HomeMy WebLinkAboutBID - 5914 LEMAY LANDSCAPING (4)SECTION 00020
INVITATION TO BID
07/2001 Section 00020 Page 1
SECTION 00020
INVITATION TO BID
Date: April 12, 2005
Sealed Bids will be received by the City of Fort Collins (hereinafter referred
to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock,
on May 4, 2005, for the LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914. If
delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort
Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580,
Fort Collins, CO 80522-0580.
At said place and time, and promptly thereafter, all Bids that have been duly
received will be publicly opened and read aloud.
The Contract Documents provide for new seeding for grass (0.70 Acres);
planting 110 Trees, 251- 5 gallon Plants, irrigation system and 14,000 Square
Feet of median beatification will be installed on the newly constructed Lemay
Avenue. Work will consist of irrigation system from back of curb in the 10
foot parkway to front of sidewalk, installation of the designed planting list,
seeding for grass and removal of existing seed soil and bark chips from the
street median. The contractor will have the choice to complete the project in
the spring planting or fall planting.
NOTE: The traffic control for this project will be provided by the City of
Fort Collins Engineering Department. Quality Traffic has been contracted to
work with the landscaping contractor for a maximum three week period and will
coordinate lane closures with the City of Fort Collins Traffic Operations
Department.
All Bids must be in accordance with the Contract Documents on file with The
City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado
80524.
Contract Documents will be available April 13, 2005.
Copies of the Contract Documents, complete with Construction Specifications
and Drawings, may be obtained from Purchasing Division at 215 North Mason St.,
2nd floor, Fort Collins, Colorado, 80524 upon payment of a refundable fee of
Fifty Dollars ($50.00) per set. No partial sets will be issued.
The Contract Documents and Construction Drawings may be examined at:
1. City of Fort Collins, Purchasing Division.
2. Dodge Plan Room, 1114 W. 7th Ave., Suite 100, Denver, Colorado.
3. Builders Exchange, 223 South Link Lane, Fort Collins, Colorado.
4. Construction News Service, 3630 Sinton Road, Suite 210, Colorado Springs,
Colorado.
07/2001 Section 00020 Page 2
A prebid conference and job walk with representatives of prospective Bidders
will be held at 10:00a.m., on April 19, 2005, in Conference Room A, at 281
North College Avenue, Fort Collins.
Prospective Bidders are invited to present their questions relative to this
Bid proposal at this meeting.
Bids will be received as set forth in the Bidding Documents.
The Work is expected to be commenced within the time as required by Section
2.3 of General Conditions. Substantial Completion of the Work is required as
specified in the Agreement.
The successful Bidder will be required to furnish a Performance Bond and a
Payment Bond guaranteeing faithful performance and the payment of all bills
and obligations arising from the performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date
fixed for opening Bids.
The OWNER reserves the right to reject any and all Bids, and to waive any
informalities and irregularities therein.
Bid security in the amount of not less than 5% of the total Bid must accompany
each Bid in the form specified in the Instructions to Bidders.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City
Council, shall have a financial interest in the sale to the City of any real
or personal property, equipment, material, supplies or services where such
officer or employee exercises directly or indirectly any decision-making
authority concerning such sale or any supervisory authority over the services
to be rendered. This rule also applies to subcontracts with the City.
Soliciting or accepting any gift, gratuity favor, entertainment, kickback or
any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited
City of Fort Collins
By ______________________________________
James B. O'Neill, II, CPPO, FNIGP
Purchasing/Risk Management Director
SECTION 00100
INSTRUCTIONS TO BIDDERS
12/03 Section 00100 Page 1
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders which are defined in the
Standard General Conditions of the Construction Contract (No. 1910-8,
1990 ed.) have the meanings assigned to them in the General Conditions.
The term "Bidder" means one who submits a Bid to OWNER, as distinct from
a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder"
means the lowest, qualified, responsible and responsive Bidder to whom
OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an
award. The term "Bidding Documents" includes the Advertisement or
Invitation to Bid, Instructions to Bidders, the Bid Form, and the
proposed Contract Documents (including all Addenda issued prior to
receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of Bidding Documents may be obtained as stated in the
Invitation to Bid. No partial sets will be issued. The Bidding
Documents may be examined at the locations identified in the Invitation
to Bid.
2.2. Complete sets of Bidding Documents shall be used in preparing Bids;
neither OWNER nor Engineer assumes any responsibility for errors or
misinterpretations resulting from the use of incomplete sets of Bidding
Documents.
2.3. The submitted Bid proposal shall include Sections 00300, 00410,
00420, and 00430 fully executed.
2.4. OWNER and Engineer, in making copies of Bidding Documents available
on the above terms, do so only for the purpose of obtaining Bids on the
Work and do not confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must
submit at the time of the Bid opening, a written statement of
qualifications including financial data, a summary of previous
experience, previous commitments and evidence of authority to conduct
business in the jurisdiction where the Project is located. Each Bid must
contain evidence of Bidder's qualification to do business in the state
where the Project is located or covenant to obtain such qualification
prior to award of the contract. The Statement of Qualifications shall be
prepared on the form provided in Section 00420.
