BID - 5911 MISCELLANEOUS CONCRETE PROJECT
SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT ESTIMATED QUANTITY EXPRESS UNIT PRICE EXPRESS TOTAL COST VOGEL UNIT PRICE VOGEL TOTAL COST 202.01 Sawcut Concrete/Asphalt ≤ 4" LF 25 $ 2.10 $ 52.50 $ 2.00 $ 50.00 202.02 Sawcut Concrete/Asphalt 4" ≤ 6" LF 25 $ 2.60 $ 65.00 $ 2.62 $ 65.50 202.03 Sawcut Concrete/Asphalt 6" ≤ 8" LF 25 $ 3.25 $ 81.25 $ 3.71 $ 92.75 202.04 Sawcut Concrete/Asphalt 8" ≤ 10" LF 25 $ 4.50 $ 112.50 $ 4.35 $ 108.75 202.05 Sawcut - Additional 1" Depth LF 25 $ 0.75 $ 18.75 $ 0.25 $ 6.25 202.06 Remove Concrete Sidewalk SF 1500 $ 2.25 $ 3,375.00 $ 2.75 $ 4,125.00 202.07 Remove Concrete Curb and Gutter LF 250 $ 3.40 $ 850.00 $ 7.00 $ 1,750.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk SF 250 $ 2.30 $ 575.00 $ 3.00 $ 750.00 202.09 Remove Concrete Driveway/Apron/Crosspan SF 750 $ 2.45 $ 1,837.50 $ 3.00 $ 2,250.00 202.10 Remove Concrete Pavement - 10" SF 500 $ 3.80 $ 1,900.00 $ 3.25 $ 1,625.00 202.11 Remove Concrete Pavement - Additional 1" Depth SF 50 $ 0.40 $ 20.00 $ 0.50 $ 25.00 202.12 Remove Asphalt - 6" SF 250 $ 2.10 $ 525.00 $ 2.00 $ 500.00 202.13 Remove Asphalt - Additional 1" Depth SF 50 $ 0.40 $ 20.00 $ 0.25 $ 12.50 202.14 Remove Inlet EA 5 $ 525.00 $ 2,625.00 $ 200.00 $ 1,000.00 202.15 Remove and Haul Driveway Fillets EA 5 $ 50.00 $ 250.00 $ 50.00 $ 250.00 203.01 Excavation - General Less Than 50 CY CY 150 $ 60.00 $ 9,000.00 $ 75.00 $ 11,250.00 203.02 Excavation - General Over 50 CY CY 150 $ 54.45 $ 8,167.50 $ 60.00 $ 9,000.00 203.03 Excavation - Walls Only CY 100 $ 11.00 $ 1,100.00 $ 15.00 $ 1,500.00 203.04 Excavation - New Inlet EA 5 $ 400.00 $ 2,000.00 $ 200.00 $ 1,000.00 203.05 Borrow - Less than 100 Ton TON 75 $ 30.00 $ 2,250.00 $ 30.00 $ 2,250.00 203.06 Borrow - Over 100 Ton TON 75 $ 26.00 $ 1,950.00 $ 18.00 $ 1,350.00 210.01 Reset Brick Pavers SF 185 $ 7.50 $ 1,387.50 $ 6.00 $ 1,110.00 210.02 Adjust Manhole EA 10 $ 125.00 $ 1,250.00 $ 75.00 $ 750.00 210.03 Adjust Valve Box EA 10 $ 115.00 $ 1,150.00 $ 75.00 $ 750.00 304.01 Aggregate Base Course TON 150 $ 24.00 $ 3,600.00 $ 30.00 $ 4,500.00 403.01 Temporary Asphalt Patching TON 100 $ 80.00 $ 8,000.00 $ 155.00 $ 15,500.00 602.01 Reinforcing Steel LB 500 $ 0.40 $ 200.00 $ 1.75 $ 875.00 602.02 Reinforcing Steel - Epoxy Coated LB 500 $ 0.78 $ 390.00 $ 2.25 $ 1,125.00 604.01 Reconstruct Inlet Deck - Catch Basin (R&R) EA 5 $ 1,000.00 $ 5,000.00 $ 1,300.00 $ 6,500.00 604.02 Reconstruct Inlet Deck - Additional Foot Opening (R&R) LF 10 $ 165.00 $ 1,650.00 $ 165.00 $ 1,650.00 604.03 Reconstruct Curb Inlet Deck - 4' Opening (R&R) EA 5 $ 1,650.00 $ 8,250.00 $ 1,400.00 $ 7,000.00 604.04 Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R) LF 10 $ 165.00 $ 1,650.00 $ 165.00 $ 1,650.00 604.05 Area Inlet EA 5 $ 1,000.00 $ 5,000.00 $ 1,300.00 $ 6,500.00 604.06 Type R Inlet - 5' Opening EA 5 $ 1,700.00 $ 8,500.00 $ 2,400.00 $ 12,000.00 604.07 Type R Inlet - Additional Foot Opening LF 5 $ 220.00 $ 1,100.00 $ 300.00 $ 1,500.00 604.08 Combination Type 13 Curb Inlet - Frame, Grate & Adjustable Curb Bonnet (East Jordan Ironworks 7030 or Equivalent) EA 5 $ 1,450.00 $ 7,250.00 $ 1,800.00 $ 9,000.00 604.09 Concrete Sidewalk