HomeMy WebLinkAboutBID - 5911 MISCELLANEOUS CONCRETE PROJECT (8)City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
INVITATION TO BID
BID #5911
MISCELLANEOUS CONCRETE PROJECT
BID OPENING: APRIL 8, 2005, 100P.M. (our clock)
Sealed bids will be received and publicly opened at the office of the Director of Purchasing and
Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522,
at the time and date noted on the bid proposal and/or contract documents. If delivered, they are
to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the
address is P.O. Box 580, Fort Collins, 80522-0580.
Bids must be received at the Purchasing Office prior to 3:00p.m. (our clock), APRIL 8,
2005.
A copy of the Bid may be obtained as follows:
Download the Bid from the Purchasing Webpage, Current Bids page, at:
www.secure2.fcgov.com/purchasing.
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request
a copy of the Bid.
Special Instructions
All bids must be properly signed by an authorized representative of the company,with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour
set for closing. Once bids have been accepted by the City and closing has occurred, failure to
enter into contract or honor the purchase order will be cause for removal of supplier's name
from the City of Fort Collins' bidders list for a period of twelve months from the date of the
opening. The City may also pursue any remedies available at law or in equity. Bid prices must
be held firm for a period of forty-five (45) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications
contained in the City's specifications initially provided to the bidder. Any proposed modification
must be accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly
identified by the bid number and bid name contained in the bid proposal.
No proposal will be accepted from, or any purchase order awarded, to any person, firm or
corporation in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Bidders must be properly licensed and secure necessary permits wherever applicable.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
Mobilization — Invoices Under
Lump
626.01
$500
$
Sum
25
$
630.01
"NO PARKING" Sign With Stand
$
Per Day
375
$
Per Each
630.02
Vertical Panel Without Light
$
Per Day
50
$
Per Each
630.03
Channelizing Barrels
$
Per Day
50
$
Per Each
630.04
Type I Barricade Without Light
$
Per Day
750
$
Per Each
630.05
Type 11 Barricade Without Light
$
Per Day
20
$
Per Each
630.06
Type III Barricade Without Light
$
Per Day
20
$
Per Each
630.07
Size A Sign With Stand
$
Per Day
225
$
Per Each
630.08
Size B Sign With Stand
$
Per Day
20
$
Per Each
630.09
Size A Specialty Sign - Cost of
$
Each
2
$
Manufacturing
630.10
Size B Specialty Sign - Cost of
$
Each
2
$
Manufacturing
630.11
Cone With Reflective Strip
$
Per Day
375
$
Per Each
630.12
Safety Fence
$
Per Day
20
$
Per Roll
630.13
Light
$
Per Day
20
$
Per Each
630.14
Advance Warning Flashing - or
$
Per Unit
5
$
Sequencing Arrow Panel
Per Day
630.15
Variable Message Board
$
Per Unit
10
Per Day
630.16
Traffic Control Supervisor
$
Per Day
25
$
630.17
Traffic Control Supervisor
$
Per Hour
100
$
630.18
Flagging
$
Per Hour
150
$
10
FORCE ACCOUNT LABOR RATES
*Materials will carry a 10% markup from the original invoice for costs $500 and below, and an 8%
markup for invoices greater than $500
*Attach hourly Equipment/Operator rates to be used for Force Account work
FAl
Laborer
$
Hour
15
$
FA2
Foreman
$
Hour
15
$
FA3
Finisher
$
Hour
15
$
FA4
Form Setter
$
Hour
15
$
TOTAL COST $
Signed
Company
Check One:
Individual Doing Business in
Company Name
Corporation
Partnership
Dollars and Cents.
Address
Phone/Fax
11
SERVICES AGREEMENT
u�Lil�3il�l•1�i�7�
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and
Provider".
WITNESSETH:
hereinafter referred to as "Service
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Services to be Performed.
a. This Agreement shall constitute the basic agreement between the parties for
services for
The conditions set forth herein shall apply to all
services performed by the Service Provider on behalf of the City and particularly described in
Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, a
sample of which is attached hereto as Exhibit "A", consisting of (_ ) page[s], and
incorporated herein by this reference, shall include a description of the services to be
performed, the location and time for performance, the amount of payment, any materials to be
supplied by the City and any other special circumstances relating to the performance of
services. No workorder shall exceed $ . The only services authorized under this
agreement are those which are performed after receipt of such Work Order, except in
emergency circumstances where oral work requests may be issued. Oral requests for
emergency actions will be confirmed by issuance of a written Work Order within two (2) working
days.
SA WO January 2005
b. The City may, at any time during the term of a particular Work Order and without
invalidating the Agreement, make changes within the general scope of the particular services
assigned and the Service Provider agrees to perform such changed services.
2. Changes in the Work. The City reserves the right to independently bid any
services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing
within this Agreement shall obligate the City to have any particular service performed by the
Service Provider.
3. Time of Commencement and Completion of Services. The services to be
performed pursuant to this Agreement shall be initiated as specified by each written Work Order
or oral emergency service request. Oral emergency service requests will be acted upon without
waiting for a written Work Order. Time is of the essence.
4. Contract Period. [Option 1] This Agreement shall commence upon the date of
execution shown on the signature page of this Agreement and shall continue in full force and
effect for one (1) year, unless sooner terminated as herein provided. In addition, at the option of
the City, the Agreement may be extended for an additional period of one (1) year at the rates
provided with written notice to the professional mailed no later than 90 days prior to contract
end.
4. Contract Period. [Option 2] This Agreement shall commence 199_, and
shall continue in full force and effect until , 199, unless sooner terminated as herein
provided. In addition, at the option of the City, the Agreement may be extended for additional
one year periods not to exceed _ (_) additional one year periods. Renewals and pricing
changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley
CPIU published by the Colorado State Planning and Budget Office will be used as a guide.
Written notice of renewal shall be provided to the Service Provider and mailed no later than 90
days prior to contract end.
SA WO January 2005
5. Delay. If either party is prevented in whole or in part from performing its
obligations by unforeseeable causes beyond its reasonable control and without is fault or
negligence, then the party so prevented shall be excused from whatever performance is
prevented by such cause. To the extent that the performance is actually prevented, the Service
Provider must provide written notice to the City of such condition within fifteen (15) days from
the onset of such condition.
6. Early Termination by City/Notices. Notwithstanding the time periods contained
herein, the City may terminate this Agreement at any time without cause by providing written
notice of termination to the Service Provider. Such notice shall be mailed at least fifteen (15)
days prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this Agreement shall be effective when mailed, postage
prepaid and sent to the following address:
City
Service Provider
In the event of early termination by the City, the Service Provider shall be paid for
services rendered to the termination date, subject only to the satisfactory performance of the
Service Provider's obligations under this Agreement. Such payment shall be the Service
Provider's sole right and remedy for such termination.
7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed
price. The actual amount of work to be performed will be stated on the individual Work Orders.
The City makes no guarantee as to the number of Work Orders that may be issued or the actual
amount of services which will in fact be requested. No Work Order of or more shall be
issued.
SA WO January 2005
8. Payments. a. The City agrees to pay and the Service Provider agrees to accept
as full payment for all work done and all materials furnished and for all costs and expenses
incurred in performance of the work the sums set forth for the hourly labor rate and material
costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit
"B", consisting of (_) page[s], and incorporated herein by this reference.
b. Payment shall be made by the City only upon acceptance of the work by the City and
upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes,
supplies and materials, and other costs incurred in connection with the performance of such
work.
9. City Representative. The City's representative will be shown on the specific
Work Order and shall make, within the scope of his or her authority, all necessary and proper
decisions with reference to the work requested. All requests concerning this Agreement shall
be directed to the City Representative.
10. Independent Contractor. It is agreed that in the performance of any services
hereunder, the Service Provider is an independent contractor responsible to the City only as to
the results to be obtained in the particular work assignment and to the extend that the work shall
be done in accordance with the terms, plans and specifications furnished by the City.
11. Personal Services. It is understood that the City enters into the Agreement
based on the special abilities of the Service Provider and that this Agreement shall be
considered as an agreement for personal services. Accordingly, the Service Provider shall
neither assign any responsibilities nor delegate any duties arising under the Agreement without
the prior written consent of the city.
SA WO January 2005
12. Acceptance Not Waiver. The City's approval or acceptance of, or payment for
any of the services shall not be construed to operate as a waiver of any rights under the
Agreement or of any cause of action arising out of the performance of this Agreement.
13. Warranty.
(a) Service Provider warrants that all work performed hereunder shall be
performed with the highest degree of competence and care in accordance
with accepted standards for work of a similar nature.
(b) Unless otherwise provided in the Agreement, all materials and equipment
incorporated into any work shall be new and, where not specified, of the
most suitable grade of their respective kinds for their intended use, and all
workmanship shall be acceptable to City.
(c) Service Provider warrants all equipment, materials, labor and other work,
provided under this Agreement, except City -furnished materials,
equipment and labor, against defects and nonconformances in design,
materials and workmanshiplworkwomanship for a period beginning with
the start of the work and ending twelve (12) months from and after final
acceptance under the Agreement, regardless whether the same were
furnished or performed by Service Provider or by any of its subcontractors
of any tier. Upon receipt of written notice from City of any such defect or
nonconformances, the affected item or part thereof shall be redesigned,
repaired or replaced by Service Provider in a manner and at a time
acceptable to City.
14. Default. Each and every term and condition hereof shall be deemed to be a
material element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default thereof.
15. Remedies. In the event a party has been declared in default, such defaulting
party shall be allowed a period of ten (10) days within which to cure said default. In the event
the default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting
party commences legal or equitable actions against the defaulting party, the defaulting party
SA WO January 2005
shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees
and costs incurred because of the default.
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the
entire agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs,
personal representative, successors and assigns of said parties.
17. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save
harmless the City, its officers, agents and employees against and from any and all actions,
suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries
to or death of any person or persons, or damages to property arising out of, result from or
occurring in connection with the performance of any service hereunder.
b. The Service Provider shall take all necessary precautions in performing the work
hereunder to prevent injury to persons and property.
c. Without limiting any of the Service Provider's obligations hereunder, the Service
Provider shall provide and maintain insurance coverage naming the City as an additional
insured under this Agreement of the type and with the limits specified within Exhibit "D",
consisting of ( ) page[s], attached hereto and incorporated herein by this reference.
The Service Provider before commencing services hereunder, shall deliver to the City's Director
of Purchasing and Risk Management, 215 N. Mason, PO Box 580, Fort Collins, Colorado 80522
one copy of a certificate evidencing the insurance coverage required from an insurance
company acceptable to the city.
18. Entire Agreement. This Agreement, along with all Exhibits and other documents
incorporated herein, shall constitute the entire Agreement of the parties. Covenants or
representations not contained in this Agreement shall not be binding on the parties.
SA WO January 2005
19. Law/Severability, This Agreement shall be governed in all respect by the laws of
the State of Colorado. In the event any provision of this Agreement shall be held invalid or
unenforceable by any court of competent jurisdiction such holding shall not invalidate or render
unenforceable any other provision of this Agreement.
20. Special Provisions. [Optional] Special provisions or conditions relating to the
services to be performed pursuant to this Agreement are set forth in Exhibit _, consisting of
( ) page[s], attached hereto and incorporated herein by this reference.
SA WO January 2005
CITY OF FORT COLLINS, COLORADO
a municipal corporation
By:
James B. O'Neill II, CPPO
Director of Purchasing and Risk Management
Date:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Assistant City Attorney
[INSERT CORPORATIONS NAME] or
[Insert Partnership name] or
[Insert individual's name]
Doing business as [Insert name of business]
0
PRINT NAME
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:
ATTEST:
CORPORATE SECRETARY
SA WO January 2005
(Corporate Seal)
Bidders not responding to this bid will be removed from our automated vendor listing for the
subject commodities.
The City may elect where applicable, to award bids on an individual item/group basis or on a
total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or
reject any and all bids, and to waive any irregularities or informalities.
Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision -
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity, favor, entertainment, kickback or any items of monetary value from any person who
has or is seeking to do business with the City of Fort Collins is prohibited.
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All
freight charges must be included in prices submitted on proposal.
Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and
not entered as separate pricing on the proposal form.
Purchasing restrictions: your authorized signature of this bid assures your firm's compliance
with the City's purchasing restrictions. A copy of the resolutions is available for review in the
Purchasing Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and
reported to authorities as such. Your authorized signature of this bid assures that such bid is
genuine and is not a collusive or sham bid.
Bid results: for information regarding results for individual bids send a self-addressed,
self -stamped envelope and a bid tally will be mailed to you. Bid results will be posted in our
office 7 days after the bid opening.
es B. 'Neill 11, CPPO, FNIGP
ctor of Purchasing and Risk Management
2
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
DATED:
Work Order Number:
Purchase Order Number:
Project Title:
Commencement Date:
Completion Date:
Maximum Fee: (time and reimbursable direct costs):
Project Description:
Scope of Services:
Service Provider agrees to perform the
services identified above and on the
attached forms in accordance with the terms
and conditions contained herein and in the
Services Agreement between the parties. In
the event of a conflict between or ambiguity
in the terms of the Services Agreement and
this work order (including the attached
forms) the Services Agreement shall control.
Service Provider
By:
Date:
SA WO January 2005
Acceptance _
User
The attached forms consisting of (_)
pages are hereby accepted and
incorporated herein by this reference, and
Notice to Proceed is hereby given.
City of Fort Collins
By:
Date:
SECTION 02000
PROJECT SPECIFICATIONS
The Colorado Division of Highways "Standard Specifications for Road and Bridge Construction",
1999, and the current Larimer County "Urban Area Street Standards", (hereafter referred to as
the "Standard Specifications") are made a part of this Contract by this reference, except as
revised herein, and are hereby adopted as the minimum Standard Specifications of Compliance
for this project. In those instances where the Standard Specifications conflict with any of the
provisions of the preceding Sections, the preceding Sections shall govern.
INDEX OF REVISIONS
SECTION
104
Traffic and Parking Control
105
Cooperation Between Contractors
105
Inspection of Work
105
Maintenance During Construction
107
Protection and Restoration of Property and Landscape
201
Clearing and Grubbing
202
Removal of Structures and Obstructions
203
Excavation and Borrow
210
Reset Structures
212
Seeding, Fertilizer, and Sodding
304
Aggregate Base Course
403
Hot Bituminous Pavement —Temporary Patching
604
Inlets
608 & 609
Sidewalks, Curb and Gutter, Drive Approaches, Aprons, Crosspans, and
Concrete Pavement
608
Detectable Warnings
626
Mobilization
630
Traffic Control Devices
REVISION OF SECTION 104
TRAFFIC AND PARKING CONTROL
Section 104 of the Standard Specifications is hereby revised as follows:
Subsection 104.04 shall include the following.
It shall be the Contractor's responsibility to clear parking from the streets when such
parking will interfere with the work. Prior to work that requires the street(s) to be closed
to parking and/or traffic, the street(s) shall be posted for "NO PARKING". The placement
of these signs shall take place at least 24 hours prior to the commencement of work and
shall clearly show the type of work, and the day, date and times that the message on the
sign is in effect. (For example, if a street is to be patched on Wednesday, July 2, the
street shall be posted no later than Tuesday, July 1, by 7:00 a.m. with a sign that reads
similar to "NO PARKING, WEDNESDAY, JULY 2, 7:00 A.M. TO 6:00 P.M., PATCHING.)
See sample "NO PARKING" sign. "NO PARKING" signs shall remain in place until the
street is opened to traffic and all clean up operations completed.
All information on the "NO PARKING" signs, with the exception of the date, shall be in
block letters permanently affixed to the sign. Any information added to a sign, such as
dates, shall be clearly legible and written in block style letters.
Any work done by the Contractor without traffic control will not be paid for under the
terms of this Contract. The Contractor will not be paid for traffic control costs incurred
during Contractor caused delays.
At or near the end of each work day, a representative of the Contractor, the Traffic
Control Supervisor, and the City Representative will meet to discuss the progress of the
work and the placement of traffic control devices including "NO PARKING" signs. Any
necessary adjustments shall be made. The Contractor shall also review at this time with
the City Representative the proposed means of handling parking and traffic control for
upcoming work. It is the responsibility of the Contractor to minimize any inconvenience to
the public as a result of this work.
At the above referenced meeting, the quantity of traffic control devices used that day
shall be agreed upon by the Contractor and the City Representative. The Contractor
shall utilize forms approved by the City for the tabulation of Traffic Control Devices
utilized.
The Contractor shall maintain access at all times to all businesses within the project.
Any changes in the traffic control, including additional signs, barricades, and/or flaggers
needed in the field shall be immediately implemented as directed by the City
Representative.
The cost for traffic control is covered in "Revision of Section 630, Traffic Control Devices"
found herein.
Project Specifications
Page 1 of 33
NO
PARKING
Md July 7
70000 AM - 60000 PM
PATCHING
:00jz/
Project Specifications
Page 2 of 33
REVISION OF SECTION 105
COOPERATION BETWEEN CONTRACTORS
Section 105 of the Standard Specifications is hereby revised as follows:
Subsection 105.07 shall include the following:
Concrete construction and/or reconstruction operations at intersections may involve the
destruction and replacement of traffic signal loop detectors. The existing traffic signal
loop detectors shall be removed by the contractor at no additional cost. New loop
detectors may be installed at other intersections where they do not now exist. New and
replacement loop detectors will be installed by the City Traffic Division. The Contractor
shall cooperate with the schedule of this work to insure the timely installation of new loop
detectors.
Also, the Contractor shall coordinate with the City Traffic Division to insure that any
cleanup required after the installation of the loop detectors will be completed before
concrete placement operations begin.
Project Specifications
Page 3 of 33
REVISION OF SECTION 105
INSPECTION OF WORK
Section 105 of the Standard Specifications is hereby revised as follows:
Subsection 105.11 shall include the following:
The Contractor shall keep the City Representative informed of his future construction
operations to facilitate scheduling of required inspection, measuring for pay quantities,
and sampling. The Contractor shall notify the City Representative a minimum of 24 hours
in advance of starting any construction operation that will require inspection, measuring
for pay quantities, or sampling. Failure of the Contractor to provide such notice will
relieve the owner and the City Representative from any responsibility for additional costs
or delays caused by such failure.
Inspection of the work or materials shall not relieve the Contractor of any of his
obligations to fulfill his contract as prescribed. Work and materials not meeting
specifications shall be corrected and unsuitable work or materials may be rejected,
notwithstanding that such work or materials have been previously inspected by the City
Representative or that payment therefore has been included in the progress estimate.
Project Specifications
Page 4 of 33
REVISION OF SECTION 105
MAINTENANCE DURING CONSTRUCTION
Section 105 of the Standard Specifications is hereby revised as follows:
Subsection 105.14 shall include the following:
The roadway area, including curb, gutter, and sidewalk, adjacent to and through the
construction area shall be cleaned of debris by the Contractor at the earliest opportunity,
but in no case shall the area be left unclean after the completion of the day's work. It
shall be the Contractor's responsibility to provide the necessary manpower and
equipment to satisfactorily clean the roadway area.
The Contractor shall utilize a combination of pick-up brooms, side brooms and/or other
equipment as needed to clean the streets. All sweeping and clean up equipment shall be
approved by the City Representative prior to the commencement of work.
The Contractor shall maintain the streets during the construction process as prescribed
above.
If a street requires additional sweeping by City forces, the Owner shall deduct from
compensation due the Contractor sufficient funds to cover the Owner's cost to provide
said service.
All cost of maintaining the work during construction and before the project is accepted will
not be paid for separately, but shall be included in the work.
Project Specifications
Page 5 of 33
REVISION OF SECTION 107
PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE
Section 107 of the Standard Specifications is hereby revised as follows:
Subsection 107.12 shall include the following:
The fact that any underground facility - sprinkler systems, utility services, etc. - is not
shown on the plans, details or construction documents shall not relieve the Contractor of
his responsibilities as provided for in the Contract. It shall be the Contractor's
responsibility, pursuant thereto, to ascertain the location of such underground
improvements which may be subject to such damage by reason of his operations.
Any pruning of vegetation shall require the written permission of the property owner
and/or the City Representative.
If the area to be repaired is five (5) inches or less in width, the Contractor shall
clean the area of all debris (i.e. concrete, road base, etc.) to a minimum depth of
four (4) inches, prepare all edges to be clean and vertical, and place (see below)
and compact topsoil. The topsoil shall be compacted utilizing a hand operated
roller or other method approved by the City Representative.
For concrete repair locations, the placement of topsoil (backfill) shall be completed
within two (2) working days of the placement of the concrete.
The topsoil shall consist of loose friable loam reasonably free of admixtures of subsoil,
refuse, stumps, roots, rocks, brush, weeds, heavy clay, hard clods, toxic substances or
other material which would be detrimental to the proper development of vegetative
growth. The material to be utilized shall be approved by the City Representative prior to
placement.
The topsoil shall be in a relatively dry state and placed during dry weather. The topsoil
shall be fine graded to eliminate rough and low areas and ensure positive drainage. The
existing levels, profiles and contours shall be maintained.
If any portion of the area to be repaired is greater than five (5) inches in width, the
Contractor shall clean and prepare the area along the entire length of the repair location
as stated above to a minimum of one (1) foot, place sod over the entire area, water once,
and notify the property owner in writing of the nature of the work that has taken place and
that the sod will be watered only once.
If the area to be repaired is only damaged on the surface, the Contractor shall remove
the damaged areas of sod to a depth that will allow new sod to be placed, place new sod,
water once and notify the property owner in writing of the nature of the work that has
taken place and the fact that the sod will be watered only once. The minimum overall
width of the area to be sodded shall be one (1) foot.
For concrete repair locations, the placement of sod shall be completed by the end
of the first working day of the week following the placement of the concrete.
Sprinkler systems - Sprinkler systems designated for relocation shall be capped off at the
limits of construction and protected from damage by the contractor. Sprinkler heads shall
be salvaged and stockpiled on each property for use when reconstructing the sprinkler
systems.
Project Specifications
Page 6 of 33
REVISION OF SECTION 107
PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE
Sprinkler systems damaged outside of the construction limits as a result of construction
operations shall be replaced at the Contractor's expense, within three (3) working days
from the date of damage. In areas where the City Representative directs new work or the
reconstruction areas require grade adjustment, the placement of topsoil, sod and
sprinkler relocation will be provided by the City under separate contract.
All landscaping that is damaged due to construction operations shall be replaced by the
Contractor at his expense unless a written waiver is obtained from the property owner
and submitted to the City Representative. Re -sodded lawns shall be watered once by
the Contractor.
All costs for protecting and restoring landscaping and lawns shall be considered a
subsidiary obligation of the Contractor in connection with the various items of the Work,
and no measurement or payment shall be made separately for the protection and
restoration of landscaping and lawns. All restoration of landscaping and lawns damaged
by construction operations, other than concrete repair, shall take place within three (3)
working days from the date of damage.
In areas where the City Representative directs new work or the reconstruction
areas require grade adjustment, the placement of topsoil, sod, and sprinkler
relocation will be provided by the City under separate contract.
All labor, materials, tools, equipment, incidentals, and work involved in protecting or
repairing underground facilities shall be considered incidental to the work being done and
shall not be measured and paid for separately.
Project Specifications
Page 7 of 33
REVISION OF SECTION 201
CLEARING AND GRUBBING
Section 201 of the Standard Specifications is hereby revised as follows:
Subsection 201.03 shall be amended to include the following:
When any tree roots are encountered during construction operations, the Contractor shall
notify the City Representative prior to any root removals. The City Representative and
the City Forester's representative shall then make a determination regarding removal.
Tree roots shall be removed with a sharpened, sanitized saw, cut orthogonally to its
longitudinal axis as closely as practical, to leave the freshly cut root surface in a clean
and smooth condition. Axes, or other blunt objects shall not be used to cut tree roots.
Where it is anticipated that tree roots may be encountered, great care shall be taken by
the Contractor to prevent any damage to the roots with tools or equipment.
