Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - BID - 5858 MISC. STREET IMPROVEMENTS (6)
JUL 2 12005 Administrative Services Purchasing Division City of Fort Collins July 12, 2005 Connell Resources Inc Attn: 4305 E. Harmony Road Fort Collins, CO 80528 Re: Renewal, 5858 Miscellaneous Street Improvements The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions and the attached revised Bid Schedule. The term will be extended for one (1) additional year, July 1, 2005 through June 30, 2006. If the renewal is acceptable to your firm, please sign this letter in the space provided and return it to the City of Fort Collins, Purchasing Division, P. O. Box 580, Fort Collins, CO 85022, within the next fifteen days. If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non -renewal. If you have any questions regarding this matter, please contact John D. Stephen, CPPO, Senior Buyer at (970) 221-6777. Sincerely, m s B. O'Neill 11, CPPO, FNIGP Dir ctor of Purchasing and Risk Management YcaWS" Signature Al;#,;.—� Date (Please indicate your desire to renew 5858 by signing this letter and returning it to Purchasing Division within the next fifteen days.) JBO:cpj 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 0 Miscellaneous Contract Bid Tab Bid 5858 2005 renewal prices Connell Resources 2005 Item Number IDescription r"M-antty I Unit I Unit Cost I Total Cost 202-01 Remove pipe ADS-CMP-RCP-PVC-CLAY TILE 30 LF $5.40 $162.00 202-02 Plug Existing Pie 12"-36" 1 EA $145.00 $145.00 202-03 Remove Vertical Curb 137 LF $4.20 $575.40 202-04 Remove Roll Over Curb And Sidewalk. 100 LF $4.85 $485.00 202-05 Remove Cross an/Drivewa /A ron. 150 SF $2.25 $337.50 202-06 Remove Concrete Paving 8" Avg Depth. 400 SF $2.40 $960.00 202-07 Remove Asphalt 8". 50 SY $5.20 $260.00 202-08 Roto Mill 3"4'As halt. 100 SY $4.01 $401.00 202-09 lProfile Mill 0-3". 600 SY $1.55 1 $930.00 202-10 Remove Sidewalk 4"-6". 403 SF $1.60 1 $644.80 202-12 Remove Ri Ra . 20 SY $1.60 $32.00 202-13 Remove Fence Various Types. 100 LF $2.20 $220.00 202-14 Saw Cutting Existing Asphalt. 100 LF $1.65 $165.00 203-01 Unclassified Excavation. 115 CY $5.00 $575.00 203-02 Embankment (CIP). 75 CY $3.10 $232.50 203-03 Borrow Suitable Fill Material. 50 CY $13.15 $657.50 203-04 114aul Dispose. 65 1 CY $6.30 $409.50 203-05 ITopsot (Stripping, Stockpiling, Placing) 75 CY $9.80 $735.00 203-06 Muck Excavation CIP). 50 CY $23.00 $1,150.00 203-07 Borrow ABC Class 5 or 6 (CIP). 50 Ton $13.00 $650.00 203-08 Borrow Fill R-25 50 CY $17.00 $850.00 203-09 Median Splash Block Shaping 500 SF $2.50 $1,250.00 203-10 Import Tosoil Screened 50 CY $39.00 $1,950.00 203-11 Potholing 10 EA $280.00 $2,800.00 206-01 Structure Excavation 50 1 CY $6.00 1 $300.00 206-02 IStructure Backfill On Site Fill 50 CY $6.60 1 $330.00 206-03 Haul And Leveling 50 CY $14.75 $737.50 206-04 Structure Backfill Flow Fill 50 CY $50.00 $2,500,00 206-05 Filter material 1" 1/2 "washed rock 50 Ton $21.00 $1,050,00 206-06 Dewaterin 15 Da $790.00 $11,850.00 208-02 Silt Fence Furnished And Installed 320 LF $1.50 $485.00 208-03 Straw Bales Furnished And Installed 10 LF $59.00 $590.00 208-04 Soil Retention Blanket 150 SY $2.75 $412.50 210-01 Adjust Valve Box 3 EA $240.00 $720.00 210-02 Ad'ust Manhole Ring/Cover 2 EA $400.00 $800.00 210-03 Modify Manhole 2 EA $920.00 $1,840.00 210-04 Relocate Fire Hydrant. 