Culvert EA 5 $ 350.00 $ 1,750.00 $ 500.00 $ 2,500.00 604.10 Metal Sidewalk Culvert - 2' Opening, 5/8" plate EA 10 $ 1,150.00 $ 11,500.00 $ 1,550.00 $ 15,500.00 604.11 Additional Square Foot 5/8" Plate SF 10 $ 100.00 $ 1,000.00 $ 150.00 $ 1,500.00 608.01 Driveover Curb, Gutter & 4" Sidewalk LF 1,000 $ 17.50 $ 17,500.00 $ 19.00 $ 19,000.00 608.02 Driveover Curb, Gutter & 6" Sidewalk LF 1,000 $ 19.50 $ 19,500.00 $ 20.00 $ 20,000.00 608.03 Driveover Curb and Gutter - No Sidewalk LF 125 $ 15.00 $ 1,875.00 $ 16.00 $ 2,000.00 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT ESTIMATED QUANTITY EXPRESS UNIT PRICE EXPRESS TOTAL COST VOGEL UNIT PRICE VOGEL TOTAL COST 608.11 Hollywood Curb, Gutter and 4" Sidewalk LF 250 $ 14.50 $ 3,625.00 $ 21.00 $ 5,250.00 608.12 Hollywood Curb, Gutter and 6" Sidewalk LF 250 $ 15.50 $ 3,875.00 $ 21.50 $ 5,375.00 608.13 Hollywood Curb and Gutter - No Sidewalk LF 75 $ 12.50 $ 937.50 $ 16.00 $ 1,200.00 608.14 Hollywood Curb, Gutter and Drive Approach LF 150 $ 15.85 $ 2,377.50 $ 22.00 $ 3,300.00 608.15 Highback Curb and Gutter - No Sidewalk LF 500 $ 22.50 $ 11,250.00 $ 26.00 $ 13,000.00 608.16 Highback Curb, Gutter and Drive Approach LF 150 $ 24.50 $ 3,675.00 $ 21.00 $ 3,150.00 608.17 Barrier Curb - 6" x 18" LF 150 $ 18.00 $ 2,700.00 $ 25.00 $ 3,750.00 608.18 Barrier Curb - Key Way Style LF 150 $ 21.00 $ 3,150.00 $ 25.00 $ 3,750.00 608.19 Barrier Curb - Epoxy LF 150 $ 17.00 $ 2,550.00 $ 28.00 $ 4,200.00 608.20 Mountable Curb - 12" x 18" LF 150 $ 19.00 $ 2,850.00 $ 39.00 $ 5,850.00 608.21 Mountable Curb - Key Way Style LF 150 $ 22.00 $ 3,300.00 $ 39.00 $ 5,850.00 608.22 Mountable Curb - Epoxy LF 150 $ 20.00 $ 3,000.00 $ 42.00 $ 6,300.00 608.23 Pedestrian Access Ramp, Driveover Curb LF 150 $ 28.50 $ 4,275.00 $ 25.00 $ 3,750.00 608.24 Pedestrian Access Ramp, Vertical Curb LF 100 $ 27.50 $ 2,750.00 $ 25.50 $ 2,550.00 608.25 Pedestrian Access Ramp, Hollywood Curb LF 150 $ 22.50 $ 3,375.00 $ 26.50 $ 3,975.00 608.26 Pedestrian Access Ramp, Highback Curb SF 375 $ 5.50 $ 2,062.50 $ 6.00 $ 2,250.00 608.27 Truncated Dome Panel SF 100 $ 40.00 $ 4,000.00 $ 40.00 $ 4,000.00 608.28 Apron - 8" SF 500 $ 5.00 $ 2,500.00 $ 4.25 $ 2,125.00 608.29 Crosspan - 8" SF 750 $ 4.25 $ 3,187.50 $ 4.25 $ 3,187.50 608.30 Valley Pan - 6" Depth SF 350 $ 5.75 $ 2,012.50 $ 7.00 $ 2,450.00 608.31 Flatwork - 4" SF 4,000 $ 2.45 $ 9,800.00 $ 3.00 $ 12,000.00 608.32 Flatwork - 6" SF 1,500 $ 2.95 $ 4,425.00 $ 4.00 $ 6,000.00 608.33 Replace Flatwork - 1" Additional Depth SF 250 $ 0.48 $ 120.00 $ 0.50 $ 125.00 608.34 Concrete Pavement 8" (Joints Sealed) SF 1,500 $ 4.22 $ 6,330.00 $ 5.75 $ 8,625.00 608.35 Alley Approach - 8" LF 100 $ 4.50 $ 450.00 $ 37.00 $ 3,700.00 608.36 Enhanced Crosswalk - 10" Tile Red SF 150 $ 9.00 $ 1,350.00 $ 9.25 $ 1,387.50 608.37 Enhanced Crosswalk - 10" San Diego Buff SF 150 $ 8.50 $ 1,275.00 $ 8.50 $ 1,275.00 608.38 Enhanced Crosswalk - 10" Brick Red, Stamped SF 150 $ 10.75 $ 1,612.50 $ 13.00 $ 1,950.00 608.39 Colored Trail with Fibermesh - 5" Yosemite Brown SF 500 $ 3.60 $ 1,800.00 $ 3.90 $ 1,950.00 608.40 Mow Strip - 4" x 12" LF 500 $ 8.50 $ 4,250.00 $ 8.00 $ 4,000.00 608.41 Splashblock - 4" Exposed Aggregate SF 500 $ 5.00 $ 