HomeMy WebLinkAboutRESPONSE - BID - 22955 5908 PLEASANT VALLEY LKE AND CANAL TRAIL (3)SECTION 00300 BID FORM PROJECT: PLEASANT VALLEY LAKE AND CANAL TRAIL; BID NO. 5908. Place Fort Collins Date April 4, 2005 1. In compliance with your Invitation to Bid dated March 9, 2005 and subject to all conditions thereof, the undersigned G L Hoff Company a **(Corporation, b+e I iab�lit}-, authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of bid amount ($ in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Westchester Fire Insurance Company, Philadelphia, PA 19103 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No.l through 7/96 Section 00300 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Please refer to the attached information 12. List your major equipment available for this contract. Dump truck, CAT 928 loader, CAT 320 track excavator, backhoes, bobcats, motor grader, grading tractor, concrete pump. 13. Experience in construction Work similar in importance.to this project: Please refer to.the attached information 14. Background and experience of the principal members of your organization, including officers: Please refer to the attached information 15. Credit available: $ 100,000. 16. Bank reference: Loran Emmons, Bank One Loveland 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? yes 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? Fort Collins, others What class, license and numbers? commercial class B: B-6 since 1976 19. Do you anticipate subcontracting Work under this Contract? yes If yes, what percent of total contract? please refer to bid information and to whom? 20. Are any lawsuits pending against you or your firm at If DETAIL this time? no 7/96 Section 00420 Page 2 yes, 21. What are the limits of your public liability? DETAIL 2 million liability plus i million umbrella What company? Travelers Isis. Agent: Flood &pPeterson Insurance 22. What are your company's bonding limitations? 1 million aggregate 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at Loveland this y day of, 20 GL�:' Hof Com an Name off er ' - T— Title: Miriam T. Hoff, Secretary Treasurer State of Colorado County of Larimer Miriam T. Hoff being duly sworn deposes and says that he is Secretary Treasurer of G.L. Hoff Company and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this Y 4 day of 1 20p�. CD otary Public My commission expires /2 -/-3 -07 7/96 Section 00420 Page 3 G.L. Hoff Company 2005 Projects Associated Thermoforming Re -grind Addition Phase I This Design -Build project included planning, engineering and architectural work for the expansion of the Associated Thermoforming Inc. facility. The scope included site work, paving, structural concrete, interior remodeling for specialized equipment installation, electrical, mechanical and construction of a pre-engineered metal building. Owner: Associated Thermoforming, Inc. 765 Second Street Berthoud, CO 80513 Contact: John Nix, President, 970-532-2000 Contract: $411,000. Completion: 4-2005 North Taft Avenue Culvert Extension The extension of the existing aluminum arch pipe culvert at the Greeley - Loveland Canal at Taft Avenue was completed to allow for road widening at Taft Avenue for the City of Loveland. The project included site work, excavation, demolition of portion of existing bridge, structural fill, rip rap, concrete washout structure, concrete wall, railing and seeding. Owner: City of Loveland 500 East 3rd Street Loveland, CO 80537 Contact: Ross, W. Shaw, Engineering Division 970-962-2627 Contract: $145,000. Completion: March 2005 Houston Gardens Pump Station Construction of a non -potable irrigation pump station including demolition, site work, concrete, masonry pump building, pump system, water line and surveying. Owner: City of Greeley 1000 Tenth Street Greeley, CO 80631 Contact: Phil Carter, 970-371-3727 City of Greeley Water System Manager Ted Borstad, Project Manger, 970-229-9668 Aqua Engineering Contract: $194,531. Completion: April 2005 8a' Avenue Trench Train Construction of a new trench drain system along 400 lineal feet of 8tn Avenue for the City of Greeley. The scope of work included