1 EA $1,100.00 $1,100.00 210-05 Relocate Water Meter 1 EA $950.00 $950.00 210-06 Relocate C.P. Test Station 1 EA $830.00 $830.00 210-07 Irrigation Service 3/4"-1" 2 EA $1,260.00 $2,500.00 210-08 Relocate Fence Various Types 100 LF $5.40 $540.00 210-09 lRelocate, Mailbox(provide temporary service 2 1 EA $340.00 1 $680.00 304-01 Aggregate Base CL 5-6 CIP 6" 50 Ton $15.00 $750.00 304-02 ShoulderingBase Class 5-6- 4in CIP 50 Ton $17.50 $875.00 304-03 Patch Placement Base CL-5-6 6" CIP 50 Ton $30.00 $1,500.00 306-01 Reconditioning8" 50 SY $3.00 $150.00 403-01 Asphalt PatchingGradingS 3" Depth) 3 Ton $110.00 $330.00 403-02 As halt PatchingGradingSG 6"-10" Depth) 6 Ton $110.00 $660.00 403-03 Hot Bituminous Pavement - Grading S 3" Depth) 50 1 Ton $48.00 $2,400.00 403-04 Hot Bituminous Pavement - Grading SG 4" Depth) 50 Ton $46.50 $2,325.00 403-05 As halt Paver Leveling Course SG 25 Ton $46.50 $1,162.50 403-06 Asphalt Paver Patch Grading S 3" depth) 25 Ton $48.00 $1,200.00 412-01 Concrete Pavement 10" 75 SY $85.00 $6,375.00 412-02 Concrete Pavement 8" 175 SY $75.00 $13,125.00 420-01 lGeotextile Stabilization Fabric 50 SY $4.00 1 $200.00 420-02 Geo-Gdd Reinforcement 50 SY $6.30 $315.00 420-03 Geotextile Paving Fabric 50 SY $3.10 $155.00 506-01 Rip Rap with Type II Bedding, Topsoil -CIP 10 SY $52.00 $520.00 603-01 12" CMP 27 Lf $29.60 $796.50 603-02 12" CMP FES 2 Ea $150.00 $300.00 603-03 24"CMP 30 EA $38.00 $1,140.00 603-04 24" CMP FES 2 LF 1 $245.00 1 $490.00 314 Miscellaneous Contract Bid Tab Bid 5858 2005 renewal prices Connell Resources 2005 Item Number Description Quantity Unit Unit Cost Total Cost 603-05 12" Class III RCP 30 LF $24.00 $720.00 603-06 15" Class III RCP 30 LF $27.00 $810.00 603-07 18" Class III RCP 30 LF $29.00 $870.00 603-08 21" Class III RCP 30 LF $35.00 $1,050.00 603-09 24" Class III RCP 80 LF $37.00 $2,960.00 603-10 27" Class III RCP 30 LF $46.00 $1,380.00 603-11 30" Class III RCP 30 LF $49.00 $1,470.00 603-12 36" Class III RCP 30 LF $59.00 $1,770.00 603-13 42"Class III RCP 30 LF $71.00 $2,130.00 603-14 12 RCP Class III FES 2 EA $330.00 $660.00 603-15 15" RCP Class III FES 2 EA $330.00 $660.00 603-16 18" RCP Class III FES 2 EA $366.00 $730.00 603-17 21" RCP Class III FES 2 EA $410.00 $820.00 603-18 24" RCP Class III FES 2 EA $410.00 $820.00 603-19 27" RCP Class III FES 2 EA $520.00 $1,040.00 603-20 30" RCP Class [it FES 2 EA $520.00 $1,040.00 603-21 36" RCP Class III FES 2 EA $626.00 $1,250.00 603-22 42" RCP Class III FES 2 EA $650.00 $1,300.00 603-23 24"x 38" RCP 30 LF $77,00 $2,310.00 603-24 24"x 38" RCP- FES 2 EA $610.00 $1,220.00 603-25 14" x23" RCP 30 LF $49.00 $1,470.00 603-26 14"x 23" RCP FES 2 EA $440.00 $880.00 603-27 Trash Rack 2 EA $480.00 $960.00 603-28 15" ADS N-12 30 LF $26.00 $780.00 603-29 15" ADS FES 2 EA $195.00 $390.00 603-30 18" ADS Pie N-12 30 