2,500.00 $ 9.50 $ 4,750.00 608.42 Splashblock - 4" San Diego Buff SF 500 $ 5.25 $ 2,625.00 $ 7.00 $ 3,500.00 608.43 Median Cover - 4" San Diego Buff SF 500 $ 5.25 $ 2,625.00 $ 7.00 $ 3,500.00 608.44 Fibermesh - Added to Any Item, Additional Charge LB/CY 100 $ 4.95 $ 495.00 $ 8.50 $ 850.00 608.45 24 Hour High Early Concrete - Added to Any Item, Additional Charge CY 50 $ 15.00 $ 750.00 $ 15.00 $ 750.00 608.46 Stamp Pattern - Added to Any Item, Additional Charge SF 150 $ 2.10 $ 315.00 $ 3.50 $ 525.00 608.47 6" Concrete Bollard EA 5 $ 75.00 $ 375.00 $ 250.00 $ 1,250.00 608.48 8" Concrete Bollard EA 5 $ 90.00 $ 450.00 $ 275.00 $ 1,375.00 608.49 Flowable Fill CY 25 $ 55.00 $ 1,375.00 $ 50.00 $ 1,250.00 608.50 Non-reinforced Concrete Wall - 8" SFF 500 $ 11.00 $ 5,500.00 $ 10.00 $ 5,000.00 608.51 Non-reinforced Concrete Footer - 8" SF 225 $ 12.00 $ 2,700.00 $ 6.00 $ 1,350.00 608.52 Concrete Staining/Sealing SF 150 $ 2.75 $ 412.50 $ 7.00 $ 1,050.00 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT ESTIMATED QUANTITY EXPRESS UNIT PRICE EXPRESS TOTAL COST VOGEL UNIT PRICE VOGEL TOTAL COST 630.11 Cone With Reflective Strip Per Day Per Each 375 $ 0.60 $ 225.00 $ 0.63 $ 236.25 630.12 Safety Fence Per Day Per Roll 20 $ 5.00 $ 100.00 $ 4.50 $ 90.00 630.13 Light Per Day Per Each 20 $ 0.50 $ 10.00 $ 0.33 $ 6.60 630.14 Advance Warning Flashing - or Sequencing Arrow Panel Per Unit Per Day 5 $ 70.00 $ 350.00 $ 75.00 $ 375.00 630.15 Variable Message Board Per Unit Per Day 10 $ 125.00 $ 1,250.00 $ 165.00 $ 1,650.00 630.16 Traffic Control Supervisor Per Day 25 $ 295.00 $ 7,375.00 $ 335.00 $ 8,375.00 630.17 Traffic Control Supervisor Per Hour 100 $ 30.00 $ 3,000.00 $ 33.00 $ 3,300.00 630.18 Flagging Per Hour 150 $ 18.50 $ 2,775.00 $ 19.30 $ 2,895.00 FA1 Laborer Hour 15 $ 21.00 $ 315.00 $ 38.00 $ 570.00 FA2 Foreman Hour 15 $ 35.00 $ 525.00 $ 55.00 $ 825.00 FA3 Finisher Hour 15 $ 29.00 $ 435.00 $ 48.00 $ 720.00 FA4 Form Setter Hour 15 $ 27.50 $ 412.50 $ 48.00 $ 720.00 $ 316,315.25 $ 381,860.30 FORCE ACCOUNT LABOR RATES *Materials will carry a 10% markup from the original invoice for costs $500 and below, and an 8% markup for invoices greater than $500 *Attach hourly Equipment/Operator rates to be used for Force Account work TOTAL COST Page 3 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. 5911 ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 202.01 Sawcut Concrete/Asphalt ≤ 4" $ 2.10 LF 25 $ 52.50 202.02 Sawcut Concrete/Asphalt 4" ≤ 6" $ 2.60 LF 25 $ 65.00 202.03 Sawcut Concrete/Asphalt 6" ≤ 8" $ 3.25 LF 25 $ 81.25 202.04 Sawcut Concrete/Asphalt 8" ≤ 10" $ 4.50 LF 25 $ 112.50 202.05 Sawcut - Additional 1" Depth $ 0.75 LF 25 $ 18.75 202.06 Remove Concrete Sidewalk $ 2.25 SF 1500 $ 3,375.00 202.07 Remove Concrete Curb and Gutter $ 3.40 LF 250 $ 850.