TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
TRAFFIC CONTROL AND WORK
AREA SAFETY:
♦ TRAFFIC CONTROL:
- Traffic Control Plans must be submitted and approved 72
hours prior to the start of construction and before making
each modification.
- Full road closures must be submitted 3 weeks prior to any
work being done.
- Local Residential & Construction Access:
• Local access must be maintained at all times for east and west
bound movements where the following streets intersect Ziegler
Road:
- Trilby Road
- Shallow Pond Drive
• Construction access must be maintained at all times for the
construction of Kinard Junior High School AVA
TRAFFIC CONTROL AND WORK
AREA SAFETY:
♦ WORK AREA SAFETY:
- The Contractor shall provide, at the Contractor's expense, all
work area safety control devices, such as barricades and
safety fence around all excavations, trenches and drop offs.
i& 1 11 1 1.
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-01 Remove Pipin
(RCP,CMP,PVC) -
(LF)
- 202-02 Remove
Vertical Curb and
Gutter - (LF)
HIGHLIGHTS FROM
SPECIFICATIONS:
• REMOVALS
- 202-03 Remove
Structure and Cap Pipe
- (EA)
i
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-04 Rotomill Asphalt Pavement (5"-10" Depth) - (SY)
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-05 Profile Mill 0"-2" - (SY)
.111111:-
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-06 Remove Existing Trees - (EA)
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-07 Remove Fence
(Various Types) - (LF)
r, &N
y a
.�+�*
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-08 Demo Existing
Concrete Box - (EA)
- 202-09 Remove Trickle
Pan - (LF) �
HIGHLIGHTS FROM
SPECIFICATIONS:
• REMOVALS
- 202-10 Remove Type III Barrier - (LS)
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ REMOVALS
- 202-11 Remove
Sidewalk - (SF)
- 202-12 Remove
Handicap Ramps -
(SF)
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
• EXCAVATION AND
EMBANKMENT
- 203-01 Unclassified
Excavation - (CY)
- 203-02 Embankment -
(CIP) - (CY)
- 203-03 Haul ® Dispose
- (2(03-04 Borrow ABC
(Tonss 5 or 6)- (CIP) -
- 203-05 Muck
Excavation - (CIP) -
(CY)
HIGHLIGHTS FROM
SPECIFICATIONS:
a MCAVAnCl Me,
CMlANKMENT
- 203-M Topsoil - (SMpying,
Stdckpli-n99,� Placing) - 6'
OepM (CY)
- 203 02uT
and Ha0oee(sniQpDingpte
- (CY)
Sha�ng(CIP)n (SF) dMardp!
- 203 09 POMoling -(LS)
- 203-I0 F1.1911 Over SM1allow
UUlitld - (LF)
TCY1 03-1Inin
pOrt Screened
(I ( ") - PdlMwav A.. -
- 203-12 Clearing and C Wnng
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ EROSION CONTROL
- 208-01 Erosion Control - (LS)
• Precautions must be taken to stabilize the work area
Curing construction to minimize erosion.
