HomeMy WebLinkAboutBID - 5856 VEHICLE STORAGE BUILDINGS (8)9/12/01 Section 00510 Page 1 SECTION 00510 NOTICE OF AWARD Date: June 8, 2004 TO: R.C. Heath Construction Co. PROJECT: 5856 Vehicle Storage Buildings OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated June 6, 2004 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 5856 Vehicle Storage Buildings. The Price of your Agreement is One Million Eight Hundred Forty-One Thousand Six Hundred Dollars ($1,841,600.00). Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by June 23, 2004. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By:________________________________________ James B. O’Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management 9/12/01 Section 00520 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the 8th day of June in the year of 2004 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and R.C. Heath Construction Co. (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1: WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 5856 Vehicle Storage Buildings. ARTICLE 2: ENGINEER The Project has been designed by Aller-Lingle Architects, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3: CONTRACT TIMES 3.1 The Work shall be Substantially Complete within 210 days after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within 7 days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: 9/12/01 Section 00520 Page 2 Two Hundred Dollars ($200) for each calendar day or fraction thereof that expires after the Two Hundred Ten (210) calendar day period for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, One Hundred Dollars ($100) for each calendar day or fraction thereof that expires after the Seven (7) calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: ($1,841,600.00), One Million Eight Hundred Forty-One Thousand Six Hundred Dollars, in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5: PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of the value of Work completed until the Work has been 50% completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 90% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation 9/12/01 Section 00520 Page 3 satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6: CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or 9/12/01 Section 00520 Page 4 will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7: CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: INDEX OF DRAWINGS CIVIL C1 GENERAL NOTES AND LEGEND C2 DEMOLITION PLAN C3 HORIZONTAL CONTROL PLAN C4 GRADING AND DRAINAGE PLAN C5 EROSION CONTROL PLAN C6 OVERALL UTILITY PLAN C6A OVERALL UTILITY PLAN C7 WATER PLAN C8 SEWER PLAN AND PROFILE 9/12/01 Section 00520 Page 5 C9 SEWER PLAN AND PROFILE C10 SEWER PLAN AND PROFILE C11 STREET PLAN AND PROFILE C12 STREET CROSS SECTIONS C13 WATER / SEWER DETAILS C14 STORM SEWER DETAILS C15 EROSION CONTROL & MISC. DETAILS C16 STORM SEWER & MISC. DETAILS C17 STOCKPILE BIN PLAN & SECTIONS LANDSCAPE L1.1 LANDSCAPE PLAN L1.2 LANDSCAPE PLAN L1.3 FENCE PLAN I-1 IRRIGATION PLAN I-2 IRRIGATION DETAILS ARCHITECTURAL SD1.0 SITE PLAN A1.0 BUILDING A FLOOR PLAN A1.1 BUILDING B & C FLOOR PLANS A1.2 BUILDING A, B, & C CEILING PLAN A1.3 BUILDING A ROOF PLAN A1.4 BUILDING B & C ROOF PLAN A1.5 BUILDINGS A, B, C CONTROL JOINT PLAN A2.0 BUILDING A ELEVATIONS A2.1 BUILDING B ELEVATIONS A2.2 BUILDING C ELEVATIONS A3.0 BUILDING SECTIONS – A A3.1 BUILDING SECTIONS - B & C A3.2 WALL SECTIONS – A A3.3 WALL SECTIONS - B & C A3.4 LADDER SECTION – A A4.0 DETAILS A4.1 ENLARGED PLANS & INT. ELEVATIONS A5.0 DOOR AND ROOM FINISH SCHEDULES STRUCTURAL S1.0 GENERAL NOTES, SHEET INDEX S1.1 LOAD KEY, TYP. DETAILS, ABBREVIATIONS S2.0 FOUNDATION PLAN BUILDING A S2.1 FOUNDATION PLAN BUILDING B & C S2.2 ROOF FRAMING PLAN BUILDING A S2.3 ROOF FRAMING PLAN BUILDINGS B & C S3.1 BRACE FRAMES S4.1 FOUNDATION DETAILS S4.2 FRAMING DETAILS S6.1 COLUMN SCHEDULE, TRUSS SCHEDULE 9/12/01 Section 00520 Page 6 MECHANICAL M0 MECHANICAL LEGEND M1 BUILDING A MECHANICAL PLAN M2 BUILDINGS B & C MECHANICAL PLANS M3 BUILDING A ENLARGED MECH ROOM PLAN M4 MECHANICAL DIAGRAMS AND DETAILS PLUMBING P1 BUILDINGS A & B PLUMBING PLANS P2 PLUMBING SCHEDULES AND DETAILS ELECTRICAL E0 ELECTRICAL LEGEND E1 ELECTRICAL SITE PLAN E2 BUILDING A ELECTRICAL PLAN E3 BUILDINGS B & C ELECTRICAL PLANS E4 ELECTRICAL ONE-LINE DIAGRAMS E5 ELECTRICAL PANEL SCHEDULE E6 LUMINAIRE & LIGHTING CONTROL SCHEDULES END OF INDEX OF DRAWINGS The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers 1 to 4, inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8: MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the 9/12/01 Section 00520 Page 7 effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9/12/01 Section 00520 Page 8 OWNER: CITY OF FORT COLLINS CONTRACTOR:R.C. Heath Construction Co. BY: ___________________________ By: _____________________________ __________________________________ Title: __________________________ JAMES B. O’NEILL II, CPPO, FNIGP DIRECTOR OF PURCHASING AND RISK MANAGEMENT Date: _________________________ Date: ___________________________ (CORPORATE SEAL) Attest: ________________________ Attest: _________________________ City Clerk Address for giving notices: Address for giving notices: P.O. Box 580 __________________________________ Fort Collins, CO 80522 __________________________________ LICENSE NO.:______________________ Approved as to Form _______________________________ Assistant City Attorney 7/96 Section 00530 Page 1 SECTION 00530 NOTICE TO PROCEED Description of Work: 5856 Vehicle Storage Buildings To: R.C. Heath Construction Co. This notice is to advise you that: The contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. The required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. The OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20__. The dates for Substantial Completion and Final Acceptance shall be , ____ and , 20__, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20__. CONTRACTOR: R.C. Heath Construction Co. By: Title: SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate 7/96 Section 00610 Page 1 SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that R.C. Heath Construction Co. (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 5856 Vehicle Storage Buildings. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00610 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal ______________________________ ________________________________________ ______________________________ ________________________________________ (Title) ________________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ IN PRESENCE OF: Surety _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00615 Page 1 SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that R.C. Heath Construction Co. (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of ___ , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 5856 Vehicle Storage Buildings. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00615 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal ______________________________ By:___________________________________ ______________________________ ______________________________________ (Title) ______________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners ______________________________ ______________________________________ ______________________________ ______________________________________ IN PRESENCE OF: Surety ______________________________ By:___________________________________ ______________________________ By:___________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00630 Page 1 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. 7/96 Section 00635 Page 1 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 5856 Vehicle Storage Buildings ______________________________ ________________________________________ ________________________________________ ________________________________________ PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins ____________________________ ____________________________ CONTRACTOR: R.C. Heath Construction Co. ____________________________ CONTRACT DATE:________________________________ The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ________________________________ _______________________________________ ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. ________________________________ By: _____________________________________ R.C. Heath Construction Co. AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: _____________________________________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: 7/96 Section 00640 Page 1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE , 20__ TO: Gentlemen: You are hereby notified that on the day of , 20__, the City of Fort Collins, Colorado, has accepted the Work completed by __ for the City of Fort Collins project, 5856 Vehicle Storage Buildings. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated___. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date:______ . Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: 7/96 Section 00660 Page 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: R.C. Heath Construction Co.