HomeMy WebLinkAboutBID - 5868 ATMS COMMUNICATIONS (9)CITY OF FORT COLLINS
ADDENDUM No. 1
BID #5868
ATMS COMMUNICATIONS SYSTEM PHASE 3
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5868 ATMS Communications System Phase 3
OPENING DATE: July 19, 2004, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
ADDENDUM NO. 1 – BID # 5868.
1). Change Pre-bid date to July 9th. Date and location shall remain the same.
2). Plan Set Corrections:
Title Sheet – Index of Sheets;
Sheet No. 37 should read:
INDEX SHEET – JEFFERSON ST. AND MOUNTAIN AVE.
Sheet No. 38-39 should read:
CONDUIT & F.O. PLAN - JEFFERSON ST. AND MOUNTAIN AVE.
Sheet 41 of 93:
Work description pointing to F.O. line on Horsetooth Rd currently states:
Install new 48 S.M. cable into the existing 2” conduit.
Correct to read:
Remove existing 48 S.M. cable and install new 48 S.M. cable in the existing 2”
conduit.
3). Specifications and Contract Documents
CDOT Standard Special Provisions, Index page
Replace:
Minimum Wages Colorado, U.S. Department of Labor General Decisions
Numbers CO030014 and CO030015, Mod 5 Highway Construction, Statewide
(May 14, 2004) 8
With:
Minimum Wages Colorado, U.S. Department of Labor General Decision Numbers
CO030014 and CO030015, Mod 6 Highway Construction, Statewide (June 18, 2004) 8
CDOT Standard Special Provisions:
In the body of the Standard Special Provisions replace the “Mod 5” wage
schedule with the provided revised “Mod 6” (June 18, 2004) wage schedule and
cover letter:
(Purchasing, please attach provided emailed documents titled: “Cover
Letter Mod 6” and “CO030014-15 Mod 6”)
If you have any questions please call John Stephen, CPPO, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.