Loading...
HomeMy WebLinkAbout102795 WESCO DISTRIBUTION INC - PURCHASE ORDER - 5506463 (2)i Date: 09/26/05 Citv of Fort Collins Page Number: 1 City of Fort Collins Purchase Order Number: 5506463 Delivery Date: 09/26/05 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: PER SPEC 368-120-180 REV FF Line City UOM Description Unit Price Extended Price 1 6 EA T1200180; 167kVA transformer 2,932.0000 17,592.00 240/120; single phase padmount T1200180 YARD TRANSFORMER, 167 kVA PAD -MOUNTED COMPARTMENTAL TYPE, SINGLE PHASE DISTRIBUTION WITH SEPARABLE INSULATED LOAD BREAK HIGH VOLTAGE CONNECTORS. HIGH VOLTAGE RATING: 13200 GRDY/7620. LOW VOLTAGE RATING: 240/120. SERIAL NUMBER 180 TO BE IN ACCORDANCE WITH SPECIFICATION #368-120-180, REVISION FF MFR -ABB GUARANTEED NO LOAD LOSS - 242 GUARANTEED FULL LOAD LOSS - 1101 GUARANTEED TOTAL LOAD LOSS - 1343 IMPEDANCE - 2.51% ESCALATION IS NOT APPLICABLE DELIVERY: 9-11 WEEKS Sing,_ 23931 s ec.. cif � Page $ REV. SYM: FF 3.2.2.9.1 The cover shall be welded construction. 3.2.2.9.2 Tank grounding provision shall consist of two steel pads, each with 1/2 inch -13 NC topped hole, 7/16 inch deep. 3.2.2.9.3 These ground pads shall be welded on the transformer base or on the tank wall near the base, one in the high -voltage side and one in the low -voltage side. In cases where the transformer tank and compartments are separate, provisions shall be made for electrically connecting them 32.2.9.4 Looking bolts shall be pentehead. 3.2.2.10 COMPONENTS FOR LOOPED PRIMARY The minimum current -carrying capability ofcomponent a for the looped primary cable system shall be 200 amperes (continuous) and 10,000 amperes symmetrical (momentary). 3.2.2.11 AUDIBLE SOUND LEVEL The audible sound level shall be in accordance with NEMA Standard TRt-1980. 3.2.2.12 BASE PLAN The base plan ofa completely assembled unit shall be such that itcon be installed on a pad ofthe dimensions shown in Fig. 1 B. 3.2.2.13 PAINT EEI "Finishing Guidelines' specification shall apply. Finish coat shall be Munsell Green, glossy. 3.22.14 LOSSES The total losses of transformer shall be the sum of the excitation losses and the load losses (12R losses). Load loss tests shall be performed and reported on all units regardless of whether or not a record ofsuch tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the "Special Conditions and Supplemental Instruction to Bidders." Transformers will be evaluated on excitation losses and PR losses atthe specified rates. If tested losses exceed quote bases but are within the tolerances of Table 18, ANSI C57.12.00-1987, the additional cost incurred from the differential of tosses will be calculated using the following equation and the above specified rates and will be deducted from the original Purchase Order or back charged to the manufacturer. In Table 18 and the following equation "Units" shall mean "Transformers of the so me size and design on one order". Excess loss $ _ [No. of units) [(No Load Loss Evaluation $) (Avg. No Load Losses - Quoted No Load Losses) +(Load Loss Evaluation $) (Avg. Load Losses -Quoted Load Losses)]. M this equation results in a negative number, no credit will be given the Supplier. If any unit or units exceed the tolerances of Table 18, ANSI C57.12.00-1987, that unit or units shall not be shipped without express permission from the City. If accepted, the deduction for excess losses will be based on the following equation: Excess loss $ _ (No Load Loss Evaluation $) (No Load Losses - Quoted No Load Losses) But Not Less Than Zero +(Load Loss Evaluation $) (Load Losses -Quoted Losses) But Not Less Than Zero. 3.2.2.15 SAFETY LABELS NEMA 1260 Safety Labels shall not be applied by the manufacturer. Purchaser will applycusbmer warning labels alter delivery. 8 368-120 urchasin 23931s ec.. df Page 9-= REV. SYM: FF 4 QUALITY ASSURANCE 4.1 GENERAL 4.1.1 RESPONSIBILITY FOR INSPECTION Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the vendor may utilize his awn facilities or ary commercial laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the inspections set forth in this Specification where such inspections are deemed necessary. 