Loading...
HomeMy WebLinkAboutRFP - 23725 P990 RESIDENTIAL LIGHTING SERVICESADDENDUM No. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid: P990 Residential Lighting Program Services OPENING DATE: 3:00 P.M. (Our Clock) May 27, 2005 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Questions and Answers: Question No. 1 Is the budget range of $35,000 - $80,000 for program implementation only and does not include the budget for program design. Answer Question No. 1 The budget range shown in the RFP does NOT include the program design work. Question No. 2 If we suggest that Utilities' staff be part or all of implementation, does staff time come out of the lighting program budget or the Utilities' staff budget? Answer Question No. 2 The answer to this one is a bit fuzzy. Most direct implementation staff costs will come out of the lighting program budget, whether we use in-house staff or a contractor of some combination. Project management costs will come out of the Utilities' staff budget. The grey area includes things like graphics design and marketing staff time. To a point, we will be able to cover some of those costs from the Utilities' staff budget. If the needs exceed what can be covered with available time from existing staff, though, and work needs to be contracted, the costs will be borne by the lighting program budget. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BIDIQUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Strect a 2p" Floor ® K0, R1)% 584) ° k)rt 04lift �, CO 80522-0589 ° (979) 221-6775 * Fax (970) 221-0707 www.fceov.con 7. REVIEW AND ASSESSMENT Professional firms will be evaluated on the following criteria. These criteria will be the basis for review of the written proposals and interview session. The City of Fort Collins reserves the right to select a qualified contractor from the written proposal submissions. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 2.0 Does the proposal show an understanding of the Scope of Proposal project objective, methodology to be used and results that are desired from the project? 2.0 Do the persons who will be working on the project Assigned Personnel have the necessary skills? Are sufficient people of the requisite skills assigned to the project? 1.0 Can the work be completed in the necessary time? Can the target start and completion dates be met? Availability Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Motivation Is the firm interested and are they capable of doing the work in the required time frame? 2.0 Do the proposed cost and work hours compare Cost and favorably with the project Manager's estimate? Are Work Hours the work hours presented reasonable for the effort required in each project task or phase? 2.0 Does the firm have the support capabilities the Firm Capability assigned personnel require? Has the firm successfully done previous projects of this type and scope? 9 Reference evaluation (Top -ranked firm) The project Manager will check references using the following criteria. The evaluation rankings will be labeled Satisfactory/Unsatisfactory. QUALIFICATION STANDARD Overall Performance Would you hire this Professional again? Did they show the skills required by this project? Was the original Scope of Work completed Timetable within the specified time? Were interim deadlines met in a timely manner? Was the Professional responsive to client Completeness needs; did the Professional anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge If a study, did it meet the Scope of Work? PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , [insert either a corporation, a partnership or an individual, doing business as ], hereinafter referred to as 'Professional'. WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of ( ) page[s], and incorporated herein by this reference. 2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of ( ) page[s], and incorporated herein by this reference. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated within ( ) days following execution of this Agreement. Services shall be completed no later than . Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in writing by the parties hereto. 4. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: 10 Professional: City: With Copy to: In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination, subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 5. Design, Project Indemnity and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City, its officers and employees in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City; and for the City's costs and reasonable attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $500,000 combined single limits, and errors and omissions insurance in the amount of 6. Compensation. [Use this paragraph or Option 1 below.] In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional a fixed fee in the amount of ($ ) plus reimbursable direct costs. All such fees and costs shall not exceed ($ ). Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's I 9. Monthly Report. Commencing thirty (30) days after the date of execution of this Agreement and every thirty (30) days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Scope of Services, Work Schedule, and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 10. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 13. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 14. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the 13 Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 14 17. Special Provisions. [Optional] Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit "_", consisting of ( ) page[s], attached hereto and incorporated herein by this reference. THE CITY OF FORT COLLINS, COLORADO By: James B. O'Neill II, CPPO, FNIGP Director of Purchasing & Risk Management DATE: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney [Insert Professional's name] or [Insert Partnership Name] or [Insert individual's name] Doing business as [insert name of business] By: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: ATTEST: Corporate Secretary (Corporate Seal) 15 City of Fort Collin ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid: P990 Residential Lighting Program Services OPENING DATE: 3:00 P.M. (Our Clock) May 27, 2005 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. CHANGE: The Bid Opening is 3:00 P.M. (Our Clock) May 27, 2005 RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 ,North Mason Street • 9 j,'Icrnr 13nx 580 • I on Collins, (.0 80522-0580 • 070) 221-6775 A Fax (9M) 221-070" www_fC govxvoRl REQUEST FOR PROPOSAL P990 Residential Lighting Program Services Written proposals, five (5) will be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals will be received before 3:00 p.m. (our clock), May 20, 2005. Proposal No. P990. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Questions concerning the scope of the project should be directed to Project Manager, Doug Swartz (970) 221-6719. Questions regarding proposals submittal or process should be directed to Opal F. Dick, CPPO, Senior Buyer (970) 221-6778. A copy of the Proposal may be obtained as follows: 1. Download the Proposal from the BuySpeed Webpage, https://secure2.fcgov.com/bso/login.isp 2. Purchasing Fax -line, 970-416-2033 and follow the verbal instruction to request document #30990. 3. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request a copy of the Bid. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Sincerely, Q 6as B. O'Neill II, CPPO, FNIGP ctor of Purchasing & Risk Management ? € � �a°iti l3asupr Street • 2,d 1,"14)ur « 11.0Box 580 - Fort Collins, (0 80522-0580 0 (q70) 22144775 - Fax (970) 221-(1707 www.fc ,ov.com Fort Collins Utilities REQUEST FOR PROPOSAL P990 Residential Lighting Program Services 1. INTRODUCTION Fort Collins Utilities (Utilities), the municipal utility for the City of Fort Collins, Colorado, is seeking proposals from qualified contractors specializing in residential lighting energy -efficiency programs to consult with Utilities in the design of a Residential Lighting Program (Program) in Utilities' service territory. If Utilities elects to implement the Program in a manner that relies on contractor services, the selected program design contractor may also have the opportunity to negotiate a contract for such services with Utilities. The Residential Lighting Program is part of a broad effort to reduce electrical energy consumption and peak electrical demand in Utilities's service territory. The Electric Energy Supply Policy, adopted by Fort Collins City Council in 2003, calls for per capita electrical consumption to be reduced 10% by 2012 and for per capita peak electrical demand to be reduced 15% by 2012. For more information, the Electric Energy Supply Policy is posted at www.fcgov.com/utilities/energypolicy.php. Lighting represents a significant part of Utilities's residential electric load. Most residential lighting is currently provided by conventional incandescent lamps. Compact fluorescent (CF) products offer a much more efficient alternative. The primary objective of this Program is to increase the market penetration of CF products in the Utilities service territory, thereby delivering long-term electric energy savings and peak demand reduction. 2. UTILITIES KEY FACTS The following information may be useful in responding to this Request for Proposals: • Utilities serves approximately 53,000 residential customers. • Approximately 1300 new homes were built in 2004 in the Utilities service territory. • Utilities purchases power from Platte River Power Authority (www.prpa.org). Utilities' average blended wholesale power cost for 2004 was 0.037 $/kWh. • The wholesale electric rate includes a strong coincident peak component. Utilities and PRPA are summer peaking utilities, with the following peak hour pattern being typical for the past five years: - Winter (November - March): 5 - 7 p.m. - Swing (April, May, October): 1 - 9 p.m. - Summer (June - September): 2 - 6 p.m. • Utilities offers two residential retail rates (www.fcgov.com/utilities/rates-eresidential.php). Most customers elect the Energy Rate (R); about 6% of residential customers elect the Demand Rate (RD). • City of Fort Collins (including Utilities) is an ENERGY STAR® partner. 