(CONTRACTOR) PROJECT: 5856 Vehicle Storage Buildings 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any 7/96 Section 00660 Page 2 claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 20__. CONTRACTOR: R.C. Heath Construction Co. By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of 20__, by Witness my hand and official seal. My Commission Expires: . Notary Public 7/96 Section 00660 Page 3 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: R.C. Heath Construction Co. PROJECT: 5856 Vehicle Storage Buildings CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for ________________ on bond of _____________________________________________________________ (Surety) hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this ____ day of , ____ . (Surety Company) By ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)- in-Fact. Section 000670 Page 1 SECTION 00670 7/96 Section 00670 Page 2 Special Notice Contractors who have completed this application in the past, please note the following changes in procedure: The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contractors will receive a Contractor’s Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor’s name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89- 12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. SECTION 00700 GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS SECTION 00800 Page 2 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment 9/99 Section 00950 Page 1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Vehicle Storage Buildings CONTRACTOR: R.C. Heath Construction Co. PROJECT NUMBER: 5856 DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost 4. Change in Contract Time: __ ORIGINAL CONTRACT COST $ 0.00 TOTAL APPROVED CHANGE ORDERS 0.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 0.00 ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) _ ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: __ Facilities Project Manager APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Contractor Project File Architect Engineer Purchasing Section 00960 Page 1 SECTION 00960 Application for Payment PROJECT:5856 Vehicle Storage Buildings PO# PAY ESTIMATE NO: DATE: CONTRACTOR:R.C. Heath Construction Co. ADDRESS: CONTRACT FOR: PARTIAL TO FINAL TO The undersigned Contractor certifies that to the best of his knowledge, information and belief the work covered by this application for Payment has been completed in accordance with the Contract Documents, that all accounts have been paid by him for Work for which previous Certificates for Payment were issued and payments received, in this current payment shown herein is now due. In accordance with the Contract Documents, based on site observations and the data comprising the above application, the Architects Certifies to the Owner that the Work has progressed to the point indicated; that the best of his knowledge, information and belief, the quality of the Work is in accordance with the Contract Documents, and that the Contractor is entitled to payment of the AMOUNT CERTIFIED. CONTRACTOR: ENGINEER: By: By: Date: Date: Application is made for Payment, as shown below, in connection with the Contract. Schedule of Values is attached. The present status of the account for this Contract is as follows: ORIGINAL CONTRACT AMOUNT APPROVED CHANGE ORDERS TO DATE ADJUSTED CONTRACT AMOUNT TOTAL WORK COMPLETED AND MATERIALS USED RETAINAGE (10% OF TOTAL) TOTAL EARNED LESS RETAINAGE LIQUIDATED DAMAGES WITHHELD TOTAL EARNED LESS LIQUIDATED DAMAGES LESS PREVIOUS PAYMENTS CURRENT PAYMENT DUE APPROVED BY: DATE: Facilities Project Manager cc: Accounting City Clerk Project File Contractor Engineer FIELD ORDER Project: 5856 Vehicle Storage Buildings To: Re: Field Order Number: From: Date: A/E Project Number: Contract For: You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without change in Contract Sum or Contract Time. If you consider that a change in Contract Sum or Contract Time is required, submit a Change Order Request to the A/E immediately and prior to proceeding with this Work. Specification Section: Paragraph: Drawing Reference: Detail: Description of Interpretation or Change: Attachments Signed by: Date: Copies: Owner Consultants File Copyright 1994, Construction Specification Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.4A REQUEST FOR INTERPRETATION Project: 5856 Vehicle Storage Buildings To: Re: R.F.I. Number: From: Date: A/E Project Number: Contract For: Specification Section: Paragraph: Drawing Reference: Detail: Request: Signed by: Date: Response: Attachments Response From: To: Date Rec’d: Date Retd: Signed by: Date: Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.2A CLARIFICATION NOTICE Project: 5856 Vehicle Storage Buildings To: Re: Clarification Notice Number: From: Date: A/E Project Number: ContractFor: This Clarification Notice is issued for the purpose of clarifying the Contract Documents based on an interpretation reasonably inferable from the Contract Documents, and therefore has no effect on the Contract Sum or Contract Time. Proceeding with Work in accordance with this Clarification Notice indicates acceptance with no change in the Contract Sum or Contract Time. Specification Section: Paragraph: Drawing Reference: Detail: Description: Attachments Signed by: Date: Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.3A