12/03 Section 00100 Page 2
3.2. In accordance with Section 8-160 of the Code of the City of Fort
Collins in determining whether a bidder is responsible, the following
shall be considered: (1) The ability, capacity and skill of the bidder to
perform the contract or provide the services required, (2) whether the
bidder can perform the contract or provide the service promptly and
within the time specified without delay or interference, (3) the
character, integrity, reputation, judgment, experience and efficiency of
the bidder, (4) the quality of the bidder's performance of previous
contracts or services, (5) the previous and existing compliance by the
bidder with laws and ordinances relating to the contract or service, (6)
the sufficiency of the financial resources and ability of the bidder to
perform the contract or provide the service, (7) the quality,
availability and adaptability of the materials and services to the
particular use required, (8) the ability of the bidder to provide future
maintenance and service for the use of the subject of the contract, and
(9) any other circumstances which will affect the bidder's performance of
the contract.
3.3. Each Bidder may be required to show that he has handled former Work
so that no just claims are pending against such Work. No Bid will be
accepted from a Bidder who is engaged on any other Work which would
impair his ability to perform or finance this Work.
3.4 No Bidder shall be in default on the performance of any other
contract with the City or in the payment of any taxes, licenses or other
monies due to the City.
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder, before submitting a Bid,
to (a) examine the Contract Documents thoroughly, (b) visit the site to
familiarize himself with local conditions that may in any manner affect
cost, progress or performance of the Work, (c) familiarize himself with
federal, state and local laws, ordinances, rules and regulations that may
in any manner affect cost, progress or performance of the Work, (d) study
and carefully correlate Bidder's observations with the Contract
Documents, and (e) notify Engineer of all conflicts, errors or
discrepancies in the Contract Documents.
4.2. Reference is made to the Supplementary Conditions for
identification of: Subsurface and Physical Conditions SC-4.2.
4.3. The submission of a Bid will constitute an incontrovertible
representation by Bidder that Bidder has complied with every requirement
of this Article 4, that without exception the Bid is premised upon
performing and furnishing the Work required by the Contract Documents and
such means, methods, techniques, sequences or procedures of construction
12/03 Section 00100 Page 3
as may be indicated in or required by the Contract Documents, and that
the Contract Documents are sufficient in scope and detail to indicate and
convey understanding of all terms and conditions for performance and
furnishing of the Work.
5.0 INTERPRETATIONS AND ADDENDA.
5.1. All questions about the meaning or intent of the Bidding Documents are to
be submitted in writing to the Engineer and the OWNER. Interpretation or
clarifications considered necessary in response to such questions will be
issued only by Addenda. Questions received less than seven days prior to
the date for opening of the Bids may not be answered. Only questions
answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
5.2. All questions concerning the scope of this project should be
directed to the Engineer. Questions regarding submittal of bids should
be directed to the City of Fort Collins' Purchasing Division.
5.3. Addenda may also be issued to modify the Bidding Documents as
deemed advisable by OWNER or Engineer.
5.4. Addenda will be mailed or delivered to all parties recorded by the
OWNER as having received the Bidding documents.
6.0 BID SECURITY
6.1. Each Bid must be accompanied by Bid Security made payable to OWNER
in the amount stated in the Invitation to Bid. The required security
must be in the form of a certified or bank cashier's check payable to
OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be
executed by a surety meeting the requirements of the General Conditions
for surety bonds.
6.2. The Bid Security of the successful Bidder will be retained until
such Bidder has executed the Agreement and furnished the required
contract security, whereupon Bid Security will be returned. If the
successful Bidder fails to execute and deliver the Agreement and furnish
the required contract security within 15 days of the Notice of Award,
OWNER may annul the Notice of Award and the Bid Security of that Bidder
will be forfeited. The Bid Security of other Bidders whom OWNER believes
to have reasonable chance receiving the award may be retained by OWNER
until the earlier of the seventh day after the effective date of the
Agreement or the thirty-first day after the Bid Opening, whereupon Bid
Security furnished by such Bidders will be returned. Bid Security with
Bids which are not competitive will be returned within seven days after
the Bid opening.
12/03 Section 00100 Page 4
7.0 CONTRACT TIME.
The number of days within which, or the date by which the Work is to be
substantially complete and also completed and ready for Final Payment
(the Contract Times) are set forth in the Agreement.
8.0 LIQUIDATED DAMAGES.
Provisions for liquidated damages are set forth in the Agreement.
9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment
described on the Drawings or specified in the Specifications without
consideration of possible substitute or "or equal" items. Whenever it is
indicated on the Drawings or specified in the Specifications that a
substitute or "or equal" item of material or equipment may be furnished
or used by CONTRACTOR if acceptable to Engineer, application for such
acceptance will not be considered by Engineer until after the "effective
date of the Agreement". The procedure for submittal of any such
application by CONTRACTOR and consideration by Engineer is set forth in
the General Conditions which may be supplemented in the General
Requirements.
