Loading...
HomeMy WebLinkAboutBID - 5881 POUDRE TRAIL REHABILITATION (14)City of Fort Collins Addendum No. 1 BID #5881 POUDRE TRAIL REHABILITATION Specifications and Contract Documents Description of Bid # Bid No. 5881 Poudre Trail Rehabilitation OPENING DATE: October 27, 2004, 3:00 p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following clarifications are hereby made. DIVISION 1 SECTION 01800 – DEFINITION OF BID ITEMS The following items describe the scope of work for this contract and are further clarified through limit-of-work boundary notes on the drawings and specifications. The work described in each Bid Item may contain work from one or several technical specification sections. Contractor shall refer to the technical specifications that apply to the individual components. Bid Item 1 – Mobilization Contractor shall furnish all labor, materials and equipment for mobilization of personnel, equipment and supplies at the project site in preparation for work on this project. Bid Item 2 – Traffic Control Contractor shall furnish all labor, materials and equipment for approved traffic control plan by a City of Fort Collins approved Traffic Control Company. This includes furnishing, installing, and maintaining traffic control for the duration of the trail project. Bid Item 3 – Demolition Contractor shall provide all labor and equipment for demolition and removal of 8’ wide asphalt trail (Existing Poudre Trail). Work includes all hauling and fees. The removed asphalt is to be hauled to 300 Hoffman Mill Road (behind Coloradoan on Riverside), coordinate with owner’s representative. Bid Item 4 – 5” Colored Concrete Paving Contractor shall furnish all labor, materials and equipment to install 10’ wide concrete trail. Bid amount includes installation of 5” thick standard concrete (3,500 psi) with fiber mesh reinforcement. All concrete paving to be Yosemite Brown Colored Concrete. Bid Item 5 - Parking Lot Improvements Contractor shall furnish all labor, materials and equipment to install 2 concrete parking stalls and connecting sidewalks. Work includes backfilling and rehabilitation of any areas disturbed by construction activities. All concrete work in the Taft hill Parking Lot is to be 6” thick standard gray concrete (3,500 psi) with fiber mesh reinforcement. Estimated quantity of concrete work is 850 sf, which includes the roll down edge connection. Bid Item 6 – Landscape Restoration Contractor shall provide all labor and equipment to backfill concrete trail, redistribute topsoil, and fine grade disturbed areas for preparation of seeding operations. This item includes removing any debris and or rocks larger than 1 ½” from seed preparation area. Bid Item 7 –Hydro Seeding Contractor shall provide all materials, labor and equipment to seed areas disturbed by construction. This work includes hydro mulching disturbed areas. If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970- 221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.