Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 5502237PROJECT i i i Lm• - PROJECT NUMBER: 320200 (Bid #5839) Lafarge Northern, Inc. (PO #5502237) CONTRACTOR: 8 CHANGE ORDER NUMBER: n prepanng c Menge! ers s oN i2 °Description of change.ere I 1. Reason for change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 1,304.19 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: Representative_ Stormwater r-I��••-•----•- ACCEPTED BY: � in Wirtment Head APPROVED BY: (purchasing Agent over $30,000) $1,304.mw 19 storater cc: Purchasing $0.0o Engineering Accounting Contractor Project File $2,230,388.32 $123,015.93 $0.00 $1,304.19 0.06% 5.57% $2 354,708.44 DATE: DATE: DATE: �� DATE: DATE: q"1°23�5 DATE: Department • 281 North College Avenue P.O. Box 580 Fort 4 City of port Collins 2005 Asphalt Overlay project Change Order No.: 8 Lafarge North America - Bid No. 5839 Date: 8/1/2005 I Reason For Change: a. Additional work was required over the box culverts related to the Utilities project at Dry Creek. 2 Description Of Change: a. Add additional quantities to accommodate paving over the box culverts. 3 Change In Contract Amount: See Attached a. Utilities 210.08 Total Valve Box Replacement 210.11 Adjust Manhole with Ring Oh' 2 Unit Unit Cost Total Cost 203.33 Shouldering 1 EA EA $ $ 203.32 Haul & Replace Recycled Asphalt TOTAL CHANGE IN CONTRACT 600 L.F. F 114.85 $ 114.75 $ 0'54 114.74 $ 114.75 $ 324.00 AMOUNT 30 TON $ 8.59 =7.70 1,34 Change In Contract Time There is no change in contract time TOTAL CHANGE IN CONTRACT TIME 0 days W1