10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS
10.1. Each Bidder shall submit at the Bid opening to OWNER a list of
principal subcontractors he proposes to use in the Work. Refer to
Section 00430 contained within these Documents.
10.2. If OWNER or Engineer after due investigation has reasonable
objection to any proposed Subcontractor, either may, before the Notice of
Award is given, request the apparent successful Bidder to submit an
acceptable substitute without an increase in Bid price. If the apparent
successful Bidder declines to make any substitution, OWNER may award the
contract to the next lowest responsive and responsible Bidder that
proposes to use acceptable subcontractors. Subcontractors, suppliers,
other persons or organization listed and to whom OWNER or Engineer does
not make written objection prior to the giving of the Notice of Award
will be deemed acceptable to OWNER and ENGINEER subject to revocation of
such acceptance after the effective date of the Agreement as provided in
the General Conditions.
10.3. CONTRACTOR shall not be required to employ any subcontractor,
supplier or other persons or organizations against whom he has reasonable
objection. The use of subcontractors listed by the Bidder and accepted
by OWNER prior to the Notice of Award will be required in the performance
of the Work.
12/03 Section 00100 Page 5
11.0 BID FORM.
11.1. A copy of the Bid Form is bound in the Contract Documents which
may be retained by the Bidder. A separate unbound copy is enclosed for
submission with the Bid.
11.2. Bid Forms must be complete in ink or typed. All lump sum prices
on the form must be stated in words and numerals; in case of conflict,
words will take precedence. Unit prices shall govern over extensions of
sums.
11.3. Bids by corporations must be executed in the corporate name by the
president or a vice-president (or other appropriate officer accompanied
by evidence of authority to sign) and the corporate seal shall be affixed
and attested by the secretary or an assistant secretary. The corporate
address and state of incorporation shall be shown below the corporate
name.
11.4. Bids by partnerships must be executed in the partnership name and
signed by a partner, his title must appear under his signature and the
official address of the partnership must be shown below the signature.
11.5. Bids by joint venture shall be signed by each participant in the
joint venture or by an authorized agent of each participant. The full
name of each person or company interested in the Bid shall be listed on
the Bid Form.
11.6. The Bid shall contain an acknowledgement of receipt of all Addenda
(the numbers of which must be filled in on the Bid Form).
11.7. No alterations in Bids, or in the printed forms therefore, by
erasures, interpolations, or otherwise will be acceptable unless each
such alteration is signed or initialed by the Bidder; if initialed, OWNER
may require the Bidder to identify any alteration so initialed.
11.8. The address and telephone number for communications regarding the
Bid shall be shown.
12.0 BID PRICING.
Bids must be priced as set forth in the Bid Schedule or Schedules.
13.0 SUBMISSION OF BIDS.
13.1. Bids shall be submitted at the time and place indicated in the
Invitation to Bid and shall be enclosed in an opaque sealed envelope
marked with the Project title, Bid No., and name and address of the
12/03 Section 00100 Page 6
Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement
of Bidders Qualifications, and Schedule of Subcontractors as required in
Section 00430. If the Bid is sent through the mail or other delivery
system, the sealed envelope shall be enclosed in a separate envelope with
the notation "BID ENCLOSED" on the face of it.
13.2. Bids shall be deposited at the designated location prior to the
time and date for receipt of Bids indicated in the Invitation to Bid, or
any extension thereof made by addendum. Bids received after the time and
date for receipt of Bids will be returned unopened. Bidder shall assume
full responsibility for timely delivery at the location designated for
receipt of Bids.
13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and
will not receive consideration.
13.4. No Bidder may submit more than one Bid. Multiple Bids under
different names will not be accepted from one firm or association.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS.
14.1. Bids may be modified or withdrawn by an appropriate document duly
executed (in a manner that a Bid must be executed) and delivered to the
place where Bids are to be submitted at any time prior to the opening of
Bids.
14.2. Bids may also be modified or withdrawn in person by the Bidder or
an authorized representative provided he can prove his identity and
authority at any time prior to the opening of Bids.
14.3. Withdrawn Bids may be resubmitted up to the time designated for
the receipt of Bids provided that they are then fully in conformance with
these Instructions to Bidders.
15.0 OPENINGS OF BIDS.
Bids will be opened and (unless obviously non-responsive) read aloud
publicly as indicated in the Invitation to Bid. An abstract of the
amounts of the Base Bids and major alternates (if any) will be made
available after the opening of Bids.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE.
All Bids shall remain open for forty-five (45) days after the day of the
Bid Opening, but OWNER may, in his sole discretion, release any Bid and
return the Bid Security prior to that date.
17.0 AWARD OF CONTRACT.
12/03 Section 00100 Page 7
17.1. OWNER reserves the right to reject any and all Bids, to waive any
and all informalities not involving price, time or changes in the Work,
to negotiate contract terms with the Successful Bidder, and the right to
disregard all nonconforming, nonresponsive, unbalanced or conditional
Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if
OWNER believes that it would not be in the best interest of the Project
to make an award to that Bidder, whether because the Bid is not
responsive or the Bidder is unqualified or of doubtful financial ability
or fails to meet any other pertinent standard or criteria established by
OWNER. Discrepancies between the indicated sum of any column of figures
and the correct sum thereof will be resolved in favor of the correct sum.