LF $28.00 $840.00 603-31 18" ADS FES 2 EA $195.00 $390.00 603-32 24" ADS Pi eN-12 30 LF $36.00 $1,080.00 606-33 24" ADS FES 2 EA $230.00 $460.00 603-34 36" ADS Pie N-12 30 LF $54.00 $1,620.00 603-35 36" ADS FES 2 EA $520.00 $1,040.00 603-36 4" PVC Irrigation Pie SCH-200 30 LF $18.00 $540.00 603-37 4"Sanitary Sewer Service SDR-35 30 LF $22.50 $675.00 603-38 6" Pvc Sanitary Sewer 30 1 LF $23.50 1 $705.00 8"Pvc Sanita Sewer SDR-35 30 LF $29.50 $885.00 Concrete Encasement 20 LF $61.00 $1,220.00 Concrete Cut Off Walls ditch crossin 2 EA $4,700.00 $9,400.00 Pi a Headwall 2 EA $2,550.00 $5,100.00 V 4" Median Underdrain Pie Perforated 30 LF $18.00 $540.00 4" Median Underdrain Pi a Solid 30 LF $18.00 $540.00 4" Clean Out 2 EA $270.00 $540.00 604-01 iType 3 Single Inlet 2 1 EA $1,850.00 $3,700.00 604-02 lTvPe 3 Double Inlet 2 EA $3,000.00 $6,000.00 640-03 5' Type R Inlet 2 EA $2,300.00 $4,600.00 604-04 19 Type R Inlet 2 EA $3,100.00 $6,200.00 604-05 15'Type R Inlet 2 EA $4,900.00 $9,800.00 604-06 Combination Type 13 Inlet 2 EA $3,000.00 $6.000.00 604-07 COFC Single Inlet Area Inlet 2 EA $1,900.00 $3,800.00 604-08 4' Diameter Manhole 2 EA $1,400.00 $2.800.00 604-09 5' Diameter Manhole 2 EA $1,900.001 $3,800.00 604-10 5' Diameter Manhole Drop 2 EA $2,300.00 $4,600.00 604-11 6' Diameter Manhole 2 EA $2,500.00 $5,000.00 607-01 Tem ora Fence- Corral Fence 100 LF $23.50 $2,350.00 607-02 Temp Fence- Corral Panel + screen 100 LF $29.51 $2,951.00 607-03 Privacy Fence 8' Cedar 100 LF $23.40 $2,340.00 607-04 Privacy Fence 6' Cedar 100 LF $18.60 $1,860.00 607-05 2 Rail Split 100 LF $16.50 $1,650.00 607-06 3 Railed Dowel Fence 100 LF $19.50 $1,950.00 607-07 4 Strand Barb Wire 100 LF $8.00 $800.00 607-08 l0range Safety Fence 100 1 LF $3.10 $310.00 608-01 Concrete Sidewalk 4" 500 SF $3.10 $1,550.00 608-02 Concrete Sidewalk 6" 935 SF $3,65 $3,412.75 608-03 Concrete Access Ramps with Colored Landings 6" 36 SF $8.00 $288,00 608-04 Concrete Drive Approach 6" 250 SF $4.00 $1,000,00 608-05 Drive Over Curb+Sidewalk 6" 200 SF $4.50 $900.00 609-06 Concrete Cross ans+A rons 19' 390 SF $8.00 $3,120.00 608-07 Concrete Trickle Pan 4ft Wide 6" Thick 760 SF $3.75 $2,850.00 608-08 Colored Concrete Bike Path 5" Fibermesh And Colored Yosemi 1000 SF $7.30 $7,300.00 608-09 Bus Stop Pad 6" Flat Work 500 SF $5.25 $2,625.00 608-10 Pedestrian Refuge Islands 100 SF $8.00 $800.00 608-11 Hi -Early Concrete 24hr 25 C $31,00 $775.00 608-12 Flow Fill 50 C $52,00 $2,Ann .00 -)I]1,jor 114 Miscellaneous Contract Bid Tab Bid 5858 2005 renewal prices Connell Resources 2005 Item Number Description Quantity Unit Unit Cost Total Cost 609-01 Remove and Replace Concrete Curb and Gutter match existin 100 LF $31.00 $3,100.00 609-02 Vertical Curb+Gutter 30" 66 LF $15.00 $990.00 609-03 Outfall Curb+Gutter 18" 50 LF $15.00 $750.00 609-04 Rollover Curb+ Gutter 50 LF $16.00 $800.00 609-05 Driveway Curb Cuts 4 EA $130.00 $520.00 609-06 Asphalt Curb 150 LF $7.60 $1,140.00 610-Ot Exposed Aggregate Concrete Hardsca a Medians 4" 250 SF $6.50 $1,625.00 610-02 Patterned Concrete (Stamped) 250 SF $10.13 $2,532.50 