excavation, structural and site concrete, and asphalt repair. Owner: City of Greeley 1000 Tenth Street Greeley, CO 80631 Contact: Joe Marcisofsky, 970-336-4124 City of Greeley Public Works Department Contract: $67,584.00 Completion: March, 2005 Loveland Sports Park Subcontract for the concrete bleachers, stairs, retaining walls and the skate board facility in the park. The scope of work included structural concrete, concrete and shotcrete for in -ground skate board park area. Contact: Ted Johnson, 970-669-6291, Project Manager ECI Site Construction Management, Inc. Contract: $1981400. Completion: May, 2005 G.L. Hoff Company 2004 Projects CSU Transit Center Construction of parking improvements at the Lory Student Center on the Colorado State University campus. The scope of work includes site excavation and demolition, grading, landscaping, irrigation system, fencing, and electrical lighting. Owner: City of Fort Collins 215 North Mason Street Fort Collins, CO 80524 Contact: Steve White, Project Manager, 970-221-6273 Contract: $230,279.. Completion: 4-2004 Loveland Industries Remodel This remodel is a design -build tenant finish project for United Agri Products, Inc. The work involves the complete remodel of an existing metal building warehouse space into a laboratory. The scope of work includes carpentry, drywall, HVAC, plumbing, electrical and all finishes. Owner: United Agri Products, Inc. 14520 WCR 64 Greeley, CO 80631 Contact: Robert Bath, 970-356-8920 ext.201 Contract: $142,817.00 Completion: 4-2004 UNC Apartments Playground Removal of existing playground equipment, sitework, concrete, irrigation and installation of new playground equipment. Owner: University of Northern Colorado Greeley, CO 80631 Contact: George Galida, UNC Project Manager, 970-351-1892 Contract: $125,008.00 Completion: 5 -2004 Rolland Moore Park Shelter Replacement Remove four existing wood laminate picnic shelters and replace with structural steel shelters for the City of Fort Collins Rolland Moore Park. Owner: City of Fort Collins 215 North Mason, Fort Collins, CO 80521 Contact: Eileen School, Project Manager, 970-416-2062 Contract: $127,684. Completion: 5-2004 Student Recreation Center Landscape Improvements Removal of existing concrete sun deck and construction of a new patio with landscaping, decorative paving, concrete, shade structures, site lighting and access drive. Owner: Colorado State University 365 Aylesworth Hall SE, Fort Collins, CO 80523 Contact: Greg Smith, CSU Project Manager, 970-491-0150 Contract: $370,906. Completion: 8-2004 West Elizabeth Bike Lane Improvements Construction of curb, gutter and concrete bike lane on both sides of Elizabeth between City Park Ave., and Shields St. while maintaining business access. Scope includes site clearing, asphalt and concrete removal, asphalt patching, curb & gutter, ramp, apron and crosspan construction, inlet reconstruction, earthwork, manhole and valve box adjustments, and traffic control. Owner: City of Fort Collins 215 North Mason St., Fort Collins, CO 80524 Contact: Erika Keeton, Project Engineer, 970-221-6605 Contract: $360,006. Completion: 8-2004 West Elizabeth Streetscape Improvements Removal of asphalt and concrete sidewalk and construction of new concrete sidewalk on both sides of Elizabeth between City Park Ave. and Shields St. Scope includes landscaping, irrigation, installation of site furnishings, pavement markings, and traffic control. Owner: City of Fort Collins 215 North Mason St., Fort Collins, CO 80524 Contact: Erika Keeton, Project Engineer, 970-221-6605 Contract: $269,542. Completion: 8-2004 Little Thompson Water District Office Remodel Remodel and finishes for existing Little Thompson Water District Office building. The project was divided into phases so portions of the building remained in use while others were remodeled. The scope included architectural design, demolition, framing, drywall, painting, folding partition, flooring, plumbing, HVAC, and electrical. Contact: Michael Cook, District Manager Contract: $189,664. Completion: October, 2004 Davidson Chevrolet Truck Lot Office Remodel Complete remodel