HomeMy WebLinkAboutARROWHEAD - CONTRACT - RFP - 22962 P982 BOBCAT (3)Fee Schedule Design Cost Estimates Phase I 4.5 miles (23,760 If) 48" wide $0.25/If $ 59940.00 1.0 mile ADA (included above) 1.0 mile singletrack parallel (additional) no charge Mobilization 10% lump sum $ 594.00 TOTAL PHASE I DESIGN $ 69534.00 Phase II 5.7 miles (30,0961f) 2-4ft wide $0.33/lf $ 99931.68 Mobilization 12% lump sum $ 1,191.80 TOTAL PHASE II DESIGN $119123.48 Phase III 3.3 miles (17,4241f) 2-4ft wide $0.35/If $ 69098.40 Mobilization 12% lump sum $ 731.81 TOTAL PHASE III DESIGN $ 6,830 20 South Add -on 0.8 miles (4,2241f) 2-4ft wide $0.25/If $ 19056.00 Mobilization 10% lump sum $ 105.60 TOTAL PHASE SOUTH DESIGN $ 19161.60 14.3 miles (75,504 It) Total Design Estimate $25 649 28 Construction Cost Estimates (Machine Construction SWECO 480 Trail Dozer and IHI NX-15 Mini Excavator) Phase I 3.5 miles (18,480 If) 48" wide $1.89/lf $34,927.20 1.0 mile ADA (5280 If) 48" wide $8.25/lf $439560.00 Mobilization 10% lump sum $ 7,848.72 TOTAL PHASE I CONSTRUCTION $869335.92 Phase II 5.7 miles (30,096 If) 2-4ft wide $2.40/if $729230.40 Mobilization 15% lump sum $109834.56 TOTAL PHASE Il CONSTRUCTION $83,064.96 Phase III 3.3 miles (17,424 If) 2-4ft wide $2.85/If $49,658.40 Mobilization 15% lump sum $ 79448.76 TOTAL PHASE III CONSTRUCTION $579107.16 South Add -on 0.8 miles (4,224 If) 2-4ft wide $1.49/lf $ 69293.76 Mobilization 10% lump sum $ 629.38 TOTAL PHASE SOUTH CONSTRUCTION $ 69923.14 14.3 miles (75,504 lf) Total Build Estimate $233 431 18 TOTAL DESIGN & BUILD PROJECT ESTIMATE $259,080 46 l?