All costs for removing tree roots shall be considered a subsidiary obligation of the
Contractor in connection with the various items of the Work, and no measurement or
payment shall be made separately for the removal of tree roots.
Project Specifications
Page 8 of 33
CITY OF FORT COLLINS
BID PROPOSAL
BID #5911
MISCELLANEOUS CONCRETE PROJECT
BID OPENING: APRIL 8. 2005, 3:00 p.m. (our clock)
WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS
FOR MISCELLANEOUS CONCRETE PROJECT PER THE BID INVITATION AND ANY
REFERENCED SPECIFICATIONS:
The Contractor must provide all equipment, labor and materials deemed necessary to remove,
haul, backfill, compact, install and patch concrete curb, gutter, sidewalk, pedestrian access
ramps, concrete pavement, aprons, crosspans, trails, and inlets for various City departments.
Needed services during the contract period will be requested through issuance of work orders.
There is no guaranteed minimum amount of services to be ordered. No work order exceeding
$50,000 will be issued. The City reserves the right to supply any or all materials. This contract
is a one year contract beginning May 1, 2005, with 4 optional years to renew and shall be
administered by the Engineering Department, but may and will be utilized by other City
Departments.
SCOPE OF WORK
GENERAL
A. This bid will be for various jobsites, as required by City Departments and should
not be construed as one site. Each jobsite will be based on isolated locations
which are separated by more than 1 city block. Needed services during the
contract period will be requested through issuance of work orders. No work order
exceeding $50,000 will be issued.
B. The Contractor must provide all labor, materials and equipment, including traffic
control and barricading to accomplish the work in accordance with City standard
specifications. Replacement of curb, gutter and sidewalk shall match existing,
i.e., vertical curb shall be replaced with vertical curb, etc., or as directed by
Engineer or Project Manager.
C. Contractor must maintain a local telephone number, and must be able to be
reached by telephone and facsimile transmissions during prescribed business
hours (8 hours per each 24 hour working period - Monday through Friday).
Contractor will respond to all City non -emergency telephone transmissions in a
reasonable time (Generally meaning within 24 hours on the next working day).
2. COMPLIANCE STANDARDS
A. Contractor must refer to City of Fort Collins Design and Construction Criteria,
Standards and Specifications for Streets, Sidewalks, Alleys and Other Public
3
REVISION OF SECTION 202
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Section 202 of the Standard Specifications is hereby revised as follows:
Subsection 202.01 is revised to include the following:
This work consists of sawing and cutting to facilitate controlled breaking, and removal of
concrete and asphalt.
Subsection 202.02 is revised to include the following:
Sawing of concrete and asphalt shall be done to a true line, with a vertical face, unless
otherwise specified.
Subsection 202.11 is revised to include the following:
Sawing shall be measured by the lineal foot. This item shall only be used where the City
Representative directs sawing not already being paid under another item.
Sawcutting related to the removal items described herein shall be considered a
subsidiary obligation of the Contractor, and shall not be measured or paid for
separately.
Subsection 202.12 is revised to include the following:
Payment will be made under:
Pay Item
Unit
202.01
Sawcut Concrete/Asphalt (0" - 4")
LF
202.02
Sawcut Concrete/Asphalt (4" - 6")
LF
202.03
Sawcut Concrete/Asphalt (6" - 8")
LF
202.04
Sawcut Concrete/Asphalt (8" - 10")
LF
202.05
Sawcut — Additional 1" Depth
LF/Inch
202.06
Remove Concrete Sidewalk
SF
202.07
Remove Concrete Curb and Gutter
LF
202.08
Remove Monolithic Curb, Gutter and Sidewalk
SF
202.09
Remove Concrete Driveway/Apron/Crosspan
SF
202.10
Remove Concrete Pavement - 10"
SF
202.11
Remove Concrete Pavement
Additional 1" Depth
SF
202.12 Remove Asphalt — 6"
202.13 Remove Asphalt
SF
Project Specifications
Page 9 of 33
Additional 1" Depth
202.14 Remove Inlet
SF
Each
202.15 Remove and Haul Driveway Fillet Each
The above prices and payments shall include full compensation for furnishing all labor,
materials, tools, equipment, and incidentals and for doing all work involved in Removal of
Structures and Obstructions as specified in these specifications, as shown on the plans,
and as directed by the City Representative.
Project Specifications
Page 10 of 33
REVISION OF SECTION 203
EXCAVATION AND BORROW
Section 203 of the Standard Specifications is hereby revised as follows:
Subsection 203.01 is revised to include the following:
This work shall consist of removing and disposing of the existing base or other material,
preparing the subgrade for the subsequent course, and placing borrow in accordance
with the specifications and in reasonably close conformity with the lines, grades, and
typical cross sections shown on the plans or as designated by the City Representative.
All excavation will be classified "General Excavation", as hereafter described. The
Contractor shall be responsible for disposal of all excavated material.
Subsection 203.05 is revised to include the following:
General Excavation shall consist of the excavation of all materials of whatever character
required for the work not being removed under some other item.
Subsection 203.09 is revised to include the following:
The Contractor shall be responsible for the protection of the subgrade/base course until
subsequent courses have been placed.
The excavation will be accomplished in the following manner:
General Excavation:
The areas to be removed will be marked on the surface by the City Representative with
paint. If, in the opinion of the City Representative, the subgrade material is unsuitable, it
shall be removed to the limits and depths designated.
Where excavation to the finished grade section results in a subgrade of unsuitable soil,
the City Representative may require the Contractor to remove the unsuitable materials
and backfill to the finished grade section with approved material.
After the material has been removed to the depth specified by the City Representative,
the Contractor shall prepare the subgrade by compacting with a sheepsfoot roller, rubber
tired roller and/or other compaction equipment as approved by the City Representative.
The subgrade preparation shall not be measured and paid for separately, but shall be
included in the contract unit price for General Excavation.
Borrow:
Borrow shall be placed as directed by the City Representative. The cost for compaction
shall be included in the Contract Unit Price for Borrow.
The material required for a specific location shall be Class 1 Pit Run or other material as
directed by the City Representative
Borrow will be paid by the ton at the proper moisture. Haul and water necessary to bring
mixture to optimum moisture content will not be measured or paid for separately, but shall
be included in the contract unit price for Borrow.
Load slips shall be consecutively numbered for each day, and submitted to the City
Representative daily.
Project Specifications
Page 11 of 33
REVISION OF SECTION 203
EXCAVATION AND BORROW
Subsection 203.17 shall include the following:
The Contractor and the City Representative shall field measure and agree upon the
excavated quantity before any further work continues. Should the Contractor fail to
request the City Representative to measure any work and perform other work that would
prevent the City Representative from measuring pay quantities, the Contractor shall not
be compensated for materials not measured by the City Representative.
The accepted quantities of Excavation will be paid for at the contract unit price per cubic
yard. Subgrade preparation, haul and disposal will not be measured and paid for
separately.
The accepted quantities of Borrow will be paid for at the contract unit price per ton.
Compaction and haul will not be measured and paid for separately.
Subsection 203.18 shall include the following:
Payment will be made under:
Pay Item
Unit
203.01
Excavation — General Less Than 50 CY
CY
203.02
Excavation — General Over 50CY
CY
203.03
Excavation — Walls Only
CY
203.04
Excavation — New Inlet
Each
203.05
Borrow - Less Than 100 Ton
Ton
203.06
Borrow — Over 100 Ton
Ton
The above prices and payments shall include full compensation for furnishing all labor, materials,
tools, equipment, and incidentals, and for doing all the work involved in Excavation and Borrow
including haul, stockpiling, placing material, watering or drying soil, compaction, proof rolling,
finish grading and disposal of unusable materials, as shown on the plans, as specified in these
specifications, and as directed by the City Representative.
Project Specifications
Page 12 of 33
REVISION OF SECTION 210
RESET STRUCTURES
Subection 210.01 is revised to include the following:
This work consists of adjusting manholes and valve boxes, and removing and resetting or
adjusting brick pavers and related materials. All pavers shall be carefully removed,
stored, reinstalled, or adjusted in a manner that will avoid loss or damage.
Subsection 210.02 is revised to include the following:
Cutting of pavers, when necessary, shall be accomplished with a double bladed splitter or
a masonry saw. The saw shall be a "wet saw" type saw to inhibit dust when cutting the
pavers. Pavers shall be cut such that tight spaced joints are maintained.
The Contractor shall spread the bedding sand evenly in the area defined and shall screed
the sand to an appropriate embedment depth as shown on the plans or as directed by the
City Representative. Sufficient sand should be placed to stay ahead of laid pavers.
The Contractors shall use a plate vibrator to embed the pavers into the sand. The size
and type of plate vibrator shall be in accordance with manufacturer's recommendations,
or as directed by the City Representative. All pavers that are damaged during
embedment shall be replaced at the Contractor's expense.
Joint spacing between paver units shall be in accordance with the manufacturer's
recommendations, or as approved by the City Representative. Joints shall be filled
completely with joint sand. Excess sand shall be removed by sweeping.
The unit price for this line item shall include all work associated with resetting the brick
pavers, including grading, compacting, and sand.
Subsection 210.05 is revised to include the following
Payment will be made under
Pay Item Unit
210.01 Reset Brick Pavers SF
210.02 Adjust Manhole Each
210.03 Adjust Valve Box Each
The above prices and payment shall include full compensation for furnishing all labor,
materials, tools, equipment, and incidentals, and for doing all the work involved in Reset
Brick Pavers, complete -in -place, including compaction and materials, as shown on the
plans, as specified in these specifications, and as direction by the City Representative.
Project Specifications
Page 13 of 33
REVISION OF SECTION 212
SEEDING, FERTILIZER AND SODDING
Section 212 of the Standard Specifications is hereby revised as follows:
Subsection 212.01 is revised to include the following:
This work shall consist of soil preparation and furnishing and placing topsoil and blue
grass sod in accordance with these specifications, accepted horticulture practice, and in
reasonably close conformity with the locations and details shown on the plans or as
designated. This work shall not include locations of concrete repair in which grade
changes and additional work does not occur. See "Protection and Restoration of
Property and Landscape" found herein.
Subsection 212.02 is revised to include the following:
Topsoil Topsoil shall conform to the requirements of "Protection and Restoration of
Property" found herein.
Sod Bluegrass sod shall be nursery grown, 99% Kentucky Blue Grass and 99%
weed free. Other sod type may be used only if approved in writing by the City
Representative. The 1% allowable weeds shall not include any undesirable
perennial or annual grasses or plants. Soil thickness of sod cuts shall not be
less than 3/4 inch nor more than one inch. Sod shall be cut in uniform strips
with minimum dimensions of 12 inches in width and 48 inches in length. The
Contractor shall submit a sample of the sod he proposes to furnish. Said
sample shall serve as a standard. Any sod furnished, whether in place or not,
that is not up to the standard of the sample may be rejected. Sod that has
been cut for more than 24 hours shall not be used.
Each load of sod shall be accompanied by a certificate from the grower
stating the type of sod, and the date and time of cutting.
Subsection 212.05 is revised to include the following:
Sodding
(a) Soil Preparation. The area shall be cleaned with a minimum depth of four (4) inches
(where topsoil does not exist) and a minimum width of one (1) foot, all
irregularities in the ground surface shall be removed, and all edges clean and
vertical. Sticks, stones, debris, and other similar material more than '/2 inch in
diameter shall be removed. Any objectionable depressions or other variances
from a smooth grade shall be corrected.
(b) Topsoil Placement. Topsoil shall be placed and compacted with a minimum depth of
four (4) inches. The amount of compaction required shall be as directed by the
City Representative.
(c) Sod Placement. The minimum width for sod shall be one (1) foot. The area to be
sodded shall be smooth. The sod shall be laid by staggering joints with all edges
touching. On any slopes, the sod shall run approximately parallel to the slope
contours. The Contractor shall water the sod once and notify the property owner
in writing of the nature of the work that has taken place and that the sod will only
be watered once.
Sod placement/replacement required due to Contractor negligence shall follow the
requirements of this section but will not be measured and paid for under the terms of this
contract.