of existing building for use as the Truck Sales Office. The scope included demolition, site concrete, masonry, framing, storefront, exterior stucco, framing, drywall, insulation, painting, flooring, plumbing, HVAC, and electrical. Contact: Joe Gebhardt, owner Contract: $63,000. Completion: September, 2004 Davidson Chevrolet Parking Lot Construction of an asphalt parking lot with lighting. The scope included demolition of the existing building, site concrete, light bases, paving, landscaping and electrical. Contact: Joe Gebhardt, owner Contract: $701000. Completion: October, 2004 G.L. Hoff Company 2003 Projects East Riverside Drive Retaining Wall and Street Rehabilitation Project Construction of approximately 200 feet of 10 foot high retaining wall with associated brick trim and metal top railing along the Big Thompson River. Removal of two city blocks of existing street asphalt. Installation of an 8 inch water line with two hydrants, new service connections to 10 buildings, 3 street inlets and piping. Installation of concrete curb & gutter, drives and pans, sidewalk, and the roadway base course and asphalt pavement along a two block section of East Riverside Drive in Estes Park. Phase One of the project was completed in October and November of 2002 and Phase Two was completed between March and May of 2003. Owner: Town of Estes Park PO Box 1200, Estes Park, CO 80517 Contact: John Spooner, Project Manager, 970-586-9388 Van Horn Engineering and Surveying 1043 Fish Creek Road Estes Park, CO 80517 Contract: $373,388.00 Completion: June, 2003 Butch Butler Press Box and Bleachers Project Construction of a single pre -cast concrete structure for use as a press box at Butch Butler Field in Greeley. The scope of work also included new stadium bleachers and a concrete slab. Owner: City of Greeley Contact: Ted Trujillo, Parks Program Manager, 970-350-9340 1000 loth Street, Greeley, CO 80631 Contract: $108,282.00 Completion: February 2004 Bellvue Hatchery French Drain Installation of a perforated and solid wall drain pipe at the Bellvue Research Hatchery for the Division of Wildlife. Scope of work included sitework and pipeline work. Owner: State of Colorado Division of Wildlife 6060 Broadway, Denver, CO 80216 Contact: Kay Sinclair, 970-472-4433, Fort Collins Contract: $17,073.00 Completion: 10-2003 Routt/Spruce Hall Sewer Line Replacement Completion of sitework and utility work to remove and replace 215 LF of sanitary sewer from Routt Hall to manhole with 6 inch PVC pipe. Owner: Colorado State University 365 Aylesworth SE, Fort Collins, CO 80523 Contact: Michael Davis, Project Manager, Facilities, 970-491-0075 Contract: $547279,00 Completion: 1-2004 Edwards -Ellis Parking Lot Construction of new parking lot on Colorado State University campus. Scope of work included demolition, sitework, storm drainage, fire line and hydrant, asphalt paving, concrete pavement, irrigation and landscape work. Owner: Colorado State University 365 Aylesworth SE, Fort Collins, CO 80523 Contact: Steve Kiess, Project Manager, Facilities, 970-491-0017 Contract: $282,608. Completion: 9-2003 Fish Creek Pedestrian Trail Construction of a concrete pedestrian trail including sitework, erosion control, culvert installation, rip rap, seeding, fencing, concrete bikeway, curb & gutter and traffic control. Owner: Town of Estes Park 170 MacGregor Ave., Estes Park, CO 80517 Contact: Mike Todd, 970-586-2458 Cornerstone Engineering, 437, S. St.Vrain, Estes Park, CO Contract: $322,056. Completion: 3-2004 CSU Annual Trial Gardens Shade Structure Construction of a custom metal shade structure with brick veneer and specialty molded concrete flatwork. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Cass Bietler, Project Manager, 491-0158 Contract: $118,973.00 Completion: December, 2002 Pool Deck and Outdoor Kitchen Project Removal and replacement of concrete pool deck with patterned concrete, and roof and outdoor kitchen addition. The scope of work includes sitework, demolition, concrete foundations and flatwork, masonry, roof addition, utilities, and exterior kitchen cabinets, painting, plumbing and gas piping, HVAC, electrical. Owner: Mr. and Mrs. Earl Sethre 3304 Bent Drive Loveland, CO 80538 Contact: Earl Sethre, owner, Contract: $51,266.00 Completion: January 2003 DeDecker Studio Remodel Project delvelopment and construction for remodel of existing shop building for artists studio. Scope of work includes sitework and site concrete, utilities, concrete/stone fence, masonry, structural timbers, carpentry, insulation, windows and doors, drywall, painting, plumbing and gas piping, HVAC, and electrical. Owner: DeDecker Sculpture Inc. 1503 West 8th Street Loveland, CO 80537 Contact: Maggie DeDecker, 663-5727 Contract: $1351279.00 Completion: February 2003 Wash Pad Improvements at Estes Park Facility Construction of a trench grate inside an existing shop, a tank to hold washdown water (septic tank) a concrete wash pad and connection to existing sanitary sewer. Owner: Waste Management of Estes Park 8310 S. Valley highway, Suite 200 Englewood, CO 80112-5806 Contact: Cort Nickel. Project Engineer, 970-224-5999 RTW Professional Engineers and Consultants, Inc. Contract: $51,252.00 Completion: April, 2003 ADDRESS: 8. BID SCHEDULE (Base Bid) Bid items are described in Section 01800 G.L. Hoff Company CONTRACTOR' 1815 West 12th Street Loveland, CO 80537 BID EST. UNIT ITEM ITEM # DESCRIPTION QTY. UNIT PRICE TOTAL 1 Mobilization 1 LS 2000.00 $ 2,000.00 2 Traffic Control 1 LS 336.00 $ 336.00 3 Demo of Existing 5' & 8' Wide Trail 561 SF 1.20 $ 673.20 4 Stump & Tree/Shrub Removal 1 LS 1480.00 $ 1, 480. 00 5 4" Topsoil Removal/Replacement 120 CY 16.10 $ 1,932.00 6 Class 5 ABC 100 TON 26.06 $ 2,606.00 7 5" Colored Concrete Paving 9,910 SF 4.64 $45,982.40 8 Earthwork Cut 100 CY 16.15 $ 1, 615.00 9 8' Wide Pedestrian Bridge 1 LS ajaj�r t6r 3 "O 10 Raise Manhole 1 LS 205.00 $ 205.00 11 Hydro Seeding 7,000 SF 0.17 $ 1,190.00 TOTAL OF BASE BID (written) 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. 7/96 Section 00300 Page 2 G.L. Hoff Company Construction Experience Gregory L. Hoff, President and Construction Manager For the past thirty five years, Greg has been involved with all aspects of construction. Greg established G.L. Hoff Company in 1984. Serving as president and project superintendent, Greg is a driving force in the company. Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering, his early work included surveying and architectural design and drafting. He has held a Class B Commercial Contractor's License with the City of Fort Collins since 1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont and Boulder. Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting company which specializes in all types of commercial construction including site work, excavation, structural concrete, and commercial buildings. As president and construction superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects including, schools, churches, city and government projects, city park developments, as well as many light industrial and concrete construction jobs. Greg oversees project scheduling, review of construction procedures and specifications, monitors quality control and safety enforcement on job sites. As president and construction supervisor, Greg works closely with project owners, architects and engineers throughout the project. Greg is an active member of the Loveland construction community. He has volunteered his time to the Loveland Construction Advisory Board for over 15 years. While serving as Chairman of this Board, the city adopted licensing for contractors. He also served on a review committee to study the International Building Code prior to its adoption by the City of Loveland Building Department. Joel S. Reger, Estimator and Project Manager Joel has a Bachelor of Science Degree in Construction Management from Colorado State University and seventeen years experience in the construction field. He has continued his education with estimating seminars including training with American Building Company's estimating Access workshop and Master Builder Computer System. He is also an active member of the Sigma Lambda Chi honorary national construction fraternity. During the