2 3. PROGRAM BACKGROUND INFORMATION Beyond limited consumer education, Utilities has not offered a residential lighting program in the past. In fall 2004, a baseline retail survey of lighting, appliances and consumer electronics for the Fort Collins market was conducted on behalf of Utilities by Ecos Consulting. The emphasis was on ENERGY STAR® qualified products. The project report is posted at http://www.fcgov.com/utilities/baselinesurvev.pdf. The survey clearly illustrated that the market for CF products was immature. In comparison to regions where CF products have been promoted by utilities, the diversity of available products was relatively low, prices were high, product visibility and stocking levels were low, and retailer knowledge of the products was low. Retailer interviews suggested that consumer awareness and knowledge of CF products were also low. Utilities has no direct Fort Collins data regarding consumer awareness, knowledge or perceptions of CF products, or the penetration of CF products. Utilities feels the time is right for a residential lighting program in Fort Collins, for several reasons: • CFL products are available from an increasing number of manufacturers. • CFL product diversity has tremendously expanded, while performance has improved, lamp sizes have decreased and prices have significantly declined. • Practical, affordable CF products are now available for many residential lighting applications. • ENERGY STAR standards and labeling for CF products are providing increased assurance of product quality and performance. • Market penetration in the Utilities service territory is probably very low. • Much practical experience has been gained by residential lighting programs operating in other parts of the U.S. Utilities would like to design and implement an effective Program that will significantly increase the penetration of CF lighting products in homes in its service territory. Utilities has no interest in reinventing the wheel; it hopes to be able to heavily rely on approaches and materials developed by successful programs elsewhere, adapted as necessary for the local market and available resources. Utilities would like to minimize administrative costs for the Program and leverage resources from other entities. Based on Utilities staff research into other residential lighting programs, Utilities anticipates a multi -year Program that supports a market transformation approach to build local retail product supply and customer demand. The Program likely will focus on ENERGY STAR qualified products. It will broadly target Utilities residential customers. The Program will operate under Utilities' The Power to Save education and awareness campaign (www.fcgov.com/powertosave). It will likely initially be delivered only in Fort Collins. Utilities has not yet established quantitative goals or a budget for the Program, however the anticipated budget range is $35,000 to $80,000 annually. A conceptual schematic that has been the basis for in-house discussion of a residential lighting program is shown on the next page. This is based on common elements of other lighting programs. Please note that this is not intended to represent the final Program design. Ideally, Utilities hopes to launch some elements of the Program in fall 2005 to capitalize on the 2005 "lighting season," with the expectation that it will take some time to ramp up to a full- fledged Program. 3 Conceptual flow chart for residential lighting program SUPPLY DEMAND Develop supply-side relationships Develop consumer education materials Work with supply side to increase retail sales expertise, increase product availability, 7r.�a FRONT develop in-store promo END materials Work with supply-side to develop financial incentives ------------------------------------------- ----- --------- -------------------------------- Kickoff event THE Financial Maintain Consumer Advertising Periodic CHANGE incentives with retailer education and media promo phase -out relationships coverage events strategy I Sustained marketing and education 4 4. SCOPE OF WORK The scope of work described in this Request for Proposals is for program design. If Utilities elects to implement the Program in a manner that relies on contractor services, the selected program design contractor may also have the opportunity to negotiate another scope of work and contract for such services with Utilities. General Approach The contractor will work closely with Utilities staff to develop the details of Program design. The design will proceed iteratively, alternating between discussion and development of an increasingly detailed Program Plan. Regular communication between Utilities staff and the contractor is essential. Pro -gram Elements and Factors Based on their expertise and discussion with Utilities staff, the contractor will provide information and recommendations on issues that include, at minimum, the following: • Scope of products to be promoted via the Program. In addition to ENERGY STAR qualified CF screw -base lamps, options may include: - ENERGY STAR qualified CF fixtures - Linear fluorescent fixtures (T-5 or T-8 lamps + electronic ballasts) - ENERGY STAR qualified ceiling fans - ENERGY STAR qualified major appliances and consumer electronics (i.e. viewing lighting as part of a broader ENERGY STAR products campaign) • How to best handle outstanding concerns about ENERGY STAR lighting product quality and how to best deal with products that have been