HomeMy WebLinkAboutCHANGE ORDER - RFP - ART IN PUBLIC PLACES W ELIZABETH ST PROJECTS c CHANGE ORDER NO. `1 PROJECT TITLE: APP W. Elizabeth St. Project CONTRACTOR: Design Tria PURCHASE ORDER NO.: 4404531 DESCRIPTION: "Long Live the Pedestrians" APP Project 1. Reason for change: The artist team of Design Tria had to modify original art concepts in the APP contract due to changes beyond their control in the construction project on the W. Elizabeth St. Project 2. Description of Change: (See attachment) 3. Change in Contract Cost: $233 will be added to purchase two additional mosaic panels. $400 will be added to compensate Design Tria for additional time & materials needed to fill the gaps on the shrouds (see invoice). For a total of $633. Payment will be changed (Contract 10 C.) $5,633 will be paid after installation of all art elements other than application/buffing of anti -graffiti coating and the staining of the gaps between'the shroud & lamp poles. Final payment of $1,000 will be paid as defined in the contract. 4. Change in Contract Time: Contract Extended to June 12, 2005 ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O.: TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S: ADJUSTED CONTRACT COST (Assuming all change orders approved) _ ACCEPTED BY: ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: $16,500 $633 $633 $ $17,133. DATE: : ' I S 16 - DATE: S /Q DTj DATE: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $15,000 cc: Purchasing Attachment A Project: West Elizabeth Art in Public Places Project — `Long Live the Pedestrians" Description of Revisions to the APP W. Elizabeth St. Project: 1. Eight obelisks (#A through #H) were anticipated in the pedestrian cross walk; only five can be installed due to a conflict with an existing cobra head light in the median. Four "Topper Sculptures" were anticipated at locations C. D, E and F on Attachment A. Obelisk #C and Topper Sculpture #C will be eliminated. (See Attachment A for revised pedestrian cross walk layout.) Tie plates will be circular and "fender" shaped. Mario Miguel Echevarria will provide stenciled artwork on the bollard side, prior to installation of final clear coat sealant on color -stained concrete bollards. 2. City's Light & Power Dept will relocate four Light Pole Banners to the two cobra head lights in the median. 3. Eighteen mosaics will be placed on the project (See attachment A). They include two mosaic panels (8 total) on each shroud (4 total), on the East & West sides of W Elizabeth St. (See attachment) 4. Design Tria will assist with the design and installation of design elements to cover gap between shrouds & light poles. H:IAPP1CONTRACnChangeordeAChange Order. W. Elizabeth attach..doc MCDONALD CORPORATION ucM V /! / 1 �_ ^� \• � /may -ALIGN SCORE JOINTS WITH EDGE OF EXISTING (,CONCRETE WALK SILVER MINE SUBS r THE PL*MNG IN PAVE1d'c1n CUT OUT, TYP. 2B RY T WALK, TYP, -,"B EN-C" • •�. •� PCRE'a'14 TRS'LtlCMbl'� '�/ CATE EXISTING SIGN TO 1N15 x LpCAT10T1 )M 'v C �I D