17.2. In evaluating Bids, OWNER will consider the qualifications of the
Bidders, whether or not the Bids comply with the prescribed requirements,
and such alternates, unit prices and other data, as may be requested in
the Bid Form or prior to the Notice of Award.
17.3. OWNER may consider the qualification and experience of
Subcontractors, Suppliers, and other persons and organizations proposed
for those portions of the Work as to which the identity of
Subcontractors, Suppliers, and other persons and organizations is
submitted as requested by OWNER. OWNER also may consider the operating
costs, maintenance requirements, performance data and guarantees of major
items of materials and equipment proposed for incorporation in the Work
when such data is required to be submitted prior to the Notice of Award.
17.4. OWNER may conduct such investigations as OWNER deems necessary to
assist in the evaluation of any Bid and to establish the responsibility,
qualifications and financial ability of the Bidder's proposed
Subcontractors, Suppliers and other persons and organizations to do the
Work in accordance with the Contract Documents to OWNER's satisfaction
within the prescribed time.
17.5. If the Contract is to be awarded, it will be awarded to the lowest
responsive and responsible Bidder whose evaluation by OWNER indicates to
OWNER that the award will be in the best interest of the OWNER. Award
shall be made on the evaluated lowest base bid excluding alternates. The
basis for award shall be the lowest Bid total for the Schedule or, in the
case of more than one schedule, for sum of all schedules. Only one
contract will be awarded.
17.6. If the Contract is to be awarded, OWNER will give the Successful
Bidder a Notice of Award within forty-five (45) days after the date of
the Bid opening.
18.0 CONTRACT SECURITY.
12/03 Section 00100 Page 8
The General Conditions and the Supplementary Conditions set forth OWNER's
requirements as to performance and other Bonds. When the Successful
Bidder delivers the executed Agreement to the OWNER, it shall be
accompanied by the required Contract Security.
19.0 SIGNING OF AGREEMENT.
When OWNER gives a Notice of Award to the Successful Bidder, it will be
accompanied by the required number of unsigned counterparts of the
Agreement with all other written Contract Documents attached. Within
fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the
required number of counterparts of the Agreement and attached documents
to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER
shall deliver one fully signed counterpart to CONTRACTOR. Each
counterpart is to be accompanied by a complete set of the Drawings with
appropriate identification.
20.0 TAXES.
OWNER is exempt from Colorado State Sales and Use Taxes on materials and
equipment to be incorporated in the Work. Said taxes shall not be
included in the Contract Price. Reference is made to the General and
Supplementary Conditions.
21.0 RETAINAGE.
Provisions concerning retainage are set forth in the Agreement.
22.0 PURCHASING RESTRICTIONS.
Purchasing restrictions: The Bidder's authorized signature of this Bid
assures the Bidder's compliance with the City's purchasing restrictions.
A copy of the resolutions are available for review in the Purchasing and
Risk Management Division or the City Clerk's office.
A. Cement Restrictions: City of Fort Collins Resolution 91-121
requires that suppliers and producers of cement or products
containing cement to certify that the cement was not made in cement
kilns that burn hazardous waste as a fuel.
23.0 COLLUSIVE OR SHAM BIDS.
Any Bid deemed by the City in its sole discretion to be a collusive or
sham Bid will be rejected and reported to authorities as such. Your
authorized signature of this Bid assures that such Bid is genuine and is
not a collusive or sham Bid.
24.0 BID RESULTS.
12/03 Section 00100 Page 9
For information regarding results for individual Bids send a self-
addressed, self-stamped envelope and a Bid tally will be mailed to you.
Bid results will be posted in the Purchasing office seven (7) days after
the Bid Opening.
END OF SECTION
SECTION 00300
BID FORM
7/96 Section 00300 Page 1
SECTION 00300
BID FORM
PROJECT: LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914
Place
Date
1. In compliance with your Invitation to Bid dated
, and subject to all conditions thereof, the undersigned
a **(Corporation, Limited Liability Company, Partnership, Joint Venture,
or Sole Proprietor)** authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of ($
) in accordance with the Invitation To Bid and Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
.
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRACTOR under one of the items listed in the Bid Schedule,
irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
7/96 Section 00300 Page 2
through .