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ RESET STRUCTURES
- 210-01 Adjust Manhole Ring/Cover - (EA)
- 210-02 Modify Manhole - (EA)
- 210-03 Adjust Valve Box - (EA)
- 210-04 Modify Valve Box - (EA)
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ AGGREGATE BASE COURSE
- 304-01 Aggregate Base Course - (Class 5 or 6) - 6"
Depth - (CIP) - (TON)
- 304-02 Base Course Patch Placement -
(Class 5 or 6) - 6" Depth - (CIP) - (TON)
♦ RECONDITIONING
- 306-01 Reconditioning (8") Under Sidewalk- (SY)
♦ FLYASH SUBGRADE STABILIZATION
- 307-01 Flyash Subgrade Stabilization - (12%)
- 307-02 Flyash Subgrade Stabilization - (6%)
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ HOT BITUMINOUS PAVEMENT
403.01 Not %Wentrout Pavament - Grading 5 - 100 (3-Depth)
(PG "-xs) - (TON)
403-02 NIX Snummaue Pavement - Grading S - 100 (Y Depth)
(PG 64-18) - (TON)
403-03 Aaphalt Paver Patrnlny - Grad hg SG - 100 (5- Depth) -
(PG 54-28) - (TON)
403-04 "phax Levefing Cpurae - Grading SG - 100
(PG 3414) - (TON)
403-05 Asphalt Patching - Grading SG - 100 (5' Depth) -
(PG 5845) - (TON)
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ RIPRAP
506-01 S' x S' x 2.5' Type L Rip -Rap, 6' Topsoil (CIP) - (LS)
506-02 10' x 8' x 1.5' Type 0 Rip -Rap, 6" Topsoil (CIP) - (LS)
506-03 6' x 6' x ls'Type L Rip -Rap, 6" Topsoil (CIP) - (LS)
HIGHLIGHTS FROM
SPECIFICATIONS:
• CULVERTS AND SEWERS
- 603-01 Tie to Existing 14" x 23" HERCP - (EA)
- 603-02 14" x 23" HERCP - (LF)
- 603-03 14' x 23" HERCP FES - (EA)
- 603-04 4" Median Underdrain Pipe - (LF)
- 603-05 4" Conduit Sleeving - (LF)
- 603-06 6' Conduit Sleeving - (LF)
- 603.02 18" RCP Class III - (LF)
- 603-08 18" RCP Class III - (FES) - (EA)
HIGHLIGHTS FROM
SPECIFICATIONS:
♦MANHOLES INLETS AND
METER VAULTS
- 604-01 5' Type R Inlet - (EA)
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
• SIDEWALKS AND DECORATIVE
CROSSWALKS
- W841 CimenKe Sidewale a' Wide (6-) - (SF)
- WS-02 Concrete Aixess Ramps with Truncated opme (8-) - (SF)
- WS-03 Concrete Cresspan and Apron (9 W-) - (5F)
- 608-N Hi -Early Concrete (24 Hour) - (CY)
- 508-05 Flowaine Fill Concrete - (CY)
- 60e-06 Ezppeed Aggregate Medlin Hardacape a- - (SF)
- doll pedestrian Refuge leand - (SF)
- 608-08 Sidewalk Chase ® Old Legacy Onve (2' x 10') - (EA)
- NS-09 Attached SlEewalk 0 Cul-de-sac (8') - F
i
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ CURB AND GUTTER
- 609-01 Vertical Curb and Gutter (30") - (LF)
- 609-02 Outfall Curb and Gutter (18") - (LF)
a NOTE: This was listed as paid for by EA in the spec, we will
be sending out an addendum to correct this on the bid
schedule
- 609.03 Roll Over Curb and Gutter - (LF)
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ WATERLINES
- 619-0121- Duaile iron Look in Face Water Fps With Wrap-(LFF)
- 619-02 Waterline Flter Minimal Be. Bla ding ZOne (Agora.. V Bllpw
OisVlct Specs) - (Cy)
- 619-03 Waterline Exmvanon Below saddling Zmw (Approx. 1' Balow
Disco. Specs) - (TON)
- ti 8- pVC Waterline c-900 FCLWO Specifications - (LF)
- 619-05 24- x 8- Tee WPM 8- Gate Valve - (EA)
- 619-06 24- Butterfly Viva and Box - (EA)
- 619-02 Fire Hydrant Assembly Indude, Tee, Valve, LBW pipe,
RaBValnt - (EA) ria
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM
SPECIFICATIONS:
♦ WATERLINES
619-08 8' Tug and Blow DR - (EA)
- 619.09 24' x t l.2S' DURile Benda With Re alnts - (EA)
- 619.10 24' x 2- Tug and Blow OH Assembly - (EA)
- 619-11 Dewatenng for Waterline - (4 )
- 619-12 Wild Tao 0' on 12' V.W. and Tiein N, to 2a'-(1$)
- 619-13 8- - 90 0,. Band - (EA)
HIGHLIGHTS FROM
SPECIFICATIONS:
• LANDSCAPING QUANTITIES
- 60/40 Topsoil - (SF)
- 1 4/2" Colored Rock - (TON)
TRILBY ROAD AND
ZIEGLER ROAD
IMPROVEMENT PROJECT
THANKS FOR COMING.