4.1.2 TEST REPORT The manufacturer shall furnish to the purchase certified copies of the results of loss tests prior to payment. Copes shall be sent to the Design Section as well as with the invoice. Unsigned copies are riot acceptable even 9 accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test report. 4.2 TEST CONDITIONS Unless otherwise specified, testing required by Section 4.4 shall be conducted under the following conditions: 4.2.1 REFERENCE TEMPERATURE The reference temperature to which losses, impedanc e, regulation, and efficiency are conected shall be 85'C. 4.2.2 TOLERANCE ON IMPEDANCE VOLTAGE Impedance on completed arts shall fall within the range specified herein. 4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP The percent departure of tested impedance voltage on any tap from tested impedance voltage at rated voltage shall not be greater than the total tap voltage range expressed as a percentage of the rated voltage. 4.3 Not used. 4.4 TESTS The kinds of tests to be performed and the test procedur es shall be as specified in ANSI C57.12.20, ANSI C57.12.00, and C57.12.90 except as specified herein. 4.4.1 DIELECTRIC TESTS No applied potential test shall be made. The induced-potentia I test shall be made by applying between the terminals of one winding a voltage which will develop from high -voltage line terminals to ground a voltage of 1000 volts pus 3.46 times the rated transfomner winding voltage. 4.4.2 IMPEDANCE AND LOAD -LOSS TESTS Impedance and load -loss tests shall be made on each Writ and may not be omitted even if a record of such tests made on a duplicate unit is available. 5 PREPARATION FOR DELIVERY Trarsfommes shall be prefrlled with the appropriate amount of transformer oil and shall be shipped by open -bed trick. Units shall be packaged in such a way as to provide for ease of handling and to protect units from shipping damage. 9 368-120 A _ _urcFiasin-,23931 s ec..pdf _ w ._.. n a .b _ �.w� a m. �_ pale 10 REV. SYM: FF Units shall be packaged on four-way universal pallets with 34 inches minimum opening and loaded on the truck for side removal. The Supplier shall give 24 hour notice prior to delivery for any shipments where an individual transformer weighs over 5,000 pounds. In addition to these requirements, the Supplier shall comply with any additional requirements or modifications shown on the purchase order ardor supplemental instructions. 6 DEFINITIONS AND ABBREVIATIONS Vendor or Supplier - The manufacturer ardlor manufacturers agent supplying or quoting on the specified article. Article, Unit Assembly - All refer to the equipment defined by this Specification. • DC or d.c. - Direct Current. • AC or a.c. - Alternating Current. • "C - Degree Celsius (Centigrade) • OF - Degree Fahrenheit • kV -1000 volts. • CPS or Hz - Cycles per second. • psig - Pounds per square inch gauge. • V or v- Vats. • KVA - 1000 Volt-amperes. 10 36&120 urchasin 23931 spec,. df _ , , m ... .. Page 11 :14FA ALTM99 APPENDIX A— Transformer Stock Number Coding Below are examples that demonstrate the coding method used by City of Fort Collins to establish transformer stock numbers. I. SINGLE PHASE Example #1:1=::> Tramfrxmx Single Phase 00 = 13.ZY/7620 & 76M13.2Y x 2400/4160 outside pole 05=13.2Y7620 ESNA pole 20=13.2Y/7620 ESNA pad 368 -1 Z/ II. THREE PHASE Example #2 ff:* 368 - 300 - XYZ Transformer �--� 3 Phase Pad 006 = 75 015 = 150 030 = 300 050 = 500 Other KYA 0 = 5 5=50 1=10 6=75 2 = 15 7 = 100 3=25 8=167 4 = 37.5 9 = 250 1 = single voltage 2 = dual voltage KVA 075 = 750 100 = 1000 150 = 1500 Al suffixes indicate 208Y/120 sec. For 480Y/277 sec., add 1 to XYZ (is. 007 would indicate a 75WA vAth 480Y277 sec) 11 368-120 purchasing - 23931 spec..pdf Page 12 REV. SYM: FF APPENDIX B - DIMENSIONAL DRAWINGS 40' MAX 28' MIN 41F WIN MIN MIN I MIN MIN MIN MIN MIN 4!G' MIN H1A' •HIB •X3 •XI T:Y GABLE AGCFa.SORV 32"max x PARKING