Addendum No. 1
BID #5881
POUDRE TRAIL REHABILITATION
Specifications and Contract Documents
Description of Bid # Bid No. 5881 Poudre Trail Rehabilitation
OPENING DATE: October 27, 2004, 3:00 p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described
above, the following clarifications are hereby made.
DIVISION 1
SECTION 01800 – DEFINITION OF BID ITEMS
The following items describe the scope of work for this contract and are further clarified
through limit-of-work boundary notes on the drawings and specifications. The work
described in each Bid Item may contain work from one or several technical specification
sections. Contractor shall refer to the technical specifications that apply to the individual
components.
Bid Item 1 – Mobilization
Contractor shall furnish all labor, materials and equipment for mobilization of personnel,
equipment and supplies at the project site in preparation for work on this project.
Bid Item 2 – Traffic Control
Contractor shall furnish all labor, materials and equipment for approved traffic control
plan by a City of Fort Collins approved Traffic Control Company. This includes
furnishing, installing, and maintaining traffic control for the duration of the trail project.
Bid Item 3 – Demolition
Contractor shall provide all labor and equipment for demolition and removal of 8’ wide
asphalt trail (Existing Poudre Trail). Work includes all hauling and fees. The removed
asphalt is to be hauled to 300 Hoffman Mill Road (behind Coloradoan on Riverside),
coordinate with owner’s representative.
Bid Item 4 – 5” Colored Concrete Paving
Contractor shall furnish all labor, materials and equipment to install 10’ wide concrete
trail. Bid amount includes installation of 5” thick standard concrete (3,500 psi) with fiber
mesh reinforcement. All concrete paving to be Yosemite Brown Colored Concrete.
Bid Item 5 - Parking Lot Improvements
Contractor shall furnish all labor, materials and equipment to install 2 concrete parking
stalls and connecting sidewalks. Work includes backfilling and rehabilitation of any
areas disturbed by construction activities. All concrete work in the Taft hill Parking Lot is
to be 6” thick standard gray concrete (3,500 psi) with fiber mesh reinforcement.
Estimated quantity of concrete work is 850 sf, which includes the roll down edge
connection.
Bid Item 6 – Landscape Restoration
Contractor shall provide all labor and equipment to backfill concrete trail, redistribute
topsoil, and fine grade disturbed areas for preparation of seeding operations. This item
includes removing any debris and or rocks larger than 1 ½” from seed preparation area.
Bid Item 7 –Hydro Seeding
Contractor shall provide all materials, labor and equipment to seed areas disturbed by
construction. This work includes hydro mulching disturbed areas.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-
221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.