_______________________________________
CONTRACTOR
BY:___________________________________
ADDRESS: ______________________________________
______________________________________
8. BID SCHEDULE (Base Bid)
Project:
Date:
Lemay Avenue Landscaping Project
4/4/05
Spec/Item
Number
Description Estimated
Quantity
Unit Unit
Cost
Item
Cost
202-01 Remove Wood Bark and Netting 14,000 SF
202-02 Haul Off Excess Wood Bark 173 CY
202-03 Expose Parks Irrigation Feed And
Tie In
1 EA
202-04 Expose Median Irrigaton Feed And
Tie In
1 EA
203-01 Strip/Haul/Dispose Existing
Grass and Topsoil In 10' Parkway
(Depth = 3")
2,112 SY
203-02 Sidewalk Bores 9' (Additional
Sleeving - Not Shown On Plans)
10 EA
203-03 Pothole Irrigation Sleeving
Under Sidewalk
7 EA
2810-01 Irrigation System Along Fossil
Creek Park (10' Parkway)
19,000 SF
2810-02 Irrigation System Median 8,500 SF
2900-01 Amended Topsoil Treatment In 10'
Parkway Area (Depth = 3")
2,112 SY
2900-02 Wood Mulch (4" Depth) 14,000 SF
2900-03 Grass Seeding 0.7 ACRES
7/96 Section 00300 Page 3
2900-04 Western Catalpa - (2" Cal.) 18 EA
2900-05 Patmore Green Ash - (2" Cal.) 3 EA
2900-06 Marshall Green Ash - (2" Cal.) 36 EA
2900-07 Skyline Honeylocust - (2" Cal.) 4 EA
2900-08 Kentucky Coffee Tree - (2" Cal.) 9 EA
2900-09 Chinkapin Oak - (2" Cal.) 7 EA
2900-10 Burr Oak - (2" Cal.) 13 EA
2900-11 Accolade Elm - (2" Cal.) 23 EA
2900-12 Indian Summer Crabapple - (1
1/2" Cal.)
25 EA
2900-13 Chanticleer Pear - (1 1/2" Cal.) 5 EA
2900-14 Creeping Western Sandcherry - (5
Gal)
18 EA
2900-15 Broadmoor Juniper - (5 Gal) 121 EA
2900-16 Buffalo Juniper - (5 Gal) 19 EA
2900-17 Virginia Creeper 93 EA
Misc Qtys.
- Contract Bond 1.00 LS
626-01 Mobilization 1.00 LS
TOTAL PROJECT COST _______________________________Dollars $_________________
7/96 Section 00300 Page 4
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
________________________________ __________________
Signature Date
________________________________
Title
________________________________
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:___________________________
Address _____________________________________
_____________________________________
Telephone _____________________________________
7/96 Section 00410 Page 1
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 2
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
as Principal, and as Surety, are
hereby held and firmly bound unto the City of Fort Collins, Colorado, as
OWNER, in the sum of $ for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors,
and assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and
hereby made a part hereof to enter into a Construction Agreement for the
construction of Fort Collins Project, LEMAY AVENUE LANDSCAPING PROJECT; BID
NO. 5914.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remain
in force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its BOND shall be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in
the State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 3
7/96 Section 00410 Page 4
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this day of , 20__, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set
forth above.
PRINCIPAL SURETY
Name:_____________________________ __________________________________
Address:__________________________ __________________________________
__________________________________ __________________________________
By:_______________________________ By: ______________________________
Title: ___________________________ Title:____________________________
ATTEST:
By:_______________________________
(SEAL) (SEAL)
7/96 Section 00420 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: _________________________________________________
2. Permanent main office address: __________________________________
3. When organized: _________________________________________________
4. If a corporation, where incorporated: ___________________________
5. How many years have you been engaged in the contracting business under
your present firm or trade name?___________________________
6. Contracts on hand: (Schedule these, showing the amount of each contract
and the appropriate anticipated dates of completion.)
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
7. General character of Work performed by your company:
_________________________________________________________________
_________________________________________________________________
8. Have you ever failed to complete any Work awarded to you?________
If so, where and why?____________________________________________
_________________________________________________________________
9. Have your ever defaulted on a contract?__________________________
If so, where and why?____________________________________________
_________________________________________________________________
10. Are you debarred by any government agency? ______________________
If yes list agency name._________________________________________
7/96 Section 00420 Page 2
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
_________________________________________________________________________
_
_________________________________________________________________________
_
_________________________________________________________________________
_
12. List your major equipment available for this contract.
_________________________________________________________________________
_
_________________________________________________________________________
_
_________________________________________________________________________
_
13. Experience in construction Work similar in importance to this
project:
_________________________________________________________________________
_
_________________________________________________________________________
_
_________________________________________________________________________
_
14. Background and experience of the principal members of your organization,
including officers:
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
15. Credit available: $______________________________________________________
16. Bank reference:__________________________________________________________
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
_________________________________________________________________________
_
18. Are you licensed as a General
CONTRACTOR?_________________________________
If yes, in what city, county and state? __________________________What
class, license and
numbers?_______________________________________________
7/96 Section 00420 Page 3
19. Do you anticipate subcontracting Work under this
Contract?_________________
If yes, what percent of total
contract?___________________________________
and to
whom?______________________________________________________________
20. Are any lawsuits pending against you or your firm at this
time?___________
If yes,
DETAIL___________________________________________________________________
_________________________________________________________________________
____
_________________________________________________________________________
__
7/96 Section 00420 Page 4
21. What are the limits of your public liability? DETAIL
_________________________________________________________________________
__
What
company?_____________________________________________________________
22. What are your company's bonding
limitations?______________________________
_________________________________________________________________________
_
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at ________________ this ______ day of __________________, 20__.