STAND ' X2 N GROUND PAD • 18'i2' o'er �b MAX. • MINIMUM OPENING KV RADIATORS RADIATORS IN BOTTOM OF COMPARTMENT 25 k 5O 32.5" FOR CABLE ENTRANCE 100 -- 42' 167 42' 53" 230 44' 55' Figure 1 - Type 1 Transformer Dimensions and bushing Designations (not to scale) 12 368-120 u urcMasin - 23931 spec.. rdf . Page 13 9 D Zj°.1e TANK xSURFACE DETAIL A CABLE ACCESSORY PARKING STAND REV. SYM: FF RSoTrom 10 tpl�M(Upl�g A FLANGE I PiDTE21 � FLANGE � � Nf&pE imifl-�---------- - I J MAx MI. OPENING ARpTRAW/ POINT (NOTE Ei 1 W-41-VOLTAGE CONNECTORS x' Z UM 51t VA. 31 WIN fi. i io u... 60° 2 RI° 4 4 MIN A Stock Number I`Dimension A'I Dimension B 1 Dimension Dimension D 'Dfinens ?n E 368-M155 13" 5" 4" 0" 3 %" Figure 2 - Type 2 Transformer Dimensions and bushing Designations (not to scale) 13 36&120 Ai purchasing-23p3i spec_pdf Page 14 REV. SYM: FF Pad Dimensions This drawing is not intended to dictate requirements for items purchased under Specification 3W120 but is included as an aid to those users desiring a minimum of pad designs for the transformers covered by Specification 368-120. The dimensions in inches of Figure 3 will fit the minimum compartments on transformers covered by this Specification as well as the maximum transformer envelope. 'B ; MUXNNE6N 1N101MMDMIll Nola on Pod mwgr - t. C .mustM3,=pim.- 2 moxm corn syyopro sm. 11/2nche. sp000,.*r s hr Pod rM Ph y-McMV oseM v stRMt* M A X 17. FWMW M oomidkRMI M Y wg th Pod YIOMMo - 1. A IolkY-TM tMwsft lr pod SW Mr IDIo to Imo bean Jr "*w lath wowrM mnwol of hxptnmlrmrs. suNl rxxsmy "w wit" YYl W . odI Frgp y 2 PlmlmtyA6u131po, WOY, 011lAl, rWr OvorMps - InWSMI IatM� Iogiod Ir of tWbn rM .MR W Ih a) Mi4 olNrrica Y tmM d tMtrrlMr a ahl M NpN MI hot rM 2) Mot. Wkft Ir. wM% ahl MMN(top that=or ton ovrAr tw olrornca b IM a tl of lh trsdp of t Rd M T m f WoLghvrhomnoy Iromth dmr WI al 1Mm tN Trrm,,, I t lhaup113f10 XVA Wq tMYd uMr tM wvmrq r 1M RRoo z I"o t Mxaori tM Pod rM o t wodlrq t r Ynt ]s IOM oM tM Ycrbn Y rmaMs to fn barn Irvcks. 1 (:Mr rM Birgrb•InrWbn to thoEwo, th MblMbn ahl oonMm to ih IWIONI EYQdt Cods rld IMrol, rho rM cIy codas (Iltl MrWIM. Figure 3 - Pad Dimensions 14 36&120 purchasing - 23931 s eC..pdf Pale 15 REV. SYM: FF APPENDIX C —Approved Manufacturers Transformers purchased under this Specification shall be of the make sham below. Manufacturers not listed below may submit written proposals demonstrating compliance with these Specifications for considerati on of addition to the accepted manufacturers list prior to the next request for bids. In addition to inclusion on the list below, manufacturer's equipment must also satisfy all requirements of this Specification to be acceptable. MANUFACTURER SERIAL NO. ABB al Cooper Power Systems All General Bectric All Howard Industries All The manufacturers in the following list have been conditionally approved and may did as an alternate. The definition and intent of "Conddionel Approval' of a manuf acturer is to allow the City to gain some experience with the manufacturer's product. Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, pan, or none of the order to them, dependant upon the current needs of the City for that item or dens. 15 3sl-lzo 4 purchasing - 23931 spec..pdf Page 16 TRANSFORMER LOSS EVALUATION - AVERAGE LOSSES City Order No. SIN Manufacturer Invoice No. KVArUnit LINE DESCRIPTION A (1) No. of units (2) Average core lasses (3) Quoted care losses (4) Excess average core losses: line (2) less line (3) (5) Penalty) for excess average care losses: line ((�1 x line 4)x $ ( (6) Average copper losses (7) Quoted copper losses (8) Excesslosses: line (6) ne (9) enaltv)forexc(5 x $erage copper losses: ne line(10) Penalty to be assessed manufacturer: line (5) plus line (9) but not less than zero Date Prepared By: Design Engineering MOUNT REV. SYM: FF NOTE: If any unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable to Light and Power. 