Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5896 ASBESTOS ABATEMENT AT GATEWAY PARKBID PROPOSAL BID #5896 ASBESTOS ABATEMENT AT GATEWAY MOUNTAIN PARK BID OPENING: FEBRUARY 3, 2006, 3:00p.m., (our clock) WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS REQUIREMENTS FOR ASBESTOS ABATEMENT AT GATEWAY MOUNTAIN PARK OF A RESIDENTIAL STRUCTURE PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS: The City of Fort Collins Parks is requesting bids for the asbestos abatement for one of the residential structures at Gateway Mountain Park. Schedules and scope of work are attached in the work plan/project design by Walsh Environmental Scientists and Engineers, LLC. Contract must be complete 24 days after notice to proceed. Since the Park will be closed for the duration of work, liquidated damages of $500.00 for each and every day, will be assessed in the event the Contractor does not meet final dates as specified. Any technical questions should be directed to Eileen Scholl, Project Manager at (970) 416-2062. Any Purchasing questions should be directed to John Stephen, CPPO, CPPB, Senior Buyer at (970)221-6775. A mandatory pre -bid meeting will be held at Gateway Mountain Park at 5218 Poudre Canyon Rd, Bellvue, Colorado on January 24, 2005 at 10:00 a.m.. BID SCHEDULE Our firm will remove asbestos containing building materials by competent persons trained, knowledgeable, experienced and qualified in the techniques of asbestos abatement. This includes the handling and disposal of asbestos containing and asbestos contaminated materials and the subsequent cleaning of contaminated areas. The Contractor must comply with all applicable federal, state, and local regulations and be capable of performing the work specified in this Contract. LUMP SUM $ (b 00 FIRM NAME IQt`1txf 15hme"rAeVIAL. SiWl@LS F :r-mC Are you a Corporation, Partnership, DBA, LLC, or PC �L SIGNATUR� ADDRESS LRIA -A. 215 !'r ��V_C NvxzRf CA '0/. q 2 PHONE/FAX # &oS-` a6-'� 52.6 / 303— 4Z5--(05-75 Business References Mr. Julian Valdez Amgen 4000 Nelson Road Longmont, CO 80503 303-401-1348 Mr. Dariush Sedaghat Veco/Roche Pharmaceuticals 2075 North 55t' Street Boulder, CO 90301 303-938-6584 Mr. Tom Amen Xcel Energy 6189 Franklin Street Denver, CO 80216 303-853-7200 Ms. Beth Davis Aurora Public Schools 1369 Airport Blvd. Aurora, CO 80011 303-367-3000 RMCAT Environmental Services, Inc. 4975 Paris Street Denver, CO 80239 (303)425-7526 Fax (303) 425-6575 Ms. Lisa Farrell City and County of Denver 201 West Colfax Denver, CO 80204 720-865-5439 Mr. Bryce Romig Phelps Dodge P.O. box 68 1746 County Road 202 Empire, CO 80438 719-486-2150 Mr. Dave Genova Regional Transportation District 1600 Blake Street Denver, CO 30202 303-299-4038 Mr. Randy Murphy Littleton Public Schools 5776 S. Crocker St. Littleton, CO 80120 303-347-3424 ENYIRONN lNTAL 8l RYICC6 INC. A BELFOR (0) Company Providing the Finest in Environmental Service Asbestos Abatement Qualifications Major Project Listing jr4� 41 Serview- � %WP t Status. 40, 0­10- an Ek "k, -41 V, i Lan Lsing Removal 27,000 S.F Completed Elementary Remediation RLH Ceiling Demo. 90% July 2004 $300,000 Arapahoe High Removal Tunnel System Completed School Remediation Risk Mgmt & ACM Soil 90% July 2004 $234,000 Plaster & Littleton High Removal Risk Mgmt g Flooring 90% Completed School Remediation Removal July 2004 $92,000 Littleton High Removal Risk Mgmt Window Removal 90% Completed School Remediation $29,000 July 2004 Hellbeck Removal Windows, VAT Completed Elementary Remediation Nova TSI 90% August $232,000 2004 Schenck Removal Crawlspace & Completed Elementary Remediation I4WS Dirt Removal 80% August $169,000 2004 Decontamination Tyco Shaw of Completed International Decontamination Environmental Semiconductor 100% July,2002 Co. Springs, CO facility. $110,000 Victor Excavation of Completed Excavation Soil Excavation Fleischle Oil contaminated 100% August Victor, CO soil. $300,000 2002 Excavation of BNSF Oil Spill Removal Remediation BNSF Contaminated 1000/0 Completed Denver, CO Railroad soil. May 2002 $100,000 Hoyte Street Excavation of Completed Properties Removal BNSF contaminated 100% December Portland, OR Remediation Railroad soils 2001 $750,000 Decontamination Nicor Battery Removal The IT Group of residential 100% Completed Chicago, IL Remediation