Project Specifications
Page 14 of 33
REVISION OF SECTION 212
SEEDING, FERTILIZER AND SODDING
Subsection 212.08 is revised to include the following:
No measurement for payment shall be made for re -sodding lawn damaged by the
Contractor adjacent to new concrete, when the grade of the existing lawn reasonably
matches the grade of the new concrete. Re -sodding in this instance shall be considered
incidental to the work being performed.
In areas where the City Representative directs new work or the reconstruction
areas require grade adjustment, the placement of topsoil, sod, and sprinkler
relocation will be provided by the City under separate contract.
All labor, materials, tools, equipment, incidentals, water, and work involved in Seeding,
Fertilizer and Sodding shall be considered incidental to the work being done and shall not
be measured and paid for separately.
Project Specifications
Page 15 of 33
REVISION OF SECTION 304
AGGREGATE BASE COURSE
Section 304 of the Standard Specifications is hereby revised as follows:
Subsection 304.02 is revised to include the following:
Aggregate Base Course shall meet the grading requirements for Class 5. Recycled asphalt or
recycled concrete may be substituted for Aggregate Base Course at any time as directed by the
City Representative.
Subsection 304.07 is revised to include the following:
Aggregate Base Course will be measured by the ton at the proper moisture. Haul and water
necessary to bring mixture to optimum moisture content will not be measured and paid for
separately, but shall be included in the contract unit price for Aggregate Base Course.
Subsection 304.08 is revised to include the following:
Aggregate Base Course used for incidentals such as temporary patching, wash pits, form board
reinforcement, and storm water protection will not be measured and paid for under this item, but
shall be considered incidental to the work.
Failure to protect open excavations, or any other use not directly related to the Work, shall not be
measured or paid for separately but shall be included in the Work.
Load slips shall be consecutively numbered for each day, and submitted to the City
Representative daily.
The accepted quantities for Aggregate Base Course will be paid for at the contract unit price per
ton.
Payment will be made under:
Pay Item
Unit
304.01 Aggregate Base Course Ton
The above prices and payments shall include full compensation for furnishing all labor, materials,
tools, equipment, and incidentals and for doing all work involved in the placement of Aggregate
Base Course, complete -in -place, including haul and water, as shown on the plans, as specified in
these specifications, and as directed by the City Representative.
Project Specifications
Page 16 of 33
REVISION OF SECTION 403
HOT BITUMINOUS PAVEMENT —TEMPORARY PATCHING
Section 403 of the Standard Specifications is hereby revised as follows:
In all concrete repair locations, the Contractor shall remove no more than six (6) inches of asphalt
pavement. The pavement areas shall be temporarily patched with a minimum of two (2) inches of
hot mix asphalt, up to a maximum depth of six (6) inches. These locations shall be paid under
the Contract Unit Price for Temporary Patching.
Subsection 403.04 is revised to include the following:
Temporary Patching will be measured by the ton. Pavement cutting, excavation, subgrade
preparation, haul, disposal, and bituminous materials will not be measured or paid for separately,
but shall be included in the contract price for Temporary Patching.
Load slips shall be consecutively numbered for each day and shall include the batch time.
Subsection 403.05 is revised to include the following:
The accepted quantities for Temporary Patching will be paid for at the Contract Unit Price per
Ton.
Payment will be made under:
Pay Item Unit
403.01 Temporary Asphalt Patching Ton
The above prices and payments shall include full compensation for furnishing all labor, materials,
tools, equipment, and incidentals and for doing all the work involved in Temporary Patching,
including pavement cutting, excavation, haul, disposal, surface preparation, and bituminous
materials, complete -in -place, as shown on these plans, as specified in these specifications, and
as directed by the City Representative.
Project Specifications
Page 17 of 33
REVISION OF SECTION 604
INLETS
Section 604 of the Standard Specifications is hereby revised as follows:
Subsection 604.01 is revised to include the following:
This work shall consist of the removal and replacement of existing inlets or inlet decks, and
installation of new inlets in accordance with these specifications, and in reasonably close
conformity with the lines and grades shown on the plans or established by the City
Representative.
Subsection 604.05 is revised to include the following:
As part of the "Reconstruct Inlet Deck" items, the concrete around the inlet as marked shall be
removed and hauled from the site. The existing frame, grate, and angle iron face shall be
salvaged and reused in the reconstruction of the inlet deck. All reinforcing steel encountered
during removal shall be replaced with new steel of the grade and size as shown on the detail
found herein.
Reconstruct Inlet Deck shall include the deck reconstruction of existing inlets, including two, three
and a half foot (3.5') transitions, measured from inside face of box, on each side. Inlets with
openings greater than those defined on the detail shall be paid for as Reconstruct Inlet Deck, per
each, plus Inlet Deck - Additional Opening, per lineal foot.
Subsection 604.07 is revised to include the following:
When concrete is to be removed and replaced around an existing grate without disturbing the
deck or box, this shall not constitute Reconstruct Inlet Deck. These locations shall be measured
and paid for separately under the items described in Revision of Sections 608 and 609 -
Sidewalks, Curb and Gutter, Drive Approaches, Aprons and Crosspans found herein.
Subsection 604.08 is revised to include the following:
Payment will be made under:
Pay Item
Unit
604.01 Reconstruct Inlet Deck — Catch Basin
Remove and Replace Each
604.02 Reconstruct Inlet Deck — Catch Basin
Additional Foot Opening — Remove and Replace Lineal Foot
604.03 Reconstruct Curb Inlet Deck —4' Opening
Remove and Replace Each
604.04 Reconstruct Curb Inlet Deck
Additional Foot Opening — Remove and Replace Lineal Foot
604.05 Area Inlet
604.06 Type R Inlet — 5' Opening
Project Specifications
Page 18 of 33
Each
Each
Ways, July 1996, for this project. These documents are available from the City
Engineering Department.
B. The Contractor must submit concrete mix designs for approval by the City
Engineering Department prior to starting work. The City may require the
Contractor to use rapid set concrete.
C. The Contractor must be licensed with the City of Fort Collins and shall comply
with all applicable Federal, State and Local Laws and regulations for the duration
of the contract.
D. All asphalt patching shall be performed in accordance with the current City
specifications and by a contractor licensed with the City of Fort Collins.
3. SERVICE AGREEMENT AND INSURANCE
A. Contractor must enter into the attached services agreement and provide the
required insurance (Exhibit "B"). This agreement is effective for one year from
the date on the service agreement. At the option of the City, the Agreement may
be extended for additional one year periods not to exceed four (4) additional one
year periods. Pricing changes shall be negotiated by and agreed to by both
parties and may (unless approved in writing) not exceed the Denver - Boulder
CPI-U as published by the Colorado State Planning and Budget Office. Written
notice of renewal shall be provided to the Service Provider and mailed no later
than ninety (90) days prior to contract end.
4. WORK ORDER PROCEDURE
A. All job estimates must be submitted on a unit price basis consistent with the
prices established in the Bid Schedule section.
B. Contractor will invoice for all jobs completed on a unit price basis with the prices
established in the Bid Schedule section.
C. Work order number must be included on the billing invoices.
D. All jobs must begin within a ten (10) day period following issue of a work
order.
Each work order shall be signed and returned to the issuing department within 48
hours. If the low responsive, responsible bidder cannot meet this performance
specification, the City has the right to offer the project to the next lowest
responsive, responsible bidder according to prices listed from their submitted bid
schedule. Exceptions to this policy will be made for inclement weather
preventing a timely response by the Contractor (a one -day extension for each
day of bad weather will be given), or a previous understanding between the
Contractor and the City's departmental representative allowing more flexibility
with regard to the individual project. It will be the Contractor's responsibility to
make these arrangements with the City's representative.
0
REVISION OF SECTION 604
INLETS
604.07 Type R Inlet - Additional Foot Opening Lineal Foot
604.08 Combination Type 13 Curb Inlet
Frame, Grate and Adjustable Curb Bonnet
(East Jordan Iron Works 7030 or equivalent) Each
604.09 Concrete Sidewalk Culvert Each
604.10 Metal Sidewalk Culvert 5/8" Plate Each
604.11 Additional Square Foot 5/8" Plate Square Foot
Expansion joint material shall be installed every 500' in long runs and between new structure slabs and
existing concrete slabs, where called for, and around fire hydrants, poles, inlets, sidewalk underdrains,
mid -block ramps, radius points at intersections, and other fixed objects, i.e. ends of sidewalk slabs and
curbs. Expansion joint material must be set vertical and installed in accordance with the CDOT M&S
Standards for Concrete Pavement Joints. The joint shall be edged with a suitable edging tool and sealed
in accordance with CDOT Section 412.18. Expansion and caulking shall be paid under Item 608.53
Expansion and Sealing.
The above prices and payments shall include full compensation for furnishing all labor, materials, tools,
equipment, and incidentals and for doing all work involved in Inlets, including demolition, disposal,
reinforcement and replacement, complete -in -place, as specified in these specifications, as shown on the
plans, and as directed by the City Representative.
Project Specifications
Page 19 of 33
REVISION OF SECTION 608 & 609
SIDEWALKS, CURB AND GUTTER, DRIVE APPROACHES, APRONS,
CROSSPANS, RAMPS AND CONCRETE PAVEMENT
Sections 608 and 609 of the Standard Specifications are to be deleted and replaced with the Larimer
County Urban Area Street Standards, October 2002, except as noted herein.
Monolithic hybrids of curb, gutter, sidewalk and highback vertical curb and gutter will be replaced using
the same configuration as it was originally installed, unless a flaw in its engineering should become
apparent. In these cases the design may be modified by the City Representative.
The finished exposed surface and edging of the concrete will match as closely as possible the surface
treatment of the surrounding existing concrete.
The mix designs for all types of concrete to be utilized shall be determined by the Contractor and
submitted to the City Representative and approved a minimum of one week prior to the beginning of
construction.
Cement used shall conform to the Standard Specification for Portland Cement, ASTM C 150-85,
AASHTO M85, Type I, Type 1/11, or Type III.
The air content shall be four (4) to seven (7) percent.
"High Early" concrete shall be used for all concrete repair locations. "High Early" concrete shall
have a specified compressive strength of 4000 psi and a minimum 48 hour compressive strength of 3000
psi. The type of concrete used for a particular location shall be approved by the City Representative.
See also Section 2.05, 'Rigid Pavement Design', and Section 4.2.4., 'Concrete Streets', of the City of Fort
Collins Design Criteria and Standards for Streets."
Water Reducing Agents shall conform to ASTM C 494-82.
Accelerating Agents shall conform to ASTM C 494-82. Calcium Chloride shall not be utilized as an
accelerating agent.
The Contractor shall furnish a load slip containing the information required by AASHTO M157, Section
13, Subsection 13.1 and 13.2, with each batch of concrete. In addition, the type of concrete (mix code)
shall be shown on each load slip. Concrete delivered without a load slip containing complete information
as specified will be subject to rejection.
In locations where concrete pavement is replaced, the new pavement shall have a minimum thickness of
7" or a thickness of 1" thicker than the existing adjacent pavement slab. Existing pavement shall be saw
cut to obtain a straight and neat edge for paving and shall be deep enough to cut through the entire
pavement thickness. All joints shall be sealed with an asphalt filler compound, or approved equal.
Joint sealing of concrete pavement will not be measured and paid for separately, but shall be
considered incidental to the concrete pavement item. Additional sealing of undisturbed pavement
may be required, and will be paid for under the Joint Sealing item. The top of the new pavement
shall be even with the existing concrete pavement. The concrete shall be consolidated with a mechanical
vibrator. All construction joints shall be doweled except for expansion joints and joints along
existing curb and gutter.
The maximum spacing for transverse joints in crosspans and concrete pavement shall be ten (10) feet.
Curing materials shall be white pigmented liquid linseed oil based or paraffin based curing compound,
and shall conform to ASTM Specification C 309-81 Type 11, Class B. The application rate for curing
Project Specifications
Page 20 of 33
REVISION OF SECTION 608 & 609
SIDEWALKS, CURB AND GUTTER, DRIVE APPROACHES, APRONS,
CROSSPANS, RAMPS AND CONCRETE PAVEMENT
compound shall be 150 sq. ft./gal. for all concrete. The curing compound shall be applied immediately
upon completion of the finishing.