_____________________________________________
Name of Bidder
By:__________________________________________
Title:_______________________________________
State of________________________
)
County of_______________________
___________________________________being duly sworn deposes and says that he
is ______________________of_____________________________ and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this _______ day of
____________, 20__.
___________________________________
Notary Public
___________________________________
___________________________________
My commission expires _____________________________.
7/96 Section 00430 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM SUBCONTRACTOR
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
9/12/01 Section 00510 Page 1
SECTION 00510
NOTICE OF AWARD
Date:_____________
TO:_____________________________________________________________________
PROJECT: LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914
OWNER: CITY OF FORT COLLINS
(hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated ___________, 20__ for the above
project has been considered. You are the apparent successful Bidder and have
been awarded an Agreement for LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914.
The Price of your Agreement is
_________________________________________________
_______________________________________________________________________________
_
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be
delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15)
days of the date of this Notice of Award, that is by _________, 20__.
1. You must deliver to the OWNER three (3) fully executed counterparts of
the Agreement including all the Contract Documents. Each of the Contract
Documents must bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security
(Bonds) as specified in the Instructions to Bidders, General Conditions
(Article 5.1) and Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle
OWNER to consider your Bid abandoned, to annul this Notice of Award and to
declare your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return
to you one (1) fully-signed counterpart of the Agreement with the Contract
Documents attached.
City of Fort Collins
OWNER
By:________________________________________
7/96 Section 00510 Page 2
___________________________________________
Title
9/12/01 Section 00520 Page 1
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the day of in the
year of 20__ and shall be effective on the date this AGREEMENT is signed by
the City.
The City of Fort Collins (hereinafter called OWNER) and
(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may be
the whole or only a part is defined as new seeding for grass (0.70 Acres);
planting 110 Trees, 251- 5 gallon Plants, irrigation system and 14,000 Square
Feet of median beatification will be installed on the newly constructed Lemay
Avenue. Work will consist of irrigation system from back of curb in the 10
foot parkway to front of sidewalk, installation of the designed planting list,
seeding for grass and removal of existing seed soil and bark chips from the
street median. The contractor will have the choice to complete the project in
the spring planting or fall planting and is generally described in Section
01010.
ARTICLE 2. ENGINEER
The Project has been designed by Landscaping Planting by BHA Design,
Landscaping Irrigation by Rocky Mountain Rain, and City of Fort Collins
Engineering, who is hereinafter called ENGINEER and who will assume all duties
and responsibilities and will have the rights and authority assigned to
ENGINEER in the Contract Documents in connection with completion of the Work
in accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The contractor will have the opportunity to complete the project in the
spring planting season or the fall planting season. The project must be
substantially complete within 3 weeks of the start date. If the spring
planting season is the preference, the project will not be allowed to go past
June 15, 2005. If the project is scheduled to be done in the fall planting
season, the contractor will not be allowed to begin installation until
September 1, 2005. Final Completion = 20 days.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of
9/12/01 Section 00520 Page 2
the essence of this Agreement and that OWNER will suffer financial loss if the
Work is not completed within the times specified in paragraph 3.1. above, plus
any extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving
in a legal proceeding the actual loss suffered by OWNER if the Work is not
completed on time. Accordingly, instead of requiring any such proof, OWNER
and CONTRACTOR agree that as liquidated damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
1) Substantial Completion:
Five Hundred Dollars ($500.00) for each calendar day or fraction
thereof (refer to 3.1 Contract Times) for Substantial Completion of
the Work until the Work is Substantially Complete.
2) Final Acceptance:
After Substantial Completion, One Hundred Dollars ($100.00) for
each calendar day or fraction thereof that expires after (refer to
3.1 Contract Times) for Final Payment and Acceptance until the Work
is ready for Final Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows: ($
), $ Dollars, in accordance with Section
00300, attached and incorporated herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with
Article 14 of the General Conditions. Applications for Payment will be
processed by ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application for Payment as
recommended by ENGINEER, once each month during construction as provided
below. All progress payments will be on the basis of the progress of the Work
measured by the schedule of values established in paragraph 2.6 of the General
Conditions and in the case of Unit Price Work based on the number of units
completed, and in accordance with the General Requirements concerning Unit
Price Work.
