PROJECT TITLE: Drake & Ziegler Phase I Improvements
PROJECT NUMBER: 30523280.6 (Bid #5803)
CONTRACTOR: Don Kahn Construction, Inc. (PO #5501441)
CHANGE ORDER NUMBER: 3
n preparing change orders snow In or er as separate numbered paragrap s the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. The contract cost will increase by $28,688.10
4. There will bo no change in contract time.
ORIGINAL. CONTRACT COST $1,207,441,00
TOTAL APPROVED CHANGE ORDERS $83,114.18
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $28,688.10
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT 9.26%
ADJUSTED CONTRACT COST $1,319,243.28
(Assuming all change orders approved)
ACCEPTED BY:
ACCEPTED BY:
REVIEWED BY:
DATE:
(Co tractors Representative)
DATE:
(Proje
DATE:
(Engineer)
APPROVED BY: f!_ — DATE:
(Department Head)
APPROVED BY: DATE:
(Purchasing Agent over $30,000)
cc: Contromor
Pumhasing
PmJect FWe
Engineering Department • 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6605
AUG-09-2005 TUE 02:35 PM CFO ENG. FAX NO, 9702218378 P. 02/03
TR=k •.NH Yi w,«i ♦�wNu,..'^N :. � 4 , .w....4 ...'�.'=...Wr
DRAKE AND ZIEGLER PHASE I IMROVEMENT PROJECT
Don Kohn Construction
Additional Work at Cargill
- See attached subroiltal
Item
Unit
$ / Unit
Total
Dan Kahn Construerlon Install T' Storm Secret Line including Excavation & HaulAff
1 I.S
2,750.00
1 S 2,750.00
Don Kehn Construction Install Area Inlet
1 EA
1 $ 1,200,00
$ 1,200.00
Don Kohn Construction Flow Fill
34 Cv
I S 313.00
1 $ 1.29200
orr Kahn Construction Core Existing manhole
1 EA
1 $ 355,00
1 $ 355.00
We could not get Cargill's parking lot to drain correctly, so we needed to add some pipe and
an inlet to got possitive drainage. TffiS work was all done as part of the rightd-way agreement
and any extra work, has been paid for by Cargill.
Posted to Pay Estimato # 5
AUG-09-2005 TUE
02:35
PM CFO ENG.
FAX NO. 9702216378
Pa 03/03
vnrn'1hr,fi'r,+Y. nxa,.�
'6 M� Av,/�
.,.��• .n ntw,,,
t.V .i.Yy� tv4 ):'
n�y�' •ley, KY, gin„ n.. "Mt � rh .,,C�TN4l Q!\�Y! A.�
"Nr. "4 Nn `t h„�Y
awwn sn�+w r"�` oin.:Y �� '.U� Y
f� .Yn, nry� I�.v� •4.�vw,t�n-h'nx.,
DRAKE AND ZIEGLER PHASE I IMROVEMENT PROJECT
..�•y ty, .. �., i'
Don Kehn Construction
Additional CrosSpans at Engle Homes and King Soopers
See attached submiffat -
Additional crosspans were added to tho project after the project was awarded because we
received money from the developers for these improvements after the project had started.
The additional concrete work is for the crosspans at both the King Soopers entrance and the
Engle Homes entrance.
Y'r'V -j(...