HomeMy WebLinkAboutBID - 5868 ATMS COMMUNICATIONS (10)CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5868
ATMS COMMUNICATIONS SYSTEM – PHASE 3
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5868 ATMS Communications System – Phase 3
OPENING DATE: July 19, 2004, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Item 1:
The work on Central Prospect Road (plan sheets 34,35 & 36) has been revised per the attached plans. In
brief, the revised work will be between Shields Street and Centre Avenue, on Horsetooth Road. No work
will be performed between Centre Avenue and College Avenue, on Horsetooth Road. See revised 6 plan
sheets: 1, 4, 34, 35, 36, and 36A.
Item 2:
The City Traffic Operations Department will provide and install all the necessary conduit and pull boxes
on the bridge crossings along the North College Avenue portion of the project work.
Item 3:
If in doubt about having to complete a Form 100-1 of the Form 347 – Certification of EEO Compliance
(last form in Section 800 of the Bid document), err on the side of caution and complete the form 100-1
and submit with your bid. To this point, we have not received a conclusive answer from CDOT on the
issue.
Please use the attached ADDENDUM 2 BID SCHEDULE when submitting your bid.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
ADDENDUM 2
BID #5868 ATMS COMMUNICATIONS SYSTEM PHASE 3
BID SCHEDULE
BASE BID
ITEM #
PAY
ITEM DESCRIPTION UNIT QTY.
UNIT
PRICE
ITEM
COST
1 203 Potholing Hour 600
2 613 2" Electrical Conduit (Plastic) L.F. 39,263
3 613 Pull Box (12"x18") Each 6
4 613 Pull Box (24"x36") Each 43
5 613 Pull Box (30"x48") Each 4
6 613 Pull Box (48"x60") Each 2
7 614 Fiber Optic Cable (Install Only) L.F. 66,244
8 626 Mobilization
Lump
Sum 1
9 630 Construction Traffic Control
Lump
Sum 1
Total Cost