5.1.1. Prior to Substantial Completion, progress payments will be in the
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with paragraph 14.7 of the
9/12/01 Section 00520 Page 3
General Conditions. 90% of the value of Work completed until the Work has
been 50% completed as determined by ENGINEER, when the retainage equals 5% of
the Contract Price, and if the character and progress of the Work have been
satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 90% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided in
paragraph 14.2 of the General Conditions) may be included in the application
for payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient to increase total payments to CONTRACTOR to 95% of the Contract
Price, less such amounts as ENGINEER shall determine or OWNER may withhold in
accordance with paragraph 14.7 of the General Conditions or as provided by
law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the
remainder of the Contract Price as recommended by ENGINEER as provided in said
paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of
the Contract Documents, Work, site, locality, and with all local conditions
and Laws and Regulations that in any manner may affect cost, progress,
performance or furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and
tests of subsurface conditions and drawings of physical conditions which are
identified in the Supplementary Conditions as provided in paragraph 4.2 of the
General Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or
to supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as CONTRACTOR
considers necessary for the performance or furnishing of the Work at the
Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents, including specifically the
9/12/01 Section 00520 Page 4
provisions of paragraph 4.2 of the General Conditions; and no additional
examinations, investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the
accurate location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information
or data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price,
within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provision of
paragraph 4.3. of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts,
errors or discrepancies that he has discovered in the Contract Documents and
the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General Conditions,
Supplementary Conditions, those items included in the definition of “Contract
Documents” in Article 1.10 of the General Conditions, and such other items as
are referenced in this Article 7, all of which are incorporated herein by this
reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related
actions in carrying out the terms of this Agreement are deemed Contract
Documents and incorporated herein by this reference, and include, but are not
limited to, the following:
7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as
follows:
Lemay Avenue Landscape Plan: Sheet 1-9. Lemay Avenue Irrigation Plan: 1-5.
9/12/01 Section 00520 Page 5
The Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated.
7.4. Addenda Numbers ____ to ____, inclusive.
7.5. The Contract Documents also include all written amendments and
other documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or
incorporated by reference in this Article 7. The Contract Documents may only
be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of
the General Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General
Conditions.
8.2. No assignment by a party hereto of any rights under or interests in
the Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but not
without limitations, moneys that may become due and moneys that are due may
not be assigned without such consent (except to the extent that the effect of
this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or
discharge that assignor from any duty or responsibility under the Contract
Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
9/12/01 Section 00520 Page 6
OWNER: CITY OF FORT COLLINS CONTRACTOR:
By: ____________________________ By:_______________________________
JAMES B. O’NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING __________________________________
AND RISK MANAGEMENT
Title:____________________________
Date:___________________________ Date:_____________________________
(CORPORATE SEAL)
Attest: ________________________ Attest:___________________________
City Clerk
Address for giving notices: Address for giving notices:
P. O. Box 580 __________________________________
Fort Collins, CO 80522 __________________________________
LICENSE NO.:______________________
Approved as to Form
_______________________________
Assistant City Attorney
7/96 Section 00530 Page 1
SECTION 00530
NOTICE TO PROCEED
Description of Work:
To: ______________________________
This notice is to advise you:
That the contract covering the above described Work has been fully executed by
the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been
received by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from
receipt of this notice as required by the Agreement.
Dated this day of , 20__.
The dates for Substantial Completion and Final Acceptance shall be
, ____ and , 20__, respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this
day of , 20__.
CONTRACTOR
By:
Title:
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
7/96 Section 00610 Page 1
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City
of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal
Corporation) hereinafter referred to as the "OWNER", in the penal sum of
in lawful money of the United States, for the payment of which sum well and
truly to be made, we bind ourselves, successors and assigns, jointly and
severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the day of
, 20__, a copy of which is hereto attached and made a part hereof for the
performance of The City of Fort Collins project, LEMAY AVENUE LANDSCAPING
PROJECT; BID NO. 5914.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its
duties, all the undertakings, covenants, terms, conditions and agreements of
said Agreement during the original term thereof, and any extensions thereof
which may be granted by the OWNER, with or without Notice to the Surety and
during the life of the guaranty period, and if the Principal shall satisfy all
claims and demands incurred under such Agreement, and shall fully indemnify
and save harmless the OWNER from all cost and damages which it may suffer by
reason of failure to do so, and shall reimburse and repay the OWNER all outlay
and expense which the OWNER may incur in making good any default then this
obligation shall be void; otherwise to remain in full force and effect.
7/96 Section 00610 Page 2
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of
, 20__.
IN PRESENCE OF: Principal
______________________________ ________________________________________
______________________________ ________________________________________
(Title)
________________________________________
(Address)
(Corporate Seal)
IN PRESENCE OF: Other Partners
_____________________________ By:_____________________________________
_____________________________ By:_____________________________________
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________ By:_____________________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should
execute Bond.
7/96 Section 00615 Page 1
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto the
City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as "the OWNER", in the penal
sum of in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind
ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the day of
, 20__, a copy of which is hereto attached and made a part hereof for the
performance of The City of Fort Collins project, LEMAY AVENUE LANDSCAPING
PROJECT; BID NO. 5914.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms,
subcontractors, and corporations furnishing materials for or performing labor
in the prosecution of the Work provided for in such Agreement and any
authorized extension or modification thereof, including all amounts due for
materials, lubricants, repairs on machinery, equipment and tools, consumed,
rented or used in connection with the construction of such Work, and all
insurance premiums on said Work, and for all labor, performed in such Work
whether by subcontractor or otherwise, then this obligation shall be void;
otherwise to remain in full force and effect.
