HomeMy WebLinkAboutRESPONSE - BID - 5917 UTILITY SERVICE CENTER ROOFING PROJECTFROM :RTN Roofing FAX NO. :419:5249 Tun, 14 2EI03 01:-I Fig FBI
µ
�.♦ 14
H
rr
ATTN: Tennis Dutton.
Fax: 970-221 �6619
-Exp%iwe.5nd PcrronnuvA
You on k r
PROPO .J
June 13, . 01)5
PROJECT: City of Fed Collins
Addition To
Utility Service Center Room Pzca;ect Bid 4 $917
- SCOPE OF WORK -
Wtall the completc DURO-LAST Roofing System as per xxxayiufactumrs spec illoatio x and
according to the same spec fications provided for in Did # 5917.
Water / Storm Water: 76,749.00 S 79,122.00
Warehouse Office:
Water Crarage:
$ 310426.00
$ 21 953. 0
$1300127,00
$ 32,398.00
2
$134,152.00
BIDFRiCE: SeeAbaYe ____. _ ________.� �.� —.. _..-��.�..,_.,.�..•
BID S(JBMltrED BY:
JE R S. 'LOZON, PRESMEV'I"
5854 I.ackheW Ave.* LOveMnd. C010n ID 80011 x (970) u"93-7100' Fax 070) 593-1$ "
'W W 14.Itht'�llk�'SiC'rIIIS. UQKR
ZO 'd
'ON Xd.d
Wd 01 ZO UM SO-ZZ-NA
Gypslum Substrate
BUR
Gravel
/Ir/Z
Concrete T Deck Gypslum Substrate -Y
3/4' Perlite 2 layers 1 1/2' ISO U
BUR Mech attached EPDM o
Gravel A
Metal Deck
2 layers 1 1/2' IS❑ L
Fully adhered EPDM � Q)
I V 00
d
3
Wall Street
Traffic ❑ps
LMetal Deck
2- 1 1/2' Iso
loose EPDM
Ballast
Gypsulm Substrate
Metal Deck EPS, Tapered .25 Inch/ft
2 layers 2' IS❑ ,5 Inch wood fiber board �V
Loose lay EPDM fully adhered EPDM
Ballast GypsiuM Substrate
BUL
Gravel ballast
®
2005
USC
Roof
Project
Ph
A
2005
USC
Roof
Project
Ph
B
Note; Callouts indicate roof
condition as of 3/15/05
GypsiuM Substrate
2-1 1/2' IS❑
Fully Adhered EPDM
Metal Deck
2 layers 1 1/2' IS❑
Fully adhered EPDM
Warehouse Area
Metal Deck
1-3' layer IS❑
Loose lay EPDM
Ballast
Light &
Power �— Metal Deck
2 layers 1 1/2' IS❑
Loose Lay EPDM
Ballast
City of Fort Collins
Utility Service Cent(
Roof Outline
Revised 4/05/05
NTS