Restoration of landscape shall be in accordance with "Revision of Section 107 - Protection and
Restoration of Property and Landscape" found herein. The time frame for restoration shall be within two
(2) working days from the time the concrete was placed for backfill with topsoil, and by no later than the
end of the first working day of the following week for sod replacement.
The Contractor shall be responsible for the protection of the subgrade/base course until the concrete is
placed.
The Contractor shall protect the concrete against moisture loss, rapid temperature change, rain, flowing
water, mechanical injury, pedestrian and vehicular traffic, and Contractor's equipment for a minimum of
36 hours after the placement of curing compound for 48 hour high early concrete. Concrete blankets
shall be used when the temperature is expected to fall to 320F or below within 36 hours after
placement of curing compound for 48 hour high early concrete. Asphalt patching against fresh
concrete shall not be permitted during the time frames for protection of concrete stated above.
The debris immediately adjacent to a concrete repair location shall be completely cleaned up on the work
day following the placement of the concrete. If required, the concrete shall be protected as stated above.
Any damage caused during the cleanup process shall be the Contractor's responsibility.
The Contractor shall utilize forms approved by the City Representative for the tabulation of concrete
quantities.
Payment will be made under:
Pay Item
Unit
608.01
Driveover Curb, Gutter and 4" Sidewalk
LF
608.02
Driveover Curb, Gutter and 6" Sidewalk
LF
608.03
Driveover Curb and Gutter, No Sidewalk
LF
608.04
Driveover Curb, Gutter and 6" Drive Approach
LF
608.05
Vertical Curb, Gutter and 4" Sidewalk
LF
608.06
Vertical Curb, Gutter and 6" Sidewalk
LF
608.07
Vertical Curb and Gutter - No Sidewalk
LF
608.08
Vertical Curb, Gutter and 6" Drive Approach
LF
608.09
Vertical Curb, Gutter and Drive Approach — No Sidewalk
LF
608.10 Out Fall Curb and Gutter
LF
608.11 Hollywood Curb, Gutter and 4" Sidewalk LF
Project Specifications
Page 21 of 33
REVISION OF SECTION 608 & 609
SIDEWALKS, CURB AND GUTTER, DRIVE APPROACHES, APRONS,
CROSSPANS, RAMPS AND CONCRETE PAVEMENT
608.12
Hollywood Curb, Gutter and 6" Sidewalk
LF
608.13
Hollywood Curb and Gutter - No Sidewalk
LF
608.14
Hollywood Curb, Gutter and Drive Approach
LF
608.15
Highback Curb and Gutter - No Sidewalk
LF
608.16
Highback Curb, Gutter and Drive Approach
LF
608.17
Barrier Curb — 6" x 18"
LF
608.18
Barrier Curb — Key Way Style
LF
608.19
Barrier Curb — Epoxy
LF
608.20
Mountable Curb — 12" x 18"
LF
608.21
Mountable Curb — Key Way Style
LF
608.22
Mountable Curb — Epoxy
LF
608.23
Pedestrian Access Ramp, Driveover Curb
LF
608.24
Pedestrian Access Ramp, Vertical Curb
LF
608.25
Pedestrian Access Ramp, Hollywood Curb
LF
608.26
Pedestrian Access Ramp, Highback Curb
SF
608.27
Truncated Dome Panel
SF
608.28
Apron - 8"
SF
608.29
Crosspan — 8"
SF
608.30
Valley Pan — 6"
SF
608.31
Flatwork - 4"
SF
608.32
Flatwork - 6"
SF
608.33
Replace Flatwork - 1" Additional Depth
SF
608.34
Concrete Pavement - 8" (Joints Sealed)
SF
608.35
Alley Approach - 8"
LF
608.36
Enhanced Crosswalk — 10" Tile Red
SF
Project Specifications
Page 22 of 33
REVISION OF SECTION 608 & 609
SIDEWALKS, CURB AND GUTTER, DRIVE APPROACHES, APRONS,
CROSSPANS, RAMPS AND CONCRETE PAVEMENT
608.37 Enhanced Crosswalk — 10" San Diego Buff SF
608.38 Enhanced Crosswalk — 10" Brick Red, Stamped SF
608.39 Colored Trail with Fibermesh — 5" Yosemite Brown SF
608.40 Mow Strip — 4" x 12"
LF
608.41 Splashblock — 4" Exposed Aggregate SF
608.42 Splashblock — 4" San Diego Buff
SF
608.43 Media Cover-4" San Diego Buff SF
608.44 Fibermesh — Added to Any Item, Additional Charge LB/CY
608.45 24 Hour High Early Concrete
Added to Any Item, Additional Charge CY
608.46 Stamp Pattern — Added to Any Item, Additional Charge SF
608.47 6" Concrete Bollard Each
608.48 8" Concrete Bollard Each
608.49 Flowable Fill CY
608.50 Non -reinforced Concrete Wall — 8" SFF
608.51 Non -reinforced Concrete Footer — 8" SF
608.52 Concrete Staining/Sealing SF
608.53 Expansion and Sealing LF
608.54 Joint Sealant LF
Removal of existing concrete shall be paid for separately under Section 202 "Removal of
Structures and Obstructions."
"Pedestrian Access Ramp, Highback Curb," shall be measured by the square foot. The length shall be
measured from the lip of the gutter to the top of the transition at the back of the ramp, and the width shall
be measured at the midpoint.
"Highback Curb, Gutter and Drive Approach" and "Alley Approach" shall include 4 feet behind the back of
the curb, and shall be measured in the flow line from the point of curvature on each radius.
Concrete Bollards shall be constructed of steel pipe of the specified diameter, placed 36" deep into firm
soil, and filled with concrete. The top of the bollard shall be finished with a smooth, domed top. The
height above ground shall not exceed 54". All materials, concrete, pipe, drilling, and compaction will not
be measured or paid for separately, but shall be included in the cost of the related bollard item.
Project Specifications
Page 23 of 33
REVISION OF SECTION 608 & 609
SIDEWALKS, CURB AND GUTTER, DRIVE APPROACHES, APRONS,
CROSSPANS, RAMPS AND CONCRETE PAVEMENT
All pedestrian access ramps shall be equipped with truncated domes. The ramp items shall include all
concrete, labor, and equipment necessary to construct the ramp, not including the truncated domes.
Truncated Dome Panels shall be measured and paid for separately under the "Truncated Dome Panel"
item, and shall include all labor, materials, and surface preparation to supply and place the panels at
pedestrian access ramps and other locations as directed by the City Representative. The type of
Truncated Dome Panels to be used shall be submitted to the City Representative for approval prior to
installation. The Truncated Dome Panels shall be red, pre -fabricated concrete, and shall meet all ADA
requirements.
Expansion joint material shall be installed every 500' in long runs and between new structure slabs and
existing concrete slabs, where called for and around fire hydrants, poles, inlets, sidewalk underdrains,
mid -block ramps, radius points at intersections, and other fixed objects, i.e. ends of sidewalk slabs and
curbs. Expansion joint material must be set vertical and installed in accordance with the CDOT M&S
Standards for Concrete Pavement Joints. The joint shall be edged with a suitable edging tool and sealed
in accordance with CDOT Section 412.18. Expansion and sealing will be paid for under item 608.53
Expansion and Sealing, except in the case of concrete pavement, where the sealing is considered
incidental to the work.
Concrete washout/truck washout shall be contained in such a manner that no visual evidence of cement
or aggregate spoils remains on the site. In addition, direct washout to curb and gutter flow lines or inlet
structures is prohibited. Washout may be accomplished by use of a designated spoils/base pile, or an
identified off -site location. Other methods shall be submitted for approval by the City Representative.
Flagstone sidewalk shall be salvaged to the maximum extent feasible. All flagstones shall become the
property of the City of Fort Collins and shall be hauled by the contractor and delivered to the City's site
located at 1500 Hoffman Mill Road. This item will not be measured or paid for separately, but shall be
considered incidental to the related removal item.
The above prices and payments shall include full compensation for furnishing all labor, materials, tools,
equipment, and incidentals, and for doing all the work involved in Sidewalks, Curb & Gutter, Drive
Approaches, Aprons, Crosspans, and Concrete Pavement, complete -in -place, including removal, haul
and disposal, as shown on the plans, as specified in these specifications, and as directed by the City
Representative.
Project Specifications
Page 24 of 33
REVISION OF SECTION 608
DETECTABLE WARNINGS
Section 608 of the Standard Specifications is hereby revised for this project as follows:
Subsection 608.01 shall include the following:
This work includes the installation of detectable warnings on concrete curb ramps at the locations
shown in the plans and in accordance with the plans.
Subsection 608.02 shall include the following:
Detectable warnings on curb ramps shall be red, prefabricated concrete mats, and shall meet all
Americans with Disabilities Act (ADA) requirements for truncated domes. The type of Truncated
Dome Panels to be used shall be submitted to the City Representative for approval prior to
installation.
The domes and the underlying surface shall have a minimum of 70% contrast with the light
reflectivity of the adjoining surface. The contrast shall be verified using the following equation:
Contrast — Bi B2 x 100
Bi
Where Bi = Light Reflectance Value (LRV) of the lighter area
B2 = LRV of the darker area
Absolute black and white will not be permitted.
Subsection 608.03 shall include the following:
If domes and mats are used, they shall be aligned to create a square grid in the predominant
direction of travel as shown in the plans.
The concrete surface to which truncated dome mats are to be applied shall be prepared in
accordance with manufacturer's recommendations. Material requirements, color and application
shall be in accordance with manufacturer's recommendations and as approved by the City
Representative.
Project Specifications
Page 25 of 33
REVISION OF SECTION 626
MOBILIZATION
Section 626 of the Standard Specifications is hereby revised as follows:
Subsection 626.01 shall be revised as follows:
This work consists of the mobilization of personnel, equipment and supplies at the project site in
preparation for work on the project in the event the total invoice, excluding traffic control, does not
exceed $500.
Subsection 626.02 shall be revised as follows:
Mobilization shall be considered a subsidiary obligation of the contractor and will not be
measured and paid for separately except where the total cost of the concrete repairs, excluding
traffic control, does not exceed $500.
Payment will be made under:
Pay Item
Unit
626.01 Mobilization — Invoices Under $500 Lump Sum
Project Specifications
Page 26 of 33
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
Section 630 of the Standard Specifications is hereby revised as follows:
Subsection 630.15 shall be revised as follows:
This work shall consist of furnishing, installing, moving maintaining and removing temporary traffic
signs, advance warning arrows panels, barricades, channelizing devices, and delineators as
required by the latest revision of the "Manual on Uniform Traffic Control Devices for Streets and
Highways" (MUTCD), the City of Fort Collins "Work Area Traffic Control Handbook", and the
Larimer County Urban Area Street Standards.
In the event of a conflict between the MUTCD criteria and the City's criteria, the City's criteria
shall govern.
When a device is not in use, the Contractor shall remove it from the project for the period it is not
needed. Devices temporarily not in use shall, as a minimum, be removed from the area. Moving
will include devices removed from the project and later returned to use. Payment shall be made
for the maximum number of each type of traffic control device being used at one given time per
day.
Traffic control devices shall be placed and/or stored in the City right-of-way in such a manner that
minimizes the hazards to pedestrians, bicyclists and vehicles.
Traffic control devices shall be removed from the site immediately upon completion of the
work.
Subsection 630.16 shall include the following:
All traffic control devices placed for this project must meet or exceed the minimum standards set
forth in the MUTCD. All traffic control devices shall be clean and in good operating condition
when delivered and shall be maintained in that manner on a daily basis. All traffic control devices
shall be clearly marked and free of crossed out information or any other form of defacement that
detracts from the purpose for which they are intended (i.e. crossed out information, information
written in long -hand style, etc.)
Additionally, any sign blank with sign faces on both sides must have the back sign face covered
when in use to avoid confusion to motorists traveling in the opposite direction and other
potentially affected parties, such as residents affected by any information the sign may present.
Subsection 630.20 shall be revised as follows:
Traffic control through the construction areas is the responsibility of the Contractor.
