Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5913 BASKETBALL COURTSTECHNOLOGY CONSTRUCTORS INCOPPOPATED 14. Qualifications of Management PRESIDENT: Richard Lee Employment with Technology Constructors, Inc. since June 1, 1978 Degree: Bachelor of Science in Civil Engineering The State University of New York, Buffalo Graduated 1976. Certifications/Training: Class B License - Supervisor for Building Construction City & County of Denver Journeyman Drainlayer City and County of Denver Excavations and Confined Space Erosion Control Current responsibilities with Technology Constructors, Inc. include: 1. Overall company operations (a) Relationship with bonding & insurance company (b) Relationship with banker (c) Other relationships vital to Technology Constructors, Inc.'s operation (d) Company policy and procedures (e) Company budgets 2. Office operations 3. Oversee contracting (a) Preparation of bid (b) Preparation of subcontracts (c) Negotiations (d) Purchase of major material items (e) Compilation of job cost control information Experience prior to Technology Constructors, Inc. In the Denver area, Richard Lee worked as an Estimator and Project Manager for a small commercial construction company involved with: windmill tower erection, waste water treatment plant construction, diversion dam construction, park construction, commercial building, and commercial remodeling. He also worked as a Design Engineer for an engineering firm. Prior to graduation, he worked summers and part time as an electrician's helper, sheet -metal worker, and general laborer. 5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax TECHNC:> -rR� 5Y 7gCor, II°'•ICOPPORATEDProject 6. Contracts on hand Owner Gross Amount JOB rovements - Trench Drain and CRegion lCreek Transportation to ParkDis $746,965.68 IFB 34-DD-002 Platte Site Imp Creek Cherry University sicians, Inc.c $59,755 eo Parking Lot Construction at The Cherry University Physicians Median Closure Project CDOT-DKS Enterprises Inc $60$60 066.22 SHE R600-240 R-6 Signal Project City of 0tieton Littleton Historical Museum Walkway 13. Recently completed contracts: (also see #11) Job 2506 FL04-01-004 FL04-01-047 F, 08-03-6 2429 GLPF 207 CE20232 Project name Location Replacment Taft Park Bridge 8th Avenue Improvements -Greeley CO South 11th Avenue Entryway Landscape - Greeley, CO Messina Park Improvements Lakewood Link Skate Feature Development s, Windermere Street Bridge Highline Emergency Bridge Repair Project Breckenridge Transit Center -Phase I 2003 Traffic Signal Construction MTCE 04-012 Bega Park Site Improvements Dahlia Street Landscaped Median Project Downing/Cherry Creek DA i Bike Ramp Improvements R-4 Concrete Slab Replacement Project Owner City of Lakewood City of Greeley City of Greeley City of Federal Heights City of Lakewood City of Littleton Town of Breckenridge City of Littleton South Suburban Parks & Recreation City of Glendale City & County of Denver CO Dept of Transportation Gross Amount $44,478 $827,201 $470,929 $91,697 $168,796 $87,460 $306,382 $160,517 $75,432 $95,331 $264,199 $304,880 Completion Date 04/29105 05/21 /05 0411 rimer 04/30/05 04130/05 Completion Date 01 /21 /05 09/17/04 07/27/04 05/21 /04 05/13104 Location Type of construction nels and abutements on Replace concrete deck pa 2951 Simms Drive pedestrian bridge 8th Avenue, 7th to 10th Streetscape-concrete curbs, median cover, pavement, Street sidewalk, landscaping & irrigation, street lighting,signs i 1th Avenue, Hwy 34 to 25th Streetscape-concrete curbs, median itit onstreets ghting, signs sidewalk, landscaping g Pavilion, Street 2020 West 90th Avenue Recreation site improvement inc. benches, landscaping ramps, drainage system W. Mississippi and Reed St. Skatepark with bowls, walks, 01/17/04 Windermere St. S. of Ridgeview Dr. 11/01/03 N. Park Avenue & Watson Breckenridge 10/23/03 Belleview Avenue/Lowell Boulevard 06/20/03 W Main SUS Rio Grande St 02/01103 1000 Dahlia Street 11/21/03 Downing/Cherry Creek 07/25102 Various- hwy 85-Greeley; 125-Loveland Bridge repair and approach to bridge Curb, gutter, walk,& ramps, HDPE pipe, storm & sanitary sewer Concrete wall, curb & gutter, walk, pavement, bus pad, traffic signalization Earthwork, colored concrete, concrete design work Concrete curb, gutter, sidewalk, pavement Bike ramps and trails, box culvert and retaining wall Concrete pavement panels