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk $ 2.30 SF 250 $ 575.00 202.09 Remove Concrete Driveway/Apron/Crosspan $ 2.45 SF 750 $ 1,837.50 202.10 Remove Concrete Pavement - 10" $ 3.80 SF 500 $ 1,900.00 202.11 Remove Concrete Pavement - Additional 1" Depth $ 0.40 SF 50 $ 20.00 202.12 Remove Asphalt - 6" $ 2.10 SF 250 $ 525.00 202.13 Remove Asphalt - Additional 1" Depth $ 0.40 SF 50 $ 20.00 202.14 Remove Inlet $ 525.00 EA 5 $ 2,625.00 202.15 Remove and Haul Driveway Fillets $ 50.00 EA 5 $ 250.00 203.01 Excavation - General Less Than 50 CY $ 60.00 CY 150 $ 9,000.00 203.02 Excavation - General Over 50 CY $ 54.45 CY 150 $ 8,167.50 203.03 Excavation - Walls Only $ 11.00 CY 100 $ 1,100.00 203.04 Excavation - New Inlet $ 400.00 EA 5 $ 2,000.00 203.05 Borrow - Less than 100 Ton $ 30.00 TON 75 $ 2,250.00 203.06 Borrow - Over 100 Ton $ 26.00 TON 75 $ 1,950.00 210.01 Reset Brick Pavers $ 7.50 SF 185 $ 1,387.50 210.02 Adjust Manhole $ 125.00 EA 10 $ 1,250.00 210.03 Adjust Valve Box $ 115.00 EA 10 $ 1,150.00 304.01 Aggregate Base Course $ 24.00 TON 150 $ 3,600.00 403.01 Temporary Asphalt Patching $ 80.00 TON 100 $ 8,000.00 602.01 Reinforcing Steel $ 0.40 LB 500 $ 200.00 602.02 Reinforcing Steel - Epoxy Coated $ 0.78 LB 500 $ 390.00 604.01 Reconstruct Inlet Deck - Catch Basin (R&R) $ 1,000.00 EA 5 $ 5,000.00 604.02 Reconstruct Inlet Deck - Additional Foot Opening (R&R) $ 165.00 LF 10 $ 1,650.00 604.03 Reconstruct Curb Inlet Deck - 4' Opening (R&R) $ 1,650.00 EA 5 $ 8,250.00 604.04 Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R) $ 165.00 LF 10 $ 1,650.00 604.05 Area Inlet $ 1,000.00 EA 5 $ 5,000.00 604.06 Type R Inlet - 5' Opening $ 1,700.00 EA 5 $ 8,500.00 604.07 Type R Inlet - Additional Foot Opening $ 220.00 LF 5 $ 1,100.00 604.08 Combination Type 13 Curb Inlet - Frame, Grate & Adjustable Curb Bonnet (East Jordan Ironworks 7030 or Equivalent) $ 1,450.00 EA 5 $ 7,250.00 604.09 Concrete Sidewalk Culvert $ 350.00 EA 5 $ 1,750.00 604.10 Metal Sidewalk Culvert - 2' Opening, 5/8" plate $ 1,150.00 EA 10 $ 11,500.00 604.11 Additional Square Foot 5/8" Plate $ 100.00 SF 10 $ 1,000.00 608.01 Driveover Curb, Gutter & 4" Sidewalk $ 17.50 LF 1,000 $ 17,500.00 Page 4 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. 5911 ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 608.02 Driveover Curb, Gutter & 6" Sidewalk $ 19.50 LF 1,000 $ 19,500.00 608.03 Driveover Curb and Gutter - No Sidewalk $ 15.00 LF 125 $ 1,875.00 608.04 Driveover Curb, Gutter and 6" Drive Approach $ 21.00 LF 200 $ 4,200.00 608.05 Vertical Curb, Gutter and 4" Sidewalk $ 19.50 LF 300 $ 5,850.00 608.06 Vertical Curb, Gutter and 6" Sidewalk $ 21.50 LF 100 $ 2,150.00 608.07 Vertical Curb and Gutter - No Sidewalk $ 15.80 LF 500 $ 7,900.00 608.08 Vertical Curb, Gutter and Drive Approach $ 22.00 LF 150 $ 3,300.00 608.09 Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk $ 16.50 LF 75 $ 1,237.50 608.10 Out Fall Curb & Gutter $ 15.00 LF 100 $ 1,500.00 608.11 Hollywood Curb, Gutter and 4" Sidewalk $ 14.50 LF 250 $ 3,625.00 608.12 Hollywood Curb, Gutter and 6" Sidewalk $ 15.50 LF 250 $ 3,875.00 608.13 Hollywood Curb and Gutter - No Sidewalk $ 12.50 LF 75 $ 937.50 608.14 Hollywood Curb, Gutter and Drive Approach $ 15.85 LF 150 $ 2,377.50 608.15 Highback Curb and Gutter - No Sidewalk $ 22.50 LF 500 $ 11,250.00 608.16 Highback Curb, Gutter and Drive Approach $ 24.50 LF 150 $ 3,675.00 608.17 Barrier Curb - 6" x 18" $ 18.00 LF 150 $ 2,700.00 608.18 Barrier Curb - Key Way Style $ 21.00 LF 150 $ 3,150.00 608.19 Barrier Curb - Epoxy $ 17.00 LF 150 $ 2,550.00 608.20 Mountable Curb - 