16 368-120 u u. pat - 23931 spec -Of _ m Page 17 INDIVIDUAL TRANSFORMER LOSS EVALUATION City Order No. SIN Manufacturer Invoice No. KVA/Unit LINE DESCRIPTION AMOUNT (1) Tested core losses (2) Quoted core losses (3) Excess care losses line (1) less line (2) but not less than zero (4) Pawl difference % line (3) ❑ line (2) x 100 (5) Tested total losses (6) Quoted total losses (7) Excess total losses line (5) less line (6) but not less than zero (8) Percent difference % line (7) ❑ line (6) x 100 (9) Tested copper losses (10) Quoted copper losses (11) Excess copper losses (12) line (9) less line (10) but not less than zero (12) Penalty for excess care losses line (3) x $ (13) Penaty for excess capper losses line (11) x $ (14) Penalty to be assessed manufacturer line (12) plus line (13) Date Prepared By: Design Engineering REV. SYM: FF 17 368-120 i Date: 09/26/05 City of Fort Collins Page Number: 2 City of Fort Collins Purchase Order Number: 5506463 Delivery Date: 09/26/05 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: PER SPEC 368-120-180 REV FF Line Qty UOM Description Unit Price Extended Price QUOTE #23931 Total $17,592.00 City of Fort C161rifis Director of Purchasing and Risk Management City of Fort Collins This order is valid over $2000 unless signed by James B. O'Neill II, CPPO, FNIGP Accounting Department City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 PO Box 580 Phone: 970-221.6775 Fax: 970-221-6707 Email: info@ci.fort-collins.co.us Fort Collins, CO 80522-0580 urchasin - 23931_spec. cond df z w, , Page 1 Issued: 8/17/72 Revised: 1/21/94 Special Conditions and Supplemental Instructions to Bidders Applicable to Specification 368-120 A. Data to be Supplied with Bidder's Proposal The following data shall be supplied with the bidder's proposal in addition to that information required by the "Invitation to Bid" and the "Purchase Requisition". 1. Atypical list of users of phase padmounted distribution class transformers manufactured by the bidd erduring the past five years. 2. A typical drawing of the transformers showing that they will meet the critical dimensions required by the Specification. 3. Impedance volts in % at full load, high voltage to low voltage at 85 °C. 4. No load and total losses at 85 oC. 5. Delivery in weeks. 6. A statement indicating compliance with our Specification without exception or detailed list of exceptions. 7. Escalation is _.is not _appplicable for the transformers bid. If escalation applies, the Bidder shall indicate in his bid the specific items or materials subject to escalation, and shall give the method and indices to be used in computing the amount thereof. Escalationoccurring after the quoted delivery date will not be paid unless delays are the result of actions by the City. Escalation occurring after acceptance, if Purchaser exercises the option to delay shipment after manufacturing is completed, will not be paid. If the above information and compliance statement are not supplied, the proposal will not be evaluated. An alternate bid for the total order maybe submitted in addition to the unit bids. B. Loss Evaluations Loss penaltiesand loss evaluations will be based onthe following values: No load or excitation losses at $3.90/watt. Load losses at $1.50/watt. purchasing - 23931 s ec. cond.. df Page 2 Shipping Terms Ship F.O.B. point of destination, freight prepaid. D. Terms of Payment If escalation applies, the City of Fort Collins shall not be billed for escalation occurring afterthe promised delivery date. 2. Test reports shall accompany the invoice. If test reports do not accompany the invoice, late payment penalty charges incurred due to delays in obtaining the test reports will not be paid. Certified copies of test reports shall be sent to the Design Section, Fort Collins Light and Power Utility. Loss penalty credits and escalation charges shall be itemized on the invoice. 