HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 23812 2005 STREET MAINTENANCEChange Order Form
Street Maintenance Program
PROJECT NUMBER: 320200 (Concrete Project Phase If - Bid #5847)
CONTRACTOR: Vogel Concrete (PO #5501541)
CHANGE ORDER NUMBER: 2
n preparing change orders snow In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1.&2. See attached invoice for details
3. The contract cost will increase by $32,423.25
4. There is no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
ACCEPTED BY:
trac
REVIEWED BY: Lt
(Project
ACCEPTED BY:
(Project
2.35%
3.39%
$1,379,095.11
$14,312.51
$0.00
$32,423.25
$1,425,830.87
DATE:
DATE: 4- bS
'2-18-05--
ACCEPTED BY: II/A DATE:
(Project Manager - Minor Streets Capital
APPROVED BY
APPROVED BY
cc: Accounting
Purchasing
Contractor
Project File
DATE:—
DATE: &ZJ/O i —
$32,423.25 ,,&, h7&,t&C.
Engineering Department • 281 North College Avenue • P.O. Boa 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
2005 Concrete Project - Phase II
Vogel Concrete Bid No. 5847
Change Order No.: 0-
Date: 7/11/2005
Reason For Change:
a. Capital Project at Mulberry and Jackson is added to this contract per City of Fort Collins plans titled "Intersection Improvements for
West Mulberry Street at Jackson Avenue" dated 3/10/05
2. Description Of Change:
a. Add quantities and new line items for work at Mulberry & Jackson, to be paid by Minor Streets Capital.
3. Change in Contract Amount:
Item
a. Additional Quantities
304.07
Aggregate Base Course
403.50
Temporary Patching
608.01
Remove Only Concrete
608.03
Apron - R & R
608.04
Crosspan - R & R
608.10
Vertical Curb, Gutter & 6" Sidewalk - R & R
608.11
Vertical Curb and Gutter - No Sidewalk - R & R
608.14
Vertical Outfall Curb and Gutter - R & R
608.15
12" Barrier Curb
608.16
Hollywood Curb, Gutter & 4" Sidewalk - R & R
608.17
Hollywood Curb, Gutter & 6" Sidewalk - R & R
608.23
Pedestrian Access Ramp - Vertical Curb - R & R
608.24
Pedestrian Access Ramp - Hollywood Curb - R & R
608.25
Pedestrian Access Ramp - Highback Curb - R & R
608.26
Truncated Dome Panel (2' x 2')
608.29
6" Flatwork - R & R
New Line Items
608.35 4" Splashblock
608.36 Exposed Aggregate
623.01 Sleeving
Qty
Unit
Unit Cost
Total Cost
35.97
TON
$
26.37
$
948.53
8.78
TON
$
155.10
$
1,361.78
855.0
SF
$
1.55
$
1,325.25
64.0
SF
$
6.62
$
423.68
366.0
SF
$
6.62
$
2,422.92
17.0
LF
$
41.36
$
703.12
348.0
LF
$
25.33
$
8,814.84
29.0
LF
$
22.75
$
659.75
46.5
LF
$
18.10
$
841.65
4.5
LF
$
32.57
$
146.57
8.5
LF
$
34.12
$
290.02
8.0
LF
$
40.84
$
326.72
8.0
LF
$
39.29
$
314.32
393.5
SF
$
9.31
$
3,663.49
82.0
SF
$
39.09
$
3,205.38
488.0
SF
$
5.69
$
2,776.72
294.0
SF
$
5.70
$
1,675.80
272.0
SF
$
8.76
$
2,382.72
40.0
LF
$
3.50
$
140.00
TOTAL CHANGE IN CONTRACT AMOUNT $ 32,423,25
CAPITAL $ 32,423.25
PMP
4. Change In Contract Time
a. There is no change in contract time
TOTAL CHANGE IN CONTRACT TIME 0 Days