S436 99&�2 GT 0&,,7- —A Telephone 3Q3 - Y3i- 2i11 7/96 Section 00300 Page 2 �nTECHNOLOGY CONSTRUCTORS INCORPORATED 14. Qualifications of Superintendent SUPERINTENDENT: Shayne Ford Employment with Technology Constructors, Inc. since March 22, 2004 Previous employment June 5, 2001 to August 10, 2002 — laid off, lack of work Certifications/Training: OSHA - Construction Safety and Health Weldingq certification CPR/15 Aide Current responsibilities include: 1. Project supervision (a) Scheduling of work crews, equipment, materials, and contractors for on site work (b) Supervise job site personnel (c) Supervision of job site construction activities Experience prior to Technology Constructors, Inc. Shayne Ford has been doing construction supervision in Colorado for 7 years. He has been a member of the Carpenter Union for 15 years and 2 years in the Operating Engineers Union. He has extensive work at scheduling crews and coordinating with subcontractors. Has supervised projects ranging from $100,000 to $25 million. Previous Colorado employers are MCL Construction Corporation, Wietz Construction, PCL Civil division, Saunders Construction. 5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax -recH raoUo(5y CONSTRUCTORS INCORPORATE «. LICENSES expiration Technology Constructors, IncType date Richard Lee Ed Callejo Arapahoe County 07/01/05 City of Arvada exp City of Aurora 07/01/04 Supervisor 9130106 City and County of Denver City of Federal Heights City of Greeley general bus 02/05/06 retail sellers license 02/05/06 general 12/31 /05 contractor/ROW contractor 12/31/05 contractor 03/30/05 general business 03/30/05 City of Greenwood Village exp City of Lakewood contractor 12/08/04 City of Littleton exp City of Louisville exp City of Thornton exp City of Wheat Ridge exp Jefferson County exp Supervisor B 6/30/05 1006536 Drainlayer 12/31/04 These are the current licenses. Note: TCI has not had any difficulty in obtaining a license in any jurisdiction in the Denver Metro area. 5636 Kendall Court, Unit A, Arvada, Colorado 80002, (303) 431-2961, (303) 431-0091 fax ` Client#: 20919 TECHCONI -/ d U -Y ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE (MI D/YYYY) • PRODUCER HRH of Colorado 7^" S. Colorado Blvd Ste 600-N THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. l 3ox 469025 Denver, CO 80246-9025 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURER A: Mountain States Insurance Grp 5900 Technology Constructors, Inc. 5636 Kendall Court Arvada, CO 80002 INSURERS: Pinnacol Assurance 10780 INSURER C: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE POLICY NUMBER DATEYEFFEpfYYI PDATYEXPIp EXPIRATION LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE 1_X_1 OCCUR x CPP0103624 01101/05 01/01/06 EACH OCCURRENCE 0,0001000 DAMAGE TO RENTED S100OOO MED EXP (Any we Person) E5 000 PERSONAL 6 ADV INJURY $1 OOO 000 GENERAL AGGREGATE s2,000,000 GEML AGGREGATE LIMIT APPLIES PER PRa LOC 17 POLICY FRI PRODUCTS - COMPIOP AGG s2,000,000 A AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS BAP0103624 01/01/05 01/01/06 COMBINED SINGLE LIMIT (Ea accident) $1,000,OOO X BODILY INJURY (Per parson) i X BODILY INJURY (Par accident) $ X PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY ANY AUTO 0 AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC AUTO ONLY: AGG $ $ A EXCESSIUMBRELLA LIABILITY X I OCCUR CLAIMS MADE DEDUCTIBLE X RETENTION E 10000 UMB0103624 01/01/05 01/01/06 EACH OCCURRENCE E1 OOO 000 AGGREGATE f1 OOO OOO S $ $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICERIMEMBER EXCLUDED? N yea, ABLSP be under SPECIAL PROVISIONS below 4051441 Owners/Officers Excluded 01/01/05 01/01/06 OTH- X I TWIT.1.1% E.L. EACH ACCIDENT $500 000 E.L. DISEASE - EA EMPLOYEE $50O 000 E.L. DISEASE -POLICY LIMIT 1000,000 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL III* DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE AGORO 25 (200V08)1 of Y JlM9391AR TMR 0 ACORD COKPUKAI IUN -I Bad 21 22 What are the limits of your public liability? DETAIL see attached certificate What company? Mountain States Mutual Casualty Company What are your company's bonding limitations? 