46 a 11 purchAsing - 23931 spec..pdf a Page 1 . THE CITY OF FORT CO W NS Light and Pmoer DeWmeht P.O. Boot 580 Fort Collins, CO 80522 SPECIFICATION NO: 368420 TITLE PAD -MOUNTED COMPARTMENTAL -TYPE SINGLE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS i APPROVED BY: / Kraig E Standards Engineering Manager ORIGINATED: 09/14M LAST REVISED: 712112004 ITEMS COVERED BY THIS SPECIFICATION DESCRIPTION STOCK NO. SPECIFICATION NO. SERIAL 25 KVA 120/240 ANSI Type 1 Transforrm. 368-120 -130 50 KVA 120/240 ANSI Type 1 Transformer. 36&120 -150 50 KVA 1201240 ANSI Type 2 Transformer. 368-120 - 155 100 KVA 1201240 ANSI Type 1 Transfomer. 368-120 -170 167 KVA 120/240 ANSI Type 1 Transfomrer. 3613-120 -180 250 KVA 120'240 ANSI Type 1 Transformer. I 3611-120 I -190 urchesin - 23931 spec pdf . k .. , x Pa e 2 REV. SYM: FF PREVIOUS REVISION DESCRIPTIONS ON FILE REVISION DESCRIPTION APPROVED REVISION DD: Sagen • Paragraph 3.2.2.7.5: Editorial 1=1/94 • Add paragraph 3.2.2.9.4 requiring pentehead locking bolls • Paragraph 3.2.2.13 add glossy to paint requirement • Paragraph 4.2.2: Clarify impedance requirement REVISION EE Sagen • Paragraph 5.0: revised pallet size from 28 to 34 inches 2f25/98 REVISION FF Kraig Bader • Added 5MVA ANSI Type 2 Transformer (368.120.155) to Specification 7/21/2004 • Charged paint color to standard Murrell Green • Reorganized to consolidate impedance and fusing requirements into one table. • Consolidated secondary terminal requirements into one table. • Added maximum impedance requirement for 250kVA tran sfa rner (+/-7.5% from nominal for transformers with impedance greater than 2.5%) per ANSMEEE C57.12.00-2000. • Reevaluated fusing requirements of all transformers in this specification. Went from dual sensing bay-o-nat (expulsion) fuses to current sensing bay-o-nel (expulsion) fuses. Fuse sizing was charged as follows: • Charged 25 WA from 8A expulsion 140 amp CL to 10A expulsion / 30A CL • Charged 50 kVA from 15A expulsion 180 amp CL to15A expulsion 140A CL • Changed 100 WA from 25A expulsion 1175 amp CL to25A expulsion I80A CL • Charged 167 kVA from 40A expulsion / 200amp CL to40A expulsion / 125A CL • Charged 250 kVA from 65A expulsion / 350amp CL to65A expulsion / 126A CL 2 368-120 urch8sin - 23Gqj'sjpeqpdf Page 3 TABLE OF CONTENTS PREVIOUS REVISION DESCRIPTIONS ON FILE. 1 SCOPE REV. SYM: FF 2 2 APPLICABLE DOCUMENTS.- __4 2.1 ANSI C57.12.00 - DISTRIBUTION, POWER, AND REGULATINGTRANSFORMERS , ANDSHUNT REACTORS, GENERAL REQUIREMENTS FOR................. ................ ................ ................ ................ ................ ................ .............. ................. I ................ ................ ................ ........4 2.2 ANSI C57.12.25 -PAD MOUNTED COMPARTMENTAL -TYPE, SINGLE-PHASE, DISTRIBUTIONTRANSFORMERS WITH SEPARABLE H-V CONNECTORS, STANDARD REQUIREMENTS FOR ................ ................ ................ ................ ................ ................ ................ .............. ...... _4 2.3 ANSI C57.1228-SWITCHGEARANDTRANSFORMERS -PAD-MOUNTEDEQUIPMENT-ENCLOSURE INTEGRITY ....................... ........4 2A ANSI C57.12.70 - TERMINALMARKINGSAND CONNECFIONSFOR DISTRTBUTIONANDPOWER TRANSFORMERS .................... ...........4 2.5 ANSI C57.12.80-TERMINOLOGYFOR POWER AND DISTRIBUTIONTRANSFORMERS ................. ................ ................ ................ .......4 2.6 ANSI C57.12.90-DISTRIBUTION, POWER, ANDREGULATINGTRANSFORMERS,ANDSHUNTREACTORS,TESTCODEFOR................. 4 2.7 IEEE C57.91 - GUIDEFOR LOADINGMINERAL-OIL IMMERSED OVERHEAD AND PAD -MOUNTED DISTRIBUTIONTRANSFORMERS RATED 500 KVA AND LESS WITH 650C OR 550C AVERAGE W INDINGRTSE................. ................ ................ ................ ................ .........4 3 REQUIREMENTS.. _ r _ _ _ -4 3.1 GENERAL REQUIREMENTS FOR DESIGN ................ ................ ................ ................ ................ ................ ................ ...............4 3.2 SPECIFIC DESIGN REQUIREMENTS .................... ................ ................ ................ ................ ................ ............... ................. ......5 4 QUALITY ASSURANCE _ _ _ __ _ _ _ w _ _ ___ _ _ _..9 4.1 GENERAL ......................... ................ ................ ................ ................ ................ ............... ................. ................ ................ ..............9 42 TEST CONDITIONS...... ................ ................ ................ ................ ................ ................ ............... ................. _........... .. ................ .9 4.3 NOTUSED................. ................ ................ ................ ................ ................ ................ .............. .................. ................ ................ ........ 4.4 TESTS., ......... ................ ................ ................ ................ ................ ................ ............... ................. ................ ................ ................ ...9 5 PREPARATION FOR DELI VERY _ ._.r_9 6 DEFINITIONS AND ABBREVIATIONS_ APPENDIX A -TRANSFORMER STOCK NUMBER CODING_ _ APPENDIX B-DIMENSIONAL DRAWINGS___ PAD DIMENSIONS APPENDIX C-APPROVED MANUFACTURERS -._.- TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES.- INDIVIDUAL TRANSFORMER LOSS EVALUATION 3 368.120 _._..16 .17 ,purchasing - 23931 specs. cif Pale 4 REV. SYM: FF SPECIFICATION FOR PAD -MOUNTED COMPARTMENTAL-TY PE SINGLE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH VOLTAGE CONNECTORS 1SCOPE This Specification establishes the minimum electrical requirements and machari cal features of single phase, 60 HZ, mineral oil immersed, self -cooled, pad -mounted, comper tmental-ty pe distribution transformers rated 250 KVA and smaller, high voltage 13,200 Grd Y/7620 volts, with separad a insulated bad break high voltage connectors. These transformers are used for step down purposes from an underground primary cable supply. Ttis standard generally conforms with ANSI requirements for pad -maned compartmentaHy pe, self -coded, single- phase, distribution trans formers, C57.12,25. 2 APPLICABLE DOCUMENTS The following documents of the issue shown form a part of this Specification to the extent specified herein. In those cases when the document is note dated, the latest issue in effect on the date of invitation for bids shall form a part of this Specification 2.1 ANSI C57.12.00 - Distribution, power, and regulating transformers, and shunt reactors, general requirements for. 2.2 ANSI C57.12.25 - Pad mooted, canpatmertal-t ype, singe -phase, distribution transformers with separable H-V connectors, standard requirements for. 2.3 ANSI C57.12.28 - Switchgear and Transformers - Pad -Masted Equipment-Encios Lye Integrity. 2.4 ANSI C57.12.70 - Terminal markings and connections for distribution and pager transformers. 2.5 ANSI C57A 2.80 - Terminology for paver and distribution transformers. 2.6 ANSI C57.12.9 0 - Distribution, power, and regulating transforrmers, and shut reactors, test code for. 2.71EEE C57.91 - Guide for Loading Mineral-Oil-Imme rsed Overhead and Pad -Maned Distribution Transformers Rated 500 WA and less with 650C or 55'C Average Wriding Rise. 3 REQUIREMENTS 3.1 GENERAL REQUIREMENTS FOR DESIGN 3.1.1 BASIC DESIGN STANDARDS Transformers purchased under these Specifications shall be new and, uNess otherwise specified, meet the requirements of the applicable ANSI Standards and the modifications and additions given in the subsequent paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shun: a) This Specification b) Applicable ANSI Standards Approved manufacturers are listed in Apfx dx C. 4 368-120 41 urchasin r- 23931 Spec..Pdf Page 5 REV. SYM: FF 3.1.2 KILOVOLT -AMPERE TEMPERATURE RATINGS Kilovolt -ampere ratings are continuous and are based on not exceeding either a 650C average winding temperature or an 80°C hot spot temperature rise. The temperature rise of the insulating oil stroll not exceed 65°C when measured near the top of the tank. The temperature rise is based on an attitude of 3,300 feet. The transformers shall be designed for overloads based on IEEE C57.91. 