past fifteen years, as the chief estimator with G.L. Hoff Company, Joel has compiled bids and development estimates for projects valued at up to five million dollars. As chief estimator, he directs the project bidding process as well as the review of specifications. He also works directly with project management, coordinating proposal requests and change orders with the architect or owner, overseeing material orders to insure that the project is completed in a timely manner and according to specifications. Joel is an important and effective member of every Design -Build project with G.L. Hoff Company. He works closely with the owner and architect to understand project goals and provide detailed project budgets and construction options to meet the owner's needs. Patrick R. Norris, Estimator/Project Manager Pat brings thirty years of construction experience to his position as estimator and project manager. His background includes experience with residential, commercial and industrial construction. Pat began his career as a carpenter, form setter and equipment operator. With 18 years working as a field foreman, he has a broad understanding of building methods and materials as well as site safety and personnel management. His knowledge of construction has enabled Pat to be an effective estimator and project manager. During the past 7 years, Pat has bid and managed projects valued up to $500,000. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. Al -Y 'o,5r Date B-6 License Number (If Applicable) (Seal,- if Bid is by corpor ion) Attest: iam T. Hoff, ec. eas. Address 1815 West 12th Street Loveland CO 80537 Telephone 970-669-3255 �/96 Section 00300 Page 3 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00410 BID BOND K�0L N LL L. Hoyt MEN BY THESE PRESENTS: that we, the undersigned „„ as Principal, and Westchester Fire Insurance Company as Suret"�� y, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ 57 of total bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collin:; Project, PLEASANT VALLEY LAKE AND CANAL TRAIL; BID NO. 5908. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other :respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect,. it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. Ll L 0 7/96 L Section 00410 Page ?. I IN WITNESS 'NHEREOF, the Principal and the Surety have hereunto set their hands and seals this 4th day of April , 20 05, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name: G. L. Hoff Company Westchester Fire Insurance Company Address:_1815 W. 12th St. Philadelphia, PA 19103 Loveland CO 80537 _. If _ BY: — By: --- — Title: f Title: Attorney -in -Fact ATTEST:- , By t ` a ""f L r L , t � I'SEAL) (SEAL) ` p T",. I ML ago 7/96 Section 00410 Page 3 LJ WE§TeWsTER FME nv ti rtc t aiv �,t it 10 $0 y,. h nil tlt s: pC$BC tS: `Eatat W B`I'GfI>p3TEAt=F NSURANC� P.AtYi' t a ootpi�iXttit#it o€.thy Mate ofNew York , fia�ug its, tyaP6�ttnt$.; Ldeorg+a, pursuant to;tlie Foltmvfttgiysotattmi, adopted 1?Y ttte 9o2d utiiteetars ccf tlt� said' Gornpany sit t 7avetn B, 199p, to a ttlF1.,0lf�f8,@y-aSW[M rtlEs6{ti:,gQQ T� p16 " y, esAite Gya;Yrc.Factt6 so excCl wo or 2hast to thousb l sd tbt'M any rat31 is R"Olui SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM 7/96 none SUBCONTRACTOR Section 00430 Page 1 e i SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: G.L. Hoff Company 2. Permanent main office address: 1815 West 12th Street, Loveland, CO 80537 3. When organized: January 1984 4. If a corporation, where incorporated: Colorado t 5. How many years have you been engaged in the contracting business under your present firm or trade name? 21 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Please see the attached project information 7. General character of Work performed by your company: Commercial general contractor: we complete site work, concrete, carpentry, project managment with our own forces. 8. Have you ever failed to complete any Work awarded to you? no If so, where and why? 9. Have your ever defaulted on a contract? no If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. 7/96 no Section 00420 Page 1