7 million single, 12 aggregate 23. The undersigned corporation to verification of Qualifications. Dated State of Colorado County of Jefferson hereby authorizes and requests any person, firm or furnish any information requested by the OWNER in the recital comprising this Statement of Bidder's this day of April 11 2005. Richard Lee being duly sworn deposes and says that he is President of Technology Constructors, Inc. and that (name of organization) the answers to, the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this llth. day of April 2005. v Notary Pub .c 5636 Kendall Court, Unit A Arvada, CO 80002 My commission expires 7/96 12/14/08 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 5e of the contract. ITEM SUBCONTRACTOR 7/96 uc�L, Gc7ec[.TR-�.G7��S Section 00430 Page 1 BID 5912 Old Town Square and Alleys Enhancement Project REVISED BID SCHEDULE ADDENDUM 4 BID SCHEDULE (Base Bid) Lump sum for three areas: Tenney Court-p7(AkkL&Jl W ^IpW7wa pwo �/aa Dollars i''Y oni. /swtiw vo, Trimble Court—syu,�AF y AW yt/y � `� ollars _($ gn S 35 ) AWf ��� L Old Town Square - W Dollars .A4y- µA"�w tauE ww,ml" rr'tC �F GRAND TOTAL 6NA oVOVV94P A)� �a DOLLARS (� sS �? S90 oa ) For additions or deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Prices shall be complete, in place including materials and installation, ie., fittings, etc. and anything incidental to the proper installation as specified. A. The Contractor agrees that for requested and/or required changes in the scope of work, . the Contract Sum shall be adjusted in accordance with the following unit prices, where the Owner elects to use this method of determining costs. B. The unit prices quoted by the Contractor shall be those unit prices that will be charged or credited for labor and materials to be provided regardless of the total number of units and/or amount of labor required for added or deleted items of work. UNIT PRICE ITEM UNIT PRICE A. Demolition of 1 I -Inch Concrete Slab $ 04� Square Foot B. Demolition of 6-Inch Concrete Slab w/ steel reinforcement Ofl $_ Square Foot C. Demolition of 6-Inch Concrete Slab $ Square Foot 5 0, D. Demolition of City Curb and Gutter $ % Linear Foot E. Unit Pavers `A' $ f% Square Foot F. Unit Paver Pavement $ Square Foot G. Unit Pavers on Concrete Base 3� $ I f l/ Square Foot H. Sandstone Pavers on Concrete Base $ 3S Square Foot 1. Granite Pavers on Concrete Base Go $ S-2 Square Foot 3s. J. Installation of 6-Inch Concrete Slab $ Square Foot K. Installation of 11-lnch Concrete Slab 2 $ % y Square Foot L. Seat Wall — Type A a+ Linear Foot M. Seat Wall —Type B $ /S Linear Foot M Sandstone Cap — 12 Inch oca $ Linear Foot O. Sandstone Cap —16 Inch $ 4f 7 Linear Foot P. Historic Medallion Q. Sandstone Stair R. Stairs S. Stair Plinth T. Handrail U. Rail Type `B' V. Rail Type `C' W. 6-Foot Bench - surface mount X. 6-Foot Bench - wall mount Y. Bicycle Rack Z. Trash Receptacle AA. Ash Urn BB. Bollard CC. Removable Bollard DD. 60-Inch Square Tree Grate EE. 72-Inch Square Tree Grate FF. 96-Inch Square Tree Grate GG. Large Planter Pot HH. Small Planter Pot II. Deep Planter Pot JJ. Strand Light KK. Brick Face Attachment for Strand Light LL. Light Post `A' MM. Light Post `B' NN. Light Post `C' 00. Lam$ ,GIGh+7- F/1CTv2E c� PP. Wall Mounted Basket QQ. Remington Entry Gate RR. Three Sided Kiosk Q2 $ Each ov $ 30' � Linear Foot oa $ Linear Foot av $ Each an $ /OS Linear Foot oa $ Linear Foot cxa $ Linear Foot $ /y2 e cc� Each $ Each $ S ©O Each 00 $ Z<-b Each vo $ %9D Each $ /l00 , Each eo $ Oo Each $ 4 jt00 60 Each w $ 23s7O— Each $ ✓ i d D Each $ /,.9 o Each - I e�J Each T vv Each 