de -listed by ENERGY STAR yet remain as labeled products in the supply pipeline. • Effective consumer outreach approaches and existing materials that Utilities can adapt in that regard (including information on restrictions, licensing or other costs for those materials). • Appropriate ways to involve manufacturers in a program of this scale. • Effective ways to involve retailers in the program (which may vary for different categories of retailers). • Practical and effective approaches for targeted financial incentives (if needed). • How to most effectively leverage other resources, including ENERGY STAR promotions. • Appropriate allocation of Program resources across the various program elements. • Effective staging of the various program elements. • Plans for ramping -up the Program over time (including considerations regarding the potential for growing regional participation). • Implementation options, including using Utilities staff, contractors or some combination. s • Realistic goals, short-term and long-term. • Realistic estimates of all Program costs, by program year, broken out by program element. • Strategies to minimize program costs that subsidize consumers outside Utilities' service territory. • Exit strategies for the Program. • Need and options to track local consumer data such as market penetration and attitudes about efficient lighting. • Evaluation plan, including indicators of success, data needs during Program implementation, economic analysis approaches and sources of data that could reasonably serve as proxy information for a Fort Collins Program. (Note that Utilities is using "Cost of Conserved Energy" as the primary evaluation criterion. Resources for evaluation will be limited.) • Fluorescent lamp disposal / recycling considerations. Proposers are encouraged to recommend additional steps or approaches they feel would be a benefit to a robust and successful Program. Program Plan As noted above, the development of the program design will proceed iteratively, alternating between staff/contractor discussion and drafting of an increasingly detailed Program Plan. Three drafts of the Plan are anticipated: • Draft 1. The contractor will outline, at relatively high level, at least three feasible levels of program effort. The objective is to outline the costs and benefits associated with essential core elements as well with optional elements that increase the Program's effectiveness. For each level, the contractor will describe the general approach, the major program elements, resource requirements, pros, cons and examples of similar programs elsewhere. • Draft 2. Based on feedback from Utilities staff, the contractor will develop the preferred approach to the next level of detail. • Draft 3. Based on feedback from Utilities staff, the contractor will revise Draft 2 as needed to fully describe the chosen approach. 6 5. TIMELINE, DELIVERABLES, RESPONSIBILITIES This section outlines the schedule, deliverables and responsibilities as currently anticipated. Details are subject to discussion as the final contract is negotiated. Hiring • RFP issued May 6 • Final questions to Utilities May 13 • Responses to final questions May 18 • Proposals due May 27 • Proposals reviewed June 3 • Interviews (if necessary) June 13-15 • Contractor selected June 17 • Contract negotiated, work begins June 24 • Staff / contractor discussion • Draft 1 Program Plan • Utilities staff review • Staff / contractor discussion • Draft 2 Program Plan • Utilities staff review • Staff / contractor discussion • Draft 3 (Final) Program Plan Program Design June 27 — July 5 Delivered July 26 July 27-August 2 August 3-9 Delivered August 16 August 17-23 August 24-26 Delivered Sept 2 Contractor + Utilities Contractor Utilities Contractor + Utilities Contractor Utilities Contractor + Utilities Contractor Program Implementation Program implementation details, including the potential scope of work for a contractor, will not be known until the program design work is complete and Utilities management has approved a particular implementation approach. 6. PROPOSAL CONTENTS All proposals must be organized in the following format to allow an orderly review and evaluation. Address all aspects of the Program described under the Scope of Work and in this section. The proposed contract between the City of Fort Collins and the successful bidder is attached for reference purposes. • Table of Contents. List proposal content by section and by page number. • Statement of understanding of required services. • Program Plan outline. Provide a hypothetical outline that represents the bidder's understanding of the information that the final Program Plan document would include. • Timeline. • Staffing. Describe each team member's or subcontractor's roles and responsibilities in completing the Scope of Work. • Qualifications. Include information describing staff capabilities and experience relevant to this project. When citing other projects, describe the specific role played by the bidder. • Proposed compensation and estimate of personnel time for program design only. • References. Provide at least five references, each including name, title, address, phone number, e-mail address of the client's program manager. • Availability. 7