Loading...
HomeMy WebLinkAboutBID - 5885 PUMP MAINTENANCE FOR PARKSEXHIBIT C SCOPE OF WORK 1. Service Provider to: A. Provide pump and motor maintenance and additional services as set out in specific work orders. B. Clean-up each job site at the end of each day and at work completion. C. Must be able to be reached by telephone during prescribed business hours. D. Remove and restore pumphouse roof if needed. E. Warranty all parts and labor for at least one year. F. Provide material invoices and labor breakdown with all billing statements. G. Be present when pump is brought on-line in spring if requested. 2. Qualifications of Bidder: A. Qualified bidder must be doing business under the present business name for the past three consecutive years unless approved by the City. B. At least five (5) years consistent, hands on experience in pulling and reconditioning vertical turbine pumps , hollow shaft motors, and centrifugal booster pumps. Must be able to demonstrate this through references which must include contact name, date when work was completed and type of work. C. Qualified bidder shall have sufficient manpower and equipment to accomplish said work in the required time. D. The Owner may make such investigation as it deems necessary to determine the ability of the bidder to perform the work and the bidder shall furnish to the Owner all such information and data as is reasonably required for this purpose. The Owner reserves the right to disqualify any bid if the evidence resulting from the Owners investigation shows, in the opinion of the Owner, that the bidder is not properly qualified to prosecute the work described herein. 3. Workmanship and Materials A. Work must be performed by skilled tradesmen. B. All parts used must meet manufacturer’s guidelines. 4. Sub-contracting A. It will be the responsibility of the Service Provider to insure that materials and all work performed by sub-contractor will be warranted for one year from completion date. 5. Work Order Procedure A. All job estimates must be submitted on a unit price basis consistent with the prices established in the Methods of Award/Bid Schedule section. The Parks Department must be notified of a “not to exceed price” after a pump is pulled and dismantled at the contractors shop. B. Contractor will invoice for all jobs completed on a unit price basis with the prices established in the Method of Award/Bid Schedule section, including appropriate mark up on materials, if any. Material invoices must be included with the billing invoices. C. Work Orders shall be issued and signed by the Designated Parks or Other Dept. Representative. D. Work order numbers shall be included on the billing invoices. 6. Payment Procedure A. Payment for parts may be paid when invoices are received. Payment for labor will be paid when job is completed and has been signed off by the Parks or other Representative.