610-03 Interlocking Sidewalk Pavers -Type 1 250 SF $29.50 $7 375.00 619-01 6" DIP Class 52 And Poly Wrap 30 LF $34.00 $1,020.00 619-02 6"x6" Tee 1 EA $300.00 $300.00 619-03 6"x6" Cross 1 EA $350.00 $350.00 619-04 6" 45' Bend 1 EA $250.00 $250.00 619-05 6" Gate Valve And Box 1 EA $725.00 $725.00 619-06 6" Mega Lugs Restraints 2 EA $120.00 $240.00 619-07 6"x2" Blow Off 1 EA $825.00 $825.00 619-08 8" DIP Class 52 And Ploy Wrap 30 LF $38.00 $1,140.00 619-09 8"xb" Tee 1 EA $385.00 $385.00 619-10 8"x8" Cross 1 EA $390.00 $390.00 619-11 8" 45' Bend 1 EA $275.00 $275.09 619-12 8x2" Blow Off 1 EA $935.00 $935.00 619-13 8" PVC C-900 30 LF $30.15 $904.50 619-14 8" Gate Valve And Box 1 EA $950.00 $950.00 619-15 8" Me a Lu s Restraints 2 EA $140.00 $280.00 619-16 8"x2" Blow Off 1 EA $936.00 $935.00 619-17 Fire Hydrant 1 EA $1,900.00 $1,900.00 619-18 6" Fire Hydrant Extension 1 EA $530.00 $530.00 619-19 12" Fire Hydrant Extension 1 EA $562.00 $562.00 619-20 3/4" Copper Pie 30 LF $20.80 $624.00 619-21 3/4" Corp Stop 1 EA $190,00 $190A0 619-22 314" Curb Stop 1 1 EA $200.00 $200.00 619-23 3/4" Meter Pit with 3/4" Yoke 1 EA $610.00 $610.00 619-24 1"Copper Pie 30 LF $28.00 $840.00 619-25 1" CorpStop 1 EA $200.00 $200.00 619-26 1"Curb Stop 1 EA $215.00 $215.00 619-27 1" Meter Pit with 3/4" Yoke 1 EA $475.00 $475.00 619-28 1" Air Vac Assembly 1 EA $3,200.00 $3,200.00 2810-01 4" CL-200 PVC Main 4.5 cover 100 LF $13.00 $1,300.00 2810-02 6" CL-200 PVC Main 4.5 cover 100 LF $16.00 $1,600.00 2810-03 Cap Irrigation Line 2 1 EA $54.00 1 $108.00 2810.04 Sprinkler Line Install Trenching and Backfill 100 LF $1.65 $165.00 2810-05 Mainline PVC Class 200 3" 100 LF $4.80 $480.00 2810-06 Laterals PVC 200 2"-11/2"-1" 100 LF $2.60 $260.00 2810-07 Remote Control Zone Valves 2 EA $160.00 $320.00 2810-08 Isolation Gate Valves 2" Square Nut 2 EA $290.00 $580.00 2810-09 Valve Boxes 2 EA $62.00 $124.00 2810-10 10ontrol System 18 Station 1 EA $1,275.00 $1,275.00 Electric Control Wiring5 Wires #14 Feed and #12 Common 100 LF $0.55 $55.00 Gear Driven Rotor Heads Rainbird 2 EA $55.00 $110.00 Po U S ra Heads Rainbird 4 EA $13.00 $52.00 Xeri-Po Heads 2 EA $5.50 $11.00 F25 Dri S stem Pie 100 LF $1.65 $165.00 Sidewalk Bore 100 LF $19.00 $1,900.00 Wood Mulch 500 SF $0.85 $425.00 Landscape Cobbles CIP 6"-9" Size 2 Ton $115.00 $230.00 2900-03 ilTopsoil 60/40 Mix For Medians CIP 20 CY $44.00 $880.00 290D-04 Native Seedln 0.5 ACRE $1,300.00 $650.00 2900-05 Turf Sod 6500 SF $0.53 1 $3,445.00 TOTAL: $284,770.95 Note: Also attach Labor Costs and Equipment costs to be used for unanticipated additional work. CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective February 1, 2005 All Rates are per hour except as noted GRADING EQUIPMENT - Fueled & Maintained Scraper 631 E $175.00 Scraper 627E $165.00 Scraper 623F $145.00 Scraper 621 E $145.00 Scraper 613B $95.00 Scraper 613C $95.00 Blade 140G $75.00 Blade 140H $75.00 Road Reclaimer -Dirt $120.00 Road Reclaimer - Asphalt $175.00 980 Loader $115.00 972 Loader $100.00 970 Loader $100.00 966 Loader $100.00 950 Loader $80.00 938 Loader $80.00 936 