12" x 18" $ 19.00 LF 150 $ 2,850.00 608.21 Mountable Curb - Key Way Style $ 22.00 LF 150 $ 3,300.00 608.22 Mountable Curb - Epoxy $ 20.00 LF 150 $ 3,000.00 608.23 Pedestrian Access Ramp, Driveover Curb $ 28.50 LF 150 $ 4,275.00 608.24 Pedestrian Access Ramp, Vertical Curb $ 27.50 LF 100 $ 2,750.00 608.25 Pedestrian Access Ramp, Hollywood Curb $ 22.50 LF 150 $ 3,375.00 608.26 Pedestrian Access Ramp, Highback Curb $ 5.50 SF 375 $ 2,062.50 608.27 Truncated Dome Panel $ 40.00 SF 100 $ 4,000.00 608.28 Apron - 8" $ 5.00 SF 500 $ 2,500.00 608.29 Crosspan - 8" $ 4.25 SF 750 $ 3,187.50 608.30 Valley Pan - 6" Depth $ 5.75 SF 350 $ 2,012.50 608.31 Flatwork - 4" $ 2.45 SF 4,000 $ 9,800.00 608.32 Flatwork - 6" $ 2.95 SF 1,500 $ 4,425.00 608.33 Replace Flatwork - 1" Additional Depth $ 0.48 SF 250 $ 120.00 608.34 Concrete Pavement 8" (Joints Sealed) $ 4.22 SF 1,500 $ 6,330.00 608.35 Alley Approach - 8" $ 4.50 LF 100 $ 450.00 608.36 Enhanced Crosswalk - 10" Tile Red $ 9.00 SF 150 $ 1,350.00 608.37 Enhanced Crosswalk - 10" San Diego Buff $ 8.50 SF 150 $ 1,275.00 608.38 Enhanced Crosswalk - 10" Brick Red, Stamped $ 10.75 SF 150 $ 1,612.50 608.39 Colored Trail with Fibermesh - 5" Yosemite Brown $ 3.60 SF 500 $ 1,800.00 608.40 Mow Strip - 4" x 12" $ 8.50 LF 500 $ 4,250.00 608.41 Splashblock - 4" Exposed Aggregate $ 5.00 SF 500 $ 2,500.00 608.42 Splashblock - 4" San Diego Buff $ 5.25 SF 500 $ 2,625.00 608.43 Median Cover - 4" San Diego Buff $ 5.25 SF 500 $ 2,625.00 608.44 Fibermesh - Added to Any Item, Additional Charge $ 4.95 LB/CY 100 $ 495.00 608.45 24 Hour High Early Concrete - Added to Any Item, Additional Charge $ 15.00 CY 50 $ 750.00 608.46 Stamp Pattern - Added to Any Item, Additional Charge $ 2.10 SF 150 $ 315.00 608.47 6" Concrete Bollard $ 75.00 EA 5 $ 375.00 608.48 8" Concrete Bollard $ 90.00 EA 5 $ 450.00 608.49 Flowable Fill $ 55.00 CY 25 $ 1,375.00 Page 5 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. 5911 ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 608.50 Non-reinforced Concrete Wall - 8" $ 11.00 SFF 500 $ 5,500.00 608.51 Non-reinforced Concrete Footer - 8" $ 12.00 SF 225 $ 2,700.00 608.52 Concrete Staining/Sealing $ 2.75 SF 150 $ 412.50 608.53 Expansion and Sealing $ 4.00 LF 250 $ 1,000.00 608.54 Joint Sealant $ 2.25 LF 100 $ 225.00 626.01 Mobilization – Invoices Under $500 $ 280.00 Lump Sum 25 $ 7,000.00 630.01 "NO PARKING" Sign With Stand $ 1.45 Per Day Per Each 375 $ 543.75 630.02 Vertical Panel Without Light $ 0.85 Per Day Per Each 50 $ 42.50 630.03 Channelizing Barrels $ 0.75 Per Day Per Each 50 $ 37.50 630.04 Type I Barricade Without Light $ 0.75 Per Day Per Each 750 $ 562.50 630.05 Type II Barricade Without Light $ 0.75 Per Day Per Each 20 $ 15.00 630.06 Type III Barricade Without Light $ 3.00 Per Day Per Each 20 $ 60.00 630.07 Size A Sign With Stand $ 1.40 Per Day Per Each 225 $ 315.00 630.08 Size B Sign With Stand $ 1.55 Per Day Per Each 20 $ 31.00 630.09 Size A Specialty Sign - Cost of Manufacturing $ 77.00 Each 2 $ 154.00 630.10 Size B Specialty Sign - Cost of Manufacturing $ 77.00 Each 2 $ 154.00 630.11 Cone With Reflective Strip $ 0.60 Per Day Per Each 375 $ 225.00 630.12 Safety Fence $ 5.00 Per Day Per Roll 20 $ 100.00 630.13 Light $ 0.50 Per Day Per Each 20 $ 10.00 630.14 Advance Warning Flashing - or Sequencing Arrow Panel $ 70.00 Per Unit Per Day 5 $ 350.00 630.15 Variable Message Board $ 125.00 Per Unit Per Day 10 $ 1,250.00 630.16 Traffic Control Supervisor $ 295.00 Per Day 25 $ 7,375.00 630.17 Traffic Control Supervisor $ 30.00 Per Hour 100 $ 3,000.00 630.18 Flagging $ 18.50 Per Hour 150 $ 2,775.00 FA1 Laborer $ 21.00 Hour 15 $ 315.00 FA2 Foreman $ 35.00 Hour 15 $ 525.00 FA3 Finisher $ 29.00 Hour 15 $ 435.00 FA4 Form Setter $ 27.50 Hour 15 $ 412.50 $ 316,315.25 Dollars and Cents. Signed Address Company Express Concrete Inc. Phone/Fax Individual Doing Business in Company Name Check One: 5305 S. Ziegler Road Fort Collins, CO 80528 970.225.1287 970.229.0846 FORCE ACCOUNT LABOR RATES *Materials will carry a 10% markup from the original invoice for costs $500 and below, and an 8% markup for invoices greater than $500 *Attach hourly Equipment/Operator rates to be used for Force Account work TOTAL COST Three Hundred Sixteen Thousand, Three Hundred Fifteen Twenty Five Page 6 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. 5911 ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST X Corporation Partnership Page 7 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 202.01 Sawcut Concrete/Asphalt ≤ 4" $ LF 25 $ 202.02 Sawcut Concrete/Asphalt 4" ≤ 6" $ LF 25 $ 202.03 Sawcut Concrete/Asphalt 6" ≤ 8" $ LF 25 $ 202.04 Sawcut Concrete/Asphalt 8" ≤ 10" $ LF 25 $ 202.05 Sawcut - Additional 1" Depth $ LF 25 $ 202.06 Remove Concrete Sidewalk $ SF 1500 $ 202.07 Remove Concrete Curb and Gutter $ LF 250 $ 202.08 Remove Monolithic Curb, Gutter & Sidewalk $ SF 250 $ 202.09 Remove Concrete Driveway/Apron/Crosspan $ SF 750 $ 202.10 Remove Concrete Pavement - 10" $ SF 500 $ 202.11 Remove Concrete Pavement - Additional 1" Depth $ SF 50 $ 202.12 Remove Asphalt - 6" $ SF 250 $ 202.13 Remove Asphalt - Additional 1" Depth $ SF 50 $ 202.14 Remove Inlet $ EA 5 $ 202.15 Remove and Haul Driveway Fillets $ EA 5 $ 203.01 Excavation - General Less Than 50 CY $ CY 150 $ 203.02 Excavation - General Over 50 CY $ CY 150 $ 203.03 Excavation - Walls Only $ CY 100 $ 203.04 Excavation - New Inlet $ EA 5 $ 203.05 Borrow - Less than 100 Ton $ TON 75 $ 203.06 Borrow - Over 100 Ton $ TON 75 $ 210.01 Reset Brick Pavers $ SF 185 $ 210.02 Adjust Manhole $ EA 10 $ 210.03 Adjust Valve Box $ EA 10 $ 304.01 Aggregate Base Course $ TON 150 $ 403.01 Temporary Asphalt Patching $ TON 100 $ 602.01 Reinforcing Steel $ LB 500 $ 602.02 Reinforcing Steel - Epoxy Coated $ LB 500 $ 604.01 Reconstruct Inlet Deck - Catch Basin (R&R) $ EA 5 $ 604.02 Reconstruct Inlet Deck - Additional Foot Opening (R&R) $ LF 10 $ 604.03 Reconstruct Curb Inlet Deck - 4' Opening (R&R) $ EA 5 $ 604.04 Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R) $ LF 10 $ 604.05 Area Inlet $ EA 5 $ 604.06 Type R Inlet - 5' Opening $ EA 5 $ 604.07 Type R Inlet - Additional Foot Opening $ LF 5 $ 604.08 Combination Type 13 Curb Inlet - Frame, Grate & Adjustable Curb Bonnet (East Jordan Ironworks 7030 or Equivalent) $ EA 5 $ 604.09 Concrete Sidewalk Culvert $ EA 5 $ 604.10 Metal Sidewalk Culvert - 2' Opening, 5/8" plate $ EA 