Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 24222R5643500A REQUISITION 9/19/2005 CITY OF FORT COLLINS Page- 1 Order Number 24222 - 000 - OR Branch/Plant 1 Shipped From LAFARGE NORTHERN INC Ship To WATER UTILITIES 22252 NETWORK PLACE CITY OF FORT COLLINS CHICAGO IL 60673-1222 700 WOOD ST FORT COLLINS CO 80521 Ordered 9/14/2005 Freight Requested 9/14/2005 Order Taken By Delivery Line Description / Supplier Item Quantity UOM Unit Price Extended Price Branch Account Number Buyer Plant Number 1.000 Addendum to P.O. 5502237 for LS .0000 1,304.19 504 50451810.529290.6 1 Utilities share of CO #8 for City of Fort Collins 2005 Asphalt Overlay Program Bid No. 5389 Totals 1,304.19 SEP-13-2005 TUE 12,45 PM CFC ENG. FAX N0, 9702216378 P. 01 .. • a& of Fort COW 2W Asphalt Overlay Project r ° Lafarge North America -,Bid No. 5839 Change order No.: 8 Dade: SI 2005 1 Reason For Chonge: a. AddlbonM Work was squired VW the box culverts related to the UtiCtles protect at Dry Creek 2 Desa"on Of Change: a. Add aMilonal quamRtes to accommodate paving over the box culverts. 3 Clnnge 1n Contract Amount: see Attaehad a. Ullldea Qty Unit unk Cat Total Coat 210.08 Total Valvo Box Replacement 2 EA $ 303.87 S 807.14 210.11 AdJust Manhole wM Ring 1 EA S 114.78 S 114.75 203.33 Shouldering 800 LF. 30 TON $ 0.54 $ 32" S 8 69 S 257.70 203.32 Haul 6 Replace Recycled Asphalt 41,394.19 TOTAL CHANGE IN CONTRACT AMOUNT 4 Change In Contract Time Them Is no change in contract time TOTAL CHANGE IN CONTRACT TIME Poat Ha Fax Noto 7671 De10 C: • 1 s�, d ► (_� vo CCL Phono s Phono r Fat Fu � 0 days