HomeMy WebLinkAboutBID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARK (2)BID UNIT ITEM
ITEM # QUANTITY UNIT PRICE TOTAL
1 1 LS
2 1 LS
3 1 LS
4 1 LS
5 125 CY
6 10 LF
7 520 LF
8 40 TON
9 1 LS
10 10 LF
11 20 TON
$
Figure
1 270 LF
2 50 CY
ESTIMATED
GENERAL REQUIREMENTS
FILL AREA - POND 1 AND 2
Dewatering
Pipe Extension
STABILIZATION AND SITTING ROCKS - POND 2
STEPPING STONES - POND 2
Riprap
(written)
Topsoil
Rip Rap at Pond 1
Riprap
TOTAL OF BASE BID
Dewatering
Earthwork - Fill
Stepping Stones
Sitting Rocks
ADD ALTERNATE:
Traffic Control
Mobilization
General Conditions
LAKE STABILIZATION AT FOSSIL CREEK PARK
BID SCHEDULE
Bid items are described in Section 01800
DESCRIPTION