For all locations, a Traffic Control Plan shall be prepared. The Traffic Control Plans shall be
submitted for approval to the Traffic Division by 8:00 a.m., two working days prior to the
commencement of work. (Note: Traffic Control Plans for work done on Monday and Tuesday
shall be submitted the previous Friday by 8:00 a.m.) Full road closure plans shall be submitted
no later than Friday mornings by 10:00 a.m. for projects starting the following week. All plans
shall be delivered to the Traffic Division, 626 Linden Street, Fort Collins, CO 80521. Facsimiles
of plans shall not be allowed. No phase of the construction shall start until the Traffic Control
Plan has been approved. Failure to have an approved Traffic Control Plan shall constitute cause
for the City to stop work, as well as the Contractor's forfeiture of payment for all work and
Project Specifications
Page 27 of 33
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
materials at that location, with no adjustment in the contract time. The cost for preparing and
submitting the traffic control plan shall be included in the contract unit price for Traffic Control
Supervisor.
All costs associated with Traffic Control Plan review will not be measured or paid for separately,
but shall be considered incidental to the Work.
The Traffic Control Plan shall include, as a minimum, the following:
(1) A detailed diagram which shows the location of all sign placements, including advance
construction signs (if not previously approved) and speed limit signs; method, length and
time duration for lane closures, and location of flag persons.
(2) A tabulation of all traffic control devices shown on the detailed diagram including, but not
limited to: construction signs; vertical panel; vertical panel with light; Type I, Type ll, and
Type III barricades; cones; drum channelizing devices; advance warning flashing or
sequencing arrow panel. Certain traffic control devices may be used for more than one
operation or phase. However, all devices required for any particular phase must be
detailed and tabulated for each phase.
(3) Number of flaggers to be used.
(4) Parking Restrictions to be in affect.
Approval of the proposed method of handling traffic is intended to indicate those devices for
which payment is to be made. Such approval does not relieve the Contractor of liability
specifically assigned to him under this contract.
Subsection 630.21 shall be revised as follows:
Traffic Control Management shall be performed by a Traffic Control Supervisor (TCS). The
TCS(s) shall possess a current American Traffic Safety Services Association (ATSSA)
certification as a Worksite Traffic Control Supervisor or Colorado Contractor's Association (CCA)
certification as a Traffic Control Supervisor. (Proof of certification shall be presented to the City
Traffic Control Manager, and when requested by a City representative, for each TCS utilized on
this project.)
The TCS shall be on site at all times during the construction when payment is made under the
contract unit price for Traffic Control Supervisor per day. When the TCS is being paid under the
TCS per hour item, time spent on site may be modified by the City Representative, as needed,
based on the size and complexity of the project, location of work, duration of the project, traffic
factors, weather, and roadway characteristics.
The TCS shall be equipped with a cellular phone. The cost of this phone shall be incidental to the
day or hour pay unit for TCS.
The TCS's duties shall include, but not be limited to:
Project Specifications
Page 28 of 33
5. PATCHING REQUIREMENT
A. All concrete placed adjacent to asphalt pavement will require
placement of a hot mix asphalt patch, unless otherwise directed by the City
Engineer's office. The minimum length shall be one (1) foot longer than the
concrete replacement. Asphalt next to new crosspans and aprons shall be
sawcut a minimum of 30 inches from the new concrete, and asphalt next to new
curb and gutter shall be sawcut a minimum of 24 inches from the new concrete
so that the patching crew can provide a clean, effective patch. Patching limits
shall be determined by the City Engineer, or his representative, and shall meet
current City of Fort Collins patching standards for limits and depth. The
Contractor shall patch the asphalt before removing the barricades and within
seven (7) days of the placement of the concrete curb and gutter. If cold weather
does not allow for a hot mix asphalt patch, the Contractor shall place a temporary
asphalt patch and maintain the patch until a hot mix patch can be installed.
6. INSPECTION
A. It shall be the Contractor's responsibility to notify the City Engineer, or their
representative, that the work is ready for inspection. Every request for inspection
shall be made at least twenty-four (24) hours before inspection is desired. Any
work completed by the Contractor and not inspected and accepted by the City
engineer's office shall be removed and replaced at the Contractor's expense.
7. AWARD
A. Prices bid shall be based upon Project Specifications and shall be each Bidder's
responsibility to familiarize themselves with the complexities involved for each
type before entering a bid. Payment will be processed by City Departments upon
the presentation of invoicing.
B. Award of this bid will be made in the best interest of the City. Evaluations will be
completed using the estimated quantities given, times the unit price.
8. TRAFFIC CONTROL
A. All traffic control, work zone protection, and/or parking control and permits shall be
the responsibility of the Contractor, and provided in accordance with the latest
revisions of the "Manual on Uniform Traffic Control Devices for Streets and
Highways" (MUTCD), the City of Fort Collins "Work Area Traffic Control Handbook",
and the attached revisions of Sections 104 and 614, Traffic and Parking Control and
Traffic Control Devices respectively.
+7
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
(1) Preparing, revising and submitting Traffic Control Plans as required. (Review fees will
not be measured or paid for separately, but shall be considered incidental to the Work.)
(2) Direct supervision of project flaggers.
(3) Coordinating all traffic control related operations, including those of the Subcontractors
and suppliers.
(4) Coordinating project activities with appropriate police and fire control agencies, Transfort,
school districts and other affected agencies and parties prior to construction. Typed hand
delivered notification to all businesses and residents at least 24 hours prior to
construction. (The notification of residents and businesses may be accomplished by a
representative of the TCS.)
(5) Maintaining a project traffic control diary which shall become part of the City's project
records.
(6) Inspecting traffic control devices on every calendar day for the duration of the project
(7) Insuring that traffic control devices are functioning as required.
(8) Overseeing all requirements covered by the plans and specifications which contribute to
the convenience, safety and orderly movement of traffic.
(9) Flagging.
(10) Setting up traffic control devices.
Notification of residents and businesses shall be the responsibility of the TCS and shall consist of
distributing letters indicating the nature of the work to be completed, any special instructions to
the residents (i.e. limits on lawn watering during concrete pouring, etc.), the dates and times of
the work, and the parking and access restrictions that will apply, as well as thorough information
placed on "NO PARKING" signs. Sample letters will be provided by the City Representative and
shall be distributed prior to the commencement of each phase of the work. Letters shall be
submitted with the Traffic Control Plans for approval. Approved letters shall be distributed a
minimum of 24 hours prior to the commencement of work. (Note: The time frame criterion for
distributing letters is the same as for posting "NO PARKING" signs.) The cost for preparing
and distributing the letters shall be included in the cost for TCS.
Traffic control management shall be maintained on a 24 hour per day basis. The Contractor shall
make arrangements so that the Traffic Control Supervisor or their approved representative will be
available on every working day, "on call" at all times and available upon the City Representative's
request at other than normal working hours. All costs associated with "on call" service, excluding
actual hours worked, shall be included in the contract unit price for Traffic Control Supervisor.
The TCS's will be paid only for days the Contractor works, and as directed by the City
Representative. On weekends and other days the Contractor is not working, the TCS will not be
paid. Time spent maintaining signs on the weekends, holidays, bad weather days, and
other days the Contractor does not work shall be included in the unit prices for the
equipment. Time spent setting up equipment, modifying equipment, maintaining
Project Specifications
Page 29 of 33
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
equipment, and picking up equipment shall be included in the unit prices for the
equipment.
All traffic control devices shall be placed under the supervision of a Traffic Control Supervisor.
The Traffic Control Supervisor shall have up to date copies of the City of Fort Collins' 'Work Area
Traffic Control Handbook", and Part VI of the MUTCD, pertaining to traffic controls for street and
highway construction, available at all times.
Subsection 630.23 shall be revised as follows:
Quantities to be measured for construction traffic control devices shall be the number of units of
the various sizes and descriptions listed below:
Construction Traffic Signs: Size A Signs - 0.01 to 9.00 Square Feet
Size B Signs - 9.01 to 16.00 Square Feet
"NO PARKING" Sign with Stand will be measured and paid for separately and not included in the
item for Size A Signs. "NO PARKING" Sign with Stand shall consist of a metal sign attached to a
device (stand) such as a Vertical Panel or Type I Barricade. The sign material and stand shall be
approved by the City Representative. The sign material and stand will not be measured and paid
for separately but shall be included in the Contract Unit Price for "NO PARKING" Sign with Stand.
The cost for "NO PARKING" Sign with Stand shall include delivery, rental, setup,
modification, maintenance, and pickup.
"NO PARKING" signs must remain in place until the street is open to traffic. The "NO PARKING"
signs shall be in effect for one or two days only.
Traffic channelizing devices consisting of vertical panel, cones, or drum channelizing devices will
be measured by the unit. Barricade warning lights shall be measured and paid for separately if
approved by the City Representative. Advance Warning Flashing or Sequencing Arrow Panels
will be measured by the unit.
The number of Traffic Control Supervisors shall be approved by the City Representative prior to
each days work. The quantity to be measured for Traffic Control Supervisor will be the number of
authorized days performed by the Traffic Control Supervisor or his approved representative. An
authorized day shall be any day, or portion of a day, authorized by the City Representative, that
construction operation would require a Traffic Control Supervisor. "On Call" and project
inspections on all other days will not be measured and paid for separately but shall be included in
the work.
The cost for setting up equipment, modifying equipment, maintaining equipment, and picking up
equipment (not including "NO PARKING" Sign with Stand) during authorized days shall be
included in the Contract Unit Price for Traffic Control Supervisor.
If a TCS(s) is used for an authorized day, but not for the entire day, the TCS shall be paid at the
Contract Unit Price for "Traffic Control Supervisor" at the per hour rate.
The quantity to be measured for flagging will be the total number of hours that flagging is actually
used as authorized. Hours of flagging in excess of those authorized shall be at the Contractor's
Project Specifications
Page 30 of 33
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
expense. Flagger breaks shall be included in the Contract Unit Price for Flagging. The method
for covering flagger breaks shall be approved by the City Representative.
Flagging outside of the construction work hours will not be paid for under the terms of this
contract unless authorized in writing by the City Representative.
Flagger stand-by time will not be paid for under the terms of this contract.
In locations where traffic control is set up and the work is not performed due to Contractor caused
delays, the traffic control shall not be paid for under the terms of this contract. The costs for
advance warning "NO PARKING' signs for periods in excess of 24 hours prior to the
advancement of work, including those instances when said signs have been changed or
otherwise updated to reflect current schedules, will not be paid for under the terms of this contract
unless authorized by the City Representative in writing. In addition, the Owner shall deduct from
compensation due the Contractor $10.00 for each traffic control device per day for said
conditions, including "NO PARKING' signs and any signs which are not removed from the site
immediately upon completion of the work.
Subsection 630.24 shall be revised as follows:
The cost for Traffic Control Devices, not including "NO PARKING' Sign with Stand, shall include
delivery, rental, and pickup. The cost for setting up equipment, modifying equipment, and
maintaining equipment will be paid for under the Contract Unit Price for TCS as described above.
The cost for "NO PARKING' Sign with Stand shall include delivery, rental, setup, modification,
maintenance, and pickup.
Payment shall be full compensation for furnishing, erecting, maintaining, moving, removing and
disposing of construction traffic control devices necessary to complete the work. All construction
traffic control devices which are not permanently incorporated into the project will remain the
property of the Contractor.
The accepted quantities will be paid for at the contract unit price for each of the pay items listed
below:
Pay Item Unit
630.01 "NO PARKING' Sign with Stand Per Day Per Each
630.02 Vertical Panel Without Light Per Day Per Each
630.03 Channelizing Barrels Per Day Per Each
630.04 Type I Barricade Without Light Per Day Per Each
630.05 Type II Barricade Without Light Per Day Per Each
630.06 Type III Barricade Without Light Per Day Per Each
630.07 Size A Sign With Stand Per Day Per Each
Project Specifications
Page 31 of 33
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
630.08 Size B Sign With Stand Per Day Per Each
630.09 Size A Specialty Sign
Cost of Manufacturing Each
630.10 Size B Specialty Sign
Cost of Manufacturing
Each
630.11 Cone With Reflective Strip
Per Day Per Each
630.12 Safety Fence
Per Day Per Roll
630.13 Light
Per Day Per Each
630.14 Advance Warning Flashing or
Sequencing Arrow Panel
Per Unit Per Day
630.15 Variable Message Board
Per Unit Per Day
630.16 Traffic Control Supervisor
Per Day
630.17 Traffic Control Supervisor
Per Hour
630.18 Flagging Per Each Per Hour
The initial manufacturing will be paid for Specialty Signs per unit and the actual use paid for under
the appropriate unit cost for Size A or Size B sign. This item shall apply to new signs only. Once
manufactured, they may be used throughout the project. Upon completion of the work, the
Specialty Signs shall be returned to the Contractor.