7/96 Section 00615 Page 2
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of
, 20__.
IN PRESENCE OF: Principal
______________________________ By:___________________________________
______________________________ ______________________________________
(Title)
______________________________________
(Address)
(Corporate Seal)
IN PRESENCE OF: Other Partners
______________________________ ______________________________________
______________________________ ______________________________________
IN PRESENCE OF: Surety
______________________________ By:___________________________________
______________________________ By:___________________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should
execute Bond.
7/96 Section 00630 Page 1
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
7/96 Section 00635 Page 1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS
(OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: LEMAY AVENUE
LANDSCAPING
PROJECT; BID NO. 5914
______________________________
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
____________________________
____________________________ CONTRACTOR:
__________________________________
____________________________
CONTRACT
DATE:________________________________
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or
specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto.
This list may not be exhaustive, and the failure to include an item on it does
not alter the responsibility of the CONTRACTOR to complete all the Work in
accordance with the Contract Documents.
_________________________________
_________________________________________
ENGINEER
AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time
indicated.
________________________________ By:
_________________________________________
CONTRACTOR
AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as substan-
tially complete and will assume full possession of the project or specified
area of the project at 12:01 a.m., on . The responsibility
for heat, utilities, security, and insurance under the Contract Documents
shall be as set forth under "Remarks" below.
7/96 Section 00635 Page 2
CITY OF FORT COLLINS, COLORADO By:
_________________________________________
OWNER
AUTHORIZED REPRESENTATIVE DATE
REMARKS:
7/96 Section 00640 Page 1
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 20__
TO:
Gentlemen:
You are hereby notified that on the day of , 20__, the City of
Fort Collins, Colorado, has accepted the Work completed by
for the City of Fort Collins project, LEMAY AVENUE LANDSCAPING PROJECT; BID
NO. 5914.
A check is attached hereto in the amount of $ as Final Payment for
all Work done, subject to the terms of the Contract Documents which are dated
.
In conformance with the Contract Documents for this project, your obligations
and guarantees will continue for the specified time from the following date:
.
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
7/96 Section 00650 Page 1
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: (CONTRACTOR)
PROJECT: LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914
1. The CONTRACTOR acknowledges having received payment, except retainage
from the OWNER for all work, labor, skill and material furnished,
delivered and performed by the CONTRACTOR for the OWNER or for anyone in
the construction, design, improvement, alteration, addition or repair of
the above described project.
2. In consideration of such payment and other good and valuable
consideration, the receipt and adequacy of which are hereby acknowledged,
the CONTRACTOR voluntarily waives all rights, claims and liens, including
but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270
a and b), stop notices, equitable liens and labor and material bond
rights which the CONTRACTOR may now or may afterward have, claim or
assert for all and any work, labor, skill or materials furnished,
delivered or performed for the construction, design, improvement,
alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund
of or in the possession or control of the OWNER, against the project or
against all land and the buildings on and appurtenances to the land
improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished,
delivered or performed to or for the construction, design, improvement,
alteration, addition or repair of the project were furnished, delivered
or performed by the CONTRACTOR or its agents, employees, and servants, or
by and through the CONTRACTOR by various Subcontractors or materialmen or
their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project
or any funds in the OWNER'S possession or control concerning the project
or against the OWNER or its officers, agents, employees or assigns
arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender,
if any, and the Surety on the project against and from any claim
hereinafter made by the CONTRACTOR'S Subcontractors, materialmen,
employees, servants, agents or assigns against the project or against the
7/96 Section 00650 Page 2
OWNER or its officers, employees, agents or assigns arising out of the
project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth
above constitutes and adequate description of the property and
improvements to which this Lien Waiver Release pertains. It is further
acknowledged that this Lien Waiver Release is for the benefit of and may
be relied upon by the OWNER, the lender, if any, and Surety on any labor
and material bonds for the project.
Signed this day of , 20__.
CONTRACTOR
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of
20__, by
Witness my hand and official seal.
My Commission Expires: .
Notary Public
7/96 Section 00660 Page 1
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR:
PROJECT: LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the
CONTRACTOR as indicated above, for
on bond of (Surety)
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final
Payment to the CONTRACTOR shall not relieve the Surety Company of any of its
obligations to the OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of , ____ .
(Surety Company)
By
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-
Fact.
SECTION 00670
APPLICATION FOR EXEMPTION CERTIFICATE
Insert State certificate here.
9/99
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Contract Change Order
00960 Application for Payment
9/99 Section 00950 Page 1
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: LEMAY AVENUE LANDSCAPING PROJECT; BID NO. 5914
CONTRACTOR:
PROJECT NUMBER:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost
4. Change in Contract Time:
__
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER 0.00
TOTAL PENDING CHANGE ORDER 0.00
TOTAL THIS CHANGE ORDER 0.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved) _
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE: __
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer Purchasing
9/99
Section 00960
Application for Payment
Insert pages 1 - 4