10 $ 604.11 Additional Square Foot 5/8" Plate $ SF 10 $ 608.01 Driveover Curb, Gutter & 4" Sidewalk $ LF 1,000 $ Page 8 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 608.02 Driveover Curb, Gutter & 6" Sidewalk $ LF 1,000 $ 608.03 Driveover Curb and Gutter - No Sidewalk $ LF 125 $ 608.04 Driveover Curb, Gutter and 6" Drive Approach $ LF 200 $ 608.05 Vertical Curb, Gutter and 4" Sidewalk $ LF 300 $ 608.06 Vertical Curb, Gutter and 6" Sidewalk $ LF 100 $ 608.07 Vertical Curb and Gutter - No Sidewalk $ LF 500 $ 608.08 Vertical Curb, Gutter and Drive Approach $ LF 150 $ 608.09 Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk $ LF 75 $ 608.10 Out Fall Curb & Gutter $ LF 100 $ 608.11 Hollywood Curb, Gutter and 4" Sidewalk $ LF 250 $ 608.12 Hollywood Curb, Gutter and 6" Sidewalk $ LF 250 $ 608.13 Hollywood Curb and Gutter - No Sidewalk $ LF 75 $ 608.14 Hollywood Curb, Gutter and Drive Approach $ LF 150 $ 608.15 Highback Curb and Gutter - No Sidewalk $ LF 500 $ 608.16 Highback Curb, Gutter and Drive Approach $ LF 150 $ 608.17 Barrier Curb - 6" x 18" $ LF 150 $ 608.18 Barrier Curb - Key Way Style $ LF 150 $ 608.19 Barrier Curb - Epoxy $ LF 150 $ 608.20 Mountable Curb - 12" x 18" $ LF 150 $ 608.21 Mountable Curb - Key Way Style $ LF 150 $ 608.22 Mountable Curb - Epoxy $ LF 150 $ 608.23 Pedestrian Access Ramp, Driveover Curb $ LF 150 $ 608.24 Pedestrian Access Ramp, Vertical Curb $ LF 100 $ 608.25 Pedestrian Access Ramp, Hollywood Curb $ LF 150 $ 608.26 Pedestrian Access Ramp, Highback Curb $ SF 375 $ 608.27 Truncated Dome Panel $ SF 100 $ 608.28 Apron - 8" $ SF 500 $ 608.29 Crosspan - 8" $ SF 750 $ 608.30 Valley Pan - 6" Depth $ SF 350 $ 608.31 Flatwork - 4" $ SF 4,000 $ 608.32 Flatwork - 6" $ SF 1,500 $ 608.33 Replace Flatwork - 1" Additional Depth $ SF 250 $ 608.34 Concrete Pavement 8" (Joints Sealed) $ SF 1,500 $ 608.35 Alley Approach - 8" $ LF 100 $ 608.36 Enhanced Crosswalk - 10" Tile Red $ SF 150 $ 608.37 Enhanced Crosswalk - 10" San Diego Buff $ SF 150 $ 608.38 Enhanced Crosswalk - 10" Brick Red, Stamped $ SF 150 $ 608.39 Colored Trail with Fibermesh - 5" Yosemite Brown $ SF 500 $ 608.40 Mow Strip - 4" x 12" $ LF 500 $ 608.41 Splashblock - 4" Exposed Aggregate $ SF 500 $ 608.42 Splashblock - 4" San Diego Buff $ SF 500 $ 608.43 Median Cover - 4" San Diego Buff $ SF 500 $ 608.44 Fibermesh - Added to Any Item, Additional Charge $ LB/CY 100 $ 608.45 24 Hour High Early Concrete - Added to Any Item, Additional Charge $ CY 50 $ 608.46 Stamp Pattern - Added to Any Item, Additional Charge $ SF 150 $ 608.47 6" Concrete Bollard $ EA 5 $ 608.48 8" Concrete Bollard $ EA 5 $ 608.49 Flowable Fill $ CY 25 $ Page 9 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 608.50 Non-reinforced Concrete Wall - 8" $ SFF 500 $ 608.51 Non-reinforced Concrete Footer - 8" $ SF 225 $ 608.52 Concrete Staining/Sealing $ SF 150 $ 608.53 Expansion and Sealing $ LF 250 $ 608.54 Joint Sealant $ LF 100 $ 626.01 Mobilization – Invoices Under $500 $ Lump Sum 25 $ 630.01 "NO PARKING" Sign With Stand $ Per Day Per Each 375 $ 630.02 Vertical Panel Without Light $ Per Day Per Each 50 $ 630.03 Channelizing Barrels $ Per Day Per Each 50 $ 630.04 Type I Barricade Without