00 Linear Foot 00 $ % 3 7 Each OJ $ ZTaZL Each ov Each eso Each 00 Each 00 $ Each o� $ JAG O Each o� $4 Each I SS. Two Sided Kiosk TT. Steel Gate "A" UU. Steel Gate "B" W. Steel Gate "C" WW. Steel Gate "D" XX. Steel Gate "E" YY. Steel Gate "F" ZZ. 6-Inch City Curb and Gutter AAA. Plaza Drain BBB. 8-Inch PVC Sewer Pipe CCC. 12-Inch PVC Sewer Pipe DDD. Irrigation for Tree at Tree Grate EEE. Planter Pot Irrigation Supply FFF. Hanging Basket Irrigation Supply GGG. Wall Mounted Basket Irrigation Supply HHH. Netafim Dripline III. 1-Inch Class 200 Irrigation Lateral Pipe JJJ. '/4-Inch Type K Copper Irrigation Lateral Pipe KKK. Portland Cement Plaster LLL. 3-Inch Caliper Deciduous Tree (Installation Only) MMM. 3-Inch Caliper Deciduous Tree NNN. 3-Inch Caliper Deciduous Tree in Tree Grate 000. 2-Inch Caliper Deciduous Tree PPP. 5 Gallon Deciduous Shrub QQQ. 7 Gallon Evergreen Shrub RRR. 5 Gallon Evergreen Shrub SSS. 1 Gallon Evergreen Shrub TTT. I Gallon Perennial UUU. 4-Inch Perennial 4 r1 $ gS�70 Each o� $ Each oSZ $_�[�_ Each �o $ Each T $ 3S ` Each cam' $ 3 7 /,v a Each o� $ SWO — Each S� $ Linear Foot $ / judo Each Gb $ J S Linear Foot $ $ Linear Foot / O $ [i S $ Each $ Each O ` $ !o % Each U $ G/ Each $ bk==Foot $ ,3 Linear Foot SO $ s Linear Foot $ Y .2S' Square Foot $ / 7,2, P_ Each ory Each Cr $ s�V Each $ o_ Each 0 $ SO ' Each 7" $ 4 SD Each 20 $ 6—% Each a $ Each $ %y 3' Each % $ Each 6/ VVV. White Glory of the Snow Bulb $ p Each W W W. Mixed Purple Giant Crocus Bulb $ 0 U Each XXX. Blue Grape Hyacinth Bulb G/ $ j% Each YYY. Giant Snowdrop Bulb $ % Each ZZZ. Blue Dwarf Iris Bulb 00 $ / ' Each AAAA. Annuals Planting for Large Planter Pot $ /0 7 Each BBBB. Annuals Planting for Small Planter Pot iS $_ & 1 — Each CCCC. Annuals Planting for Deep Planter Pot $ 47 Each DDI b. Annuals Planting for Hanging Basket iS $ Z Each EEEE. Unit Price Item: Curb At Building Description: Cast -in -place concrete curb (as drawn on detail C/LS507, assume 6 inch heath above adjacent granite paves), including all excavation, formwork, concrete, steel dowels, finishing, and other materials, transportation of materials, and incidental efforts required for a complete finished product. Does not include cost of adjacent granite or unit pavers. ZS Linear Foot RESPECTFULLY SUBMITTED: r-1 Signature Date Title License Number (If Applicable) (Seal — it Bid is b corporation) Attest: ta61e Lee, Mast se4-040-f #4y Address �C700-J— (�� Y Telephone �34>3 — 7/96 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors Section 00410 Page 1 SECTION 00410 BID BOND KNOW ALL "MEN BY THESE PRESENTS: L•hat we, the undersigned Technology* as Principal, and Employers Mutual Casualty Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of **5--------- 5%------ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, OLD TOWN SQUARE AND ALLEYS ENHANCEMENT PROJECT; BID NO, 5912- NOW•THEREFORE, (a) If said Bid shall be rejected, or (b) if said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall, furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other xespects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein Stated. TheSurety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact buainess in the State of Colorado and be accepted by the OWNER_ *Constructors, Inc. **Five Percent of Total Amount Bid 7/96 Section 00410 Page 2 , 6 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 16th day of Tune , 20_Q5, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above - PRINCIPAL Name:_TechnologYCons rurt,Qrg, Tnr• Address: 5636 Kendall Court ATTEST: BY.r%1- 7/96 Mark DeMane Secretary (StAL) SURETY Employers.Mutual raszlalty r nngn• P.O. Box 370010 Denver CO 80237-0010 BY: Kristen L. McCormick Title:Attornev-In-Fact 1 H R H HRH P.O.B Colorado . Box 469025 s Denver, CO 80246-9025 h i l b r o g a l & h o b b s- m 303-722-7776 303-722-8862 Section 00410 Page 3