HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 23967FROM : NATURAL RESOURCES PHONE NO. : 970 224 6177 Aug. 08 2005 11:51AM P1
SECTION 00950
CHANGE ORDER NO. 01
PROJECT TITLE: NIX FARM LOAFING SHED, BID NO. 5906
CONTRACTOR: WALSH CONSTRUCTION, INC.
PROJECT NUMBER: 5906
DESCRIPTION:
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Design error of silt fence location. Contaminated soil found
2. Description of change: Additional silt fence required- Contaminated soil removed-
3. Change in contract cost $5849.00
j
4. Change in contract time: This Change Order will bank 5 days- No change at this time
(Attach additional sheets as required)
ORIGINAL CONTRACT COST ...... ................... ......................... $107,711.00
TOTAL APPROVED CHANGE ORDERS. .............. 11— .......................... 00.00
TOTAL PENDING CHANGE ORDERS_ .. ................... ............ - ....... ... 00.00
TOTAL. THIS CHANGE ORDER.......................................................5.849.00
TOTAL. % OF THIS CHANGE ORDER
TOTAL % OF ORIGINAL. CONTRACT....S%.
ADJUSTED CONTRACT COST................................................$113,560.00
(Assuming all change orders approved)
ACCEPTED BY
REVIEWED BY
APPROVED SN
cr-:
City Clerk
Contractor
Engineer
Steve White, Project Manager
Project File
Purchasing
Sg 0
Date
Da e
7 2 &,-
Date
Post-W Fax Note
7671
Date �+� ��/�
pago,,,
v�
f�
bcr
From rJrJ�I iJ
f'�1l 41
co.)Dapt.t.
Co.
Phony u
Phone #
Fax 4 �'7
Fax # / -7
' The, 3mI 23, 2005
Potential .Change Orders t
PCDts:003 62312008 ADDFilOHALSITE WORK
Category Reason Change Order Owner 4ireave Reference
Notes
TH IS POTENTIAL CHANGE ORDER 18 FOR THE FOLLOW:
ADD ADMIONAE SILT FENCING AS REQUESTED-
- REMOVE CONTAMINATED SOIL
-Of$POSEOF CONTAMINA-MI) SOIL
THIS PROPOSAL DOES NOT INCLUDE:
IMPORT OF ANY REPLACEMENT MATERIAL
-ANY MANIFESTS OR OTHER DOCUMENTED DISPOSAL OF SOIL.
- ANYT'HI NG NOT OPEC] FICALLY MENTIONED ABOVE
Summary;
Requested Days; 3 Budget; Estimate
0
Approved Days: 0 Cost: 0
Itemised Details:
Ge
Detailed W Cost Into), Grouped by Each Number
Pending
COR Number PCCO Number
Task Name Raven us Code
Proposed Approved
21�45 0
0
7
T
0
m
0
to
m
..
A
co
ro
�
m
Applied N
A
0
0 r3
Herat Description toots Dug Quote Reed
fl0I Hr3WD55
Allocation
EsUrnaled
Proposed
Approved
Applied
Sadgat:
0
253
n
O
SfLT FENCE
Cost:
0
253
0
0
GMWD05
Budget
0
2,086
0
0
COVE, HAUL AND DISPOSE OF CONTAMINATED SOIL
Cost:
o
z,aes
o
a
ProlagMmaper Frfntedon: GJmoo.5
Pmfidarahasg
Page 1
4
G
D
t71 m
m
r-j
W m
U µ
3 (n
ro
N1 3
N