HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 23812 2005 STREET MAINTENANCEChange Order Form Street Maintenance Program PROJECT NUMBER: 320200 (Concrete Project Phase If - Bid #5847) CONTRACTOR: Vogel Concrete (PO #5501541) CHANGE ORDER NUMBER: 2 n preparing change orders snow In order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1.&2. See attached invoice for details 3. The contract cost will increase by $32,423.25 4. There is no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY: trac REVIEWED BY: Lt (Project ACCEPTED BY: (Project 2.35% 3.39% $1,379,095.11 $14,312.51 $0.00 $32,423.25 $1,425,830.87 DATE: DATE: 4- bS '2-18-05-- ACCEPTED BY: II/A DATE: (Project Manager - Minor Streets Capital APPROVED BY APPROVED BY cc: Accounting Purchasing Contractor Project File DATE:— DATE: &ZJ/O i — $32,423.25 ,,&, h7&,t&C. Engineering Department • 281 North College Avenue • P.O. Boa 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 2005 Concrete Project - Phase II Vogel Concrete Bid No. 5847 Change Order No.: 0- Date: 7/11/2005 Reason For Change: a. Capital Project at Mulberry and Jackson is added to this contract per City of Fort Collins plans titled "Intersection Improvements for West Mulberry Street at Jackson Avenue" dated 3/10/05 2. Description Of Change: a. Add quantities and new line items for work at Mulberry & Jackson, to be paid by Minor Streets Capital. 3. Change in Contract Amount: Item a. Additional Quantities 304.07 Aggregate Base Course 403.50 Temporary Patching 608.01 Remove Only Concrete 608.03 Apron - R & R 608.04 Crosspan - R & R 608.10 Vertical Curb, Gutter & 6" Sidewalk - R & R 608.11 Vertical Curb and Gutter - No Sidewalk - R & R 608.14 Vertical Outfall Curb and Gutter - R & R 608.15 12" Barrier Curb 608.16 Hollywood Curb, Gutter & 4" Sidewalk - R & R 608.17 Hollywood Curb, Gutter & 6" Sidewalk - R & R 608.23 Pedestrian Access Ramp - Vertical Curb - R & R 608.24 Pedestrian Access Ramp - Hollywood Curb - R & R 608.25 Pedestrian Access Ramp - Highback Curb - R & R 608.26 Truncated Dome Panel (2' x 2') 608.29 6" Flatwork - R & R New Line Items 608.35 4" Splashblock 608.36 Exposed Aggregate 623.01 Sleeving Qty Unit Unit Cost Total Cost 35.97 TON $ 26.37 $ 948.53 8.78 TON $ 155.10 $ 1,361.78 855.0 SF $ 1.55 $ 1,325.25 64.0 SF $ 6.62 $ 423.68 366.0 SF $ 6.62 $ 2,422.92 17.0 LF $ 41.36 $ 703.12 348.0 LF $ 25.33 $ 8,814.84 29.0 LF $ 22.75 $ 659.75 46.5 LF $ 18.10 $ 841.65 4.5 LF $ 32.57 $ 146.57 8.5 LF $ 34.12 $ 290.02 8.0 LF $ 40.84 $ 326.72 8.0 LF $ 39.29 $ 314.32 393.5 SF $ 9.31 $ 3,663.49 82.0 SF $ 39.09 $ 3,205.38 488.0 SF $ 5.69 $ 2,776.72 294.0 SF $ 5.70 $ 1,675.80 272.0 SF $ 8.76 $ 2,382.72 40.0 LF $ 3.50 $ 140.00 TOTAL CHANGE IN CONTRACT AMOUNT $ 32,423,25 CAPITAL $ 32,423.25 PMP 4. Change In Contract Time a. There is no change in contract time TOTAL CHANGE IN CONTRACT TIME 0 Days