ARE THERE ANY QUESTIONS?
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
INTRODUCTIONS:
*Street Oversizing Program:
— Matt Baker — Program Manager (224-6108)
— Eileen Bayens — Project Engineer (222-0351 cell #)
— Quentin Egan — Construction Manager (222-0860 cell #)
— Mark Laken — Project Engineer (222-3546 cell #)
— Craig Farver— Construction Manager (222-0854 cell #)
INTRODUCTIONS:
♦COFC DEPARTMENTS:
— John Stephen — Purchasing Agent (221-6777)
— Don Bachman —Acting City Engineer (221-6605)
— Syl Mireles— Traffic Control Coordinator (221-6815)
♦KINARD JUNIOR HIGH:
— Tami Simpson — Project Manager (490-3617)
— Todd Piccone - FCI (Project Manager) (970-396-8240)
— John Luthi - FCI __ ,,-A
"W.
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
INTRODUCTIONS:
♦JVA Consulting Engineers
— Alaina Kneebone-Marler - Designer (303)444-1951
♦FCLWD
— Nate Gil — Systems Manager 226-3104
ATTENDANCE:
*Please be sure to
register
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
BID OPENING:
♦ When:
-August 16, 2005 at 3:00 p.m. (Our
Clock)
♦ Where:
- 215 North Mason Street (2nd Floor)
IMPORTANT
MILESTONES:
♦ AWARD CONTRACT
- Approximately the fourth week in August
♦ PRE -CONSTRUCTION MEETING WITH FCLWD
- Mandatory Meeting Prior to Start of Construction
- Date to be determined after contract is awarded - Best if scheduled
immediately after contract is awarded
• PRE -CONSTRUCTION MEETING
- Mandatory Meeting Prior to Start of Construction
- Date to be determined after contract is awarded
♦ CONSTRUCTION START DATE
- The project is available to start on September 1't after all contracts with the
City of Fort Collins have been signed
♦ SUBSTANTIAL COMPLETION
- Substantial Completion must be met by October 31, 2005
♦ FINAL COMPLETION
- Maximum allotted time = 10 working days following substantial c ,
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
SUMMARY OF WORK:
♦ TRILBY AND ZIEGLER IMPROVEMNTS:
- The improverrents include widening Ziegler Road from Shallow
Pond Drive sotth to Trilby Road to a 2 lane collector width
with: Curb antlgutter, bikelanes, sidewalk and asphalt paving.
This project aWo connects Trilby Road along the Kinard Junior
Higgh School poperty. The new Trilby Road connection will be
a 2 lane colledtor with: curb and gutter, bikelanes, sidewalk,
asphalt pavillandscaped median, 24' FCLWD waterline
connection arr►tllstormsewer improvements. Old Legacy Drive
in the Homesigad Development Just north of the school site
will have a cuFde-sac constructed with this project also.
- Closures for tkt waterline improvements and top lift will be
granted with -Ais project.
CONSTRUCTION DOCS:
♦ TRILBY AND ZIEGLER
IMPROVEMENTS:
- Designed blVJVA Consulting Engineers
• Sheet #'s EC:0.0 - CO.6
• Sheet #'s T1..0 - C1.16
• Sheet #'s T2.0 - C2.3
• Sheet #'sHi,!.0 - H2.0 (Northern Engineering Cul-de-Sac)
- Specifications
• COFC Specs.