properties 2001 $400,000 Excavation and Sabino Canyon Removal US Forest disposal of lead contaminated 100% Completed Tuscon, AZ Remediation Service soils 2002 $760,000 Lean Removal Decontaminate Infrastructure Decontamination Lockheed and demolish 9 100% Completed Demolition Demolition Martin process 2001 Program structures P:\DaveR\ASBEST0S\Abstracts Asbestos Abatement Qualifications Littleton, CO $1,100,000 Abatement of Jefferson High Removal Denver Public Asbestos - Completed School Remediation Schools containing 70% 2001 Denver, CO ceiling texture $209,000 Decontaminate/ Abatement of Climax 2000 Decontamination, Phelps Dodge electrical 100% Completed Henderson, CO Removal substations at 2001 mining facility $189,000 Abatement of Kepner Middle Remova Denver Public Asbestos Completed School Remediation Schools containing 70% 2001 Denver, CO materials $187,644 Removal of Tyron Mill Removal US BLM Mine wastes, ° 100% Completed Kingman, AZ Remediation excavation and 2002 tank removals Decontamination DG&E Vaults Decontamination DG&E of electrical 100% Completed Denver Demolition substations 2001 $300,000 Decontamination SW Forest US Forest of a government Completed Science Complex RemovaURemediation Service facility for mold 100% 2001 Flagstaff, AZ contamination. $550,000 Decommision and Foundry Decontaminate Ingersol Rand/ decontaminated Completed Decommissioning Decommission Schlage Lock a foundry for ° 100% 1998 Co.Springs, CO non industrial use $104,000 Goddard Middle Littleton Abatement of Completed School Littleton, Removal/Remediation public Schools ceiling materials 80% 2003 CO $118,000 Littleton High Removal/Remediation Littleton Abatement of Completed School Public Schools VAT and Mastic ° 80% 2003 $65,000 Lockheed Martin Removal/Remediation Lockheed Abatement of Completed Boulder, CO Martin VAT and Mastic 90% 2003 $64,000 Vail Village Removal/Remediation Vail Villag Abatement of Completed Condominiums Condominiums ceiling material ° 80 /° 2003 Vail, CO $50,000 Aspen Removal/Remediation Aspen View Abatement of Completed Condominiums Condo. Ceiling materials 100% 2003 Aspen, CO Associaton $70,000 RemovaURemediation Abatement prior Completed RTD Nederland RTD to demolition 100% 2003 P:\DaveR\ASBESTOS\Abstracts Asbestos Abatement Qualifications RemovaURemediation City and Asbestos 55 projects City and County County of Abatement 100% completed of Denver Denver Projects (varying YTD- 03 in size) Texas Bldg. RemovalRemediation Rocky Abatement of Completed Lakewood, CO. Mountain VAT and Plaster ° 75 /0 2002 College $95,000 Good Shepard RemovalRemediation Asbestos School Middle S ch K.K. Abatement VAT 100% Completed Denver, Environmental and TSI 2003 $67,000 J.F.K High RemovalRemediation Asbestos Schol Denver Public Abatement VAT ° 90% Completed ver, CO. Denver, Schools Mastic 2002 $33,000 Completed Asbestos 2002 Bronzetree Cunningham Abatement Colorado Springs, RemovaURemediation & Lindsey US Ceiling Material 100% CO. Inc. $30,000 RemovaURemediation Asbestos Lodge At Vail Abatement Wall Completed Vail, CO. Lodge At Vail & Ceiling ° 100% 2001 Material $30,000 RemovaURemediation Asbestos Manor Vail Jim Lavery Abatement 100% Completed Vail, CO. Ceiling Material 2000 $13,000 RemovaURemediation Asbestos IBM IBM Abatement 1000/0 Completed Boulder, CO. Fireproofing 2002 $62,000 RemovaURemediation Asbestos IBM IBM Abatement 100% Completed Boulder, CO. Boiler and TSI 2002 $30,000 RemovaURemediation Asbestos Black Fox Black Fox Abatement Wall Completed Denver, CO Estates &Ceiling 100% 2000 Material $34,000 RemovalRemediation Asbestos Swedish R.M. Capital Abatement TSI Completed Demolation Management and Soils in 100% 2000 Denver, CO. Crawlspace $28,000 HERW Co. RemovaURemediation Wells Fargo Abatement\Mold 100% ° Completed Denver, CO. Bank $21,000 2000 RemovaURemediation Asbestos 6 Garden Centers City of Abatement VAT 100% Completed Broomfield Mastic & Plaster 2000 $75,000 P:\DaveR\ASl3EST0S\Abstracts Asbestos Abatement Qualifications Henderson Mine Removal, Asbestos Completed Empire, CO Remediation and Phelps Dodge Abatement, 2004 ° /o Headftame $99,254 Henderson Mine Removal, Asbestos Demolition Empire, CO Remediation and Phelps Dodge Abatement, 85 ° �° still taking Urad Mill Demolition Demolition Place $194,377 Oct. 04 P:\Da:veR\ASBESTOS\Abstacts