3.1.3 GENERAL CONSTRUCTION 3.1.3.1 The pad -mounted oonpartmental-ty pe transformers shall consist of the transformer tank and high -and -low• voltage cable terminating compartment constructed in accordance with ANSI C57.12.25 and ANSI C57.12.28. The terminating compartment and tank shall be assembled seen integral unit tamperproof and weatherproof for mounting on a pad. There shall be no exposed screws, bolts, or other fastening devices which are externally removable. The cover shall be welded construction. There shall be no opening through which foreign objects such as sticks, rods, or wires might be inserted lo contact live parts. Suitable means for padlocking the compartrnent door(s) shall be provided. 3.1.3.2 The high- and kxv-voltage compartment shall be located side by at de on one side of the transformer tank When facing the compartment the kxv-voltage side shall be on the right 3.1.3.3 Construction of the unit shall be such tot itcan be lifted, skidded, and slid into place on the mounting pad without disturbing the entrance cables. 3.1.3A An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that are in contact with the pad to rninimize corrosion. 3.1.3.5 Minimum dimensions for Type 1 transformers shall be as shown in Figure 1, Appendix B. Minimum dimensions for Type 2transformers shall be as shown in Figure 2, Appendix B. 3.2SPECIFIC DESIGN REQUIREMENTS 3.2.1 FUNCTIONAL DESCRIPTION The transformer shall be a singe phase, pad mounted, loop feed -safe break, "dead -front" type for use on a 13.8 kV grounded 'Y' distribution system. 3.2.2 DESIGN AND CONSTRUCTION 3.2.2.1 RATING The transformer shall be rated as follows a) High Voltage 13,200 Grd. Y77620 volts b) Low Voltage 240/120 c) Taps Two - 2%% FC above and below normal d) Polarity Additive e) Capacity, Impedance values, and fusing for transformers in this specification shall conform to Table 1: 5 3WI20 purchasin - 23931 s ec.. of Page 6 REV. SYM: FF Table 1 - Transformer Capacity, Impedance and Fuse Selection Stock I WA I Min. I Max. I Bay-0-Nat I Current Limiting Fuse(a) Number Capacity Impedance Impedance Fuse 36&120-130 25 1.77% 2.16% 10 Arrp ELSP 354403gWIM (30 A) 3W 120-150 50 1.77% 2.16% 15 Arrp ELSP 3543040M51M (40 A) 4000353COO 3W120-155 50 1.77% 2.16% 15 Arrp ELSP 3543090M IM (40 A) 4000353COO 368-120170 100 1.95% 2.38% 25 Arrp ELSP W430BOWIM (80 A) 10 388-120.180 167 2.28% 2.79% 40 Anp ELSP 3543125WIM (125 A) 368-120-190 15.75% 16.61% 14000353C14 ELSP 3543125M71M (125 A) 125D I 'The BAY-O-NET fuse shall be located in the high voltage side of the Contpartrilent. 3.22.2INSULATION LEVEL 3.2.2.2.1 The basic inpulse insulation level (BIL) ofcompletely, assembled high -voltage and low -voltage terminals shall be 95 kV and 30 kV respectively. 3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels in Section 4 of ANSI C57.12.00. 3.22.3 HIGH -VOLTAGE TAPS A no-load tap changer with external operating handle shall provide two - 2'h% full capacity taps above and below normal. The tap changer operating handle shall be located wilhin the high -voltage terminal side ofthe terminal compartrrent 3.2.2.4 NOT USED 3.22.5 BUSHING WELLS AND TERMINALS 32.2.5.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as shown in Fig. 1 or Fig. 2 in Appendix B. All low -voltage bushings and high -voltage wells shell be externally damped and shall have leads of sufici ant length t0 allow them to be changed wi8lout removing the cover. Welded bushings and wells are expressly prohibited. 3.2.2.5.2 High -voltage terminals shall be universal flowerpot bushing wells in accordance with Figure 3 of ANSIAEEE 386-1985. Two wells shall be provided and shall be connected in a feed -through configuration. Loadbreak bushing inserts in accordance with Figure 5 of ANSIAEEE 386-1986 will be owner furnished. 3.2.2.5.3 Low•volthge line and neutral terminals shall be sized as shown in Table 2 in accordance with ANSI C57.12.25. Bushing arrangement and spacing shall be shown in Fig. 1 or Fig. 2 in Appendix B. Table 2 - Low Voltaoe Terminal Sizes Stock Number kVA Capacity Low voltage Terminal Size 368-120.130 25 5r8" x 11" UNC-2A copper studs 368-120.150 50 5l8" x 11" UNC-2A copper studs 368-120.155 50 5/8" x 11" UNC-2A copper studs 368-120.170 100 1" x 14" UNC-2A copper studs 368-120-180 167 1" x 14" UNC - 2A copper studs 368-120-190 250 1Y." x 12 UNF - 2A copper studs. 