Flagger hand signs will not be measured and paid for separately, but shall be included in the
work.
The flaggers shall be provided with electronic communication devices when required. These
devices will not be measured and paid for separately, but shall be included in the work.
The cost of batteries, electricity and/or fuel for all lighting or warning devices will not be paid for
separately but will be considered subsidiary to the item.
Sand bags will not be measured and paid for separately, but shall be included in the work.
The Contractor may provide larger construction traffic signs than those typically used in
accordance with the MUTCD, if approved; however, payment will be made for the typical panel
size.
The City shall not be responsible for any losses or damage due to theft or vandalism
Project Specifications
Page 32 of 33
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
SPECIAL CONDITIONS FOR WORK ON ARTERIALS AND COLLECTORS
NOTE: CROSS STREET TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS AUTHORIZED
BY THE CITY REPRESENTATIVE IN WRITING.
NOTE: FULL CLOSURES ON ARTERIALS AND COLLECTORS, INCLUDING THOSE LISTED ABOVE,
WILL BE ALLOWED UNDER EXTREME CIRCUMSTANCES AND ONLY UPON APPROVAL OF
THE CITY REPRESENTATIVE. PLANS SHALL BE APPROVED A MINIMUM OF ONE WEEK
PRIOR TO THE COMMENCEMENT OF WORK AND/OR THE TIME REQUIRED TO
ADEQUATELY NOTIFY THE PUBLIC THROUGH THE MEDIA.
SPECIAL CONDITIONS FOR WORK ON RESIDENTIAL STREETS
NOTE: FULL CLOSURES ON ALL RESIDENTIAL STREETS SHALL BE ALLOWED AS SHOWN ON
THE TRAFFIC CONTROL PLANS.
Project Specifications
Page 33 of 33
John Stephen - Misc Concrete Page 1
From: Erika Keeton
To: John Stephen
Date: 4/18/2005 3:09:42 PM
Subject: Misc Concrete
John, please find attached the bid comparison for the Miscellaneous Concrete Bid No 5911. Express
Concrete is the apparent low bidder. I found 3 mistakes on the Express bid tab, and I have highlighted
them in yellow on the attached spreadsheet. They are:
202.15 Remove Driveway Fillets $50/unit x 5 Units = $50.00, total cost should read $250.00
608.40 Mow Strip - 4x12 $8.50/1-F x 500 LF = $1,275.00, total cost should read $4,250.00
608.44 Fibermesh - Added to Any Item, Additional Charge $4.95 Ib/cy x 100 cy = $247.50, total cost
should read $495.00
The revised total bid for Express should read $316,315.25, instead of the submitted $316,067.75.
In addition, there was a sum error on the Vogel Concrete bid, the total cost of the bid should read
$381,860.30, instead of the submitted total of $377,776.55. These corrections do not affect the outcome
of the bid, as Express is still the apparent low bidder. The bid prices are reasonable and I recommend
award to Express Concrete Inc.
CC: Rick Richter
SECTION 00330 CITY OF FORT COLLINS
BID SCHEDULE MISCELLANEOUS CONCRETE PROJECT
BID NO.5911
ITEM
NO
DESCRIPTION
UNIT PRICE
UNIT
ESTIMATED
QUANTITY
TOTAL COST
202.01
Sawcut Concrete/Asphalt = 4"
$ 2.10
LF
25
$ 52.50
202.02
Sawcut Concrete/Asphalt 4" = 6"
$ 2.60
LF
25
$ 65.00
202.03
Sawcut Concrete/Asphalt 6" = 8"
$ 3.25
LF
25
$ 8 L25
202.04
Sawcut Concrete/Asphalt 8" = 10"
$ 4.50
LF
25
$ 112.50
202.05
ISawcut- Additional l" Depth
$ 0.75
LF
25
$ 18.75
202.06
Remove Concrete Sidewalk
$ 2.25
SF
1500
$ 3,375.00
202.07
Remove Concrete Curb and Gutter
$ 3.40
LF
250
$ 850.00
202.08
Remove Monolithic Curb, Gutter & Sidewalk
$ 2.30
SF
250
$ 575.00
202.09
Remove Concrete Driveway.%Apron/Crosspan
$ 2.45
SF
750
$ 1,837.50
202.10
Remove Concrete Pavement - 10"
$ 3.80
SF
500
$ 1,900.00
202.11
Remove Concrete Pavement - Additional I" Depth
$ 0.40
SF
50
$ 20.00
202.12
Remove Asphalt - 6"
$ 2.10
SF
250
$ 525.00
202.13
Remove Asphalt -Additional l"Depth
$ 0.40
SF
50
$ 20.00
202.14
Remove Inlet
$ 525.00
EA
5
S 2,625.00
202.15
Remove and Haul Driveway Fillets
$ 50.00
EA
5
$ 250.00
203.01
Excavation - General Less Than 50 CY
$ 60.00
CY
150
$ 9,000.00
203.02
Excavation - General Over 50 CY
$ 54.45
CY
150
$ 8,167.50
203.03
Excavation - Walls Only
$ 11.00
CY
I00
$ I.I00.00
203.04
Excavation - New Inlet
$ 400.00
EA
5
$ 2,000.00
203.05
Borrow - Less than 100 Ton
$ 30.00
TON
75
$ 2,250.00
203.06
Borrow - Over 100 Ton
$ 26.00
TON
75
$ 1,950.00
210.01
Reset Brick Pavers
$ 7.50
SF
185
$ 1,387.50
210.02
Adjust Manhole
$ 125.00
EA
10
$ 1,250.00
210.03
lAdjustValveBox
$ 115.00
EA
10
Is 1.150.00
304.01 1 Aggregate Base Course Is 24.00 1 TON 150 $ 3.600.00
403.01 Temporary Asphalt Patching $ 80.00 1 TON 1 100 1 $ 8.000.00
602.01
Reinforcing Steel
is 0.40
LB
500
$ 200.00
602.02
Reinforcing Steel -Epoxy Coated
$ 0.78
LB
500
Is 390.00
604.01
Reconstruct Inlet Deck - Catch Basin (R&R)
$ 1,000.00
EA
5
$ 5,000.00
604.02
Reconstruct Inlet Deck - Additional Foot Opening (R&R)
$ 165.00
LF
10
$ 1.650.00
604.03
Reconstruct Curb Inlet Deck - 4' Opening (R&R)
$ 1.650.00
EA
5
$ 8.250.00
604.04
Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R)
$ 165.00
LF
10
S 1,650.00
604.05
Area Inlet
$ 1..000.00
EA
5
$ 5,000,00
604.06
Type R Inlet - 5' Opening
$ 1.700.00
EA
5
$ 8,500,00
604.07
Type R Inlet - Additional Foot Opening
$ 220,00
LF
5
$ 1,100.00
604.08
Combination Type 13 Curb Inlet - Frame. Grate & Adjustable Curb
Bonnet (East Jordan Ironworks 7030 or Equivalent)
$ 1.450.00
EA
5
$ 7 250.00
604.09
Concrete Sidewalk Iulverl
$ 350.00
EA
5
$ 1.750,00
604.10
Metal Sidewalk Culvert - 2' Opening, 5l8" plate
$ 1.150.00
EA
10
$ 11.500.00
604.11
Additional Square Foot 518" Plate
$ 100.00
SF
10
$ L000.00
608.01
Dtiveover Curb, Gutter & 4" Sidewalk
$ 17,50
LF
1.000
Is 17,500.00
608.02
Dtiveover Curb, Gutter & 6" Sidewalk
$ 19.50
LF
1.000 -
Is 19.500.00
608.03
Driveover Curb and Gutter- No Sidewalk
$ I5.00
LF
125
$ 1,875.00
Pagel of3
SECTION 00330 CITY OF FORT COLLINS
BID SCHEDULE MISCELLANEOUS CONCRETE PROJECT
BID NO. 5911
ITEM
NO
DESCRIPTION
UNIT PRICE
UNIT
ESTIMATED
QUANTITY
TOTAL COST
608.04
Driveover Curb, Gutter and 6" Drive Approach
$ 21.00
LF
200
$ 4.200.00
608.05
Vertical Curb, Gutter and 4" Sidewalk
$ 19.50
LF
300
$ 5,850.00
608.06
Vertical Curb, Gutter and 6" Sidewalk
$ 21.50
LF
100
$ 2,150.00
608.07
Vertical Curb and Gutter - No Sidewalk
$ 15.80
LF
500
$ 7,900.00
608.08
Vertical Curb, Gutter and Drive Approach
$ 22.00
LF
150
$ 3-300.00
608.09
Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk
$ 16.50
LF
75
$ L237.50
608.10
Out Fall Curb & Gutter
$ 15.00
LF
100
$ 1,500.00
608.11
Hollywood Curb, Gutter and 4" Sidewalk
$ 14.50
LF
250
$ 3,625.00
608.12
Hollywood Curb, Gutter and 6" Sidewalk
$ 15.50
LF
250
$ 3,875.00
608.13
Hollywood Curb and Gutter - No Sidewalk
$ 12.50
LF
75
$ 937.50
608.14
Hollywood Curb, Gutter and Drive Approach
$ 15.85
LF
150
$ 2,377.50
608.15
Highback Curb and Gutter - No Sidewalk
$ 22.50
LF
500
$ 11,250.00
608.16
Highback Curb, Gutter and Drive Approach
$ 24.50
LF
150
$ 3,675D0
608.17
Barrier Curb - 6" x 18"
$ I8.00
LF
150
$ 2,700.00
608.18
Barrier Curb - Key Way Style
$ 2I.00
LF
150
$ 3,150.00
608.19
Barrier Curb - Epoxy
$ 17.00
LF
150
$ 2,550.00
608.20
Mountable Curb - 12" x 18"
LF
150
$ 2,850.00
608.21
Mountable Curb - Key Way Style
LF
150
$ 3.300.00
608.22
Mountable Curb - Epoxy
r$g20.00
LF
150
$ 3.000.00
50823
Pedestrian Access Ramp, Driveover Curb
LF
150
$ 4275.00
608.24
Pedestrian Access Ramp, Vertical Curb
27.50
LF
100
$ 2J50.00
608.25
Pedestrian Access Ramp, Hollywood Curb
$ 22.50
LF
150
$ 3,375.00
608.26
Pedestrian Access Ramp, Highback Curb
$ 5.50
SF
375
$ 2,062.50
608.27
Truncated Dome Panel
$ 40.00
SF
100
S E000.00
608.28
Apron - 8"
$ 5.00
SF
500
$ 2,500.00
608.29
Crosspan-8"
$ 4.25
SF
750
$ 3,187.50
608.30
Valley Pan - 6" Depth
$ 5.75
SF
350
$ 2,012.50
608.31
Flatwork - 4"
$ 2.45
SF
4-000
$ 9,800.00
608.32
Flatwork-6"
$ 2.95
SF
1,500
$ 4,425.00
608.33
Replace Hatwork - 1" Additional Depth
$ 0.48
SF
250
$ 120.00
608.34
Concrete Pavement 8" (Joints Sealed)
$ 4.22
SF
1,500
$ 6.330.00
608.35
Alley Approach - 8"
$ 4.50
LF
100
$ 450.00
608.36
Enhanced Crosswalk - 10" Tile Red
$ 9.00
SF
150
$ 1,350.00
608.37
Enhanced Crosswalk - 10" San Diego Buff
$ 8.50
SF
150
$ 1.275.00
608.38
Enhanced Crosswalk - 10" Brick Red, Stamped
$ 10.75
SF
