Loading...
HomeMy WebLinkAboutPrebid - BID - 5913 BASKETBALL COURTSAGENDA City of Fort Collins Pre -bid Conference for City Park Basketball Court April 12, 2005 10:00 a.m. 1 Introductions 2 Attendance Sign In, distribute business cards 3 Bid Opening: Tuesday, April 26, 2005 — 3:00 pm 4 Last day for questions: Tuesday, Apri1K2'2005 5 Project Schedule I� • Substantial completion 60 days 6 Coordination with other Contractors/Parks • Baseball and Softball fields in use after 5:00 pm 7 Highlights from Plans and Specifications • Review drawings and project highlights — Tree protection Pot hole 6" water line — Asphalt basketball court with color coat — Basketball equipment is furnished by Parks, installation only — Irrigation and landscape repair — Add Alternates; sidewalk, perimeter beam, bench 8 Highlights from General Conditions • Superintendent — Required on site during construction • Liquidated Damages — Substantial Completion $300/day, Final Completion $150/day • Warranty — Two year warranty period for all City projects • Construction Hours — 7:00 am to 6:00 pm; Need permission for weekend hours • Construction Surveying — Contractor's responsibility • Geotechnical and Materials Testing — Outlined in Section 01450 • Project Meetings — Pre -construction, Weekly progress meetings • Progress and Schedule Revisions — As needed 9 Questions 10 Site Visit ATTENDANCE RECORD PRE CONFERENCE Project: Bid #5913 BASKETBALL COURT AT CITY PARK Time: 10:OOA.M. Date: APRIL 12, 2005 Location: BASEBALL FIELDS AT OAK AND BRYAN AVE. NAME FIRM NAME ADDRESS TELEPHONE FAX # E-MAIL ADDRESS y� I 'tt� \O�riC CTl N® Fv Cods X, I$ I lc� , i`A-,>` ,�. LID�JtJAvt cY ,C.� -si 4+10 )Q iR l- 'J q /)`� _ fl¢ '�`J e4- ��+® GL No v- ea . �S �U1 06 j0", U1�bar C4�fl %0 0 S� l71- M 671- l`iiT «�,n s kro gal-��`t�t as -��07 sff�� 'get"