Loader $75.00 IT 28 Loader $75.00 John Deere 8650 with Disk $76.00 John Deere Landscape Loader $55.00 Skid Steer $35.00 D-9 Cat Dozer $155.00 0-8 Cat Dozer w/rippers $135.00 D-6 Cat Dozer $80.00 D-4 Cat Dozer $60.00 D-3 Cat Dozer $55.00 ASV 4810 Track Dozer $40.00 EXCAVATION EQUIPMENT - Fueled & Maintained Komatsu PC600 $145.00 Komatsu PC400 $125.00 Komatsu PC300 $105.00 Komatsu PC220 $80.00 Komatsu PC150 $55.00 Komatsu PC200 W/Hammer $105.00 Cat 350 Excavator $125.00 Cat 330 Excavator $105.00 Cat 325 Excavator $95.00 Cat 436 Backhoe $60.00 Cat 426 Backhoe $60.00 Cat 416 Backhoe $60.00 cAsherh6pUabor,equip rates 2004 Rock $195.00 $175.00 CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective February 1, 2005 All Rates are per hour except as noted PUMPS 3" 4" 5" 101, PAVING EQUIPMENT - Fueled & Maintained Paving Machine Cat AP1055B Paving Machine BG225 Paving Machine BG145 Gilcrest 813 Pro Paver CMI PR-500 Profiler CS 8200 Profilograph Power Curber 150 Johnson Street Sweeper Crew Truck & Tools Spray Rig Tractor w/Spreader Bar Tack ROLLER EQUIPMENT - Fueled & Maintained 815B Sheepsfoot Compactor Rex 3-35 Compactor Dynapac CA151 Vibratory Roller Dynapac CA151 Compactor Cat CP323 Compactor Cat CP434 Smooth Drum Hypac 530A Rubber Roller Hyster C766 Roller Dynapac Roller,CC21,CC101,CC122 Ing Rand D032 Asphalt Roller MISCELLANEOUS Broom Asphalt Saw Compressor & Tools Pickup Truck & Tools Fuel Truck $30.00 $35.00 $40.00 $55.00 $135, 00 $75.00 $75.00 $60.00 $445.00 $75.00 $75.00 $85.00 $200.00 Day $150.00 Day $300.00 Day $3.00 Gal $105.00 $75.00 $60.00 $60.00 $50.00 $60.00 $40.00 $65.00 $30, 00 $35.00 $30.00 $65.00 $280.00 Day $14.00 $70.00 cAsherAcipMabor,equip rates 2004 CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective February 1, 2005 All Rates are per hour except as noted LABOR Straight Time Overtime Project Site Manager with Pickup $65.00 Supervisor with Pickup $60.00 Foreman - Pickup Truck with Tools $50.00 $70.00 Operator - Blade $38.00 $48.00 Operator - Lg Scraper,Loader, Dozer,Hoe $35.00 Operator - Sm Scraper,Loader, Dozer,Hoe $32.00 Operator - 815, Rex Compactors $32.00 Operator - Disk, Skid Steer $26.00 Operator - Paver, Screedman $38.00 $48.00 Operator - Paving Rollers, Sweeper $35.00 Laborer - Asphalt $30.00 Grade Checker $34.00 $44.00 Pipe Layer $28.00 Laborer $25.00 $43.00 Field Mechanic $37.00 Oiler $35.00 Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours per day during the week. All units listed above will be an additional $12.00 per hour for overtime. TRUCKS - Fueled, Operated & Maintained Tractor w/Low Boy $110.00 Tractor w/Rock Trailer $75.00 Tractor w/Flow Boy $75.00 Tractor w/Belly Dump $75.00 Tractor w/End Dump $75.00 Truck and Pup $75.00 Tandem Dump $65.00 Cat D35 Rock Truck $100.00 Cat 621 Rock Truck $145.00 Cat D25 Water Tanker $90.00 International Water Truck $80.00 Ford 2000 Gallon Water Truck $70.00 Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours per day during the week. All units listed above will be an additional $12.00 per hour for overtime. cAsheri\cip\labor,equip rates 2004