150
S 1.612.50
608.39
Colored Trail with Fibermesh - 5" Yosemite Brown
$ 3,60
SF
500
$ 1,800.00
608.40
Mow Strip - 4" x 12"
$ 8.50
LF
500
$ 4.250.00
608.41
Splashblock - 4" Exposed Aggregate
$ 5.00
SF
500
$ 2,500.00
608.42
Splashblock-4" San Diego Buff
$ 5,25
SF
500
$ 2,625.00
609.43
Median Cover-4" San Diego Buff
$ 5.25
SF
500
$ 2.625.00
608,44
Fibermesh - Added to Any Item, Additional Charge
$ 4.95
LB/CY
100
$ 495.00
608.45
24 Hour High Early Concrete - Added to Any Item, Additional
Charge
$ 15.00
Cy
50
$ 750.00
608.46
Stamp Pattern - Added to Any Item, Additional Charge
$ 210
SF
150
$ 315.00
608.47
6" Concrete Bollard
$ 75,00
EA
5
$ 375.00
608.48
8" Concrete Bollard
S 90.00
EA
5
S 450.00
608.49
Flowable Fill
$ 55.00
CY
25
$ 1.375.00
608,50
Non -reinforced Concrete Wall-8"
$ 11.00
SFF
500
$ 5.500.00
608.51
Non -reinforced Concrete Footer-8"
$ 12.00
SF
225
$ 2170Q00
608,52
Concrete Staining/Sealing
$ 2.75
SF
150
$ 412,50
Page 2 of 3
SECTION 00330
BID SCHEDULE
CITY OF FORT COLLINS
MISCELLANEOUS CONCRETE PROJECT
BID NO. 5911
ITEM
NO
DESCRIPTION
UNIT PRICE
UNIT
ESTIMATED
TOTAL COST
QUANTITY
608.53
Expansion and Sealing
$ 4.00
LF
250
$ 1.000.00
608.54
Joint Sealant
$ 2.25
LF
to0
$ 225.00
626.01 1 Mobilization -invoices Under $500 $ 280.00 Lump Sum 25 $ 7-000.00
630.01
"NO PARKING" Sign With Stand
$ 1 A5
Per Day Per Each
375
$ 543.75
630.02
Vertical Panel Without Light
$ 0.85
Per Day Per Each
50
$ 42.50
630.03
Channelizing Barrels
$ 0.75
Per Day Per Each
50
$ 37.50
630.04
Type 1 Barricade Without Light
$ 0.75
Per Day Per Each
750
$ 562.50
630.05
Type II Barricade Without Light
$ 0.75
Per Day Per Each
20
$ 15.00
630.06
Type III Barricade Without Light
$ 3.00
Per Day Per Each
20
$ 60.00
630.07
Size A Sign With Stand
$ 1.40
Per Day Per Each
225
$ 315.00
630.08
Size B Sign With Stand
$ 1.55
Per Day Per Each
20
$ 31.00
630.09
Size A Specialty Sigm - Cost of Manufacturing
$ 77.00
Each
2
$ 154.00
630.10
Size B Specialty Sign - Cost of Manufacturing
$ 77.00
Each
2
$ 154.00
630.11
Cone With Reflective Strip
$ 0.60
Per Day Per Each
375
$ 225.00
630.12
Safety Fence
$ 5.00
Per Day Per Roll
20
$ 100.00
630.13
Light
$ 0.50
Per Day Per Each
20
$ 10.00
630.14
Advance Warning Flashing - or Sequencing Arrow Panel
$ 70.00
Per Unit Per Day
5
$ 350.00
630.15
Variable Message Board
$ 125.00
Per Unit Per Day
10
$ 1,250.00
630.16
'Traffic Control Supervisor
$ 295.00
Per Day
25
$ 7375.00
630.17
Traffic Control Supervisor
$ 3Q00
Per Hour
too
$ 3,000.00
630.18
Flagging
$ 18.50
Per Hour
150
$ 2,775.00
FORCE ACCOUNT LABOR RATES
*Materials will carry a 106/6 markup from the original invoice for costs $500 and below, and an 8 % markup
*Attach hourly Equipment/Operator rates to be used for Force Account work
for invoices greater than $500
FAI
Laborer
$ 21.00
Hour
15
$ 315.00
FA2
Foreman
$ 35.00
Hour
15
$ 525.00
FA3
Finisher
$ 29.00
Hour
15
$ 435.00
FA4
Form Setter
$ 27.50
Hour
15
$ 412.50
TOTAL COST
Three Hundred Sixteen Thousand, Three Hundred Fifteen Dollars and
Signed
Company
Check One:
Express Concrete Inc.
Individual Doing Business in Company Name
X Corporation
Partnership
Address
Phone Fax
$ 316,315.25
Twenty Five Cents.
5305 S. Ziegler Road
Fort Collins, CO 80528
970.225,1287 970.229.0846
Page 3 of3
BID #5911: BID SCHEDULE
ITEM
NO.
DESCRIPTION
UNIT
PRICE
UNIT
EST.
QTY.
TOTAL COST
202.01
Sawcut Concrete/Asphalt < 4"
$
LF
25
$
202.02
Sawcut Concrete/Asphalt 4" < 6"
$
LF
25
$
202.03
Sawcut Concrete/Asphalt 6" < 8"
$
LF
25
$
202.04
Sawcut Concrete/Asphalt 8" < 10"
$
LF
25
$
202.05
Sawcut - Additional 1" Depth
$
LF
25
$
202.06
Remove Concrete Sidewalk
$
SF
1500
$
202.07
Remove Concrete Curb and Gutter
$
LF
250
$
202.08
Remove Monolithic Curb, Gutter &
Sidewalk
$
SF
250
$
202.09
Remove Concrete
Driveway/Apron/Crosspan
$
SF
750
$
202.10
Remove Concrete Pavement - 10"
$
SF
500
$
202.11
Remove Concrete Pavement -
Additional 1 " Depth
$
SF
50
$
202.12
Remove Asphalt - 6"
$
SF
250
$
202.13
Remove Asphalt - Additional 1"
De th
$
SF
50
$
202.14
Remove Inlet
$
EA
5
$
202.15
Remove and Haul Driveway Fillets
$
EA
5
$
203.01
CY avation - General Less Than 50
$
CY
150
$
203.02
Excavation - General Over 50 CY
$
CY
150
$
203.03
Excavation - Walls Only
$
CY
100
$
203.04
Excavation - New Inlet
$
EA
5
$
203.05
Borrow - Less than 100 Ton
$
TON
75
$
203.06
Borrow - Over 100 Ton
$
TON
75
$
210.01
Reset Brick Pavers
$
SF
185
$
210.02
Adjust Manhole
$
EA
10
$
210.03
Adjust Valve Box
$
EA
10
$
304.01 1 Aggregate Base Course $ TON 150 $
403.01 Temporary Asphalt Patching $ TON 100 $
602.01
Reinforcing Steel
$
LB
500
$
602.02
Reinforcing Steel - Epoxy Coated
$
LB
500
$
604.01
Reconstruct Inlet Deck - Catch
$
EA
5
$
Basin (R&R)
604.02
Reconstruct Inlet Deck - Additional
$
LF
10
$
Foot Opening (R&R)
604.03
Reconstruct Curb Inlet Deck - 4'
$
EA
5
$
Opening (R&R)
604.04
Reconstruct Curb Inlet Deck -
$
LF
10
$
Additional Foot Opening (R&R)
604.05
Area Inlet
$
EA
5
$
604.06
Type R Inlet - 5' Opening
$
EA
5
$
604.07
Type R Inlet - Additional Foot
$
LF
5
$
Opening
Combination Type 13 Curb Inlet -
604.08
Frame, Grate & Adjustable Curb
$
EA
5
$
Bonnet (East Jordan Ironworks 7030
or Equivalent)
604.09
Concrete Sidewalk Culvert
$
EA
5
$
604.10
Metal Sidewalk Culvert - 2'
$
EA
10
$
Opening, 5/8" plate
604.11
Additional Square Foot 5/8" Plate
$
SF
10
$
Driveover Curb, Gutter & 4"
608.01
Sidewalk
$
LF
1,000
$
Driveover Curb, Gutter & 6"
608.02
Sidewalk
$
LF
1,000
$
Driveover Curb and Gutter - No
608.03
Sidewalk
$
LF
125
$
Driveover Curb, Gutter and 6" Drive
608.04
Approach
$
LF
200
$
Vertical Curb, Gutter and 4"
608.05
Sidewalk
$
LF
300
$
Vertical Curb, Gutter and 6"
608.06
Sidewalk
$
LF
100
$
Vertical Curb and Gutter - No
608.07
Sidewalk
$
LF
500
$
608.08
Vertical Curb, Gutter and Drive
$
LF
150
$
Approach
608.09
Vertical Curb, Gutter and 6" Drive
$
LF
75
$
Approach - No Sidewalk
608.10
Out Fall Curb & Gutter
$
LF
100
$
608.11
Hollywood Curb, Gutter and 4"
$
LF
250
$
Sidewalk
608.12
Hollywood Curb, Gutter and 6"
$
LF
250
$
Sidewalk
608.13
Hollywood Curb and Gutter - No
$
LF
75
$
Sidewalk
608.14
Hollywood Curb, Gutter and Drive
$
LF
150
$
Approach
608.15
Highback Curb and Gutter - No
$
LF
500
$
Sidewalk
608.16
Highback Curb, Gutter and Drive
$
LF
150
$
Approach
608.17
Barrier Curb - 6" x 18"
$
LF
150
$
608.18
Barrier Curb - Key Way Style
$
LF
150
$
608.19
Barrier Curb - Epoxy
$
LF
150
$
608.20
Mountable Curb - 12" x 18"
$
LF
150
$
608.21
Mountable Curb - Key Way Style
$
LF
150
$
608.22
Mountable Curb - Epoxy
$
LF
150
$
608.23
Pedestrian Access Ramp, Driveover
$
LF
150
$
Curb
608.24
Pedestrian Access Ramp, Vertical
$
LF
100
$
Curb
608.25
Pedestrian Access Ramp, Hollywood
$
LF
150
$
Curb
608.26
Pedestrian Access Ramp, Highback
$
SF
375
$
Curb
608.27
Truncated Dome Panel
$
SF
100
$
608.28
Apron - 8"
$
SF
500
$
608.29
Crosspan - 8"
$
SF
750
$
608.30
Valley Pan - 6" Depth
$
SF
350
$
608.31
Flatwork - 4"
$
SF
4,000
$
608.32
Flatwork - 6"
$
SF
1,500
$
608.33
Replace Flatwork - 1 " Additional
$
SF
250
$
Depth
608.34
Concrete Pavement 8" (Joints
$
SF
1,500
$
Sealed)
0
608.35
Alley Approach - 8"
$
LF
100
$
608.36
Enhanced Crosswalk - 10" Tile Red
$
SF
150
$
608.37
Enhanced Crosswalk - 10" San
Diego Buff
$
SF
150
$
608.38
Enhanced Crosswalk - 10" Brick
Red, Stamped
$
SF
150
$
608.39
Colored Trail with Fibermesh - 5"
Yosemite Brown
$
SF
500
$
608.40
Mow Strip - 4" x 12"
$
LF
500
$
608.41
Splashblock - 4" Exposed Aggregate
$
SF
500
$
608.42
Splashblock - 4" San Diego Buff
$
SF
500
$
608.43
Median Cover - 4" San Diego Buff
$
SF
500
$
608.44
Fibermesh - Added to Any Item,
Additional Charge
$
LB/CY
100
$
608.45
24 Hour High Early Concrete -
Added to Any Item, Additional
Charge
$
CY
50
$
608.46
Stamp Pattern - Added to Any Item,
Additional Charge
$
SF
150
$
608.47
6" Concrete Bollard
$
EA
5
$
608.48
8" Concrete Bollard
$
EA
5
$
608.49
Flowable Fill
$
CY
25
$
608.50
Non -reinforced Concrete Wall - 8"
$
SFF
500
$
608.51
Non -reinforced Concrete Footer - 8"
$
SF
225
$
608.52
Concrete Staining/Sealing
$
SF
150
$
608.53
Expansion and Sealing
$
LF
250
$
608.54
Joint Sealant
$
LF
100
$