HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - VERTICALAPPLICATION FOR PAYMENT PROJECT: PAY ESTIMATE NO: DATE: CONTRACTOR: ADDRESS: CONTRACT FOR: PARTIAL TO The undersigned Contractor certifies that to the best of his knowledge, information and belief the work covered by this application for Payment has been completed in accordance with the Contract Documents, that all accounts have been paid by him for Work for which previous Certificates for Payment were issued and payments received, in this current payment shown herein is now due. CONTRACTOR: IZiT.r3 FINAL TO In accordance with the Contract Documents, based on site observations and the data comprising the above application, the Architects Certifies to the Owner that the Work has progressed to the point indicated; that the best of his knowledge, information and belief, the quality of the Work is in accordance with the Contract Documents, and that the Contractor is entitled to payment of the AMOUNT CERTIFIED. ENGINEER: Application is made for Payment, as shown below, in connection with the Contract. Schedule of Values is attached. The present status of the account for this Contract is as follows: ORIGINAL CONTRACT AMOUNT APPROVED CHANGE ORDERS TO DATE ADJUSTED CONTRACT AMOUNT TOTAL WORK COMPLETED AND MATERIALS USED RETAINAGE (10% OF TOTAL) TOTAL EARNED LESS RETAINAGE LIQUIDATED DAMAGES WITHHELD TOTAL EARNED LESS LIQUIDATED DAMAGES LESS PREVIOUS PAYMENTS CURRENT PAYMENT DUE APPROVED BY: (Title) cc: Accounting City Clerk Contractor Engineer Project File DATE: DATE OF ISSUANCE OWNER CONTRACTOR Contract: Project: OWNER's Contract No. WORK CHANGE DIRECTIVE No. EFFECTIVE DATE ENGINEER's Project No. You are directed to proceed promptly with the following change(s): Description: Purpose of Work Change Directive: Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. Method of determining change in Contract Price: Unit Prices Lump Sum Cost of the Work Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract $ Times: If the change involves an increase, the estimated Substantial Completion: days; amount is not to be exceeded without further Ready for final payment: days. authorization. RECOMMENDED: AUTHORIZED: ENGINEER OWNER. By: By: EJCDC No. 1910-8-F (1996 Edition) Meprred by the Engineers Mint Contract 0ocuments'Committee and endorsed by The Associated General Contractors. of America and the. Construction Specifications Inginde. WORK CHANGE DIRECTIVE INSTRUCTIONS A. GENERAL INFORMATION This document was developed for use in situations involving changes in the Work which, if not processed expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with Work that may be included in a subsequent Change Order. For suppleni euta I instructions and minor changes not involving a change in the Contract Price or the Conti -act Times a Field Order should be used, & COMPLETING TUF WORK CHANGE DIRECTIVE FORM Engineer initiates the form, including a description or the items involved and attachments. Based on conversations between Engineer and Contractor, Engineer completes the following: METHOD 017 DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to Ere used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated price or Contractor may stop the changed Work when the estimated time is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked "Not Applicable". Once E ugineer has completed and signed the form, all, copies should be sent to Owner for authorization bemuse Engineer alone does no( have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation. Paragraph 10.03 -A-2 of the General Conditions requires that a Change Order be initiated and processed to cover• any undisputed sum or amount of time for Work actually performed pursuant to this Work Change Directive. Once the Work covered by*tbis directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order. THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT PRICE OR CONTRACT11MES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDEMD PROMPTLY. W Advancement of Construction Technology REQUEST FOR INTERPRETATION Project: R.F.I. Number: From: To: Date: A/E Project Number: Re: Contract For: Specification Section: Paragraph: Drawing Reference: Detail: Request: Signed by: Date: Response: ❑ Attachments Response From: To: Date Rec'd: Date Ret0d: Signed by: Date: Copies: ❑ Owner ❑ Consultants ❑ ❑ ❑ ❑ ❑ File Copyright 1994, Construction Specifications Institute, Page of July 1994 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 CS] Form 13.2A Advancement of Construction Technology CLARIFICATION NOTICE Project: Clarification Notice Number: To: From: Date: A/E Project Number: Re: ContractFor: This Clarification Notice is issued for the purpose of clarifying the Contract Documents based on an interpretation reasonably inferable from the Contract Documents, and therefore has no effect on the Contract Sum or Contract Time. Proceeding with Work in accordance with this Clarification Notice indicates acceptance with no change in the Contract Sum or Contract Time. Specification Section: Description: Paragraph: Drawing Reference: Detail: ❑ Attachments Signed by: Date: Copies: ❑ Owner ❑ Consultants ❑ Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 _ ❑ Cl ❑ ❑ File Page of July 1994 CSI Form 13.3A Advancement of ConstructionrV 7� Technology - FIELD Project: Field Order Number: From: To: Date. A/E Project Number: Re: Contract For: You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without change in Contract Sum or Contract Time. If you consider that a change in Contract Sum or Contract Time is required, submit a Change Order Request to the A/E immediately and prior to proceeding with this Work. Specification Section: Paragraph: Drawing Reference: Detail: Description of Interpretation or Change: ❑ Attachments Signed by: Date: Copies: ❑ Owner ❑ Consultants ❑ ❑ ❑ ❑ ❑ File Copyright 1994, Construction Specification Institute, Page of July 1994 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 CSI Form 13.4A