• FCLWD Spixs
• Typical Bid Schedule with unit prices and totals
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S:
♦ SUPERINTENDENTS:
- The General Contractor SHALL employ a full time Superintendent whose 2912
responsibility is to monitor and coordinate all facets of the work.
♦ LIQUIDATED DAMAGES:
- SUBSTANTIAL COMPLETION:
♦ Sustantial Completion is defined as: the completion of all pavement, curb
and gutter, sidewalks, ramps, underground utility work, inlets, storm
drainage work, medians, earthwork and any other pertinent items as
regcared for this project. The roadway must be striped and opened to
traffic.
• If substantial completion has not been met by October 31 2005, then the
Contractor will be charged liquidated damages of $1,150.60 per calendar
day until substantial completion has been met.
FINAL COMPLETION:
♦ After the City of Fort Collins Engine
Completion has been met, the con
completion. The Contractor will be
or fraction thereof that expires afti
for Final Payment and Acceptance.
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S:
♦ WARRANTY:
- The Contractor will be required to warranty the street
improvements 2 years after date of final acceptance.
♦ CONSTRUCTION HOURS:
- The operation of all machinery and vehicles must take
place between the hours of:
♦ 6:30 a.m. thru 7:30 p.m.
*The Contractor may request extended hours
- The requests must be approved by the City of Fort
Collins 3 days prior to any work.
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S:
♦ CONSTRUCTION SURVEYING:
- Provided by the Contractor.
♦ TRAFFIC CONTROL:
- Provided by the Contractor.
♦ GEOTECHNICAL AND MATERIALS
TESTING:
- Provided by the Owner. It will be the Contractor's
responsibility to schedule the testing.
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S:
♦ PROJECT MEETING:
- Once a week on -site, time and place to be determined. The
TCS will be required to attend all weekly meetings.
♦ PROGRESS AND SCHEDULE REVISIONS:
- Schedules shall be updated weekly. The schedule for this
project is important to the City of Fort Collins. The Contractor
may be required to submit additional schedules depending on
the progress of the project.
♦ HAUL ROUTES:
- Arterial and Collector streets only. Contractor will not be
allowed to use residential streets to access the site with trucks
hauling materials.
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S:
♦ SITE CLEAN-UP:
- The Construction work and processes shall be kept and
accomplished in a neat, clean and orderly fashion. Due to the
high visibility of this job, it is important to keep a professional
looking site.
SITE COORDINATION WITH
OTHER CONTRACTORS:
♦ PSD / FCI Constructors:
- We will need to keep access into the Kinard Junior High site at
all times. We will also need to coordinate all of our
construction activities with the School District and FCI
Constructors so we do not interfere with their schedule.
♦ QWEST:
- There is a phone line buried on the west side of Ziegler that
will need to be temporarily relocated while we are under
construction. The contact from QWEST are: Bill Johnson
(377-6401)
TRILBY ROAD AND ZIEGLER ROAD
IMPROVEMENT PROJECT
SITE COORDINATION WITH
OTHER CONTRACTORS:
♦COFC LIGHT AND POWER:
- There will be a new COFC duct bank installed on the West side
of Ziegler and the North side of the newly constructed Trilby
Road behind the curb and gutter. This work is already being
done by the COFC Light and Power Company, however, this
work will need to be coordinated with: Monica Moore (224-
6150)
*CONDUIT PLACEMENT:
- The Contractor must install conduit underneath the sidewalk
for future irrigation and future City of Fort Collins
telecommunication along the school property. 1.0
TRAFFIC CONTROL AND WORK
AREA SAFETY:
♦ TRAFFIC CONTROL:
- The traffic control for this project will be paid for by the Lumo
Sum to the Contractor and will include all costs for the traffic
control associated with this project.
- Message Boards will be paid for by the Lump Sum
• A total of 2 message boards for 3 days will be required to inform
the surrounding public of any road closures.