3.2.2.5.4 The low-voltthge Xz bushing shall be a fully insulated bushing. A ground pad shall be provided on the outer surface of the tank and an external removable ooppef ground strap shall be provided and connected between the knv-voltage Xz bushing and the ground pad. 3.2.2.5.5 The high -voltage neutral shall be sea rely grounded internally. 6 368-120 purchesin 23 1 Spec..pdf Page 7' REV. SYM: FF 3.22.6 ACCESSORY CABINET 3.2.2.6.1 The accessory cabinet shall consist of compartment containing high -and low -voltage bushings constructed in acoordance with applicable ANSI specifications, including ANSI C57.12.28. Dimensions shall be in accordance with Fig. 1 of this specification. 3.2.2.6.2 Cabinet doors she II be hinged, removable, lockable, and of su Ificient size to provide adequate working space when removed or open. Unlocking the padlock shall permit access to both the high- and low• voltage terminations. Stainless steel hinge pins shall be provided. 3.2.2.7 ACCESSORY EQUIPMENT Accessory equipment shall be provided in accordance with the following details: 3.2.2.7.1 Deleted 3.2.2.72 The transformer base shall be arranged for rolling in two directions: Parallel to and at right angles to the center line of the high -voltage bushings. 3.2.2.7.3 Lilting lugs or bosses for screw -in lift bolts shall be provided. These lugs or bosses shall be adequate strength and size and arranged on the tank to provide a suitable balanced lift for the mrnplebly assembled unit 3.2.2.7.4 The base of the assembly shall be provided with suitable means for mounting the unit on the pad. An internal flange shall be provided Stine base ofthe accessory compartment to provide means for mounting the unit on the pad. (Fig. Land Figure 2, Appendix 8). 3.2.2.7.5 Terminal designations are shown in Figure 1 and Figure 2,Appendix B. The identification oflarminal connections shall be shown on the instruction nameplate. Instruction nameplate shall be located in the low-vohage side and shall be readable with cables in place. Where the nameplate is mounted on a removable part the manufacturer's name and transforms r serial number shall be permanently affixed to a non -removable part Instruction nameplate shall contain the information specified in 5.12 ofANSI C57.12.00-1987, Nameplate A. Also, on the nameplate, or label affixed near it the manufacturer shall indicate that the dielectric fluid contains less than t ppm PCB. 3.2.2.7.6 A suitable marking inside of the tank shall indicate the correct oil level at25•C. 3.2.2.7.7 An automatic pressure relief device shall be located within the wrnpartinent This device shall neat the following requirements: • Y." NPT or larger male Iriet Pat. Exposed parts of weather and corrosion resistant materials. No-deterioratin g gasket and o4ing material. Manual pull ring able to withstand 25 pound force minimum. Body able to withstand 100 pond shear face minimum. Bug shield. Cracking pressure of 10 t 2 psig. Resealing pressure of 8 t 2 psig. Zero leak rate from 8 t 2 psig to -8 psig. • Minimum flow rate of 35 SCFM at 15 psig. 3.2.2.7.8 An RTE BAY-O-NET current sensing fuse and infernally mounted partial range current limiting fuse shall be furnished as shown in Table 1. 3.22.8 OIL PRESERVATION Transformers shall be of sealed -lank construction. Sealed -tank construction is that which seals the interior of the tank from the atmosphere, and in which the gas plus the oil volume remains constant The transformer will remain effectively sealed for a fop -oil temperature range of-5"C to 105"C. 3.22.9 TANKS The tank shall be domed or sloped to shad water. T he tank shall be of sulfid ant strength to support a minimum of 500 Ibs vertical load. Construction of the tank shall be in accordance with ANSI C57.1225- 1981, paragraphs 6.1 and 6.6. 7 368-120