Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BID - 5870 FOSSIL CREEK TRAIL SOUTH OF FORT COLLINS (2)
BID ESTIMATED ESTIMATED UNIT ITEM ITEM # QUANTITY UNIT PRICE TOTAL 1 1 LS $ 5,000.00 $ 5,000.00 2 1 LS $ 500.00 $ 500.00 3 1 LS $ 4,000.00 $ 4,000.00 4 1,070 CY $ 3.00 $ 3,210.00 5 136 $ 25.00 $ 3,400.00 6 1,990 LF $ 8.00 $ 15,920.00 7 26,000 SF $ 3.00 $ 78,000.00 8 2 EA $ 1,500.00 $ 3,000.00 9 850 LF $ 3.00 $ 2,550.00 10 190 LF $ 3.25 $ 617.50 11 2 EA $ 500.00 $ 1,000.00 12 675 SF $ 1.50 $ 1,012.50 13 10 LF $ 10.00 $ 100.00 14 3 EA $ 500.00 $ 1,500.00 15 1 EA $ 500.00 $ 500.00 16 1 AC $ 2,178.00 $ 2,178.00 17 1 EA $ 600.00 $ 600.00 18 2400 LF $ 1.00 $ 2,400.00 $ 125,488.00 ESTIMATED Mobilization Traffic Control Surveying Excavation Borrow - A.B.C. Class 6 TONS Fence - Western 3-Rail 5" Colored Concrete Paving ADA Accessible Ramps 12" Curb head 18" Curb head Adjust Valve Box Remove Concrete Sidewalk Remove Curb and Gutter Relocate Barricade Relocate Tree Drill Seeding Metal Trail Gate Silt Fence TOTAL OF BASE BID Project: Fossil Creek Trail @ Fossil Creek Parkway ENGINEER'S ESTIMATE (BASE BID) Fossil Creek Trail @ Fossil Creek Parkway DESCRIPTION BID UNIT ITEM ITEM # QUANTITY UNIT PRICE TOTAL 1 1 LS 2 1 LS 3 1 LS 4 1,070 CY 5 136 6 1,990 LF 7 26,000 SF 8 2 EA 9 850 LF 10 190 LF 11 2 EA 12 675 SF 13 10 LF 14 3 EA 15 1 EA 16 1 AC 17 1 EA 18 2,400 LF $ (written) Figure ESTIMATED Mobilization Traffic Control Surveying Excavation Borrow - A.B.C. Class 6 TONS Fence - Western 3-Rail 5" Colored Concrete Paving ADA Accessible Ramps 12" Curb head 18" Curb head Adjust Valve Box Remove Concrete Sidewalk Remove Curb and Gutter Relocate Barricade Relocate Tree Drill Seeding Metal Trail Gate Silt Fence TOTAL OF BASE BID DESCRIPTION Project: Fossil Creek Trail @ Fossil Creek Parkway BID SCHEDULE (BASE BID) Bid Items are described in Section 01800 BID SCHEDULE Bid Estimated Engineer's Est. Engineer's Est. Item Description Quantity Unit Unit Price Total 1 Mobilization 1 LS $ 5,000.00 $ 5,000.00 2 Traffic Control 1 LS $ 500.00 $ 500.00 3 Surveying 1 LS $ 4,000.00 $ 4,000.00 3 Excavation 1,070 CY $ 3.00 $ 3,210.00 4 Borrow - A.B.C. Class 6 136 CY $ 25.00 $ 3,400.00 5 Fence - Western 3-Rail 1,990 CY $ 8.00 $ 15,920.00 6 5" Colored Concrete Paving 26,000 LF $ 3.00 $ 78,000.00 7 ADA Accessible Ramps 2 SF $ 1,500.00 $ 3,000.00 8 12" Curb head 850 EA $ 3.00 $ 2,550.00 9 18" Curb head 190 LF $ 3.25 $ 617.50 10 Adjust Valve Box 2 LF $ 500.00 $ 1,000.00 11 Remove Concrete Sidewalk 675 EA $ 1.50 $ 1,012.50 12 Remove Curb and Gutter 10 SF $ 10.00 $ 100.00 13 Relocate Barricade 3 LF $ 500.00 $ 1,500.00 14 Relocate Tree 1 EA $ 500.00 $ 500.00 15 Hydro Seeding 1 EA $ 2,178.00 $ 2,178.00 16 Metal Trail Gate 1 EA $ 600.00 $ 600.00 17 Silt Fence 2,400 LF $ - $ 123,088.00 Project: Fossil Creek Trail @ Fossil Creek Parkway Colorado Constructors Colorado Constructors North Star Concrete North Star Concrete ABCO Contracting Unit Price Total Unit Price Total Unit Price $ - $ - ABCO Contracting TLM Constructors TLM Constructors Don Kehn Const. Don Kehn Const. Total Unit Price Total Unit Price Total $ - $ - $ - Advanced Concrete Const. Advanced Concrete Const. G.L. Hoff Co. G.L. Hoff Co. Thoutt Bros Conc. Const. Unit Price Total Unit Price Total Unit Price $ - $ - Thoutt Bros Conc. Const. AVERAGE AVERAGE MEDIAN MEDIAN Total Unit Price Total Unit Price Total $ - $ - $ -