Light $ Per Day Per Each 750 $ 630.05 Type II Barricade Without Light $ Per Day Per Each 20 $ 630.06 Type III Barricade Without Light $ Per Day Per Each 20 $ 630.07 Size A Sign With Stand $ Per Day Per Each 225 $ 630.08 Size B Sign With Stand $ Per Day Per Each 20 $ 630.09 Size A Specialty Sign - Cost of Manufacturing $ Each 2 $ 630.10 Size B Specialty Sign - Cost of Manufacturing $ Each 2 $ 630.11 Cone With Reflective Strip $ Per Day Per Each 375 $ 630.12 Safety Fence $ Per Day Per Roll 20 $ 630.13 Light $ Per Day Per Each 20 $ 630.14 Advance Warning Flashing - or Sequencing Arrow Panel $ Per Unit Per Day 5 $ 630.15 Variable Message Board $ Per Unit Per Day 10 630.16 Traffic Control Supervisor $ Per Day 25 $ 630.17 Traffic Control Supervisor $ Per Hour 100 $ 630.18 Flagging $ Per Hour 150 $ FA1 Laborer $ Hour 15 $ FA2 Foreman $ Hour 15 $ FA3 Finisher $ Hour 15 $ FA4 Form Setter $ Hour 15 $ $ Dollars and Cents. Signed Address Company Phone/Fax Individual Doing Business in Company Name Check One: FORCE ACCOUNT LABOR RATES *Materials will carry a 10% markup from the original invoice for costs $500 and below, and an 8% markup for invoices greater than $500 *Attach hourly Equipment/Operator rates to be used for Force Account work TOTAL COST Page 10 of 11 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO. XXXX ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST Corporation Partnership Page 11 of 11 608.53 Expansion and Sealing LF 250 $ 4.00 $ 1,000.00 $ 5.00 $ 1,250.00 608.54 Joint Sealant LF 100 $ 2.25 $ 225.00 $ 3.00 $ 300.00 626.01 Mobilization – Invoices Under $500 Lump Sum 25 $ 280.00 $ 7,000.00 $ 350.00 $ 8,750.00 630.01 "NO PARKING" Sign With Stand Per Day Per Each 375 $ 1.45 $ 543.75 $ 1.85 $ 693.75 630.02 Vertical Panel Without Light Per Day Per Each 50 $ 0.85 $ 42.50 $ 0.65 $ 32.50 630.03 Channelizing Barrels Per Day Per Each 50 $ 0.75 $ 37.50 $ 0.75 $ 37.50 630.04 Type I Barricade Without Light Per Day Per Each 750 $ 0.75 $ 562.50 $ 0.63 $ 472.50 630.05 Type II Barricade Without Light Per Day Per Each 20 $ 0.75 $ 15.00 $ 0.62 $ 12.40 630.06 Type III Barricade Without Light Per Day Per Each 20 $ 3.00 $ 60.00 $ 3.70 $ 74.00 630.07 Size A Sign With Stand Per Day Per Each 225 $ 1.40 $ 315.00 $ 1.33 $ 299.25 630.08 Size B Sign With Stand Per Day Per Each 20 $ 1.55 $ 31.00 $ 1.54 $ 30.80 630.09 Size A Specialty Sign - Cost of Manufacturing Each 2 $ 77.00 $ 154.00 $ 77.00 $ 154.00 630.10 Size B Specialty Sign - Cost of Manufacturing Each 2 $ 77.00 $ 154.00 $ 85.00 $ 170.00 Page 2 of 11 608.04 Driveover Curb, Gutter and 6" Drive Approach LF 200 $ 21.00 $ 4,200.00 $ 22.00 $ 4,400.00 608.05 Vertical Curb, Gutter and 4" Sidewalk LF 300 $ 19.50 $ 5,850.00 $ 20.00 $ 6,000.00 608.06 Vertical Curb, Gutter and 6" Sidewalk LF 100 $ 21.50 $ 2,150.00 $ 22.50 $ 2,250.00 608.07 Vertical Curb and Gutter - No Sidewalk LF 500 $ 15.80 $ 7,900.00 $ 19.00 $ 9,500.00 608.08 Vertical Curb, Gutter and Drive Approach LF 150 $ 22.00 $ 3,300.00 $ 21.00 $ 3,150.00 608.09 Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk LF 75 $ 16.50 $ 1,237.50 $ 19.00 $ 1,425.00 608.10 Out Fall Curb & Gutter LF 100 $ 15.00 $ 1,500.00 $ 18.00 $ 1,800.00 Page 1 of 11