HomeMy WebLinkAboutCHANGE ORDER - BID - 5911 MISCELLANEOUS CONCRETE PROJECT (3)�.��1a/zn ✓17in/o.r�
Change Order Form
Engineering Department
PROJECT TITLE: Miscellaneous Concrete Project
PROJECT NUMBER:
CONTRACTOR: Express Concrete, Inc: (Bid No. 5911)
CHANGE ORDER NUMBER: 1
jiuParrrry cndnye users snow in oraer as separate numbe
1.. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. No change in contract price $
4. There will be no change in contract time.
ORIGINAL CONTRACT COST $50,000.00
TOTAL APPROVED CHANGE ORDERS $0.00
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $0.00
TOTAL % OF THIS CHANGE ORDER 0.00%
TOTAL C.O. % OF ORIGINAL CONTRACT 0.00%
ADJUSTED CONTRACT COST $50,000.00
(Assuming all change orders approved)
ACCEPTED BY
ACCEPTED BY:
(+-4ect IM' I
REVIEWED BY:
(Engineer)
DATE: ✓u,. c- 3 ti
)ATE:
DATE: b uc5
ACCEPTED BY: if hztc �V, t 1f -f.- DATE:
(Department Head)
APPROVED BY:
cc: City Clerk
Contractor
Purchasing
Project File
DATE:
(Purchasing Agent over $30,000)
Engineering Department • 281 North College Avenue • P.O. Boa 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
City of Fort Collins Miscellaneous Concrete Project
Express Concrete - Bid No. 5911
Change Order No: 1
Date: 6WO05
1. Reason For Change:
a. Temporary asphalt patching will be used in place of permanent patching.
b. The contract should reference the current Larimer County Urban Area Street Standards.
c. There is not an item for removal of flagstone.
d. There is not an item for Class D Concrete.
2. Description Of Change:
a. Remove section 5A of the Bid Proposal and replace with the following: "All concrete placed adjacent to asphalt pavement will
require placement of a temporary asphalt patch, unless otherwise directed by the City Representative. The Contractor shall
remove no more than sb((6) inches of existing asphalt pavement. The pavement areas shall be temporarily patched with a
minimum of two (2) inches of ha mix asphalt, up to a mapmum depth of six (6) inches. These locations shall be paid under the
Contract unit price for Temporary Patching."
b. Remove section 2A of the Bid Proposal and replace with the following: "Contractor must refer to the current Larimer County Urban
Area Street Standards for this project."
c. Add item 202.16 Remove Flagstone.
d. Add item 608.55 Class D Concrete.
3. Change In Contract Amount:
a. There is no change in Contract amount
b. There is no change in Contract amount
c. 202.16 Remove Flagstone
d. 608.55 Class D Concrete
4. Change In Contract Time
a. There is no change in contract time
b. There is no change in contract time
c There is no charge in contract time
d. There is no change in contract time
Quantity Cost per Unit Unit
100 $ 2.85 SF
20 $ 90.00 CY
6/6/2005